Healthcare Electrical Reference Architecture for Large Hospitals in North America

Similar documents
Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

ELECTRICAL SAFETY IN HEALTHCARE FACITILIES

ASCO PowerQuest Critical Power Management System

Isolated Power Panels Line Isolation Monitor (LIM) Remote Indicators/Displays Accessories 15-6

16620 EMERGENCY POWER SYSTEMS

KELTRON LS 7000 ALARM MANAGEMENT SYSTEM Keltron Alarm Monitoring, Dispatch, and Reporting Software

Delivering reliable power for patient safety

Operation and use. Functions and characteristics

Advantage Services Capabilities

VAmP 120. Arc Flash Protection Units. Arc Protection. Customer benefits

For Complete Fire and Gas Solutions

Moving to the Cloud: The Potential of Hosted Central Station Services

Distribution Control Center Operator Training

EMERGENCY POWER SYSTEMS

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

SEL Arc-Flash Solutions

Index Arc Guard Systems. Arc Guard Systems. Arc Guard Systems Industrial Automation Supply - Tel:

17 TH APRIL 2017 Switch Board Monitoring Protecting Switchboard. Courtesy of ABB. Paul Lee

SEL Arc-Flash Solutions

AmpLight group management

Energy Commander Paralleling Switchgear

VAMP 120 & 121. Arc Flash Protection Units. Arc Protection. Customer benefits

Making the Most of Alarms

Arc Fault Detection Devices (AFDDs) Protecting People and Property

Guide to Compliance with the Electrical Workplace Safety Standards in the United States

i-con Switchgear Condition Monitoring HV Switchgear Integrated Substation Condition Monitoring ISCM Answers for Infrastructure & Cities.

Assetguard GDM. Gas density Monitoring for Gas Insulated Switchgears

Arc Flash Codes & Compliance: What You Need to Know to Deliver Both Protection and Performance

HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove

AQ 100 Series. Arc Flash Protection System

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

Guide Specification Model CTG Automatic Transfer Switch

PART 4 ELECTRICAL STANDARDS

Element D Services Electrical

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

DynAMo Alarm & Operations Management

Predictive Maintenance Training

NFPA Edition Review

XYZ XYZ XYZ XYZ XYZ XYZ. Energy Utility Based billing for Individual Tenants. Comprehensive Base Station Monitoring. Diesel Generator Monitoring

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction

What Utility Analytics means to Exelon

EC Standard & NFPA 110 (EPSS) Documentation Best Practice. 1: Division Team Mission

VAMP 120 & 121. Arc flash detection units. Product picture

US Navy Leading the Way in Switchboard Protection

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management

AmpLight Lighting Management System

Development of standards for MV Switchgear for Arc Flash protection. ABB Group May 20, 2013 Slide 1

Harrier + Smart Controller & Chemical Management System

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

SECTION AUTOMATIC TRANSFER SWITCHES

Be sustainable while protecting your business

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

Electrical Safety Compliance: NFPA 70E

To find your nearest dealer go to: LEBE /13

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

The evolution of level switches and detectors

Perimeter Product Overview. Effective protection for your business

The safe way to verify the absence of voltage.

VeriSafe Absence of Voltage Tester The safe way to verify the absence of voltage

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

CombustionONE. Improving and Sustaining the Combustion Asset. Driven by the New Standards. Bulletin 53A90A01-01E-A

PD alarm system brings peace of mind in Malta

Energy Division. Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series

Standard PRC Protection System Misoperation Identification and Correction

NFPA 70B and CSA Z463 Standards for Electrical Maintenance Where Does Airborne Ultrasound Fit In?

Arc Flash Mitigation Solutions: A Proactive Approach To Arc Flash Risk

Electrical Energy department

Standard PRC Protection System Misoperation Identification and Correction

THERMAL DIAGNOSIS OF MV SWITCHBOARDS: A COST-EFFECTIVE, DEPENDABLE SOLUTION BASED ON AN OPTICAL SENSOR

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

Schneider Electric solutions for the PV market. Denis Koch Strategy Director / Renewables January 2011

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

SECURITY SOLUTIONS Banking and finance

PGR-8800 TECHNICAL FAQ

SMB/4676/R STRATEGIC BUSINESS PLAN (SBP) Title of TC TC 62: Electrical equipment in medical practice

GE Energy Digital Energy. Zenith Energy Commander Paralleling Switchgear

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Continuous, real-time detection, alarming and analysis of partial discharge events

Purpose of Emergency Response Program Emergency Response Team / Leader Evacuation Procedures Building Life Safety System Virtual Evacuation Building

SOLUTIONS FOR SENIOR CARE FACILITIES BUSINESS COMMUNICATION SERVERS

Public Safety in the Healthcare Facility

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0

Remote Pump Monitoring

Arc Fault Protection ARCON ARCON. The Lightning Fast Airbag for Your Switchboard.

