RISK ASSESSMENT. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 76. M/s Alton Buildtech India Pvt. Ltd.

Similar documents
1.1.1 HAZARD IDENTIFICATION

Chapter 7: ADDITIONAL STUDIES

Chapter 1: ADDITIONAL STUDIES

Chapter 7: ADDITIONAL STUDIES

Risk assessment is a term used to describe the overall process or method where you:

Enclosure 4- RISK ASSESSMENT

Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM

7.0 GENERAL 7.1RISK ASSESSMENT. STEP 1: DEFINE THE PROJECTS/TASKS Project Proponents : M/s. Goel Ganga Developers (I) Pvt. Ltd

RISK ASSESSMENT, ITS MITIGATION & DISASTER MANAGEMENT PLAN

FACTORY VISIT REPORT. Rimso Battery & Company Private Limited Masabo, Borpa, Rupjong, Narayangonj. Infrastructure Development Company Limited

DMP FOR ONSITE AND OFFSITE

DMP & RISK MANAGEMENT PLAN

ERDMP & RISK ASSESSMENT REPORT

Department Of Public Works: Internal Operations

CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 1.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

IIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations

SCALES NW EMERGENCY ACTION PLAN

Contingency/Emergency Plan for all Hazards Page 1 of 9

HEALTHCARE SAFETY INSPECTION

Proposed construction of National Institute of Homeopathy at Sec-A8, Narela Delhi by Ministry of Ayush. Risk Assessment

Regulations Regarding Emergency Planning & Preparedness for Long Term Care Facilities. Regulation Explanation Document Reference

EMERGENCY PREPAREDNESS: EVACUATIONS

product guide 240 VOLTS NO ENTRY 240 VOLTS DANGER SAFETY SIGNS AND LABELS WE DESIGN IT - WE MAKE IT - IN AUSTRALIA

EMERGENCY RESPONSE PLAN FOR

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation

Workplace Safety North

FIRE PREVENTION PLAN EMERGENCY ACTION

Fire Prevention and Emergency Preparedness Plan for Black Oak Wind Farm

Training Toolbox Series. ICA11v1.0 Information, Digital Media & Technology

Emergency Response Guide

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

RAMBLER PARK FIRE SAFETY INFORMATION

WORKPLACE AND SAFETY SIGNS

Emergency Evacuation or Lockdown

Employee Health Protection

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

A.C.E. Security Consultants House of Worship Checklist

Emergency Action Fire Prevention Plan

Safety Plan. 2/1/2012 Page 1

These telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

Following are the systems proposed as per NBC & Local Fire Authority:

Health & Safety Policy

AMADOR FIRE PROTECTION DISTRICT

Emergency Evacuation Plan South Patterson Building (SPB)

Plan GRAND RENEWABLE WIND LP HALDIMAND COUNTY ONTARIO AUG 26, 2013

KEARNS HIGH SCHOOL. Memo No. 33 August, 2010

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

School EMERGENCY PLAN

PASCOE S PTY LTD EMERGENCY PLAN JULY 2015

WHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation in which the normal life is suddenly

Bloomsburg University of Pennsylvania Hot Work Safety Program Effective Date: July 1, 2015

Emergency Action Plan. Revised: 1/22/2018

FIRE PROTECTION PROGRAM

FACILITY OF EMERGENCY PLAN. (Template)

CHAPTER 8 DISASTER CONTROL PLAN

Bishopstone Village Hall Health and Safety and Fire Evacuation Policy

RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES (ONSITE & OFFSITE)

Project: Location: Date Prepared: Last Reviewed:

DISASTER RECOVERY PLAN. Disaster Planning Evacuation Planning Emergency Planning Recovery Planning Business Continuity Planning

Beau s Emergency Response Plan

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

Environmental emergency preparedness and response

State of North Carolina Department of Environment and Natural Resources Division of Waste Management. Safety and Risk Management Program

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

EIA REPORT OF PRATHAM RIVIERA (M/S. PRATHAM DEVELOPERS), BILL VILLAGE, VADODARA.

