Jack Creek Park Capital Improvement Project

Similar documents
Old Mill Community Association Bioretention Facility

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Severn River Sub-Watershed: BMP 09-Retrofit

Use of Best Management Practices

Preliminary Sketch Plan for Fort Hunter Park

River Mile 10.9 Removal Action Overview

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Chesapeake Bay Critical Area Conservation Plan

Lawn Fertilizer Awareness Week April 1 - April 8

Mission Bay Park Master Plan Update: Fiesta Island Amendment (Information) Mission Bay Park Committee October 3, 2017

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Worksheet #14 Water Runoff Management

Bristol Marsh Heritage Conservancy

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Weston s Wetlands, Stormwater, & Open Space

Managing Stormwater Naturally. July 17, 2013

Lake Arlington Master Plan. Presented by Randle Harwood, Planning and Development Director October 27, 2015

Monica Smith, PE President Robinson Engineering Company

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

Guidance on Preparation of Construction and Maintenance Costs

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

NORTH DISTRICT. Description

Working Group Meeting

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Town of Essex Small Site Erosion Control Guide

NDIA Environment, Energy, and Sustainability Symposium & Exhibition Denver, Colorado May 2009

2013 Summer Recap. Rockaway Beach

Riverview Road Fort Washington, MD. 163 Waterfront Street, Suite #450 National Harbor, MD (301)

Figure 1. Proposed Strategic Habitat Conservation Areas for Florida

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

MASTER PLAN for the EARL NEWHOUSE WATERFRONT

Stream Corridor Management Plan

Erosion Control for Home Builders in the. City of Jacksonville

Brice Prairie Master Plan

Alternatives Analysis Summary Memorandum

Lesson 2: Stormwater Best Management Practices (BMPs)

STORWATER AWARNESS TRAINING

Shoreline Master Program Town of La Conner, Washington

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

CAMA LAND USE PLAN TOWN OF KITTY HAWK IMPLEMENTATION STATUS REPORT 2013

All About Rain Gardens

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Just The Basics: Illicit Discharge. What does it mean to me?

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

COLLIER BOULEVARD (CR 951) CORRIDOR

Phase 1 Habitat Replacement & Reconstruction

Stormwater Low Impact Development - A Natural Solution

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15

Improvement of the Atlantic Coast of New York City,

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Forest Grove Park Master Plan

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

Rain Gardens. A Welcome Addition to Your Landscape

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Master Plan Objectives and Policies

Maryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017

Landscape Design. earth-wise guide to. earth-wise guide to

Legend. Figure 1 Programmatic Concept Map. Greater Salmon Bay Concept Plan COMMUNITY WAYFINDING AND INTERPRETIVE POTENTIAL PUBLIC ACCESS IMPROVEMENTS

Pine Flat Lake Master Plan Update FACT SHEET September 2014

STORM WATER POLLUTION PREVENTION TRAINING. For Officials and Residents of Doylestown Township

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Funding Assistance to Stormwater Utility Fee Payers for Stormwater Solutions and Incentives. Danny Bowden City of Raleigh Stormwater Utility

Inventory and Assessment of Stormwater Infrastructure

INTRODUCING THE BALTIMORE CITY GREEN NETWORK VISION PLAN

Tips for Maintaining and Enhancing Stormwater Management Areas

Ravenswood Working Group Mee4ng, February 10, 2011, 1-4 p.m.