INDEPENDANT LIVING SOLUTIONS

T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards

Application Note on Reading the Vigilohm IM400 Insulation Monitoring Device Installed in Conext Core XC and XC-NA Series Inverters

Arc Flash Protection Training - NFPA 70e Electrical Safety

Perfect Grounding system. SmartEco M2M. Maximum 67% high-efficiency power saving function. (Machine to Machine, Machine to Mobile)

Element D Services Electrical ODG010107

Applications and Discussions of Arc Flash Protection Relay as a Main Busbar Protection in MV Switchboards

Milsoft Amelia Island June 12-14, 2018

Improving Pipeline Integrity and Performance

Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for

NFPA 99 for Facility Managers

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Transcription:

Healthcare Electrical Reference Architecture for Large Hospitals in North America Catalog 0100CT1803 2018 schneider-electric.com/ecostruxure

EcoStruxureTM Power Electrical Reference Architecture for Large Hospitals in North America Introduction Overview The main objective of this electrical distribution design is to address continuity of service for enhancing patient care and satisfaction. The NFPA 99 Health Care Facilities Code establishes criteria for levels of health Beds: more than 1000 beds Operating rooms: from 5 to 10 care services or systems based on risk associated with the impact (to patients, staff, Adaptable: more than 5000 kw or visitors) of a failure (of an activity, system, or equipment). Hospital Capacity Building: single or multi Emergency facility: yes According to NFPA 99, the following items define the failure consequences for the given categories: Regional Voltage and Frequency Category 1 is likely to cause major injury or death Medium voltage: up to 34.5 kv Low voltage: 480 V, 60 Hz Category 3 is not likely to cause injury Category 2 is likely to cause minor injury Category 4 would have no impact on patient care Categories 1 and 2 require a backup power source, such as a generator, to restore power to critical and life safety loads within 10s after interruption of the normal source. Equipment Branch Normal Branch 2 Life Safety 10/2018 Critical Branch 2018 Schneider Electric

Electrical Distribution Principle The continuity of service in the hospital is mainly managed by: Multiple energy sources: electrical utilities, generator backup system, with battery. Redundant energy path significantly reduces the mean time to recovery in case of outage. This design is also necessary to implement maintenance in the 24/7 hospital building. Utility Sources The hospital building should reinforce utility energy sourcing through double-separated incomers. Medium Voltage (MV) System Management The MV system is dependent on the utility sources available, hospital profile, redundancy scheme, and cost. MV system redundancy can include composite primary and/or secondary selective radial systems. Source transfer automation and protection reduces outages and recovery time. Essential Electrical System (EES) An EES is comprised of alternate sources of power and all connected distribution systems, designed to help maintain continuity of electrical power to designated areas and functions of a health care facility during disruption of normal power sources. Designated areas and functions are described in three branches: Life Safety Branch: in accordance with the NFPA 101: Life Safety Code, applies exclusively to circuits essential to life safety systems, such as emergency lighting and other systems that aid in exiting the hospital Critical Branch: supplies power for task illumination, fixed equipment, select receptacles, and select power circuits spaces and functions related to patient care Equipment Branch: comprised of power equipment and associated control systems Generator Backup System The generator backup system should manage outage recovery within 10s for the corresponding load classification. for Operating Room and Specific Equipment A can help maintain continuity of service for the operating rooms, intensive care units, and other critical medical applications related to patient safety. Additionally, a helps maintain service for long cycle or critical processes where even a brief outage can have a financial impact to the hospital and discomfort for the patient. 2018 Schneider Electric 3 10/2018

Reduce Risk and Enable a Future Ready Design Utility A Utility B (Back Up) MV Service Entrance Equipment Generator Paralleling Switchgear G G Load G G Bank Main Building Normal Distribution LV Substation Emergency Distribution To Chiller Plant & Other Buildings Auto Control To Automatic Transfer Switches (ATSs) PFCC ATS Light VFD Isolated Med M M Lighting & Receptacles Normal Branch Emergency Lighting & Communication, Fire Alarm Systems Life Safety Branch Medical Machines Operating Rooms IT Loads Critical Branch Patient Rooms Medical Air Compressor, Elevators, & Water Pumps Equipment Branch Fire Pump 4 10/2018 2018 Schneider Electric