HARDWOOD INDUSTRY FACILITY & SAFETY INSPECTION CHECKLIST

College: Campus: Building: Room #: Building Marshall: # 1 st Responder: # 2 nd Responder: # Cut to 3 3/4 x 11 - white

Who am I?? Trade this -- And this-- for this. HSVMA Webinar Just in Case: Essentials of Disaster Preparedness for The Veterinary Clinic

Procedure: Emergency Preparedness Response & Operational Control

SPILL PREVENTION AND RESPONSE PLAN

NATIONAL COMPETENCY STANDARD

Rescues individuals in danger from fire, vehicle accidents, industrial accidents and other situation requiring extraction.

General Workplace Safety Checklist

Table of Contents. EMERGENCY PROCEDURES Policy 190

Phase 2 Security Response

A. General Safety LAB/ROOM: INSPECTED BY: DATE:

Fire Prevention Plan

3.5-GALLON PARTS WASHER OWNER S MANUAL

PROCEDURE FOR EMERGENCY PREPAREDNESS AND RESPONSE

Fire Prevention Plan

Fire Drill Policy. Facilities Manager DCD. Statutory. Principal. Staff. REVIEW DATE 20 th August Owner. Version Number: 8 Legal Sign:

Emergency Plan. Chemistry and Chemical Biology. Clark Hall Building 22. Revision 1 January

Emergency Evacuation Plan. Kettering Labs. School of Engineering

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

WARDENS WEB SAMPLE Phone: or Stephen Shaw on or

Portable Generator Safety Lloyd Shank, P.E. Director of Electric and Gas Utilities 4/12/2005

HEALTH & SAFETY AND EMERGENCY RESOPNSE MANAGEMENT

Outlines. 1. Introduction of Safety at Laboratories. 2. Emergency Situations. 3. Basic Safety Rules for All the Labs (Engg.

Transcription:

RISK ASSESSMENT Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 76

RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination of qualitative and quantitative value of risk related a situation or hazard. Hazard is a situation that poses a level of threat to life health or environment. Risk assessment involves the following: Hazard Identification Vulnerability Analysis Risk Analysis Emergency Preparedness Plan 4.1.1 HAZARD IDENTIFICATION The project is an Affordable Group Housing and there may be following types of hazards: 4.1.1.1 Natural hazard: 1. Earthquake 2. Flooding 4.1.1.2 Manmade hazard: 1. Health Injuries 2. Fire & explosion 3. Electrical 4. Mechanical 5. Radiation 6. Thermal 7. Chemical 4.1.2 VULNERABILITY ANALYSES This is an Affordable Group housing hence residents, staff & visitors will be vulnerable to risks. 4.1.3 RISK ANALYSIS The risk is likelihood of harmful effect big or small due to hazard, together with severity of harm suffered. Risk also depends on number of people exposed to hazard. Risk analysis provides severity of harm from particular type of hazard. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 77

4.1.3.1 Earthquake: The project will be located at seismic zone IV where earthquake can occur from 4.0-7.0 Ricter scale. 4.1.3.2 Flooding: The project site will be located in our area where no natural river or drainage. However, flooding can occur due to excess rain. 4.1.3.3 Health Injuries 1. Safety nets shall be provided at appropriate level and various shafts/ openings will be covered to prevent falls, slips, trips etc. 2. Necessary safety belts, helmets and eye-masks as required will be enforced at site. 3. Adequate guardrails will be provided to the staircases and common areas. 4. Adequate guardrails/ fences will be provided around the water storage spaces to prevent drowning accidents. 5. Adequate protection/ fence will be provided around the excavated areas. 6. The machinery and the equipments will be regularly tested and maintained with the specific emphasis against accidents failures. 7. The deployed Safety officers ensure that the personnel/ labour will be kept at a safe distance from working machinery to avoid accidents/ injuries due to toxic gases/ chemical/ noise. 8. Moving parts of various parts of machineries/ equipments shall be properly guarded. 9. Required fire extinguishers will be provided at the construction site. 10. Arrangements for clean drinking water will be made. 11. Rest rooms and first aid facilities will be made available for the workers. 4.1.3.4 Fire & Explosion: Since it is an Affordable Group Housing colony, fire can occur due to electrical spark or gas leakage from pantry. Fire is mainly caused in Group housing colony due to carelessness, short circuits, and malfunctioning of gas regulator, tube, and such related products. 4.1.3.5 Electrical: The electrical current can pass to the floor & metals due to inadequate insulation or accidently. 4.1.3.6 Mechanical: The mechanical fault can cause the risk & hazard which include the elevators. 4.1.3.7 Radiation: Due to use of wireless equipment s there may be electromagnetic radiation. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 78

