DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division NOTICE OF PREPARATION

Similar documents
DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division DRAFT NOTICE OF PREPARATION

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

NEWBRIDGE SPECIFIC PLAN PROJECT DESCRIPTION SEPTEMBER 24, 2012

Jackson Highway Master Plans

COUNTY OF SACRAMENTO CALIFORNIA PLANNING COMMISSION REPORT

COUNTY OF SACRAMENTO CALIFORNIA. PLNP Jackson Township Specific Plan. Workshop And Initiation of Environmental Review Process

2.0 PROJECT DESCRIPTION

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

ACTION SUMMARY VINEYARD CPAC Smedberg Middle School Library 8239 Kingsbridge Drive Sacramento, CA 95829

Development Guidelines - Florin-Vineyard Community Plan Administrative Draft

COUNTY OF SACRAMENTO Inter-Departmental Correspondence

COUNTY OF SACRAMENTO CALIFORNIA

III. PROJECT DESCRIPTION

NOTICE OF PREPARATION

4.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS AND ASSUMPTIONS USED

01 PROJECT DESCRIPTION

NOTICE OF PREPARATION

CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)

Glenborough at Easton Land Use Master Plan

APPENDIX C SPECIAL PLANNING AREAS

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Jackson Township Specific Plan Applicant Prepared Project Description Revised

Land Use element LAND USE POLICY AREAS ESTATE AND RURAL RESIDENTIAL AREAS/RURAL SHELDON AREA OLD TOWN ELK GROVE

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Leduc Industrial Outline Plan SE W4

Ten Mile Creek Planning Area

Natomas Vision Plan and PLNP

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Parks, Trails, and Open space Element

Natomas Joint Vision Open Space Plan

HAZARD MITIGATION GOALS AND OBJECTIVES

OP Council Resolution June 16, Planning and Development Services

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

APPENDIX X. Analysis of Project Consistency with City Policies

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5I

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Parks, Trails, and Open Space Element

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

NOTICE OF PREPARATION

PLANNING COMMISSION. Submitted

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

COMMISSION ACTION FORM

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

Planning Commission Staff Report June 5, 2008

NOTICE OF PREPARATION

Staff Report and Recommendation

SUSSEX COUNTY COMPREHENSIVE PLAN COUNTY PLANNING AND ZONING COMMISSION WORKSHOP

ENVIRONMENTAL SETTING

Zoning Ordinance Chapter 10

Planning Commission Staff Report March 15, 2007

STREAM BUFFERS

Glenborough at Easton Land Use Master Plan

Land Use Element. policy areas are discussed in this Element:

COLVER ROAD INDUSTRIAL CONCEPT PLAN

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

DISCUSSION ON VACAVILLE S2 INVESTORS PROPERTY IN URBAN RESERVE

& 035; ; ;

4.8 LAND USE AND PLANNING

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Chapter 5: Natural Resources and Environment

City of Grande Prairie Development Services Department

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Venice Pumping Plant Dual Force Main Project Draft EIR

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

ARTICLE 6: Special and Planned Development Districts

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Appendix PD-1. Mather South Community Master Plan

SONOMA LOCAL AGENCY FORMATION COMMISSION

SECTION 2.0 INTRODUCTION

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

3.0 PROJECT DESCRIPTION

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Appendix A: Notice of Preparation and Responses

3. Project Description

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

NOTICE OF PREPARATION and ANNOUNCEMENT OF SCOPING MEETINGS

TABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

4.1 LAND USE AND PLANNING EXISTING CONDITIONS REGULATORY BACKGROUND LAND USES IN THE PLAN AREA SURROUNDING LAND USES

SHEFFIELD PARK Paulding County, GA DRI #588

3.0 PROJECT DESCRIPTION

ARTICLE VI: SITE PLAN REVIEW

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT

Town of Rico Three Mile Plan for Annexation

Transcription:

Department of Community Development Lori A. Moss, Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental Review SEPTEMBER 10,2013 TO: ALL INTERESTED PARTIES DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division NOTICE OF PREPARATION SUBJECT: NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT FOR WEST JACKSON HIGHWAY MASTER PLAN (CONTROL NUMBER: PLNP2008-00240) Sacramento County will be the CEQA Lead Agency for preparation of an Environmental Impact Report (EIR) for a project known as. This Notice of Preparation has been sent to responsible and trustee agencies and involved federal agencies pursuant to Section 15082 of the CEQA Guidelines. Agencies should comment on the scope and content of the environmental information that is germane to the agencies statutory responsibilities in connection with the proposed project. Due to the time limits mandated by State law, your response must be sent at the earliest possible date, but not later than 30 days after receipt of this notice. The project description, location, and the probable environmental effects are contained in the attached materials and may also be viewed online by going to the PER homepage (www.per.saccounty.net) and searching for environmental documents. The direct link to the document search page is: http://www.per.saccounty.net/environmentaldocuments/pages/searchdocuments.aspx. Please send your Agency s response to this Notice to: Catherine Hack, Environmental Coordinator Department of Community Development Planning and Environmental Review Division 827 7 th Street, Room 220, Sacramento, CA 95814 or via e-mail at: DERA@saccounty.net. Your response should include the name of a contact person in your agency. Agencies with specific questions about the project should contact Michelle Nagao, Environmental Review Project Manager, at (916) 874-7914 for further information. 827 7 th Street, Room 220 Sacramento, California 95814 phone (916) 874-6141 fax (916) 874-7499 www.development.saccounty.net

PROJECT TITLE: CONTROL NUMBER: PLNP2008-00240 PROJECT PROPONENT(S): Majority Property Owners: Teichert Land Co. Attn: Norm Eilert Applicants: Stonebridge Properties, LLC Attn: Mike Isle Architect/Engineer: Wood Rodgers (Engineer) Attn: Tim Crush Granite Construction Company, a California Corporation Attn: Kevin Molloy Granite Construction Company, a California Corporation Attn: Kevin Molloy SWA (Landscape Architect) Attn: Sean O Malley PROJECT DESCRIPTION AND LOCATION: The proposed Project is located along State Route 16 (Jackson Highway) in generally the geographic center of Sacramento County (Plate NOP-1). The Project boundaries are generally Jackson Highway, Kiefer Boulevard and Goethe Road to the north, portions of Elder Creek Road and Florin Road to the south, the City of Sacramento to the west and Excelsior Road to the east (Plate NOP-2). The Project site has various land uses and is currently designated by the Sacramento County General Plan as the following: General Agriculture (1,713.3 acres), Agricultural-Urban Reserve (1,722.2 acres), Extensive Industrial (2,384.5 acres), Intensive Industrial (72.1 acres), Commercial & Offices (16.8 acres), and Public/Quasi-Public (4.4 acres). In addition, portions of the Plan Area contain an Aggregate Resource Area overlay. Of the entire 5,913± acres of the Plan Area, the applicants collectively own 4,079± acres Teichert owns 3,106± acres and Granite owns 1,063± acres. Thus, the applicant controlled properties represent 69% of the total Plan Area acreage. The properties owned by the applicants primarily include aggregate mining sites used for sand and gravel extraction, many of which have already been reclaimed. Although most of the mining is complete, some of the Project Applicants properties continue to support various mining related activities. Notice of Preparation NOP-2 PLNP2008-00240

Plate NOP-1: Project Location in Sacramento County = Project Location Notice of Preparation NOP-3 PLNP2008-00240

Plate NOP-2: West Jackson Highway Master Plan Project Boundary Notice of Preparation NOP-4 PLNP2008-00240

