CITY OF VESTAVIA HILLS COMMUNITY SPACES WALD PARK 17 SEPTEMBER 2018
PROJECT STATUS SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS 15% 30% 100% DESIGN CONSTRUCTION SCHEMATIC DESIGN PHASE The Architect shall examine and analyze available information provided by the Owner and Owner s Representative and shall advise and recommend as to additional information necessary to begin specific design work on the Project. The Architect shall assist in the development of the Owner s program. Upon analysis of all available information and prior to initiating any design tasks, the Architect shall participate in a preliminary evaluation project analysis with the Owner and Owner s Representative.
DESIGN CONSIDERATIONS
DESIGN CONSIDERATIONS Planning Premier Park Central Green, Pavilion supports all other functions Neighborhoods Park, Play, Sport, Nature, Swim Balance Formal and natural Natural elements Preserve and celebrate where possible Slope Embrace as amenity where possible Active/Variety Bring people together (games, activities, food trucks) Look and Feel Identity Consistent features, materials used throughout Neighborhoods Identity for overall park, and each specific function Identity Heart of City Part of collective memory Livability Integral to City s brand/message, the place to go Presence Create identity from Hwy 31, and within park Moments Art, Branding, Instagram moments
DESIGN PROGRESS
EXISTING SITE PLAN
EXISTING SITE PLAN
TCU PROPOSED PLAN F3 F4 DOG PARK F2 MIRACLE/ SMALL FIELD PREMIER GREENSPACE PLAY GROUND PREMIER GREENSPACE POOL FACILITY SCHOOL/ AFTERHOURS PARKING POOL AREA PARKING MULTIPURPOSE FIELD BOE VH ELEM. SCHOOL CIVIC CENTER
SITE MASTER PLAN DEVELOPMENT SCHOOL BOE
DEVELOPMENT AREA DEVELOPMENT SCHOOL BOE
TRAFFIC & PARKING PARKING DEVELOPMENT SECONDARY PARKING PARKING SCHOOL PARKING BOE
NEIGHBORHOODS MAINTENANCE TENNIS BASEBALL NATURE/DISCOVERY NATURE/DISCOVERY GREAT LAWN DEVELOPMENT HEART OF THE PARK MULTIPURPOSE SWIM SCHOOL BOE
NEIGHBORHOODS TRAFFIC PARKING PARKING 81 APPROX. 255 SPACES 191 +- EXISTING TENNIS *NOT INCLUDING SECONDARY PARKING 24 BASEBALL NATURE/DISCOVERY NATURE/DISCOVERY GREAT LAWN DEVELOPMENT HEART OF THE PARK SECONDARY PARKING PARKING MULTIPURPOSE SWIM SCHOOL 74 PARKING 76 BOE
MASTER SITE PLAN FIELD 4 FIELD 3 MIRACLE FIELD GRAND LAWN FIELD 2 DEVELOPMENT SCHOOL BOE
VIEWS / IDENTITY FIELD 4 FIELD 3 MIRACLE FIELD GRAND LAWN FIELD 2 DEVELOPMENT SCHOOL BOE
DEVELOPMENT SCHOOL BOE
GRAND LAWN ENLARGED SITE PLAN
STAGE/ PAVILION GRAND LAWN ENTRY PAVILION HEART OF THE PARK
STAGE/ PAVILION GRAND LAWN ENTRY PAVILION FOOD TRUCK/LOADING ZONE
STAGE/ PAVILION GRAND LAWN ENTRY PAVILION PLAY AREA(S)
MULTIPURPOSE FIELDS
APPROX. 28,000 SF POOL DECK COMPETITION POOL 9,860 SF LIESURE POOL 3,450 SF TERRACE 50M COMPETITION POOL POOL DECK STORAGE GATE LIESURE POOL ZERO ENTRY POOL EQUIP. DINING POOL
LIFEGUARD / STAFF GATE LIESURE POOL ZERO ENTRY WOMEN MEN EQUIPMENT ROOM DINING POOL HOUSE CONDITIONED COVERED 5,500 SF 1,450 SF POOL
LIESURE POOL 3,450 SF - ZERO ENTRY - VORTEX POOL - ADA RAMP ENTRY - 4 DEPTH FOR SWIMMING LESSONS - ACTIVITY FEATURES COMPETITION POOL 9,859 SF - 50 METER, 6-LANE ; 25 YD, 8-LANE ; RECREATION DIVING WELL - ADA RAMP ENTRY P O O L F A C I L I T Y
BATTING CAGES FIELD 4 REFURBISHED FIELD HOUSE & DUGOUTS NEW BACKSTOPS FIELD 3 MIRACLE FIELD BASEBALL PAVILION GRAND LAWN FIELD 2 BATTING CAGES, RESTROOMS, STORAGE BUILDING, MATERIAL BINS BASEBALL
RESTROOMS GRAND LAWN TENNIS / DOG PARK / NATURE TRAIL / PUBLIC WORKS
MAINTENANCE FACILITY (PARKS + PUBLIC WORKS) LEVEL 1: 8,675 SF LEVEL 2: 1,750 SF TOTAL: 10,425 SF MAINTENANCE FACILITY
MAINTENANCE FACILITY P U B L I C W O R K S / P A R K S & R E C
QUESTIONS?