PROPOSED NEW BUILDING

Similar documents
LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE

HOME INSPECTION CHECKLIST

2. Sanitary Plumbing General Installation Requirements

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications

Union County Vocational - Technical Schools Scotch Plains, New Jersey

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

STUDENT NOTES Plan, size and layout sanitary pipe work and fixtures

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE

Installing, modifying and maintaining domestic plumbing systems. Water Supply (Water Fittings) Regulations 1999

LUDMILLA PRIMARY SCHOOL REDEVELOPMENT STAGE 1 SANITARY SCHEDULE. Hodgkison Architecture. Project No: Tender Issue Rev 0 23/3/18

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

PLUMBING INSTALLATIONS

Water Supply (Water Fittings) Regulations 1999

DUKE UNIVERSITY CONSTRUCTION STANDARDS

PLUMBING REQUIREMENTS

PLUMBING FIXTURES CHAPTER 27

A. This Section includes the following domestic water piping specialties:

Modular Grease Trap MGTA

NIGHTCLIFF RENAL UNIT SANITARY SCHEDULE. Hodgkison Architecture. Project No: CONTRACT ISSUE 29/06/2018

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

CRAFTSMAN EXAMINATION, NOVEMBER 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

Level 1. Certificate of Conformity. Australian Certification Services Pty Ltd grants to the WaterMark User: Logi Dezign. Trading as Logi Dezign

SEALED THERMAL STORE

SECTION PLUMBING

A. This Section includes the following emergency plumbing fixtures:

Mechanical System Description

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

PLUMBING FIXTURES Reserved

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Deluxe Inclusions. Harrington Homes reserves the right to change designs and inclusions without notice.

SECTION DOMESTIC WATER PIPING SPECIALTIES

MATERIALS Traps TRAPS. No. IPC IRC Description

University of Wollongong

INSTALL AN ELECTRIC SHOWER

Read Only Document Not For Distribution

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

Read Only Document Not For Distribution

Manual / Handbuch Spare parts list / Ersatzteilliste

Flue Installation Manual

Plumbing Products & Tapware

Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

AIRPORT PLUMBING DESIGN STANDARDS REV. 3 3/18/2016

APPENDIX L ALTERNATE PLUMBING SYSTEMS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

2018 RETAIL PRICELIST

Gulfport, Mississippi 21 May 2007

APPENDIX J ILLUSTRATIONS

REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

SINKS AND HYGIENE EQUIPMENT

Special Requirements For Health Care Facilities

Owner s Manual. Installation Details Owner s Information Warranty. 25L and 50L Electric Storage Water Heater

Sanitary & Hospital Equipment

WATER HAMMER ARRESTORS & MISC. SPECIALTIES

AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

Mechanical Inspection Plumbing


SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING

STORAGE HOT WATER SERVICES

Water Supply and Sanitation 16. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

DOMESTIC & COMMERCIAL PLUMBING SYSTEMS FURTHER INFOMATION

900 N. Via Piemonte Ontario, CA

Building Utilities 1 Plumbing and Sanitary Systems

Modern Exteriors Stylish Kitchens Designer Bathrooms Comtemporary Living Fixtures & Finishes Schedule Inclusions Brochure

NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS

FEATURES. Other Fed-Flush Arrangements

Food Premises - Structural Specifications

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Owner s Guide and Installation Instructions Electric Domestic Water Heater

1 Exam Prep Plumbing State Contractors Practice Exam 2

Stainless Steel Sanitaryware

south-west the bourke H O M E S your home, your choice

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

FRESH FROM THE KITCHEN FRESH FROM THE KITCHEN

Issue 4 Oct Panamatic Top loading Maxi & Optima 3 Installation

Land Use and Environmental Service Agency (Code Enforcement) Plumbing 2010

time flow tapware and showers

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

time flow tapware and showers

House Drainage System. Building Utility & Services

A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

Owner s Manual. Installation Details Owner s Information. 80L to 400L Electric Storage Water Heaters

