BeltLine Corridor Environmental Study

Similar documents
BeltLine Corridor Environmental Study

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Transit Implementation Strategy Westside Study Group Meeting

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Atlanta BeltLine Subarea 3 Master Plan Update

Atlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

The Atlanta BeltLine. Quarterly Briefing March @atlantabeltline. Reynoldstown Senior Affordable Housing

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Chapter 1.0 Introduction

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

Subareas 9 & 10 Master Plan Updates

East Corridor Final Environmental Impact Statement

New Partners for Smart Growth Conference February 5, 2010

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

The University District envisions, in its neighborhood

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Northern Branch Corridor SDEIS March Table of Contents

SOUTHEAST CORRIDOR EXTENSION. PUBLIC SCOPING MEETING/OPEN HOUSE October 15, 2008

City of Tacoma Planning and Development Services

Welcome to the LYNX Blue Line Extension Transit Station Area Plans Public Workshop No. 3. Presentation will begin at 6:00 P.M.

Michigan City Alternative Analysis Realignment Study. Progress Status Update Report Presentation to City Council February 1, 2012

Midtown Greenway Land Use and Development Plan Executive Summary

Ann Arbor Intermodal Station Environmental Review

City of Nogales General Plan

Draft Plan Recommendations

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

REVIEW AND EVALUATION OF REGIONAL LAND USE

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

2017 General Obligation Bond

Lesson 6. Corridor Planning

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

1.0 PROJECT PURPOSE AND NEED

Ten Mile Creek Planning Area

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

Description of Preferred Alternative

CHAPTER 7: Transportation, Mobility and Circulation

NACCED/NACo CONFERENCE JULY 10, 2015

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

3.0 Action Plan. Strategic Recommendations Regulatory Enhancements Five- Year Action Plan 25-Year Projections LCI Goals

City of Meriden Harbor Brook Flood Control Project Overview

PLAN ON A PAGE SUMMARY

Mississippi Skyway Preliminary Engineering Report

Joint Public Hearing. Preliminary Subregion 5 Master Plan and Proposed Sectional Map Amendment

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Washington Union Station s 2nd Century DEVELOPMENT PLAN

Technical Memorandum 5

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

Asbury Chapel Subdivision Sketch Plan

THE NEIGHBORHOOD TODAY

Seattle Transit Master Plan

Prepared for the Citizens of Forsyth County by the City-County Planning Board

Community Open House March 26 th, 2018

Plano Tomorrow Vision and Policies

Welcome to the first Community Workshop for Wesley Heights Greenway Cedar Street to Bruns Avenue

MAY 2012 CITY OF ST. LOUIS PARK, MINNESOTA SAINT LOUIS PARK BELTLINE AREA FRAMEWORK & DESIGN GUIDELINES

Illiana Corridor CPG/TTF Meeting #1

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Northern Branch Corridor SDEIS March 2017

Planning for TOD Implementation at a Corridor Scale

Transportation. Strategies for Action

Making Transit Oriented Development Work For Boonton, NJ

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

History: a Grand Urban Boulevard

South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

S C O P E O F W O R K A P R I L

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Phase I Redevelopment Plan. First Community Meeting

Right-of-Way Acquisitions and Relocations Technical Memorandum

East Bench Master Plan Update

Southeast Extension to RidgeGate Parkway Scoping Booklet

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Gary & Regional Investment Project. October 27, Creating Tomorrow Today Comprehensive Regional Plan - NIRPC

Planned Manufacturing District Review

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Public Forum. Kelley s Corner: The Corner that Connects Us. The Cecil Group. March 7, Acton 2020 Town of Acton.

This page intentionally blank.

