ECAH SERIES ECM AIR HANDLER

Similar documents
PCAH SERIES AIR HANDLER

Heat Your Home Cool Your Home Ventilate Your Home All With One Unit

CAH SERIES INSTALLATION & MAINTENANCE MODELS CAH CAH

NU800, NU1200 & NU1600

MX Series Indoor Modular Blowers Electric Heat, Hot Water Heat, or No Heat

Technical Data Manual Model Nos. and pricing: see Price List

69-CAF. Models. Operation, Sizing and Installation Manual. Hydronic Models with Built-in Heat Recovery Ventilator (HRV)

Operation, Sizing and Installation Manual Hydronic Models with Built-in Heat Recovery Ventilator (HRV)

INSTALLATION INSTRUCTIONS

maintenance should only be performed by a trained, qualified person. Consumer service is recommended only for filter replacement.

POWER VENTER. Model: PVE Series

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

INSTRUCTIONS! DO NOT DISCARD!

INSTRUCTIONS! DO NOT DISCARD!

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Hydronic Air Handler Powered by Tankless Technology

INSTRUCTIONS! DO NOT DISCARD!

Installation Instructions

TWIN-FLOIII HEATER INSPECT THE SHIPMENT IMMEDIATELY WHEN RECEIVED TO DETERMINE IF ANY DAMAGE HAS OCCURRED DURING SHIPMENT.

AllStyle Coil Company, LP 7037 Brittmore Houston, TX Phone Fax

Service Manual ES50LVS / ES90LVS MULTI-SPEED AIR HANDLER. Ecosmartair 105 Haist Avenue, Unit 10 Vaughan, ON L4L 5V ecosmartair.

ENGINEERING SPECIFICATIONS

ENGINEERING SPECIFICATIONS

INSTALLATION MANUAL WARNING WARNING MODULAR NON-VARIABLE SPEED AIR HANDLERS MODELS: MA LIST OF SECTIONS LIST OF FIGURES LIST OF TABLES

PVE SERIES POWER VENTER SYSTEM MANUAL

Installation Instructions

CATALOG. SKYPAK Self-Contained Heating/Cooling Units

Hydronic Air Handler Powered by Tankless Technology

JH Series Installation

P.O. Box 2758 Windsor, Nova Scotia, B0N 2T0 Ph Fax:

BUILD YOUR REPUTATION ON OURS. Universal Modular Hi-Rise Series FAN COIL TECHNICAL CATALOG

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

Steam Humidifier Fan Pack Installation & Maintenance Instructions

intelligent TECHNOLOGIES iflow HYDRONIC FURNACE NEW GENERATION OF HEATING & COOLING

HEATER E L E CT R I C DUCT RENEWAIRE EVERYWHERE EVERY GEOGRAPHY, EVERY CLIMATE, EVERY HOME, EVERY BUILDING AND EVERY APPLICATION

EarthLinked SCW Series Compressor Unit R-410A Quik-Start Instructions

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

SPXB-HW Series Single Package Vertical Unit Cooling with Hot Water Heat 1 through 2 tons, up to 47,800 BTUH Heating

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons

Vertical Concealed Fan Coil. FCVC Series MANUAL INSTALLATION, OPERATION, & MAINTENANCE

Installation Instructions

INSTALLATION MANUAL CONDITIONING ENERGY RECOVERY VENTILATOR (CERV) MODEL CERV-001-PARTA, CERV-001-PARTB

COMBUSTION AIR SYSTEM

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

CAUTION WARNING INSTALLATION INSTRUCTIONS FOR HEALTHY CLIMATE WHOLE HOME DEHUMIDIFIER MODEL HCWH-065 (Y3013) DEHUMIDIFIERS

EnviroZone-4 & EnviroZone-2 Quick-Start Guide

AG Series Electric Heaters

DIGI3U. Zoning Systems. Installation Guide. That s all we do. Three-Zone, Universal Controller for Gas/Electric or Heat Pump Applications

INSTRUCTIONS! DO NOT DISCARD!