PROPOSED LAND USES The proposed Project involves a series of entitlements which are listed below in order to establish a master planned community. The proposed Master Plan creates two District Plan Areas (labeled as District 1 and District 2), three Future Planning Areas (FPA) (labeled as FPA A, B and C), as well as general land use policies and development standards. The District Plans establish specific land uses, policies and development standards for the properties within the District Areas. Although future land uses for the FPAs will be established in gross by the Master Plan, there will be no rezones in these areas. It is anticipated that the landowners within the FPAs will initiate District Plans or Specific Plans in the future. Should the landowners in those areas contemplate changing existing land uses within the FPA, such future use must be consistent with the provisions of the Master Plan. The applicants do not own property within the FPAs. Overall, the Project includes a mixture of residential, recreational, and employment nodes intended to reduce vehicle miles traveled (VMT) within the Master Plan Area and support the provision and use of transit alternatives. The Master Plan Land Use Plan is depicted in Plate NOP-3 and the land uses are further described below: Residential The Project includes five different types of residential land uses, all of which are categorized based on the proposed density. The residential land uses account for a total of approximately 2,356± acres of the Plan Area and are intended to provide for a wide diversity of housing types. The five residential types are: Very Low Density Residential (0.1 4.0 units/acre) Low Density Residential (3.0 8.0 units/acre) Medium Density Residential (7.0 18.0 units/acre) High Density Residential (20.0 30.0 units/acre) Mixed Use (20.0 30.0 units/acre) Affordable Housing Plans will be developed and adopted as part of the Project for the entire Plan Area, as well as individual Affordable Housing Plans for District 1 and District 2. The County is updating its Affordable Housing Ordinance and the Affordable Housing Plans will comply with the Ordinance in place at the time of project approval. Schools, Open Space and Park Uses The size and number of parks and schools have been proposed based on the acreage or number of dwelling units of the proposed residential component of the Project. The ratios are based on the requirements of the Southgate and Cordova Recreation and Park Districts and the Elk Grove Unified School District. There are four proposed elementary schools and one proposed middle/high school within District 1 of the Master Plan. It is anticipated that additional school sites will be identified during future District or Specific Plan processing of FPAs A, B and C. Notice of Preparation NOP-5 PLNP2008-00240

Plate NOP-3: West Jackson Highway Master Plan Proposed Land Use Plan Exhibit Notice of Preparation NOP-6 PLNP2008-00240

The Project designates a total of 1,266± acres as Open Space, which includes preserving the existing two vernal pool complexes within the Plan Area. The proposed Rock Creek Parkway is expected to vary in width up to 300 feet wide in some locations and will contain separated roadways along the outer edge of the parkway. Rock Creek Parkway will include right-of-way for a future transit line, and a large swath of land in the center (designated as Open Space) which is intended to accommodate drainage as well as pedestrian/bicycle trails. Rock Creek Parkway will traverse the central portion of the Plan Area and the trails of Rock Creek Parkway will connect with the trails of the recreated portion of Morrison Creek; the intent is to provide alternative modes of transportation throughout the Plan Area. The Project also incorporates 166± acres of parks, dispersed throughout the Plan Area. Finally, the Project includes a land use designation of Open Space/Urban Farm for 272± acres, which in addition to open space uses, will allow community based agriculture and education within the Plan Area. Employment Uses The Project provides for a mix of approximately 1,400± acres of commercial, employment and industrial land uses. These uses are located throughout the Plan Area in order to provide jobs and services in close proximity to residences. In addition, the land use plan has been designed around the 60 db (decibel) Community Noise Equivalency Level (CNEL) contour line of Mather Airport. The Mather Airport Community Land Use Plan (CLUP) identifies land uses that are compatible, compatible subject to conditions or incompatible within specified Mather CNEL noise contours, which are based on guidelines for height, noise and safety near airports. The Mather Airport CLUP classifies residential uses as incompatible within the 60-65 db CNEL. Due to these restrictions the applicants have designed the land use plan to exclude residential land uses within this contour and place other land uses such as retail commercial, employment, industrial and open space uses. This results in a concentration of employment uses in the geographic center of the Plan Area. PROJECT ALTERNATIVES The applicants have proposed two alternatives to the proposed Project. These two alternatives are Project Alternatives that have been provided by the applicants to assess variations in the Project and are not CEQA Alternatives. A CEQA Alternative is different than a Project Alternative in that the CEQA Alternative is used to look at different project options in order to reduce environmental impacts associated with the Project. CEQA Alternatives will be developed as part of the preparation of the EIR. Alternative 1 is called the No Vineyard Road to Happy Lane Connection Alternative. As shown on Plate NOP-3, Vineyard Road is shown as a separated roadway with an open space center (similar to the proposed Rock Creek Parkway) from Florin Road to Rock Creek Parkway. Alternative 1 would eliminate the continued extension of Vineyard Road north of Rock Creek Parkway (as shown on Plate NOP-4). Under this Alternative, Vineyard Road would not intersect with Jackson Highway. In addition, since Vineyard Road would not exist between Jackson Highway and Kiefer Boulevard, this alternative would not include the extension of Mayhew Road east of Bradshaw Road. Minor land use changes would occur with this Alternative as a result of the elimination of this roadway. Alternative 2 is called the Vineyard Road High School Alternative which proposes an alternative middle school/high school (MS/HS) site. As shown in Plate NOP-5, this alternative would move the MS/HS slightly to the southeast and would result in minor land use changes. Land use changes would primarily involve a small reduction in MS/HS acreage of 2± acres, a reduction of approximately 68± acres of low density residential and a gain of approximately 74± acres of employment resulting from the shift in school location. Notice of Preparation NOP-7 PLNP2008-00240