4.1.3.8 Thermal: Thermal heat can be generated from the D.G sets and the vehicles in the project. 4.1.3.9 Chemical: Chemical use in the Affordable Group housing will be limited to cleaning agents & medicines. 4.1.4 ONSITE EMERGENCY PLAN An onsite emergency is caused by an accident or hazard that takes place within the project and the effects are confined to the project. The onsite emergency plan consists of following key elements: Planning as per hazard analysis Preventive measures Emergency response procedure Recovery procedure 4.1.4.1 Planning 1. Mapping of hazard vulnerable area shall be done in consultation with management. 2. There shall be Disaster Management Cell in place 3. The disaster management cell have following members to share the responsibility I. Site Controller (Administrator of project) II. Incident Controller (Asstt. Administrator) III. Personal Manager IV. Communication Officer V. Fire Officer VI. Security Officer VII. Engineering Incharge VIII. Fire pump attendant IX. First Aid Team 4.1.4.2 Preventive Measures 4.1.4.2.1 Earthquake: Since project will be located at Seismic Zone IV, structural designing will be done as per National Building Code 2005. 4.1.4.2.2 Flooding: Proper designing of drainage system for domestic as well as storm water. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 79

Rain water harvesting pits will have provision of storage for one hour peak rainfall. Excess water will go to surface water body. 4.1.4.2.3 Fire: Reference: NBC-2005 FIRE STATIC STORAGE TANK: UNDER GROUND Fire storage tank of capacity 75 KL capacity for covering the entire complex shall be provide with fire pumps like Hydrant Pumps, Jockey Pump, and Pressure Vessel & Diesel engine driver pump is proposed near the water storage tanks for proposed group housing. OVER HEAD TANKS a) Block-A1-5000 LTRS b) Block-A2-5000 LTRS c) Block-A3-5000 LTRS d) Block-A4-5000 LTRS e) Block-B1-5000 LTRS f) Block-B2-5000 LTRS g) Block-B3-5000 LTRS h) Commercial & Community Facilities - 5000 LTRS PROPOSED PUMPING SYSTEM AND ACCESSORIES Pumping System: Motor Type Nos. Capacity Head Electrical motor 1 2280 LPM 90 Mtr. driven pump for Hydrant system. Electrical motor 1 180 LPM 90 Mtr. driven jockey pump Diesel engine 1 2280 LPM 90 Mtr. driven pump Electrical motor 1 900 LPM 35 Mtr. driven booster terrace pump for commercial bldg Accessories: i) Suction manifold (in fire pump room) fed from two fire water storage tanks. ii) Delivery manifold (in fire pump room) fed by the pumps as explained above. iii) An Air vessel shall be provided on delivery manifold of Hydrant system, to compensate for slight loss of pressure and to provide an Air cushion for Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 80

counter acting pressure surges from the system. Separate delivery pipes will be given for Hydrant system. FIRE HYDRANT SYSTEMS: Fire hydrant system shall consist of the following: i) Each fire hose cabinet shall be provided with a) One single out let landing valve b) Two sets of canvas hose pipe with branch pipe c) One first aid fire hose reel. d) One firemen s Axe e) 2 Nos fire Extinguishers PORTABLE EXTINGUISHERS & FIRE SAFETY APPLIANCES: Portable Extinguishers will be located in prominent and easy to reach during fire emergency. Type of Extinguishers: Selection type and capacity of the Extinguishers shall be done as per I.S: 15683. Water-CO2 Type Dry Chemical Power (DCP) Type CO2 Type Extinguishers ABC (Power Type) Extinguisher: Test Demonstration: At least 1 extinguisher per each type shall be demonstrated at site in simulated fire conditions. EXIT SIGNAGE Exit Signage and evacuation instruction shall be displayed judiciously at prominent locations. FACILITY OF FIRE MAN AT MAIN GATE i) Fire brigade inlet connection to tank. ii) Fire brigade draw out connection to tank 4.1.4.2.4 Electrical: i) Planning Stage: Safety parameters as indicated under Indian Electricity Rules 1956 and ECBC shall be complied. The following safety measurement is considered. Earthing system The earthing system shall comply the requirement of IS: 3043, Indian Electricity rules and other applicable statuary regulations and safety codes in the locality of installation. GI plates earthing system shall be provided. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 81