1 Exam Prep Plumber s Handbook Tabs and Highlights

CHAPTER 10 TRAPS AND INTERCEPTORS

Transcription:

HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER PLUMBING upvc (CONCEALED) SOLVENT WELDED JOINTS GREASY DRAINAGE HDPE ELECTRO FUSION JOINTS GREASY PLUMBING HDPE ELECTRO FUSION JOINTS EXPOSED WASTES 70/30 BRASS CHROME PLATED EXCEPT FOR HIGH TEMP COLD WATER INTERNAL TYPE B COPPER TUBE SILVER SOLDERED JOINTS COLD WATER EXTERNAL DRAWING INDEX DRAWING NUMBER DRAWING TITLE H001 FACE SHEET AND DRAWING INDEX H002 GENERAL NOTES H003 SITE PLAN H004 SANITARY DRAINAGE PART PLAN 1 H005 SANITARY DRAINAGE PART PLAN 3 H006 WATER RETICULATION PART PLAN 1 H007 WATER RETICULATION PART PLAN 3 CLASS 16HDPE PE100 ABBREVIATIONS BASIN BABY BATH BUCKET TRAP CEILING SPACE COLD WATER CHILLED WATER DRINKING UNIT COPPER DRINKING TROUGH DISCONNECTOR GULLY NOMINAL PIPE SIZE DRAWING EXISTING FLOOR WASTE GULLY HOT WATER HOSE COCK INSPECTION OPENING TO SURFACE ISOLATION VALVE LAUNDARY TROUGH OVERFLOW RELIEF GULLY POLYETHYLENE SHOWER SINK STAINLESS STEEL STOP TAP THERMOSTATIC MIXING VALVE TEMPERED WATER TUNDISH UNPLASTICIZED POLYVINYL CHLORIDE UNDER GROUND VALVE BOX WASHING MACHINE WATER CLOSET BB BT CS CW CWDU Cu DT DG DN Drg Ex HW ISO.V Lt ORG PE Shr SS ST TW Td upvc U/G VB WM SYMBOLS EXISTING SEWER MAIN EXISTING WATER MAIN PROPOSED SEWER DRAIN PROPOSED WASTE PIPES PROPOSED COLD WATER SERVICE PROPOSED HOT WATER SERVICE PROPOSED TEMPERED WATER ISOLATION VALVE ISOLATION VALVE IN CI BOX FLOOR WASTE BUCKET TRAP INSPECTION OPENING TO SURFACE THERMOSTATIC MIXING VALVE TUNDISH HOSE COCK EX. S EX. W HOT/WARM WATER FLOW & RETURN TYPE B COPPER TUBE SILVER SOLDERED JOINTS LAGGED 13mm CLOSED CELL POLYMER TGN 0 05/11/2018 N.T.S NEIGHBOURHOOD FACE SHEET AND DRAWING INDEX 18DA0540 H001 0 1:44:25 PM

