North York Centre South Service Road

Similar documents
North York Centre South Service Road Environmental Assessment Addendum Study

St. Clair Avenue West Area Transportation Master Plan

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Emery Village Road 2A Municipal Class Environmental Assessment Study

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Commissioners Road West Realignment Environmental Assessment

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

WELCOME TO OPEN HOUSE TWO November 28, 2018

Mavis Road Class Environmental Assessment

Services Department F May 28, 2007

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Evaluation Criteria. Detailed Evaluation Criteria

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Commissioners Road West Realignment Environmental Assessment

Public Information Centre #1

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

WELCOME TO OPEN HOUSE # 3

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

California Environmental Quality Act (CEQA) Environmental Review Process

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Shift Rapid Transit Public Participation Meeting May 3, 2017

Chapter 22. Alternatives to the Proposed Project

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Portage Parkway Environmental Assessment Public Information Centre No. 1

City of Toronto. Emery Village Transportation Master Plan

March 21, 2018 ALCA Meeting. March 21, 2018

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

City of Toronto Official Plan Indicators

Official Plan Review: Draft Built Form Policies

Heritage Road Improvements from Steeles Avenue to Rivermont Road

planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

DOWNTOWN GEORGETOWN PLANNING STUDY

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

Welcome to the Oakridge Centre Open House

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

1071 King Street West Zoning Amendment Application - Preliminary Report

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Northeast Corner of Steeles Avenue West and Jane Street, City of Vaughan

38 Queen s University Campus Master Plan Part 1

TORONTO COMPLETE STREETS GUIDELINES

Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary

Edward R. Sajecki Commissioner of Planning and Building

South of Eastern Strategic Direction Status Update

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

c. DTAH Toronto Complete Streets Guidelines

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

The purpose of tonight s PIC is to:

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

Clairtrell Area Context Plan

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

KING-SPADINA COMMERCIAL HERITAGE CONSERVATION DISTRICT PLAN COMMUNITY CONSULTATION MEETING #1

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Dallas CBD Second Light Rail Alignment (D2)

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Capital Improvement Program. Development Services Staff Recommended Projects

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Dallas CBD Second Light Rail Alignment (D2)

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Toronto Complete Streets Guidelines

Lambeth Main Street Streetscape Improvements

Access Management: An Overview

Toronto Complete Streets Guidelines

BATHURST QUAY NEIGHBOURHOOD PLAN IMPLEMENTATION. Streetscape & Public Realm Improvement Plan - Canada Malting Silo Site and Eireann Quay

Services Department B September 10, 2007

Bridge Type Assessment and Evaluation

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

71 75 Curlew Drive - Zoning Amendment Application - Preliminary Report

Elfrida Growth Area Study

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Transcription:

North York Centre South Service Road Municipal Class Environmental Assessment Addendum Potential Changes to Doris Avenue, Bonnington Place & Tradewind Avenue Study Summary (June 11, 2015) toronto.ca/nyc-south-road.

Project Time Line 1996 Municipal Class Environmental Assessment (Class EA) Need for south service road project first established 1998 Class EA Addendum Reflected new South Downtown Area boundary Related links and background 2006 North York Centre Secondary Plan Reinforced need for project Delay in Implementation Reasons for delay include issues of costs, property materials available on the project web page impacts and timing of other projects 2013 Review of Class EA Addendum Study Report Study reopened to consider development updates. Offset intersection (Option D) recommended to Council in April 2014. Council directed staff to revise all options and re-asses with a strong focus on traffic capacity and operations/safety. 2015 May-June 2015 (present) revised study publishes a preliminary recommendation of a single intersection (Option B) for public consultation. 2

Existing Conditions Some important changes and considerations since the 1998 study: 2002 Sheppard Subway Line opened Extensive high-rise development in North York Centre Anndale Dr. has been extended to Yonge St. Traffic congestion during peak hours Increased pedestrian movements Growing number of cycling trips Key required properties have been acquired by City of Toronto 3

Problem / Opportunity Statement An opportunity exists to complete the North York Service Road on the east side of Yonge St. by linking Doris Ave. and Tradewind Ave. across Sheppard Ave E. This project would provide multiple benefits: Improve mobility and access Relieve congestion on alternate routes Improve cyclist and pedestrian mobility and safety Support current and future residential and commercial growth This project would achieve the goals of the Official Plan and the North York Centre Secondary Plan. The current configuration of roads does not achieve these goals. 4