One Earth Leakage Breaker sensitivity 30 ma shall be used per phase in all Distribution Boards In addition to that, following measures shall be adopted There will be color coding and labeling of high voltage electrical wires. Sand bags/ wire bucket shall be placed near the electrical control/panel. Installation of electrical equipments shall be properly done like insulation, guarding and grounding. Work practices and handling of the electrical equipments shall be properly managed. Employees and workers shall be trained for awareness of safe work practices and systems. Properly maintained equipments and tools will be used. Service of electrical equipments shall be done under the supervision of trained personnel. Temporary connections made for experimental reasons shall be safe and properly insulated. Live electrical terminals shall be shielded. ii) Operation Stage: Have only licensed electricians install, repair and dismantle jobsite wiring. That way, everything will be completed according to electrical safety codes, ensuring greater protection for the workers who will be using the wiring to power tools and equipment. Bringing in a professional electrician also prevents the injuries that result when less-qualified individuals attempt electrical jobs that they aren t properly trained to do. Check each extension cord before use. Ensure that insulation is completely intact (free from cracks, tears, or abrasion) and that power extension cables haven t been knotted, which can cause conductor damage and increase the risk of fire. Do a thorough check for electrical wiring before cutting through any wall, floor or ceiling. Any time that a tool inadvertently makes contact with an unseen electrical line, the person holding that tool is likely to be shocked or electrocuted. Always size up the situation before you get started to reduce your risk of injury. Inspect power equipments on a regular basis. Look over the tools power cords and plugs for any sign of damage to the insulation, blades, or grounding pin. If you find signs of excessive wear and tear, take tools out of commission until they ve been properly repaired. Maintain awareness during electrical tool use Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 82

as well; if a tool starts to overheat, smoke, give off a burning smell, or shock you on contact, discontinue use immediately. Check insulated tools for damage before each use. Once the insulation layer of an insulated hand tool becomes nicked, cracked or cut, the tool is no longer effectively insulated it actually becomes more of an electrical conductor, and can increase your risk of injury. If a tool has damaged insulation, it is no longer safe to use destroy and replace it right away. Never modify electrical plugs. Under no circumstances should you ever file down the blades, remove the ground pin, or otherwise modify an electrical plug so that it will fit into a socket doing so only increases the likelihood of shock, electrocution, and fire. Either have a certified electrician change the device s plug, or replace outdated two-prong receptacles with grounded outlets that can accommodate a ground pin. Keep extension cords in a safe place where they won t be stepped on or driven over. The force of a vehicle or even repeated treading by pedestrians can cause an extension cord s conductor to become misshapen or break, a problems that can lead to electrical fires. Because it occurs in the core of the cable, conductor damage isn t always obvious to the eye, so play it safe from the start by guarding jobsite extension cords with heavy-duty cord covers. Ensure that all electrical components stay dry. It s one of the cardinal rules of electrical safety: don t mix electricity and water. Store power tools and cables above water level when not in use, cover outdoor receptacles, and never use electrically powered tools in a wet environment. Use the right extension cord for the job. Before you plug in, make sure that the wattage rating of the extension cord you re using is greater than the pull (or power requirement) of the equipment it s powering. Using an extension cord to supply more wattage than it s rated for can cause conductor strain, overheating, and possibly even fire. 4.1.4.2.5 Chemicals: This is an Affordable Group housing project no chemical container/tanker shall be allowed inside the project. The chemical hazard includes the following: Causing fire, explosion. Release of harmful /toxic gas or particles. Splashing of hot corrosive or toxic liquid. To prevent chemical hazard following measures shall be taken: 1. Use of safer chemicals as for as possible. 2. Keep material safety Data Sheet (MSDS) of all chemical. 3. Storage of chemical in appropriate container (which is safer for chemical) Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 83