GENERAL NOTES: 1. THE DRAWING/S DEPICT THE INSTALLATION DIAGRAATICALLY AND ARE NOT TO BE SCALED. SET OUT ALL WORK TO SUIT ACTUAL ON SITE DIMENSIONS. 2. ALL DRAINAGE AND WASTE PIPING SHALL BE EQUAL TO OR GREATER THAN THE NOMINATED OUTLET SIZE OF THE FIXTURE, APPLIANCE OR TUNDISH. 3. ALL WATER SUPPLY PIPING SHALL BE 20mm WITH 15mm BRANCHES TO INDIVIDUAL FIXTURES AND HOSE COCKS UNLESS NOTED OTHERWISE. MAXIMUM LENGTH OF 15mm BRANCHES SHALL BE 2.0m 4. ALL ISOLATION VALVES SHALL BE POSITIONED IN AN ACCESSIBLE LOCATION ADJACENT FIXTURES OR EQUIPMENT. VALVES LOCATED IN CEILINGS, DUCT OR WALLS TO BE LOCATED BEHIND ACCESS COVERS. 5. ALL PLUMBING APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. 6. HOT AND / OR COLD WATER SUPPLY BRANCHES CONNECTING TO APPLIANCES SHALL BE PROVIDED WITH PRESSURE LIMITING VALVES, STOP VALVES, STRAINERS / FILTERS AND ALL OTHER NECESSARY FITTINGS AS REQUIRED BY THE APPLIANCE MANUFACTURER. 7. SUPPLY AND INSTALL ALL FIXTURES AND TAPWARE AS SCHEDULED IN THE ARCHITECTS SPECIFICATION. 8. THOROUGHLY INSPECT THE SITE PRIOR TO TENDERING AND TAKE INTO ACCOUNT ANY CONDITION LIKELY TO AFFECT THE EXTENT OR PERFORMANCE OF THE CONTRACT. 9. ALL EXPOSED METAL PIPING, TUNDISHES AND FLOOR GRATES IN ROOMS OTHER THAN PLANT ROOMS SHALL BE CHROME PLATED METAL PIPES AND FITTINGS UNLESS NOTED OTHERWISE. 10. ALLOW FOR THE DISCONNECTION AND REMOVAL OF ALL REDUNDANT FIXTURES AND ASSOCIATED PIPE WORK AS REQUIRED BY THE CONTRACT WORKS. ALLOW TO CUT AND SEAL ALL REDUNDANT HYDRAULIC PIPING AT POINT OF ORIGIN. 11. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING: OBTAINING APPROVALS, PERMITS AND FINAL CERTIFICATION FROM CONTROLLING AUTHORITIES. PAYING APPLICABLE FEES AND CHARGES IN ACCORDANCE WITH CONTROLLING AUTHORITIES CURRENT FEE SCALES. PAYING ALL CHARGES FOR INSURANCE, SALES TAX AND STORAGE. PROVIDING TO THE BUILDER A COMPLETE SET OF 'AS CONSTRUCTED' DRAWINGS. 12. APPLICABLE REGULATIONS: BUILDING CODE OF AUSTRALIA LOCAL DEPARTMENT OF HEALTH REQUIREMENTS. NATIONAL PLUMBING CODE AS 3500 PART 0-4 INCLUSIVE. REQUIREMENTS FROM ALL CONTROLLING LOCAL AUTHORITIES. 13. LIAISE AND CO ORDINATE WITH ALL OTHER SERVICES CONTRACTORS PRIOR TO ANY INSTALLATION. 14. ALL MATERIAL, FIXTURES AND FITTINGS SHALL BE IN ACCORDANCE WITH THE RELEVANT CURRENT AUSTRALIAN STANDARDS. 15. VERIFY ALL CRITICAL LOCATIONS AND LEVELS OF EXISTING SERVICES PRIOR TO COENCING ANY WORKS. 16. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS, AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. 17. INSPECTION OPENINGS RISERS SHALL BE PROVIDED AS SHOWN OR IN ACCORDANCE WITH AS 3500.2 AND P STANDARD DRAWING W2-1-05 (AMEND. 5) FOR ALL GRASSED / LANDSCAPED AREAS - HEAVY DUTY COVER. ALL INSPECTION OPENINGS TO SURFACE SHALL INCLUDE RISER SHAFT TERMINATING WITH BOLTED TRAP SCREW (BRASS INSERT) AT SURFACE / FLOOR LEVEL OR MOWING STRIP. upvc INSERTS ARE NOT ACCEPTABLE. 18. ALL THERMOSTATIC MIXING VALVES SHALL BE PROVIDED TO ALL FIXTURES USED FOR PERSONAL HYGIENE, IE. BASINS, SCRUB SINKS, ETC. ALL ISOLATION VALVES SHALL BE POSITIONED IN AN ACCESSIBLE LOCATION ADJACENT FIXTURES OR EQUIPMENT. INSTALLATION SHALL INCLUDE STOP TAPS TO HOT AND COLD WATER INLETS. LENGTH OF TEMPERED WATER SERVICE PIPE SHALL NOT EXCEED 6.0m. THERMOSTATIC MIXING VALVES SHALL BE LOCATED IN A POSITION READILY AVAILABLE FOR ADJUSTMENT, SERVICING AND REPLACEMENT. 