Alternative Solutions Four alternative solutions have been studied to link Doris Avenue and Tradewind Avenue: two with a single intersection, two with an offset intersection. Option A Single Intersection Right-Angle at Sheppard Ave. Option B Single Intersection Skewed at Sheppard Ave. * Recommended * Option C Offset Intersection Maintaining Doris Ave. Option D Offset Intersection Realigning Doris Ave. Alignment

Legend for Map Drawings 6

Option A Single Intersection Right-Angle at Sheppard Ave. Sheppard Ave Sheppard Ave High resolution PDF of drawing on web page 7

Option B Single Intersection Skewed at Sheppard Ave. * Recommended * Doris Ave Sheppard Ave Sheppard Ave High resolution PDF of drawing on web page 8

Option C Offset Intersection Maintaining Doris Ave. Alignment Sheppard Ave Sheppard Ave High resolution PDF of drawing on web page 9

Doris Ave Option D Offset Intersection Realigning Doris Ave. Sheppard Ave Sheppard Ave High resolution PDF of drawing on web page 10

Roadway Cross Section Alternatives Section A-A Tradewind between Anndale and Glendora Section B-B Tradewind between Sheppared and Anndale Section C-C Doris between Greenfield and Sheppard 11

Pros & Cons of the Preferred Option B Pros: Option B provides the travel and safety benefits of a single intersection. Although a right-angle intersection is normally preferred (like in Option A) the skewed intersection design avoids the sharp curves in Option A and also maintains Bonnington Place as a separate street, so that the homes on the east side do not have their driveways directly on the service road. Cons: As a trade-off, Option B must cut through the existing green space north of Sheppard Avenue, is more complicated to implement (which likely means more years to construct), and will cost more than double the offset intersection designs (Options C & D). 12

Impacts to Green Space North of Sheppard Ave. To achieve a single intersection design, Doris Avenue would need to be shifted east, bisecting the existing green space north of Sheppard Avenue. Currently this green space is a Privately Owned Publically-Accessible Space (POPS), and would need to acquired by the City, in part or in whole. Mitigation of Impacts 1:1 replacement for impacted trees located within the Right-Of-Way (ROW). 1:3 replacement for trees located within private property. Existing Green Space (private) Potential relocation of driveway for 90 Sheppard Ave E property will reserve some lands for the eastward expansion of the open space. Potential New Green Space There is potential for converting the available space in to a high quality urban park or plaza - but this would be decided outside of this EA study. 13

About the Green Space North of Sheppard Ave. Owner: Heinz Corporate Offices (formerly C-I-L House) Size of Site: 2.4 ha Year Completed: 1982 Landscape Architect: Moorhead Fleming Corban Inc. Landscape Design Description: "Moorhead Park" is an important feature of North York Centre by virtue of its bold and simple design, its large scale, and its location on a prominent corner along Sheppard Avenue at Doris Avenue. Designed as a coherent landscape composition, the building atrium, roof top terraces and at-grade gardens are all inter-related. The spacious landscaped at-grade open space features an oval sodded mound surrounded by a pedestrian circuit, seating and landscaping. The garden is designed to give access, amenity and address to the existing 7-storey Heinz Corporate Office and the adjacent Catholic Education Centre in a way that is democratic and universal. The circular walkway layout together with the central mound allow people within the space to enjoy a sense of privacy, a series of changing views along the circuit Although Moorhead Park is privately owned and not a public park, it is well used by local residents, students, area and an opportunity for longer views from the top of the mound. visitors and office workers. 14

Evaluation Matrix (page 1 of 3) Single Intersection Offset Intersection Criteria: Transportation A * B * C D Accommodation of east-west travel for motorists and cyclists on Sheppard Ave. Good Good Poor Moderate. Accommodation of north-south travel for motorists and cyclists on Tradewind Ave./Doris Ave. Good Good Poor Poor City street and sidewalk maintenance Good Good Poor Poor Accommodation of north-south travel for pedestrians on Tradewind Ave./Doris Ave. Good Good Moderate Moderate Conformance to roadway geometric design standards Poor Good Moderate Moderate High-speed collisions Moderate Moderate Good Good Vehicle queue spillback between study area intersections on Sheppard Ave. Good Good Poor Moderate Conflicts at adjacent driveways Poor Good Good Good Function of Tradewind Ave./ Doris Ave. as a parallel route to Yonge St. that provides access to residential, business and institutional buildings in North York Good Good Moderate Moderate Centre A more detailed version of the evaluation is available on request. 15