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Importance of Master Planning Marcy Colclough

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Low Impact Development for your homes, businesses & streets

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Inventory and Assessment of Stormwater Infrastructure

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Ashbridges Bay Erosion and Sediment Control Project

A TWENTY YEAR PLAN TO RESTORE NAPLES BAY. Natural Resources Manager

Small Project Guidance Document

Post-Construction BMPs

The Nature of Soil Soil Conservation Sustainable Ag.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

TABLE OF CONTENTS PAGE

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Infiltration. Keep Water Where it Falls. Frank Franciosi Novozymes

Stormwater and Your Rain Garden

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

& SUSTAINABILITY PLAN

Costs Design Construction Operation Maintenance

2.1 Principles & Objectives

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Spokane River Forum: City of Spokane Permeable Pavements

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

The Napa River Flood Protection Project

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

HUMBER BAY PARK PROJECT - BUILDING CONCEPT

Transcription:

Jack Creek Park Capital Improvement Project Public Information Meeting October 2, 2017 Consultants & Designers, Inc. Integrating Engineering and Environment 7455 New Ridge Road, Suite T Phone: (410) 694-9401 Hanover, Maryland 21076 Fax: (410) 694-9405 1

Introduction Office of County Executive Steven R. Schuh Michelle Corkadel, Constituent Services Officer Anne Arundel County Department of Public Works Masoud Ghatineh, P.E., Project Manager Design Consultant BayLand Consultants & Designers, Inc. Sepehr Baharlou, P.E., Project Manager Meeting Purpose Increase Community Awareness of the Project Provide Project Overview and Status Update Respond to Questions 2

Project Goals Protect park from shoreline erosion Enhance water quality of the Chesapeake Bay Address County MS4/TMDL permit requirements Improve public access to the waterway Support recreational boating dredging program 3

Shoreline Protection Living shoreline Project Overview Waterway Access Soft (natural) canoe/kayak launch Dredged Material Placement Place dry material from Idlewilde DMP Site 4

Jack Creek Park 58 acres 5

1994 Aerial Photo Shoreline Protection 6

2014 Aerial Photo Shoreline Protection 7

Shoreline Protection 2014 VS 1994 Aerial Photo 6 acres lost due to erosion 8

Shoreline Protection Existing shoreline conditions Bay Front Jack Creek Along the Point 9

Shoreline Protection Living Shorelines Controls shoreline erosion Provides a productive, natural shoreline Strategic placement of plants, stone, sand fill and other structural and organic materials Implemented through a variety of shoreline protection methods 10

Shoreline Protection Stone structures provide erosion protection Sand fill provides planting terrace Marsh plantings provide flood protection and habitat enhancement 11

Shoreline Protection Protects 1,488 LF of shoreline Restores 58,811 SF of tidal marsh Preliminary Concept Plan 12

Waterway Access Access Road Parking Launch Area Preliminary Concept Plan 13

Waterway Access Launch Area Soft (natural) canoe/kayak launch Natural shoreline 14

Waterway Access Access shoreline through existing trail Provide ADA compliant surface Incorporate launch area into living shoreline design 15

Waterway Access Parking 20 car parking spots (no trailers) Permeable grass paving 16

Waterway Access Access Road Follow existing gravel road Gravel surface to the parking area Trail to water will be permeable gravel (ADA compliant) Controlled access (gate) will remain 17

Dredged Material Placement Place dry material from Idlewilde DMP Site 18

Dredged Material Placement Idlewilde DMP Site primarily used for South County recreational dredging projects such as: Parish Creek (Federal and County channels) Rockhold Creek Jetty Broadwater Creek Church Creek West River, etc All materials are tested before dredging Metals Pesticides & PCBs Priority pollutants volatiles & semi-volatiles Total of 149 parameters 19

Dredged Material Placement Jack Creek Park placement area 20

Dredged Material Placement Place dry material from Idlewilde DMP Site 14,000 cubic yards 3-acre area Amend soil with lime and fertilizer Cover with 6 inches of topsoil Shape to form natural land features Re-seed with meadow mix Create small wetlands (rain garden) Restore to existing use and vegetative cover 21

Dredged Material Placement Truck Route Idlewilde Road to Snug Harbor Road ½ mile 22

Dredged Material Placement Example During Placement After 23

Schedule Project has been split into two phases Phase 1: Dredged Material Placement Under construction to be completed in 2 months Phase 2: Living Shoreline & Waterway Access Design completed Federal, State and County permitting underway To be constructed in 12 to 18 months 24

Discussion 25