Plate NOP-4: No Vineyard Road to Happy Lane Connection Alternative (Alternative 1) Notice of Preparation NOP-8 PLNP2008-00240

Plate NOP-5: Vineyard Road High School Alternative (Alternative 2) Notice of Preparation NOP-9 PLNP2008-00240

REQUESTED ENTITLEMENTS: 1. A General Plan Amendment to: a. Amend the Urban Policy Area (UPA) boundary south and east to include the approximately 5,913± acre West Jackson Highway Master Plan area as depicted in Plate NOP-6: Urban Policy Boundary Amendment Exhibit. Note: Approximately 69.3 acres of the Master Plan Area is currently within the UPA. b. Amend the General Plan, including the Land Use Element, Land Use Consistency Matrix, and Land Use Diagram, to add a West Jackson Highway Master Plan Combining Land Use Designation. c. Amend the Land Use Diagram to apply the West Jackson Highway Master Plan Combining Land Use designation to the entire 5,913± acre Plan Area, as depicted in Plate NOP-7: Land Use Diagram Amendment Exhibit. d. Amend the Land Use Diagram to change the specified land use designations within the Plan Area from Commercial & Offices (16.8± acres), Cemetery, Public & Quasi-Public (4.4± acres), Intensive Industrial (72.1± acres), Extensive Industrial (2,384.5± acres), General Agriculture (1,713.3± acres) and Agricultural Urban Reserve (1,722.2± acres), to Low Density Residential (1,756.5± acres), Medium Density Residential (163.9± acres), Mixed Use (89.5± Acres), Commercial & Offices (1,297.8± acres), Recreation (1,418.9± acres), Cemetery, Public & Quasi Public (32.7± acres), Intensive Industrial (44.7± acres), Extensive Industrial (164.9± acres), General Agriculture (688.7± acres) and Agricultural-Urban Reserve (255.7± acres) as shown in Plate NOP-7. Note: Amendments to the Land Use Diagram listed above will not affect the designation of the existing Aggregate Resource Area (ARA) Overlay, which will remain in place. e. Amend the Transportation Diagram to reflect proposed roadway alignments as shown in Plate NOP-8: Transportation Diagram. f. Amend the Bicycle Master Plan to reflect proposed trail alignments as shown in Plate NOP-9: Bicycle Master Plan Diagram. g. Amend the General Plan including the Land Use Diagram, to include a Mixed Use Land Use Designation. 2. A Community Plan Amendment to: a. Amend the Cordova Community Plan to add a West Jackson Highway Master Plan Overlay and apply it to the 1,114.3± acres of the Master Plan area located within the boundaries of the Cordova Community Plan, as depicted in Plate NOP-10: Community Plan Amendment Exhibit. b. Amend the Cordova Community Plan land use designation of the parcels located within the District 1 and District 2 Area Plans (1,114.3± acres) from Permanent Agriculture (AG-20) (73.1± acres), Limited Commercial (3.3± acre), Light Industrial (58.3± acres), Heavy Industrial (286.3± acres), and Industrial Reserve (657.6± acres) and Major Roads (35.7± acres) to West Jackson Highway Master Plan as shown in Plate NOP-10. Note: Amendments to the land use designations listed above will not affect the designation of the existing Surface Mining Combining Zone, which will remain in place. c. Amend the Vineyard Community Plan to add a West Jackson Highway Master Plan Overlay and apply it to the 4,799± acres of the Master Plan area located within the boundaries of the Vineyard Community Plan, as depicted in Plate NOP-10. Notice of Preparation NOP-10 PLNP2008-00240