Green Infrastructure The Indianapolis Greenways Connection

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Denver Moves: Transit Task Force

FUNDING CORRIDOR REVITALIZATION

Staff Report and Recommendation

SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

FUTURE LAND USE PLAN 7

9/19/2018 TODAY S WEBINAR AGENDA CONTINUING EDUCATION UPCOMING TRAINING FROM APBP

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Transcription:

BeltLine Corridor Environmental Study Citywide Conversation on Transit and Trails April 2, 2009

Agenda & Introductions Introductions Environmental Study Process Overview of the BeltLine Project BeltLine Corridor Environmental Study Environmental Study Interface with Subarea Master Planning Evaluation Criteria Public Outreach Activities 2

Environmental Study Process 3

Environmental Study Process Project Objectives: Environmental review of Northeast (NE) Zone under Georgia Environmental Policy Act (GEPA) Right-of-way requirements identified for NE Zone Tier 1 Environmental Impact Study (EIS) completed under National Environmental Policy Act (NEPA) for entire corridor 4

Environmental Study Process NEPA Tiering 5

Environmental Study Process Broad Overall Corridor Issues Develop evaluation measures Identify system-level impacts Transit and Trail Alignment Refine alignments and station areas Identity facility locations Conceptual Design Design transit and trails concepts Determine right-of-way preservation needs Mode Type Identify service characteristics Analyze travel time impacts 6

Environmental Study Process Phase 1 Project scoping and initiation of environmental review processes Project Phasing Phase 2 Complete GEPA for NE Zone Phase 3 Complete Tier 1 EIS for entire 22-mile corridor 7

Environmental Study Process Decision Making Framework 8

Environmental Study Process Accomplishments Scoping Meetings and Scoping Summary Report Refined Purpose and Need and Goals and Objectives Northeast Zone Screening Assessment Existing Conditions Assessment Evaluation Methodology and Criteria Assessment 9

Environmental Study Process Right-of-Way Preservation: Map existing conditions Develop typical sections for transit and trail components Align routes along existing railroad corridor and streets Identify additional right-of-way needs 10

Environmental Study Process Conceptual Design Provide design sufficient to identify potential environmental effects of project Develop conceptual footprint of project to determine right-of-way preservation 11

Environmental Study Process Basic System Components: Multi-Use trail 16-foot typical width Connections to major streets, proposed transit stops, and other trails Linear greenways and pocket parks parallel and adjacent to the trail Double-track transit alignment Initial operating plan assumes LRT/Streetcar vehicles (8-10 minute headways) Passenger stations: ¼ to ½ mile spacing Storage and maintenance facility for vehicles 12

Environmental Study Process Typical Minimum Section for Transit and Trail* *Minimum dimensions apply only in locations of flat cross-slope and straight alignment 13

Environmental Study Process Typical Minimum Section for Transit and Trail at Side Platform Station* *Minimum dimensions apply only in locations of flat cross-slope and straight alignment 14

Environmental Study Process Varied Right-of-Way Dimensions Example: between Highland Avenue and Ralph McGill Boulevard 15

Environmental Study Process Transit and Trail within Existing Right-of-Way Example Cross-Section for Transit and Trail: Near Ralph McGill * *Minimum dimensions apply only in locations of flat cross-slope and straight alignment 16

Overview of the BeltLine Project 17

BeltLine Project History 18

BeltLine Project Purpose and Need Community Needs Mobility Recreation Economic Development Workforce Housing Cultural Resources BeltLine Outcomes Transit, Trails & Transportation Parks and Greenspace Transit Supportive Land Use Affordable Housing Trust Fund Historic Preservation 19

BeltLine Corridor Environmental Study Major BeltLine Accomplishments 9 Initial Tax Allocation District (TAD) funding 9 Master Plan preparation 9 Key land parcel acquisition 9 Parks and trails construction 20

Regional Transit Vision The BeltLine is just one piece of a much larger regional transit plan, which includes: Heavy Rail Commuter Rail Light Rail / Street Car Express Bus Regional Bus 21

BeltLine Corridor Environmental Study 22

Environmental Study Update 23

Environmental Study Goals - Contribute to an integrated regional multimodal transportation network that promotes seamless intermodal connectivity, increases community access to the existing transit and trails network and improves reliability of personal travel. - Support local neighborhood preservation and regional land use initiatives, and fulfill emerging demand for transit-adjacent land development. 24

Environmental Study Goals - Provide a cost-effective and efficient transportation investment. - Provide a bicycle and pedestrian friendly environment. - Provide transit, bicycle and pedestrian connectivity between communities and existing and planned recreational opportunities. 25