USERS INFORMATION MANUAL

Certification Information. Qualifications. Test Specifications

SmartZone TM System Manual

CAUTION WARNING. 50T Integrated Furnace Control INSTALLATION INSTRUCTIONS DESCRIPTION PRECAUTIONS

EarthLinked SW Series Compressor Unit R-410A Quik-Start Instructions

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas

Hydronic Air Handler Powered by Tankless Technology

Installation Instructions

IMPORTANT CB26UH CBX26UH. Service Literature. CB26UH and CBX26UH Series Table of Contents. Model Number Information... 2

GE Zoneline. vertical packaged terminal air conditioners Home Products and Services

LV Installation Manual

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

AHG**-0B Series Hydronic Air Handling Units

Safety and Installation Instructions Model 1700

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

MACH N-407 Heat Pump Air-Cooled Chiller

EarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions

Installation Instructions

Model GB1AAV UPFLOW GAS FURNACE. Series G SS-GB1A-04 FEATURES

A910.8A Remote Water Chiller, 8 GPH A A / A A-220V TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER:

ERGOMAX 7 INSTALLATION

FORM NO. G REV. 2 Supersedes Form No. G Rev. 1 GAS FURNACES

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions

Total Comfort TC Series Air Handler

Vertical Air Handler Unit

Water Source / Geothermal Heat Pumps & Air Conditioners

OPERATIONS AND MAINTENANCE MANUAL FOR THE 8-TON TURF CART ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER

Installation Instructions

Total Comfort TC Series Air Handler

FCC Fan-Coil Units High-Performance, Vertical

TECHNICAL SPECIFICATIONS

ClimaDry II. Table of Contents. ClimaDry II Whole House Dehumidification Option. Tranquility 30 Tranquility 20

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS

GTIP60 ISO GT Series, Inch Pounds - 60 Hz GT (iso) Spec Guide Drawings Spec Sheets Low Temp Heating P/T Charts

WIRING DIAGRAMS R410A MODELS PAC 2OAC/2OACH CAC OWC PWC

High Profile Evaporator

EarthLinked AVN Series Air Handlers Installation Manual

Owner s Manual & Installation Instructions

VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System

VertiCool CLASSIC. Engineering Guide. Effective March Air-Cooled, Water-Cooled, Chilled Water and Water Source Heat Pump

The Premium Quality Fan Coil Units for Vertical, Horizontal (Left or Right) Application with Direct Expansion, Hydronic or Electric Heat

Installation, Operation and Service Manual

ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION ACCESSORIES - FIELD INSTALLED. K5EU090 and K4EU Hz 7.5 and 10 NOMINAL TONS SUNLINE 2000 (WORLD 50 HZ)

GEOTHERMAL HYDRONIC CONTROL MODULE By TERRA-THERM, INC.

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

AVS Series Air Handlers Installation Manual for CLASSIC SERIES SYSTEMS Models SC, SD, and SDH

Transcription:

ECAH SERIES ECM AIR HANDLER ECAH40 OPERATING MANUAL

TABLE OF CONTENTS 1 GETTING STARTED... 3 2 ELECTRICAL CONNECTIONS... 3 3 DIMENSIONAL DATA... 4 4 PLUMBING... 5 4.1 OPEN SYSTEM... 5 4.2 CLOSED SYSTEM... 6 5 DUCTING... 7 5.1 TRADITIONAL DUCTING (LOW VELOCITY)... 7 6 COMMISSIONING... 7 6.1 WATER SIDE COMMISSIONING... 7 6.1.1 Filling the water heater and setting system temperature:... 7 6.1.2 To fill the heating loop:... 7 6.1.3 Purging the pump and verifying flow in the heating loop:... 8 6.1.4 Water flow Balancing:... 8 6.2 COMISSIONING SHEET... 9 7 SERVICE AND MAINTENANCE:... 10 8 WIRING DIAGRAM... 11 9 SPECIFICATIONS... 11 10 WARRANTY... 14

