Fig 31 INDICATIVE SITE SECTION - KENT/ CAMBRIDGE TERRACE (NOTE: SECTION TO SCALE BACKGROUND PERSPECTIVE INDICATIVE SCALE) EXISTING TREE

Similar documents
25 Crime Prevention through Environmental Design (CPTED)

B A S I N B R I D G E P R O J E C T

Part G: Assessment of Effects on the Environment. 11 Environmental Effects Assessment

Volume 2: Assessment of Environmental Effects 438

Assessment of Crime Prevention through Environmental Design [CPTED]

Social Impact Assessment TECHNICAL REPORT 14

BASIN RESERVE WORKSHOP - NEW ZEALAND TRANSPORT AGENCY

Ringsend & Irishtown Local Environmental Improvement Plan

appendix and street interface guidelines

Project introduction and relevance:

Clairtrell Area Context Plan

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

(DC1) Direct Development Control Provision DC1 Area 4

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

GREENFORD HALL & ADJOINING LAND

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

3.1 The hybrid planning application proposes the following description of development:

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

4. MASTERPLAN FRAMEWORK

1. General Purpose. 3. Uses

WINDSOR GLEN DESIGN GUIDELINES

5.2 LAND USE AND ZONING

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

5.7.6 St Peters Interchange Portal

BULL & DOG Page 1

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

RIVERSIDE DESIGN CD-1 GUIDELINES. Adopted by City Council August 9, 1983

Urban Design Brief to 1557 Gordon Street & 34 Lowes Road West

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

The Residences at Alewife Station

GUIDELINES BAYVIEW INSTITUTIONS CONTEXT PLAN LOCATION PLAN COMPONENTS URBAN DESIGN GUIDELINES

DESIGN OF FOOTBRIDGES

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

Description of Preferred Alternative

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

REPORT TO: Council FOR: Regular Meeting. PRESENTED: April 1, 2008 FILE: , Byl 1932 & 1936

CHAPTER 6 PRECINCT PLANS. PLANNING PARTNERS: CENTURY CITY URBAN DESIGN FRAMEWORK October REVISION 1

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Section Three, Appendix 17C Multiple Unit Housing Design Assessment Criteria

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

Adelaide Road Planning for the Future. Adelaide Road Framework. A long-term vision for future growth and development

Section 5 (S5) - Sneydes Parade

Photo Please fit in text box

Blue Line LRT Extension

A VISION FOR BLAIRGOWRIE

Asbury Chapel Subdivision Sketch Plan

edge of gas line corridor setback edge of gas line corridor aligned with Schlumberger building 37.0 m AOD 33.0 m AOD max

PIQUA OHIO PLACEMAKING INITIATIVE

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 5. Local Business Zone PALMERSTON NORTH CITY COUNCIL FINAL

FARMING PROTECTION. The Farming Protection Development Permit Guidelines are organized into five main categories:

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

PRELIMINARY DESIGN + DEVELOPMENT PLAN

CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN

Building and Public Space Design Guidelines

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

Heritage Park Master Plan. Heritage Park Master Plan

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

APPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES

M E M O R A N D U M February 21, 2018

Eglinton West LRT Update

27 Cedar Drive, West Heath, B31 3PE

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected.

I615. Westgate Precinct

385,000. Local Market Ref: LR Bedrooms 1 Bathroom Sunny Rear. 23 Hour On Street Garden. Parking Fully Renovated Close to The Bridge

Wallace Emerson Park and Community Centre

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

4.0 Open Space and Laneways

The principal elements of the NTC Strategic Vision plan are as follows.

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

LIST OF TABLES, FIGURES AND APPENDICES

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Water Works: Downtown Minneapolis Riverfront Destination

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Am I at risk of flooding?

Preliminary Sketch Plan for Fort Hunter Park

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

ALTERNATIVE STATION AREA -

Hidden Pointe Landscape Master Plan. June, archi terra

CHAPTER 5 Public Realm Improvements

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

CONSTRUCTION COST ESTIMATE. MANAGEMENT PLAN at VAUXHALL PARK, LAMBETH for LAMBETH PARKS MARCH 2006

Welcome to. kzla. Codman Square Park

SITE ANALYSIS MEMORIAL HOSPITAL NORTH ADELAIDE LARGE INSTITUTIONS AND COLLEGES DPA MEMORIAL HOSPITAL

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

Johnson Street Bridge Public Realm Update

For Sale - 264,950 2 RHEAST MOOAR AVENUE, RAMSEY, IM8 3LR

North Lotts and Grand Canal Dock

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

University of Pennsylvania, Neural and Behavioral Sciences Building

Complete Neighbourhood Guidelines Review Tool

Transcription:

EXISTING TREE NEW TREE NEW TREE BRIDGE BASIN BUILT SQUARE NEW TREE BASIN OUTER SQUARE NORTHERN GATEWAY BUILDING BASIN INNER CIRCLE BASIN RESERVE BUCKLE ST KENT/ CAMBRIDGE TCE INDICATIVE SITE SECTION - KENT/ CAMBRIDGE TERRACE SECTION LINE Source: 5B.02 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. Fig 31 INDICATIVE SITE SECTION - KENT/ CAMBRIDGE TERRACE (NOTE: SECTION TO SCALE BACKGROUND PERSPECTIVE INDICATIVE SCALE) SECTION REFERENCE

SUMMARY OF EXISTING SITE CONDITIONS AND PARAMETERS CAMBRIDGE TCE CORRIDOR A KENT TCE CORRIDOR KEY Existing Warm up facilities Existing Entry Gates A_Kent & Cambridge Terrace and Median strip B_Buckle/Ellice Street corridor BRIDGE NORTH ELLICE STREET PROPERTY LINE C_The Pedestrian thoroughfare around the Basin D_C S Dempster gate E_J R Reid Gate R A VANCE STAND F D C B SOUTH ELLICE STREET PROPERTY LINE F_R A Vance Stand BRIDGE G_Museum Stand MUSEUM STAND G H H_Cricket Block Source: TR3 ULDF, Appendix 3.H (10.06.13) Note: Graphic & text adjustment for presentation clarity purposes only. E Fig 32 SUMMARY OF EXISTING SITE CONDITIONS & PARAMETERS

POTENTIAL PLAYERS DROP OFF ENTRY LOBBY TEMPORARY FOOD VENDORS EXISTING CHANGING ROOM EXISTING PLAYERS PAVILION TICKETING+ SUPPORT EXISTING TOILETS EXISTING CHANGING ROOM INDICATIVE GROUND LEVEL PLAN INDICATIVE GROUND LEVEL PLAN EXISTING WARM UP NETS CHANGING VIEWING LOUNGE VIEWING LOUNGE LOBBY VIEWING LOUNGE CHANGING EXISTING PLAYERS PAVILION INDICATIVE LEVEL 1 PLAN INDICATIVE LEVEL 1 PLAN fig.66 VIEWING LOUNGE KITCHEN LOBBY + TOILET DECK DECK INDICATIVE LEVEL 2 PLAN INDICATIVE LEVEL 2 PLAN Source: TR3 ULDF, Appendix 3.H (10.06.13) & 6D.01 (15.05.13) Fig 33 65M OPTION - FLOOR PLANS

Upper Level Screen and Pergola Structure Mid-level Player s accommodation Ground level Gateway Source: TR3 ULDF, Appendix 3.H (10.06.13) Fig 34 A STRUCTURE IN 3 INTER-RELATED PARTS

R A VANCE STAND R A VANCE STAND BOUNDARY FENCE EXISTING PLAYERS PAVILION PERFORATED PLAYERS VIEWING LOUNGE METAL SCREEN CORPORATE VIEWING LOUNGE COVERED PUBLIC ENTRY SECTION AA_1:250 @ A3 SECTION BB_1:250 @ A3 B A CHANGING VIEWING LOUNGE VIEWING LOUNGE LOBBY VIEWING LOUNGE CHANGING EXISTING PLAYERS PAVILION A B Source: TR3 ULDF, Appendix 3.H (10.06.13) Fig 35 65M OPTION - SECTIONS

ROOF DECK VIEWING AREA SCULPTURED TIMBER ROOF CANOPY EXISTING PLAYERS PAVILION NORTH ELEVATION_1:500 INDICATIVE NORTH ELEVATION KENT TERRACE CAMBRIDGE TERRACE PERFORATED METAL SCREEN R A VANCE STAND R A VANCE STAND PERFORATED METAL SCREEN SCULPTURED TIMBER ROOF CANOPY ROOF DECK VIEWING AREA SOUTH ELEVATION_1:500 INDICATIVE SOUTH ELEVATION EXISTING PLAYERS PAVILION NEW PLAYERS LOUNGE EXISTING TOILETS Source: 6D.02 (15.05.13) Fig 36 65M OPTION - ELEVATIONS

View looking south west toward new ground entry View looking south east toward new players entry g.74_view looking south west toward new ground entry g.75_view looking south east toward new players entry Source: 6E.03 & 6E.04 (15.05.13) Fig 37 65M OPTION - PERSPECTIVES

View looking south west toward new ground entry View looking south east toward new players entry Source: 6E.02 & 6E.03 (15.05.13) Fig 38 65M OPTION - PERSPECTIVES

Hania St Kent Tce Cambridge Tce n KENT/ ELLICE STREET CORNER ZONE Ellice St Fig 39 The Basin Reserve Source: 5A.12/13 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. KENT/ ELLICE STREET CORNER ZONE - EXISTING VEGETATION REMOVAL/ RELOCATION Dufferin St

Hania St Kent Tce Cambridge Tce b a c Ellice St KEY a proposed wide footpath b new building under bridge c wetland planting Fig 40 KENT/ ELLICE STREET CORNER ZONE The Basin Reserve n Dufferin St Source: TR3 ULDF (10.06.13) Note: Text adjustment for presentation clarity purposes only.