Environmental Study Goals - Minimize adverse impacts to the environment and foster positive environmental impacts. - Ensure consideration of public input throughout project planning and development. 26

Environmental Study Area Four distinct zones defined by MARTA rail lines Northeast Southeast Southwest Northwest The Four Zones of the BeltLine Study Area 27

Environmental Study Outcomes Develop transit and trail alignment and connections Identify and preserve station location areas Document environmental impacts Refine capital and operating costs Determine transit service features 28

BeltLine Corridor Existing Conditions Socioeconomics Natural Environment Transportation Bicycle and Pedestrian Study of Related Plans and Efforts The BeltLine and Proposed Alternatives 29

BeltLine Corridor Existing Conditions Population Growth 2007-2030 Atlanta Regional Commission (ARC) forecasts: Population 68,700 (2007) 86,700 (2030 forecast) Growth of 20% Demographic 58% Minority 21% Low income 14% Transit-dependant 30

BeltLine Corridor Existing Conditions Employment Growth 2006-2030 Atlanta Regional Commission (ARC) forecast: Employment 51,000 (2006) 66,600 (2030 forecast) Growth of 30% Serves 59 neighborhoods and over 60 community facilities 31

BeltLine Corridor Existing Conditions Wetland Areas and 100-Year Floodplains Floodplains of Peachtree, Proctor, Clear and Tanyard Creeks 21 streams and 8 bodies of water Over 230 contaminated and hazardous materials sites Connects more than 50 parks (400+ acres) 32 *Georgia Environmental Protection Agency, United States Geological Survey (USGS)

BeltLine Corridor Existing Conditions Historic Buildings/Structures Over 300 historic buildings/structures and 20 historic districts* Districts Buildings/Structures Listed 8 32 Eligible 12 271 Total 20 303 *Georgia Department of Natural Resources, 33Historic Preservation Division, Atlanta Urban Design Commission

BeltLine Corridor Existing Conditions Public Transportation Within the BeltLine Study Area there are: 5 MARTA rail stations 56 MARTA bus routes 1 GRTA express bus route Several local shuttle buses Active and inactive freight rail About 14% use transit for work trips Approximately 50 bicycle routes planned 34

Environmental Study Interface with Subarea Master Planning 35

Environmental Study and Subarea Master Planning Master Plans Parks / Greenspace Trail Alignment Alternatives Access Points / Transit and Trails Street Framework Historic Resources Development Patterns EIS Process Conceptual Engineering Environmental Impact Transit and Trail Service Features Ridership Capital and Operating Cost Outcome of EIS Corridor Design Alignment Station Location Areas Transit Alignment Trail Alignment Transit Characteristics 36

Environmental Study and Subarea Master Planning Master Planning Provides: Basis for refining transit and trail alternatives and station areas Land use, open space, and transportation/circulation plans used in the impact analysis Information used to evaluate land use and transit-friendly design for project alternatives 37

Environmental Study and Subarea Master Planning Tier 1 Environmental Study Provides: Location of project alignment and station areas Project right-of-way needs A forum for consensus building regarding transit and trails investments that supports community plans 38

Evaluation Criteria 39

Evaluation Criteria Basis for comparing alternative alignments and technologies Performance measures for each evaluation criteria Assessment of the range of alternative alignments and technologies through the listed criteria: 40

Evaluation Criteria Breakout discussions of evaluation criteria and performance measures: Mobility Accessibility and Connectivity Equity Cost Effectiveness and Efficiency Travel Time Pedestrian and Bicycle Compatibility Support of Other Planning Initiatives Land Use and Economic Development Community Fit Environmental Quality Public Input 41

Public Outreach Activities 42

Upcoming Public Workshops Review the transit and trails concept and features Refine alternatives considered in Tier 1 EIS Identify key concerns to address in the impact analysis 43

Upcoming Public Workshop Open house with video display Presentation on purpose Breakout groups to review and refine alternatives Summary of key results from groups Next steps 44

Upcoming Public Workshop Five meetings (one for each of the BeltLine Study Groups) April 13 th Southeast April 16 th Northeast April 23 rd Southwest April 27 th Westside May 4 th Northside 45

Upcoming Meeting May 14 th Public Hearing on the Environmental Effects Report 46