Evaluation Matrix (page 2 of 3) Single Intersection Offset Intersection Criteria: Social / Economic Environment A * B * C D Supports current & future residential & commercial growth in North York Centre Good Good Moderate Moderate Consistency with the policies & schedules of North York Centre Secondary Plan Poor Poor Good Good Proximity to existing Downtown Plan Boundary (Anndale to Avondale) Moderate Moderate Good Good Impacts on property due to partial acquisition or construction Moderate Moderate Moderate Moderate Impacts on parking Good Good Good Good Impacts on future Open Space Poor Poor Good Good Need to acquire private property Poor Poor Poor Poor Short-term construction-related nuisance effects such as noise and dust on area residents/businesses Moderate Moderate Moderate Moderate Short-term effects on accessing residential properties during construction Good Good Good Good A more detailed version of the evaluation is available on request. 16

Evaluation Matrix (page 3 of 3) Single Intersection Offset Intersection Criteria: Natural / Cultural Environment A * B * C D. Alteration of existing terrestrial features. Poor Poor Good Moderate Effects on air quality Good Good Moderate Moderate Impacts on heritage features (displaced or disrupted) Poor Poor Good Good Impacts on archaeological resources Good Good Good Good Criteria: Financial Conflicts with existing municipal and utility services Moderate Moderate Good Good Construction staging Moderate Moderate Good Poor Cost of acquiring additional private property Moderate Moderate Good Good Capital cost of implementation $7.1 Million $7.1 $3.0 $3.4 Million Million Million A more detailed version of the evaluation is available on request. 17

Evaluation Summary Option A Option B Option C Option D Single Single Offset Offset Intersection Right- Intersection Intersection Intersection Angle at Skewed at Maintaining Doris Realigning Doris Sheppard Ave. Sheppard Ave. Ave. Alignment Ave. Ranked #2 Ranked #1 Ranked #4 Ranked #3 Improves north-south travel Improves north-south travel Marginally improves north- Marginally improves north- for motorists and cyclists for motorists and cyclists south travel for motorists south travel for motorists on Doris/ Tradewind on Doris/ Tradewind and cyclists on Doris/ and cyclists on Doris/ Tradewind Tradewind Improves east-west travel Improves east-west travel for motorists and cyclists for motorists and cyclists Does not improve east-west Does not improve east-west on Sheppard Ave on Sheppard Ave travel for motorists and travel for motorists and cyclists on Sheppard Ave cyclists on Sheppard Ave Improves safety for Improves safety for pedestrians traveling north- pedestrians traveling north- Does not improve safety for Does not improve safety for south through intersection south through intersection pedestrians traveling north- pedestrians traveling north- south through intersection south through intersection High conflicts with adjacent High implementation costs driveways Lowest implementation Low implementation costs Moderate impacts to costs Poor conformance with Privately owned publicly- No impacts to Privately roadway geometry accessible space No impacts to Privately owned publicly-accessible standards owned publicly-accessible open space open space High implementation costs * Recommended * High impacts to Privately owned publicly-accessible 18 open space

Next Steps Please provide your feedback by June 25, 2015 (see details on next slide) Summer 2015: Continued engagement with affected property owners and other interested stakeholders, as needed Further refinement of the design based on public and stakeholder input, and other considerations Fall 2015: Staff report to Public Works and Infrastructure Committee, and City Council Winter 2015: (If endorsed by Council) Complete an Environmental Study Report (ESR) Addendum and publish for 30 Day Public Review A construction schedule for this project has not been determined. If the plan is approved, timing will depend on funding availability, property acquisition and design development.

We would like to hear from you! Provide your feedback on this project using the online comment form (click here) Attend the Public Drop-in Event Thursday, June 11, 2015 6 p.m. to 8 p.m. Earl Haig Secondary School, 100 Princess Ave. Contact: Jason Diceman Public Consultation Coordinator City of Toronto Tel: 416-338-2830 Fax: 416-392-2974 jdiceman@toronto.ca Metro Hall, 19 th Floor 55 John St. Toronto, ON M5V 3C6 toronto.ca/nyc-south-road