d. Amend the Vineyard Community Plan land use designations of the parcels located within the District 1 and District 2 Area Plans (4,799± acres) from Permanent Agriculture (AG-20) (38.7± acres), Permanent Agriculture (AG-40) (39.4± acres), Permanent Agriculture (AG-80) (1,065.2± acres), Permanent Agriculture (AG-160) (912.6± acres), Agricultural Residential-1 (AR-1) (95.3± acres), Agricultural Residential-2 (AR-2) (30.7± acres), Shopping Center (SC) (13.5± acres), Light Industrial (LI) (500.6± acres), Heavy Industrial (HI) (658.5± acres), Industrial Reserve (IR) (1,375.9±) and Major Roads (68.6± acres) to West Jackson Highway Master Plan as shown in Plate NOP-10. Note: Amendments to the land use designations listed above will not affect the designation of the existing Surface Mining Combining Zone, which will remain in place. 3. Adoption of the West Jackson Highway Master Plan for approximately 5,913± acres as shown in Plate NOP-3: West Jackson Highway Master Plan Proposed Land Use Plan Exhibit. 4. Adoption of the District 1 Area Plan including a Land Use Diagram, Design Guidelines, and Development Standards. 5. Adoption of the District 2 Area Plan including a Land Use Diagram, Design Guidelines, and Development Standards. 6. A Rezone to change the zoning designations within designated properties within District 1 and District 2 Area Plans to Special Planning Area, as shown in Plate NOP-11: Rezone Exhibit. 7. Adoption of an Affordable Housing Plan for the West Jackson Highway Master Plan Area. 8. Adoption of an Affordable Housing Plan for the District 1 Area Plan. 9. Adoption of an Affordable Housing Plan for the District 2 Area Plan. 10. Adoption of a Development Agreement for the District 1 Area Plan by and between the County of Sacramento and Teichert Land Co. 11. Adoption of a Development Agreement for the District 2 Area Plan by and between the County of Sacramento and Granite Construction Company. 12. Adoption of a Public Facilities Plan for the West Jackson Highway Master Plan Area. 13. Adoption of a Water Supply Master Plan Amendment: Amends the existing Zone 40 Water Supply Master Plan to include provision of water service to the West Jackson Highway Master Plan Area. Requires Sacramento County Water Agency Board of Directors approval. 14. Approval of a Water Supply Assessment for the West Jackson Highway Master Plan. Required by the California Water Code to link land use and water supply planning activities. Requires Sacramento County Water Agency and California-American Water Company Board of Directors approval. In addition to the above listed entitlements, separate annexation requests to LAFCo will include: 1. Sphere of Influence Amendment (SOIA) and concurrent Annexation to County Service Area (CSA) 10 or creation of a new CSA. Note: a separate subsequent action may be required by the County Board of Supervisors to establish a Benefit Zone, to implement funding and service provisions. 2. Annexation into Sacramento Regional County Sanitation District (SRCSD). 3. Annexation into Sacramento Area Service District (SASD). 4. Possible modification of common boundary between the Southgate Recreation and Park District and the Cordova Recreation and Park District boundaries. Notice of Preparation NOP-11 PLNP2008-00240

