Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Similar documents
Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

New High School Concept

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Briar Crest Elementary

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Master Facility Planning Update School Board Meeting May 26, 2016

PLATTEVILLE MIDDLE SCHOOL

30% Design Community Meeting

2014 Bond Project Guide

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Number of persons with a disability that live with a disability in your community?

EMMS IEQ Walkthrough Summary Spring Room Observations (Responses)

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Forest Hills Facilities Plan

Facility Improvements

Safety Checklist for Science Instruction, Preparation and Storage Area

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

NYC Department of Education

NYC Department of Education

Beaufort County Community College. Maintenance and House Keeping Plan

Electrical Inspection Special Electrical

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

Room Number or CUSTODIAL FACILITIES WORK ORDERS ADMINISTRATION IEQ WORK ORDERS ASSIGNED DATE COMPLETION DATE 30-DAY REVISIT CLOSED

University of Delaware

NYC Department of Education

Chabot College: Plan Kickoff and Visioning Session with Student Senate

School District of Milton 5- Year Capital Maintenance and Improvement Plan

PROCTOR TERRACE ELEMENTARY SCHOOL

H107 Video Conference Room

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

MCB/DDS Partnership Orientation & Mobility/Low Vision Services

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Home Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI

Cleaning Service Levels

Tillamook High School Bond Projects

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Building Self-Inspection Program

dusty. Room shakes and Student restrooms across All vents need cleaning

If there are emergency situations they should be reported to Maintenance Department immediately.

Workplace Safety Observation Tour Notes

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

Bethlehem University 2008 Projects Summary

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

EMERGENCY RESPONSE PLAN MANUAL. Nursing

Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information)

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR

Proposed Bond Construction Projects

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

IEQ SCHOOL DATA BASE

FACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan

SPLOST I, II, III,IV

Design Review of Facility Improvement Projects

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

MEDIA CENTER September 30, 2010

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Emergency Evacuation Plan

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

PASS Security Plan Checklist

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

Green-Sea. Attendance Area

August 2012 CRISIS MANAGEMENT PLAN

Facilities Procedure for Accessibility or Compliance Related Requests:

Aging-in-Place Safety Checklist

CUSTODIAL CUSTOMER SERVICE GUIDE

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

bold/italic items are revisions to the previous program notes

Building and Grounds Self-Inspection Program

Master Project List Report

Plant Operations Cleaning and Sanitation Audits.

Florence High School / Middle School Page 1 of 3 Florence, WI

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Athletic Facilities Needs Assessment

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Puyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup

Revised 06/07 EMERGENCY GUIDELINES

Existing Facilities Assessment

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Commercial Properties

SCHEMATIC DESIGN PRESENTATION

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Monthly Report of Consultants June 1, 2011 through June 30, 2011

SJLES IEQ Walkthrough Summary Spring Room Observations (Responses)

Transcription:

Rockwell/Johnson School Renovations Project Existing Conditions September, 2016

Rockwell School Conditions

RS - Custodial Closet Shared w/ Book Room.

RS - Aging Telephone Switch Gear/No Growth for Additional Phones/Communication

RS -Age of School/Settling Cracked Floors Throughout

RS Lack of Storage/Electrical Switch Room Used as Storage, Fire Violation

RS -Two of Four Air Handlers Operational/Two Un-repairable

RS -Nurse's Room Limited Abilities/ Treatment Area Cramped, Not Private.

RS -Main Stairwell ADA Issues w/ Railings & Supports

RS -Media Center Shelves Not Age Appropriate, Upper Shelf Unusable/Unsafe

RS - Media Center is too small.

RS -Only mechanical ventilation available. Lower blue unit/upper air conditioner unit has limited abilities. Struggles to keep the temp. from overheating in the computer lab.

RS -Additional electrical circuits are needed but are not available due to the age of the building abilities.

RS - Not enough outlets to support technology needs.

RS - Class size can be 18-28 students along with all the furniture.

RS -One undersize exhaust fan serves the entire second floor hallway. Resulting in inadequately exhausting heat and humidity throughout the day.

RS -Restrooms not grade appropriate for the size of the students using them.

RS -Restrooms not grade appropriate for the size of the students using them.

RS -Current electrical panels have no growth potential.

RS - Elevator does not meet ADA and NFAP fire codes. Stretchers and wheelchairs are unable to maneuver.

RS - Paved walkways around the perimeter of the school require extensive grading to remove previous years of patching.

RS - 4 Specialist have to share space - up to 4 groups running at the same time.

RS - School Psychologist Office - No room to meet with students.

RS - Playground Equipment - Outdated and broken pieces.

RS - Playground - Cracked and sealed pavement.

RS - Only one Conference Room - Too small, no ventilation, and often double booked.

Johnson School Conditions

JS-Gym shower restroom spaces forced to be used for school storage.

JS-Gym toilets not suitable for current ADA requirements.

JS-Cafeteria air handlers lack ability to exhaust /heat the space as needed due to size and age of the equipment.

JS-Bus drop off area & parent drop offs lanes need to be separated with plastic barricades due to design issues.

JS-Service road that goes behind the building is not adequate for emergency vehicles.

JS-Stage cramped and has limited abilities for use.

JS-Guidance Office lobby cramped with space concerns.

JS-STEM classroom crammed, with space concerns.

JS-STEM classroom crammed, with space concerns.

JS-Student restrooms not grade appropriate fixtures for size of students.

JS-Paved walkways around perimeter of school require extensive grading to remove previous years of patching.

JS-Several classroom windows have broken thermal seals resulting in foggy condensation forming within the window.

JS-Several doorways throughout the building have locking bars in the middle of the travel path of the doors causing exiting issues and injuries.

JS-Old cabinet heaters have become difficult to keep in operation due to age and condition of equipment.

JS- Pavement & concrete surfaces w/patched over mounds, broken & raised sections, w/potholes & cracks.

JS - Band room does not have storage and not large enough to hold ensemble.

JS - Shared classrooms - multiple groups going on at the same time.

JS - Lack of Space - ELL Instruction occurs in small office.

JS - Chorus room not large enough to hold 75+ students.

JS - School Counseling Office too small & poor ventilation.

JS - Conference room too small for parent meetings and poor ventilation.