1 GETTING STARTED The unit is shipped complete with the following: 1. The air-handler HRV module 2. Circulating pump 3. Check valve 4. Filters 5. HRV drain kit Additional items required which are field installed include: plumbing fittings and valves such as an air purge valve, anti scald valve, shut off valve, gate valves, pipe insulation and drain valves. Also required are duct fittings, a thermostat, a dehumidistat and other accessories such as grills and wire. Note: When locating/placing the Air Handler, ensure there is a minimum clearance of 8 inches below to allow for drain pipe connections. This can be accomplished by way of stand (Part # Ener Stand) or blocks. 2 ELECTRICAL CONNECTIONS A single point, hard-wired electrical connection requiring 115 VAC service and a dedicated 15 amp fused circuit. There are 7 available terminals for control connections. Power the thermostat (R) with 24 VAC. Chose low, medium or high for heating (W) and cooling (Y) speeds. Continuous fan (G) if used is typically set to Low. 24 COM can be used for auxiliary devices (humidifier, AC condenser). T and T are dry contacts that close when medium speed is engaged. This can be use to control a boiler or pump relay (24 V only).

3 DIMENSIONAL DATA

4 PLUMBING All plumbing between components is typically done with 1/2" copper pipe and appropriate fittings. All interconnecting piping is to be insulated. System Types: a) An Open System uses hot water from the residential hot water heater to supply both domestic hot water and hot water to the Air Handler for space heat. See schematic on next page. Well systems that incorporate a pressure tank are normally open systems. b) A system becomes closed when a backflow prevention valve or check valve is installed in the cold water pipe upstream of the water heater. The backflow prevention valve does not allow pressure created by the heated water to be relieved into the cold water system. Therefore an expansion tank must be installed. Local codes may require this type of system. The spring loaded check valve must be installed on the return water line close to the Air Handler. Ensure flow arrow points to tank or boiler. An air purge valve should be installed at the high point in the supply line close to the Air Handler. 4.1 Open System

4.2 Closed System

5 DUCTING Air Handler The Air Handler distributes heating, air through a 20x10 rectangular plenum in an up-blast configuration. Return air enters the unit through a 20x10 rectangular duct knock out on the sides, back or bottom. 5.1 Traditional Ducting (Low Velocity) Good engineering practice should be followed when designing a duct system. Nu-Air recommends the use of HRAI's Residential Air System Design Manual. 6 COMMISSIONING 6.1 Water Side Commissioning 6.1.1 Filling the water heater and setting system temperature: 1. At this point all valves should be closed and the system dry. 2. Open the cold water supply valve and a hot water tap. 3. Fill the water heater/boiler with water allowing air to escape at the open tap. Shut off the tap when air has stopped escaping. 4. Using the boiler or water heater's control, set the system to operate at your design temperature. See Equipment Selection Chart and preliminary design information forms. 5. Following the manufacturers instructions, start the water heater and allow it to reach the set point. For cases where high water temperatures are used, an anti-scald valve will be required. Set this to 120 F and verify by measuring the water temperature at the taps. 6.1.2 To fill the heating loop: 1. Connect a garden hose to the drain valve and direct water to a floor drain or similar. 2. Open the drain valve. 3. Open the heating loop's hot water supply shut off valve 4. Allow water to flow until only water (no air) is flowing at the drain. 5. Close the hot water shut off valve.

6. Open the return water shut off valve and allow water to flow until no air is escaping at the drain. 7. Close the drain valve. 8. Open the hot water shut off valve. 6.1.3 Purging the pump and verifying flow in the heating loop: 1. Turn on electrical power to the Air Handler. 2. Set the house thermostat well above room temperature to force a call for heat. 3. Check that the circulating pump and fan are operating. 4. Hot water should be entering the fan coil and cooler water leaving. 5. Warm air should be exiting all supply grills/diffusers. 6. Apply the supplied warning label to the water heater near the aqua stat without covering any existing labels. 6.1.4 Water flow Balancing: This step should be done when both the room air temperature and water heater temperature are stabilized. NOTE: Return air temperature needs to be near 70 F ( 21 C). 1. Initiate a call for heat from the room thermostat. 2. Measure the supply (SAT) and return (RAT) air temperatures. 3. Measure the supply (SWT) and return (RWT) water temperatures 4. Calculate the heat output by the formula: Btu/hr = (SAT-RAT) x CFM x 1.08 (See Air Handler spec sheet for CFM at heating speed.) 5. If the design heat loss is not being met at this condition, increase the water heater temperature set point and repeat the previous steps 6. If the water temperature drop in the fan coil is less than 20 F, adjust the throttling valve to reduce water flow. NOTE: T increases above 20 F (11 C) increases water heater efficiency. 7. Repeat until heat loss is met and water temperature drop is greater than or equal to 20 F. 8. The minimum recommended supply air temperature is 115 F. 9. If the supply air temperature or heat output cannot be met at with a 20 F water temperature drop, allow a lower temperature drop across the coil. 10. Important - Verify the anti-scald valve is adjusted properly once final adjustments have been made. [ 140 F ( 60 C) or less]