Plate NOP-6: Urban Policy Boundary Amendment Exhibit Notice of Preparation NOP-12 PLNP2008-00240

Plate NOP-7: Land Use Diagram Amendment Exhibit Notice of Preparation NOP-13 PLNP2008-00240

Plate NOP-8: Transportation Diagram Notice of Preparation NOP-14 PLNP2008-00240

Plate NOP-9: Bicycle Master Plan Diagram Notice of Preparation NOP-15 PLNP2008-00240

Plate NOP-10: Community Plan Amendment Exhibit Notice of Preparation NOP-16 PLNP2008-00240

Plate NOP-11: Rezone Exhibit Notice of Preparation NOP-17 PLNP2008-00240

ENVIRONMENTAL/LAND USE SETTING: The Plan Area is mostly comprised of existing and former mining properties as mining activities have dominated the landscape since the 1930 s, the Plan Area is not highly developed. The remaining land uses within the Plan Area are comprised of a mixture of rural residential, institutional, agricultural and industrial properties. Refer to Plate NOP-12 for an aerial photo (dated 2011) of the Plan Area. The Plan Area is located within the unincorporated portion of Sacramento County and is located adjacent to the City of Sacramento and City of Rancho Cordova. Existing and proposed urban development surrounds the Plan Area. Plate NOP-13 is a context map that shows these various developments. West of the Plan Area are Industrial uses within the boundaries of the City of Sacramento; however, it should be noted that in 2008 the City of Sacramento adopted a new General Plan which designates this area for new residential, commercial and employment land uses. Adjacent to and west of the Plan Area is Teichert Land Company s Aspen 1- New Brighton project, located within the boundaries of the City of Sacramento. The Aspen 1-New Brighton project consists of 133.5 acres of land designated for single-family residential, located in the northwest, center and southeast portion of the Aspen 1 site. Of the 133.5 acres, 8.8 acres is designated for an elementary school. In the central and southern portions of the Aspen 1 site, 43.1 acres are designated for multifamily residential/mixed-use land uses. The Aspen 1- New Brighton project also includes the designation of 13.1 acres of Shopping Center located in the northeastern portion of the site; 14.4 acres for parks/open space in three separate areas of the site; and 28.2 acres for Urban Farm uses in the southwest portion of the site. The Aspen 1- New Brighton project and the proposed West Jackson Highway Master Plan project have been designed to be compatible with each other. Just north of the Plan Area is a residential neighborhood known as the Rosemont community. The land north of the Plan Area is almost entirely built out. Agricultural residential uses are located south of the Plan Area; however, this area is a part of the previously approved Florin-Vineyard Gap Community Plan which consists primarily of rezones from agricultural/agricultural-residential land uses to low density residential land uses. Further south is the North Vineyard Station Specific Plan that also primarily consists of rezones from agricultural-residential to low density residential land uses. The lands east of the Plan Area are largely comprised of agricultural-residential land uses, but are now proposed for future development similar to the proposed Project in concurrent applications known as NewBridge (County Control Number PLNP2010-00081), Jackson Township (County Control Number PLNP2011-00095) and Mather South (County Control Number PLNP2013-00065). These proposed large master plan projects are shown on Plate NOP-13. Mather Airport is located just north/northeast of the Plan Area. The runways of Mather Airport are located at the northern boundary of the Plan Area (refer to Plate NOP-12). Mather Airport is the former Mather Air Force Base and is now primarily used as an air cargo facility and business park (largely aviation services). Just east of the Plan Area, on the east side of Excelsior Road, north of Jackson Highway is the Sacramento Raceway. Events at the Sacramento Raceway include drag racing and motocross. Notice of Preparation NOP-18 PLNP2008-00240