19. ALL HOSE COCKS SHALL BE PROVIDED WITH PERMANENTLY FIXED HOSE CONNECTION VACUUM BREAKERS AND BE VANDAL PROOF. (KEY OPERATED) 20. ALL FIXTURES AND ITEMS OF EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. 21. FLOOR WASTES SHALL BE OF SUITABLE TYPE (PUDDLE FLANGE) TO BE INSTALLED WITH THE FLOOR FINISHED SHOWN ON THE ARCHITECTURAL DRAWINGS PROVIDING A WATER TIGHT SEAL WITH TILES, VINYL, CONCRETE ETC. WHERE THE FLOOR WASTE IS NOT CHARGED BY A FIXTURE OR TAP, A TRAP SEAL PRIMER VALVE SHALL BE INSTALLED IN ACCESSIBLE LOCATION WITH BLEED LINE CONNECTED TO THE FLOOR WASTE RISER. 22. a) ALL WATER CLOSETS () TO DISCHARGE VIA 100mm WASTE AND TO BE SUPPLIED WITH 15mm STOP TAP TO CISTERNS. b) ALL BASINS () TO DISCHARGE VIA 40mm TRAP AND WASTE TO FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE AND BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) c) ALL SHOWERS (Shr) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND OR FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE. DISABLE SHOWERS, INSTALL BACK FLOW PREVENTION DEVICE AT WALL OUTLET BEFORE FLEXIBLE HOSE CONNECTION. (ENWARE ZBD002 DUAL CHECK VALVE) d) ALL SINKS () TO DISCHARGE VIA 50 mm TRAP AND WASTE TO 100 x 90 deg. BEND AND BE SUPPLIED WITH HOT AND COLD WATER AND TO BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) e) ALL CLEANERS SINK (CL. ) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND OR FLOOR WASTE GULLY AND TO BE SUPPLIED WITH HOT AND COLD WATER AND SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) f) ALL BABY BATH (BB) TO DISCHARGE VIA 50mm TRAP AND WASTE TO FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE AND BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) g) ALL CHILLED WATER DRINKING UNITS (CWDU) TO DISCHARGE VIA 40mm TRAP AND WASTE TO 100 x 90 deg BEND AND TO BE SUPPLIED WITH COLD WATER ONLY. h) ALL LAUNDRY TROUGHS (Lt) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND AND BE SUPPLIED WITH HOT AND COLD WATER AND WITH DN15 MINI STOP COCKS. (BALL VALVE) j) ALL WASHING MACHINES (WM) TO DISCHARGE VIA 50mm TRAPPED UPSTAND AND BE SUPPLIED WITH HOT AND COLD WATER AND WITH DN15 MINI STOP COCKS. (BALL VALVE) k) ALL DISHWASHERS (DW) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x90 deg BEND AND BE SUPPLIED WITH COLD WATER AND WITH DN15 MINI STOP COCK. (BALL VALVE) m) ALL TUNDISHES (Td) PROVIDED FOR MECHANICAL AND HYDRAULIC SERVICES DRAINAGE AND ARE TO BE IN WALL (WINDOWED) TYPE UNITS M.A.GRIFFITH MODEL 78000 UNO. WITH 50mm BUILT INTO WALL TO FLOOR WASTE GULLYS / DISCONNECTOR GULLY OR ABOVE FIXTURE TRAPS AS SHOWN ON THE PROJECT DRAWINGS. 23. ALL EXPOSED WASTE TRAPS, VERTICAL WASTE PIPES AND HOT / COLD WATER TAILS TO WALL HUNG BASINS SHALL BE CHROME PLATED METAL PIPE. 24. NO FLEXIBLE HOSES TO BE USED ON FITTINGS OR FOR CONNECTING FIXTURES TO WATER SUPPLY POINTS. ALL EXPOSED PIPE WORK SHALL BE CHROME PLATED COPPER. 25. SUPPLY AND INSTALL 'SOLAHART - 300 LITRE JBA CLOSED CIRCUIT' SOLAR HOT WATER UNITS AT LOCATIONS SHOWN ON PLANS. FIX UNITS TO ROOF IN ACCORDANCE WITH DEEMED TO COMPLY STANDARDS AND MANUFACTURERS REQUIREMENTS. TGN 0 05/11/2018 N.T.S NEIGHBOURHOOD GENERAL NOTES 18DA0540 H002 0 1:21:44 PM