4. Storage of chemical at defined place will spillage control system. 5. Proper environment like ventilation, temperature. 6. Use of chemicals by qualified and trained personals. 7. Use of personal protective equipment (PPE) during handing of chemicals. 8. Use of emergency procedures in case of leakage like a) Fire fighting for fire b) Spillage treatment c) First aid d) Evacuation of area For building projects only chemicals used are: 1. Cleaning agent (acid /caustic) 2. Insecticides Cleaning agents can be treated by water. Insecticides shall be contained with specified space during sand & cotton and waste shall be sent to TSDF. The spray of insecticide shall be done by using gas mask. 4.1.4.2.6 Terrorism: All the preventive measures shall be taken as given in security plan. 4.1.4.2.7 4.2.6 Mechanical: Mechanical hazards are created by powered operation of equipments or tools. Mechanical hazards can occur at three locations: 1. Elevators 2. DG set room, Pump & motors room. 3. Vehicular Movement Following preventive measures shall be taken. 1. Elevators shall be properly maintained with record book of maintenance. 2. Periodic replacement of critical components of elevator/ machine. 3. Proper training to operators of machines. 4. The protective guard will be installed at fan & motors. 5. There will be safe distance demarcation on heavy machines like cranes (during construction) 6. Sign of danger at the hazard places. 4.1.4.2.8 Radiation: The radiation hazard can be of two types: Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 84

Ionizing Radiation (nuclear radiation) No ionizing radiation (non-nuclear radiation) In the buildings in a Group Housing, radiation hazard is non ionizing. The radiation can be prevented in following manner: 1. Shielding of radiation. 2. Safe distance from radiation source. 3. Sign of radiation hazard at vulnerable areas. 4.1.4.2.9 Thermal: Thermal hazards are objects or substances that transfer energy as heat. Typical building can have following points of thermal hazard. Open flame Boiling liquid Hot machines/ equipments The thermal hazard can cause burn of skin, following preventive measures can be taken: 1. The open flame area like mess shall be restricted. 2. Water heaters shall be properly insulated and safe distance & guard will be installed. 3. D.G set room will have restricted entry. 4. Operators in the thermal hazard area shall be provided with protective gears like gloves, goggles etc. 5. For emergency first acid room will be maintained. 4.1.4.3 Emergency Response Procedure After all the preventive measures for any emergency following infrastructure shall be provided. 1. Administrative office shall also make an Emergency Control Room. 2. Assembly area shall be demarked for each type of flats. 3. Communication system shall be installed in the project which includes intercom and public addressing system. 4. Fire alarm shall be installed at vulnerable place. 5. The evacuation plan of each building shall be displayed at each floor of respective building. 6. The safe zones (at the time of emergency) on map shall be displayed at different locations. 7. First Aid facility shall be made available at Control room. In case of emergency following action shall be taken. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 85

1. The emergency shall be declared in case of following: i) Fire alarm buzzing (Fire hazard) ii) Vibration/Earthquake feeling (Earthquake) iii) Water logging in the project above 30 cm (Flood) iv) Any unusual smell of gas or suffocating feeling (Chemical leakage) v) Security alarm from main gate. (Security risk/terrorism) 2. On declaration of emergency communication shall be made to residents for any type emergency 3. All the resident of the affected area shall be moved to safe zone 4. The control measures shall be done as per the emergency action plan for each type of hazard. 5. All the members of disaster management cell shall take charge of their respective duties. 6. Outside help like fire tender, police ambulance etc. shall be called by site controller or Incident controller. 4.1.4.4 Recovery Procedure The recovery procedure will depend on the type of emergency. Recovery procedure shall be followed by engineering section to restore the essential services like electricity, water, telephone, food items. 4.1.5 Offsite Emergency Plan If an accident take place in the project and its effect are felt outside the project, the situation thus created is called an offsite emergency. In this case off site emergency is not applicable. 4.1.6 Security plan An ISO 27001 and 27002, which are the international best practice information security management standards, defining and guiding Information Security Management System (ISMS) development shall be adopted. These will provide the necessary benchmarking for individual users to know the type of cover and the responsibilities that are defined and provided by that institution for its guests. Most importantly, training, to staff needs to be regularly imparted in dealing with such situations. 1. Manual Checks: At all gates the visitors and guest shall be manually checked and asked for ID s. 2. CCTV: At all important location with a remote viewing facility and record back up. With highest resolution and picture quality. DVR being the back bone, its recording and replaying capabilities must be considered. 3. Video Door Phone System: VDP equipment with associated telephone wiring shall be provided for all flats having color view screen. 4. Central Control Room: This will control the security system from inside. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 86