Reduce Downtime by Identifying Potential Issues The Power Monitoring and Control system reinforces and maintains energy availability performance for the full life cycle of the hospital. This system should be composed of: Power Monitoring and Control Power monitoring monitors the electrical distribution from main incomers to the final distribution with animated one-line diagrams. Source control (incomers, generators), network control (automatic transfer switch [ATS], ) and load control (load shedding) are automated to maximize uptime without user intervention. Connected hardware provides the ability for remote control and supervision of electrical distribution automation. Electrical Distribution - Power Network Sepam 80 ASCO ATS 7000 Alarming By automatically sending notifications for alarms and events to designated users using mobile devices, users can quickly identify system abnormalities and take appropriate action. Masterpact MTZ 5000 A PowerPact J 250 A Alarms are focused on the by centralizing all battery remaining time. A centralized alarming system for the operating ward is also recommended by NFPA Standards. The breaker coordination dashboard analyzes and monitors breaker settings compared to baseline, "as-designed" breaker coordination. Alarming Focus on Galaxy PowerPact B 100 A QO Breaker LV Circuit Breaker Coordination Thermal Monitoring for the Medium Voltage Switchboard Thermal monitoring (TH110) detects abnormal temperature rises in MV equipment and LV busway. Thermal Sensor (TH110) 2018 Schneider Electric 5 10/2018

Power Events Analysis The EcoStruxure Power Events Analysis isolates the power system and reduces downtime with the following features and capabilities: High resolution, high accuracy event sequence record to find origins of fault Cross-system event correlation to help reconstruct sequence of events Speed the diagnosis of power incidents by automatically creating a visual timeline of the incidentshowing related events, waveforms, and trends -- Gain deeper insight about the cause and impact of an incident by seeing a visual timeline before, during, and after the incident -- Record analysis for later viewing, with custom annotations and custom filters to show only what is most relevant -- Continuously record, replay, and analyze power system events visually using animated electrical one lines, floor plans, and riser diagrams Power Events Analysis Asset Advisor The EcoStruxure Asset Advisor evaluates live data from your critical connected assets and applies advanced analytics to identify potential threats. With this data, Asset Advisor gives you the power of choice for critical decisions, either to take action yourself or to leverage Schneider Electric s Service Bureau to do so on your behalf. Advanced analytics enable a much more predictive approach to maintenance by using advanced pattern recognition and machine learning to detect equipment issues before they become operational and provide early warnings. Power Advisor The EcoStruxure Power Advisor provides data quality management by performing regular system health checks that find missing or incorrect data, devices missing in the hierarchy, stagnant or misreported values, etc. Power Advisor also helps ensure your system is reliable with recommendations to improve data quality and system evolution with expert support throughout the entire life cycle. Asset Advisor 6 10/2018 2018 Schneider Electric Power Advisor

Helps Ensure Protection The risk of fire or similar situations in a building are addressed in multiple standards, including NFPA 99: Healthcare Facilities Code, NFPA 101: Life Safety Code, and NFPA 70: National Electrical Code. Utility A Utility B (Back Up) MV Service Entrance Equipment G Generator Paralleling Switchgear G Load G G Bank Main Low Voltage Breaker The Low Voltage Masterpact MTZ circuit breaker can be remotely operated from outside the arc flash zone using Bluetooth technology. Main Building Normal Distribution LV Substation Emergency Distribution To Chiller Plant & Other Buildings Auto Control Masterpact MTZ remote control To Automatic Transfer Switches (ATSs) PFCC ATS Light VFD Isolated Med M M Lighting & Receptacles Normal Branch Emergency Lighting & Communication, Fire Alarm Systems Life Safety Branch Medical Machines Operating Rooms IT Loads Critical Branch Medical Air Patient Compressor, Elevators, Rooms & Water Pumps Equipment Branch Fire Pump 2018 Schneider Electric 7 10/2018

Isolates the Power System and Reduces Downtime The electric equipment operating in the patient vicinity produces a leakage current. This leakage is not intended to be applied to a patient, but could pass from exposed metal parts of an appliance to ground. To reduce the risk, an isolated ungrounded electrical distribution system is designed into the building, creating a small local network with low leakage capacitance. These systems include limits and methods for checking the system integrity. Line Isolation Monitors (LIMs) continuously check the impedance of the total isolated ungrounded system to ground. Isolated systems are now commonly used to protect against electrical shock in many areas, among them: Intensive care units (ICUs) Coronary care units (CCUs) Emergency departments Special procedure rooms Cardiovascular laboratories Dialysis units Various wet locations IG2000CBM (Remote Alarm Indicator) Incoming power Fault Location Detector 1 3 5 7 9 11 13 15 L1 H2 H1 Iso-Gard 6 (LIM) L2 ground 2 4 6 8 10 12 14 16 X1 X2 4800IGGW465 Fault Location Comm. Detector Gateway : Internal bus : Ethernet By adding the optional Fault Locator System to the isolated ungrounded electrical distribution system, the branch circuit with resistive fault can be identified quickly, allowing the hospital staff to determine the next step after the alarm condition occurs. Power Monitoring Expert Operating Ward Dashboard Medical 8 10/2018 2018 Schneider Electric

