Environmental Impact Assessment July 2017 PAK: Jalalpur Irrigation Project Project No. 46528-002 Part 8 of 12 of the Appendices Prepared by Irrigation Department, Government of Punjab for the Asian Development Bank (ADB). This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Detailed Design of Jalalpur Irrigation Project APPENDICES EIA Aman 4/28/2017
ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation project Environmental Impact Assessment (Updated) LIST OF APPENDICES Appendix-I: Appendix-II: Appendix-III: Appendix-IV: Appendix-V: Appendix-VI: Appendix-VII: Appendix-VIII: Appendix-IX: Appendix-X: Appendix-XI: Appendix-XII: Appendix-XIII: Appendix-XIV: Appendix-XV: Appendix-XVI: Appendix-XVII: Appendix-XVIII: Appendix-XIX: Appendix-XX: Appendix-XXI: Appendix-XXII: Appendix-XXIII: Appendix-XXIV: Appendix-XXV Project Area of Influence Map Checklists and Performa used During EIA Summer Environmental Monitoring Results 3.1 Ambient Air Monitoring 3.2 Noise Monitoring, 3.3 Surface and Ground Water Winter Environmental Monitoring Results at Detailed Design Stage A list of Secondary Sources used in Compiling (Biological and Natural Environment) Segment of EIA A Detailed List of Flora and Fauna Prevalent in the Project Area PID s Letter to Wildlife Department Response Letters from Wildlife Department Socioeconomic Map showing List of Villages Situated in Project AOI Infrastructure Map of Project AOI Detailed Proceedings and Photographs of the Workshops Letter from Archaeology Department Project Impact Evaluation Matrix Commodity Prices as per Directorate of Agriculture Punjab Noise Modeling for the Prediction of Noise Levels on Sensitive Receptors during Construction Phase Emergency Response Plan for Breach of Canal Bank ADB s Prohibited Investment Activities List WHO List of Restricted Pesticides Locations of Existing & Proposed Interventions in Project AOI Punjab Environmental Quality Standards (PEQS) Waste Management Plan for Construction Waste & Campsite Waste During Construction Phase Approval Forms and Monitoring Sheets Tree Plantation Plan Chance Find Procedure Traffic Management Plan National Engineering Services Pakistan (Pvt.) Limited
ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation project Environmental Impact Assessment (Updated) Appendix X: Infrastructure Map of Project AOI
371856.00 362712.00 353568.00 344424.00 335280.00 326136.00 316992.00 307848.00 298704.00 289560.00 280416.00 271272.00 262128.00 252984.00 3631692.00 COLLEGE ZONE 2 3622548.00 ZONE 1 Thill Sharif link RD a ha Pin Sha karp ur R dd a ad nk nm i nd Bh au din RD Sa oad /S r pu ar gh yid ai an d la wa ZONE 3 pur R Kharid to Karimpur 3613404.00 Sod ian Gu jar RD n Pind Dada khan RD Toba h to A oor Isla 2 -M bad ma D thar R Lah ZONE 4 3604260.00 ad b da t M2 e hm oa 3595116.00 to ak Dh ua nj Ja 3585972.00 3576828.00 0 2.5 5.0 10 15 20 kilometer LENDEND: PROPOSED CANAL... DISTRIBUTARY... PROJECT AREA BOUNDARY ROAD... CLIENT: ASIAN DEVELOPMENT (TA-8404 PAK) EXECUTING AGENCY: IRRIGATION DEPARTMENT GOVERNMENT OF THE PUNJAB CONSULTANT - A JOINT VENTURE OF NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LIMITED LAHORE INTEGRATED CONSULTING SERVICES (PVT.) LIMITED LAHORE NEC CONSULTANTS (Private) Limited RAILWAY TRACK... COLLEGE... DRAINAGE... REIVER... POST OFFICE... ELECTRICITY... ZONE BOUNDARY...... ROAD... DISPENSARY...... WATER SUPPLY... TECHNICAL ASSISTANCE FOR PREPARING JALALPUR IRRIGATION PROJECT DRAWING NO. 2X1506/9 DATE. SEP 2015 DRAWN AJ DESIGN KM CHECKED KM / IUR APPROVED IUH