DN40 Cu CW DN100 HDPE DN40 Cu CW ABLUTIONS CRECHE DN25 Cu CW LOT 507 DN32 Cu CW AREA FOOD ADMIN MEETING ROOM OP-SHOP DN25 Cu CW 1000 LITRE GREASE TRAP NEIGHBOURHOOD SHED TOY AND PUZZLE LIBRARY CONTRACTOR TO CONSTRUCT NEW DN40 WATER METER ARRANGEMENT / SERVICE IN ACCORDANCE WITH LOCAL AUTHORITY REQUIREMENTS INCLUDING BACK FLOW PREVENTION DEVICES. CONTRACTOR TO LOCATE EXISTING SEWER STUB AND CONNECT TO NEW DRAINAGE IN ACCORDANCE WITH LOCAL AUTHORITY REQUIREMENTS SITE PLAN SCALE: 1 : 200 TGN 0 0 4 8 12m 1:200 05/11/2018 1:200 NEIGHBOURHOOD SITE PLAN 18DA0540 H003 0 11:27:43 AM

DN50 VENT TO ABOVE ROOF ORG LAUNDRY Lt WM DN50 UPSTAND WITH TRAP FOR WM. AREA CWDU FOOD ADMIN OP-SHOP DN50 VENT TO ABOVE ROOF REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF SANITARY DRAINAGE SERVICE MEETING ROOM DG SANITARY DRAINAGE PART PLAN 1 TGN 0 05/11/2018 NEIGHBOURHOOD SANITARY DRAINAGE PART PLAN 1 18DA0540 H004 0 11:31:13 AM

DN50 VENT TO ABOVE ROOF DG Shr ABLUTIONS TUNDISH FOR RPZ BACK FLOW UNIT. REFER DETAIL ON SHEET H007 CL. Td BB DT CRECHE ORG DN100 HDPE DN100 VENT TO ABOVE ROOF KITCHEN BT SANITARY DRAINS TO BE CAPPED OFF AT FLOOR LEVEL FOR FUTURE STAGE 2 FIT-OUT WORKS 1000 LITRE GREASE TRAP, TOP OF CHAMBER TO BE SET 100mm ABOVE FINISHED GROUND LEVEL. REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE NEIGHBOURHOOD SHED REFER DRAWING H004 FOR CONTINUATION OF SANITARY DRAINAGE SERVICE SANITARY DRAINAGE PART PLAN 3 TGN 0 05/11/2018 NEIGHBOURHOOD SANITARY DRAINAGE PART PLAN 3 18DA0540 H005 0 11:39:28 AM

REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN32 Cu CW IN U/G REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN25 Cu CW IN U/G DN20 STOP TAP, EXPANSION CONTROL NON-RETURN AND PRESSURE LIMITING VALVE WITH LINE STRAINER AT 1.8m ABOVE F.F.L FOR SHWU. DN20 CW RISER AND DN15 HW DROPPER TV FOOD OP-SHOP DN20 CW IN CS LAUNDRY Lt WM DN15 HW IN CS AREA 300 LITRE SOLAR HOT WATER UNIT FIXED TO ROOF REFER GENERAL NOTES CWDU DN20 CW IN CS ADMIN STIEBEL ELTRON 'SNU 5' NON PRESSURIZED HOT WATER UNIT UNDER BENCH COMPLETE WITH 'MES' SINGLE LEVER MIXER, AND DN15 ISO.V DN20 ISO.V IN VALVE BOX MEETING ROOM REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN20 UPSTAND SUPPORTED ON 40 x 40 SHS 600mm ABOVE F.S.L, 300dia x 400 DEEP FOOTING WATER RETICULATION PART PLAN 1 TGN 0 05/11/2018 DESIGNER: CHECKED: DRAWN: APPROVED: NEIGHBOURHOOD WATER RETICULATION PART PLAN 1 18DA0540 H006 0 11:27:47 AM

REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE Shr CL. 75 75 PURPOSE MADE STAINLESS STEEL CABINET / DRAIN TRAY WITH REMOVABLE ACCESS PANEL WALL MOUNTED IN CUPBOARD DN40 Cu CW IN U/G DN20 Cu CW IN CS CRECHE ABLUTIONS DN20 STOP TAP, EXPANSION CONTROL NON-RETURN AND PRESSURE LIMITING VALVE WITH LINE STRAINER AT 1.8m ABOVE F.F.L FOR SHWU. SOLAR HOT WATER UNIT FIXED TO ROOF REFER GENERAL NOTES DN15 Cu HW IN CS RPZ DN15 Cu HW IN CS BB 2 DT 150mm RPZ VALVE CABINET - DRAIN TRAY NOT TO SCALE NOTE 2 OFF MIXED & COLD WATER RPZ VALVES WITHIN STAINLESS STEEL CABINET DN50 OUTLET IN BASE BASE OF CABINET / DRAIN TRAY TUNDISH DIRECTLY UNDER OUTLET WITH AIR GAP. OVER ALL SIZE AND DEPTH OF S.S. CABINET IS TO SUIT RPZ VALVE DIMENSIONS. MANUFACTURE UNIT FROM 312 GRADE 1.2mm SHEET STAINLESS STEEL. CONTRACTOR TO PROVIDE DETAILED SHOP DRAWINGS OF UNIT FOR APPROVAL BY SUPERINTENDENT, PRIOR TO MANUFACTURE. 11:27:49 AM DN20 Cu CW IN CS REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE KITCHEN DN32 PE WATER RETICULATION PART PLAN 3 TGN 0 WATER RETICULATION PIPEWORK TO BE INSTALLED AND CAPPED OFF FOR FUTURE STAGE 2 FIT-OUT OF KITCHEN DESIGNER: CHECKED: 05/11/2018 DRAWN: APPROVED: NOTES 1. ALL HOT, TEMPERED AND COLD WATER DROPPERS IN WALLS TO SINGLE OUTLETS SHALL BE DN15 Cu. (UNLESS NOTED OTHERWISE) DN20 Cu FOR MULTIPLE OUTLETS. 2. ALL COLD WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN32 Cu. (UNLESS NOTED OTHERWISE) 3. ALL TEMPERED WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN15 Cu. (UNLESS NOTED OTHERWISE) 4. ALL HOT WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN20 Cu. (UNLESS NOTED OTHER WISE) 5. ALL 's SHALL BE INSTALLED IN RECESSED STAINLESS STEEL WALL BOX AT 1.5m ABOVE F.F.L. (UNLESS NOTED OTHER WISE) 6. ALL 2 SHALL BE INSTALLED UNDER BABY BATH, TEMPERATURE SET AT 32 deg C MAX. NEIGHBOURHOOD WATER RETICULATION PART PLAN 3 PROJECT NUMBER : DRAWING No. 18DA0540 H007 0 REVISION