Save Money by Reducing Energy Cost The energy management system is key to reducing operational cost during the building life cycle. Utility Billing Verification The shadow bill, which compares energy consumed during the billing period, provides evidence of errors to the utility, which can have fast financial return. PM8000 Power Meter Understanding the billing levers can help change the behavior (examples: peak shaving, demand response). Original Bill Shadow Bill EM3500 Power Meter Cost Allocation This allocates energy cost to different departments or to identified loads, and often leads to reduction as a result of change in behavior. Energy Usage Analysis This analyzes how much energy is consumed by the various load types or areas to identify where to focus energy conservation initiatives. By implementing energy usage models, the actual consumption can be compared against expectation. Power Factor Correction Measuring and correcting power factor or reactive power (kvar) caused by inductive loads like motors can result in a fast ROI by reducing penalties charged by many utilities. Cost Allocation by Department Energy Usage Report Sustainability Reporting Greenhouse gas reporting is based on equivalent tons of CO 2 emissions, saved trees, km driven, etc. The building energy rating is directly linked to the energy consumption by square meter. Carbon emissions are reported and segmented by source, scope, and pollutant, and can be indexed to various metrics you specify. Power Factor Trend Report Maintain Compliance to Regulations and Sustainability VarSet Capacitor Bank Building Energy Rating Carbon Emission Awareness 2018 Schneider Electric 9 10/2018

Microgrid Application The EcoStruxure Microgrid Application helps protect facility operations against extreme weather, cyberattacks and grid instability (avoiding costly downtime). Strategic partners provide Energy-as-a-Service (EaaS) with flexible governance models, enabling you to control your financial and operational risks. With seamless DER integration, you get actionable insights on when to consume, store, and sell energy for the greatest financial advantage. Application outputs include: User interface: animated one-line diagrams gives situational awareness of the state of your power system from anywhere and allows operators to perform remote control Reporting: comprehensive reporting on power quality, power, and energy usage with EcoStruxure Power Monitoring Expert or EcoStruxure Power SCADA Operation with Advanced Reporting and Dashboards Notifications: ability to automatically notify appropriate personnel of power system events via email or SMS Control and command: EcoStruxure Microgrid Operation (EMO) can perform automatic control for load sharing, DER management, load shedding, black-start sequence, grid management, etc. 10 10/2018 2018 Schneider Electric

Save Money by Optimizing Maintenance The NFPA 110 includes maintenance and testing requirements for performance of emergency power including sources, transfer equipment, controls, supervisory equipment, and all related electrical and mechanical auxiliaries. Diesel Generator Backup System The diesel generator sets in service should be exercised at least once monthly, for a minimum of 30 minutes, using one of the following methods: Loading that maintains the minimum exhaust gas temperatures as recommended by the manufacturer Under operating temperature conditions and at not less than 30 percent of the Emergency Power Supply (EPS) standby nameplate kw rating Diesel-powered EPS installations that do not meet these requirements should be exercised monthly with the available EPSS load and exercised annually with supplemental loads at no less than 50 percent of the EPS nameplate kw rating for 30 continuous minutes and at no less than 75 percent of the EPS nameplate kw rating for 1 continuous hour for a total test duration of no less than 1.5 continuous hours. LV Circuit Breaker Preventive Maintenance The condition based maintenance is based on the operation and tripping of the breaker in the main LV switchboard environment. This automatic tracking system optimizes the annual preventive maintenance. Monthly Test testing typically complies with NFPA 110 or NFPA 111. Generator Backup Monthly Test Report Breaker Aging Report Generator Capacity Report Monthly Test Report 2018 Schneider Electric 11 10/2018

Increase Electrical System and Asset Reliability Power Quality Monitoring, Correction, and Compliance Reporting Good power quality limits the risk of disrupting or damaging the critical loads. Monitor the status of power quality in the system based on industry recognized thresholds, and identify areas to correct power related issues that may impact equipment. Comprehensive power quality reports, per the EN50160, IEC61000-4-30, IEEE 519 standards, provide accurate diagnosis on sag/swell, harmonics, and transient. Power Quality Accusine PCS+ Power Quality Reports Schneider Electric USA, Inc. 800 Federal Street Andover, MA 01810 USA 888-778-2733 www.schneider-electric.us Schneider Electric, Accusine, EcoStruxure, Galaxy, Innovation At Every Level, Iso-Gard, Masterpact, PowerPact, QO, Sepam, and VarSet are trademarks and the property of Schneider Electric SE, its subsidiaries, and affiliated companies. 2018 Schneider Electric