Grandstand Apartments PRECEDENTS Commercial activity as a viable use of under bridge space. Tenancy One Green planted structure above Tenancy Two 4m x 9m Possible internal loading dock Access from Hania Street Hania Street Zaanzang, Koog aan de Zaan,Netherlands Bridge pier Park 01 Park 02 Park 03 Park 04 Park 05 Disabled Outer edge of bridge superstructure above Maintain minimum 5m footpath width through corner Building facade edge aligned with parking edge Glazed shop front Integrated seating to base of bridge pier Bridge pier Amenity planting Jianguo flower market,taipei Ellice Street Indicative Building Under Bridge Plan. KEY Basin Reserve inner circle Basin Reserve outer square Basin Reserve built square Proposed new tree Existing tree Northern Gateway Building Green wall structure Bridge. Level 6 Level 5 Level 4 Level 3 Level 2 Level 1 Salford Station, Greater Manchester, UK The Basin Reserve Ellice Street Integrated building Grandstand Apartments Indicative Site Section Building Under Bridge. (Note: Section to scale background perspective indicative scale) Fig 41 KENT/ ELLICE STREET CORNER BUILDING Source: TR3 ULDF (10.06.13)

Source: 1B.04 (15.05.13) Fig 42 INDICATIVE PERSPECTIVE - KENT/ CAMBRIDGE LOOKING EAST

Hania St Ellice St n PATERSON/ ELLICE/ DUFFERIN INTERFACE ZONE Brougham St Dufferin St The Basin Reserve Paterson St Source: 5A.13 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. Fig 43 PATERSON/ ELLICE/ DUFFERIN INTERFACE ZONE - EXISTING VEGETATION REMOVAL/ RELOCATION

Hania St n KEY a Wetland planting with trees b Amenity planting c Planted abutment d Pedestrian & cycle foopath e Lane f St Joseph s parking integration b d Ellice St b a f d e a b c b Brougham St The Basin Reserve Dufferin St Paterson St Fig 44 PATERSON/ ELLICE/ DUFFERIN INTERFACE ZONE Source: TR3 ULDF (10.06.13) Note: Text adjustment for presentation clarity purposes only.

BASIN BUILT SQUARE PED/ CYCLE BRIDGE ELLICE ST PATERSON ST BRIDGE DUFFERIN ST BASIN OUTER SQUARE NEW TREE EXISTING TREE BASIN INNER CIRCLE NORTHERN GATEWAY BUILDING BEYOND BASIN RESERVE INDICATIVE SITE SECTION - NEAREST THE BASIN RESERVE SECTION LINE Source: 5B.04 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. Fig 45 INDICATIVE SITE SECTION - NEAREST THE BASIN RESERVE (NOTE: SECTION TO SCALE BACKGROUND PERSPECTIVE INDICATIVE SCALE) SECTION REFERENCE

ELLICE ST ST JOSEPH S CHURCH NEW TREE PATERSON ST PATERSON ST INDICATIVE SITE SECTION - ST JOSEPH S CHURCH SECTION LINE Source: 5B.05 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. Fig 46 INDICATIVE SITE SECTION - ST JOSEPH S CHURCH (NOTE: SECTION TO SCALE BACKGROUND PERSPECTIVE INDICATIVE SCALE) SECTION REFERENCE

Source: 1B.05 (15.05.13) Fig 47 INDICATIVE PERSPECTIVE - HANIA ST LOOKING EAST

Source: 1B.07 (15.05.13) Fig 48 INDICATIVE PERSPECTIVE - PATERSON ST LOOKING NORTH

Paterson St n The Basin Reserve Dufferin St DUFFERIN/ RUGBY, SCHOOLS/ CHURCH/ GOVERNMENT HOUSE INTERFACE ZONE Rugby St Adelaide Rd Source: 5A.14 (15.05.13) Note: Graphic & text adjustment for presentation clarity purposes only. Fig 49 DUFFERIN/ RUGBY STREETS, SCHOOLS/ CHURCH/ GOVERNMENT HOUSE INTERFACE ZONE EXISTING VEGETATION REMOVAL/ RELOCATION PLAN