6.2 COMISSIONING SHEET

7 SERVICE AND MAINTENANCE: Nu-Air recommends annual service and maintenance by a qualified HVAC contractor. Disconnect the power supply to the Air Handler before attempting any service. Maintenance should include: QUARTERLY 1. Filter Replacement Wipe down all interior surfaces of the cabinet with disinfectant. ANNUALLY 1. Coil cleaning Vacuum with a brush attachment. If necessary, wash with a non toxic coil cleaner taking precautions not to wet motors and electrical components. To access the heating coil, remove the EC motor/blower by disconnecting the two molex connectors and removing the two screws at the front of the blower housing. 2. Fans Vacuum or use a small brush to clean the blades. 3. Check the controls for proper operation. 4. Check boiler/ water heater set point against commissioning report. 5. Inspect the duct work for air leaks (at joints and seams) and blockages (crushed ducts and crimps at elbows).

8 WIRING DIAGRAM 9 SPECIFICATIONS ECM air handler with hydronic coil (heating). Features: 3-speed ECM motor. 800, 600 and 400 cfm. 3-row hot water coil Installer configurable return air locations. Left, right, back, bottom Reversible door access 24 VAC, 20VA transformer for thermostat and auxiliary components Relay contact closure for boiler t-stat, pump, etc. 22 Ga galvanized steel construction Thermally insulated cabinet Coil Performance

CFM GPM 2 3 4 EWT 140 160 180 140 160 180 140 160 180 400 19,116 24,757 30,448 20,476 26,476 32,516 21,206 27,392 33,611 CFM 600 24,074 31,230 38,466 26,559 34,402 42,315 27,946 36,157 44,428 800 27,635 35,873 44,216 31,252 40,526 49,900 33,340 43,186 53,121 FPD (ft) 0.8 0.7 0.7 1.6 1.5 1.5 2.7 2.6 2.5 Blower/Motor Performance ECAH40 800 700 600 High Medium Low 500 400 300 200 100 0 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 esp (in)

Electrical Data Power Power consumption at installed ducting of 0.2" Controls 24 VAC, 20 VA Volts 120 Low 88 Watts Terminals Low Med High 24 V Com Hz 60 Medium 190 Watts Relay contact Normally open, closes on Medium speed call * FLA 7.7 High 325 Watts * Factory shipped on medium. Installer may chose other speeds with simple field wiring Feb. 22, 2010 Page 13 of 14

10 WARRANTY YOUR Air Handler TRANSFERABLE WARRANTY Should your ECAH Series Air Handler cease to function within one (1) year of the date of original purchase due to defective material of workmanship of the product, NU-AIR Ventilation Systems Inc. will supply a new or rebuilt part FOB factory to replace the defective part. Delivery, installation, and labor costs are not covered. Warranty Limitations The above warranty does not cover damage to the unit while in your possession (other than damages caused by defective parts or material) due to the following: 1) improper installation or unreasonable use of unit: 2) failure to provide reasonable and necessary maintenance. If the unit is put to commercial use or application other than consumer use, warranty is for a period of one (1) year. This warranty does not cover water heaters, instantaneous water heaters, boilers or condenser units supplied or used with the Air Handler. See water heater, boiler or compressor manufacturer's warranty. P.O. Box 2758 16 Nelson St., Windsor, NS B0N 2T0 Tel: (902) 798-2261 Fax: (902) 798-2557 Email: nuair@nu-airventilation.com Website: www.nu-airventilation.com Feb. 22, 2010 Page 14 of 14