5. Communication Systems: Proper communication system to security staff shall help them to coordinate better during emergencies. Training and Security Drills (including Surveillance System) Disaster planning is the responsibility of all sections of the community. The police, fire brigade, civil defence, Home Guards, press, clergy, industrial groups, and community groups must participate in the pre-disaster planning. The community as a whole has the responsibility to teach first aid to groups in the community that could be utilized in disaster situations. The disaster may involve the normal communication network itself. Therefore, two-way radio systems and messenger systems must be included as backups in the event of a communication-system failure. Proper training, security drill and evacuation drill shall be conducted in a defined time period, so as to train the management people, security personnel s, senior staff and all other working staff in the Group housing project to take control of all odds what so ever come in the way. These trainings shall be conducted for use of weapons and Arms by some trained agencies for the said trainings. The training shall be done periodically. Making of Standard Operating Procedures A standard operating procedure manual shall be prepared, followed and maintained for all the eventualities due to attack by armed intruders. Emergency Response Team The disaster management cell shall act as an emergency response team shall be formed in the project which will comprise of persons from Internal Control room personnel, security staff, trainers, Police Control, Army official, Nearest Hospital Management, Fire officer to take control of any eventuality if comes in the project. EVACUATION PLAN Standard operating procedures will be formulated and maintained for all eventualities due to attack by armed intruders. Evacuation plan includes the evacuation due to fire hazard in the project Armed Intrusion Flood Earthquake During any of the above mentioned hazards, the evacuation will be as follows: Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 87

INFORM CONTROL ROOM SUGGEST EVACUATION PLAN INFORM CONCERNED AGENCY SHIFTING RESIDENTS TO INTERNAL SAFE AREA FIRST AID TRANSPORT PEOPLE TO SAFE PLACE TRANSPORT INJURED TO NEAREST HOSPITAL CALL NECESSARY HELP Communication The communication system is useful for rapid notification to appropriate units and expeditious implementation of relief procedures. The fire brigade and metro police units are linked through a wireless communication network. Additional channels of communication are now available through personal cell phones. Use of personal cell phones will not be restricted during disasters. On-site crowd control and information management Disasters usually attract crowds consisting of curious bystanders, onlookers, overenthusiastic volunteers, and self-styled advisers. In general, this hampers rapid triage and transport. The primary responsibility for crowd management is with the police. When a call is received at any of the control rooms, the information is passed on to the local police. The police contingent which arrives on the scene has the primary responsibility for crowd control. During construction Phase Safety nets shall be provided at appropriate level and various shafts/ openings would be covered to prevent falls, slips, trips etc. Necessary safety belts, helmets and eye-masks as required are enforced at site. Adequate guardrails shall be provided to the staircases and common areas. Adequate guardrails/ fences shall be provided around the water storage spaces to prevent drowning accidents. Adequate protection/ fence shall be provided around the excavated areas. During Operation Phase The project is located at Seismic Zone IV. Structural designing will be done as per best structural engineering practices complying with all the applicable codes / standards. Also we have received the structural stability certificate. Proper designing of drainage system for domestic as well as storm water shall be provided. Rain water harvesting pits will have provision of storage for 45 minutes peak rainfall. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 88

The machinery and the equipments shall be regularly tested and maintained with the specific emphasis against accidents failures. The deployed Safety officers ensure that the personnel/ labour shall be kept at a safe distance from working machinery to avoid accidents/ injuries due to toxic gases/ chemical/ noise. Moving parts of various parts of machineries/ equipments shall be properly guarded. Required fire extinguishers shall be provided at the construction site. Arrangements for clean drinking water shall be made. Rest rooms and first aid facilities shall be made available for the workers. Fire Protection system shall be designed as per requirements of National Building Code 2005. Fire Protection system shall be designed as per requirements of National Building Code 2005 Proper Fire evacuation system shall be provided. Safety parameters as indicated under Indian Electricity Rules 1956 and ECBC shall be complied. Elevators shall be properly maintained with record book of maintenance. Periodic replacement of critical components of elevator/ machines. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 89