Plate NOP-12: Aerial Photo (dated 2011) of the West Jackson Highway Master Plan Project Area Notice of Preparation NOP-19 PLNP2008-00240

Plate NOP-13: Context Map Notice of Preparation NOP-20 PLNP2008-00240

As a result of the existing and former mining operations, the Plan Area is characterized by varied topography and a series of drying beds and aggregate wash ponds used in conjunction with the mining operations. The varied topography includes mining areas up to 30 feet deep and some mining areas have been raised and compacted to be close to existing grade. The mining areas also contain assorted electrical transmission lines and public utilities, as well as a portable conveyor belt system. The conveyor belt system transports raw aggregate material to the Teichert Perkins Plant just northwest of the Plan Area, as well as to the Granite facility located at the northeast corner of Kiefer Boulevard and Bradshaw Road. The mined areas are relatively devoid of native vegetation due to on-going operational activities. Existing trees are limited, except for what has been planted to screen the mining operations from the roadways and surrounding land uses. Natural water bodies within the Plan Area include Morrison Creek and Elder Creek. Morrison Creek essentially bisects the Plan Area, entering the Plan Area from the northeast at Kiefer Boulevard and exits the Plan Area at Hedge Avenue, along the western boundary of the Plan Area. Native vegetation remains along the undisturbed portions of Morrison Creek located between Jackson Highway and Bradshaw Road. The portion of Morrison Creek located between Hedge Avenue and Mayhew Road has been reconstructed and contains restoration plantings within the creek channel with adjacent pedestrian/bicycle trails. Elder Creek passes through the Plan Area at the intersection of Excelsior Road and Jackson Highway and exits the Plan Area on the most southwestern side, just south of Elder Creek Road; this portion of Elder Creek has not been disturbed. Assorted manmade and native wetlands are located within the Plan Area. There is one wetland complex on the east side of Bradshaw Road, between Kiefer Boulevard and Jackson Highway. Another wetland complex is also located east of Bradshaw Road, between Jackson Highway and Elder Creek Road. PROBABLE ENVIRONMENTAL EFFECTS/EIR FOCUS: The analysis in the EIR will describe existing conditions, describe the legal and regulatory framework relevant to the proposed Project, describe standards of significance to be used in analysis, and describe analysis methodologies. A review of the proposed project and of the environmental resources in the study area has resulted in the identification of the following potential areas of environmental effects: Aesthetics Proposed new development areas will be analyzed for their effect on the views from surrounding properties and roadways. Agricultural Resources Areas of active agricultural use, designated agricultural lands, and soil classification per the Farmland Mapping and Reporting Program (such as prime farmland) will be identified and analyzed within and adjacent to the project area. Air Quality Project related emissions analyzed may include, but are not limited to, toxic air contaminants, ozone precursors and particulates. The analysis will include discussions of emissions resulting from construction activities and emissions resulting from operational activities of the completed project. Where possible, emission will be quantified using the approved California Emissions Estimator Model (CalEEMod) to calculate criteria pollutants and greenhouse gas emissions (Climate Change). Other models may be used where appropriate. Notice of Preparation NOP-21 PLNP2008-00240

Biological Resources Biological resources such as wetlands, trees, and riparian habitat will be identified within the project area. The Project will be analyzed to identify where proposed changes may affect wildlife populations and their habitats, focusing on special-status species and their habitats. Climate Change Greenhouse gas emissions of the Project will be quantified and analyzed for the Project s cumulative impact to climate change. A discussion of the probable impacts to the project as a result of climate change will also be examined. Cultural/ Historical Resources The Project will be analyzed to determine the impact proposed development may have to cultural and historical resources. Geology, Soils and Mineral Resources The past mining operations have created a unique landform in this part of the County. The stability and suitability of the compacted soils of prior mining areas for the proposed type of land use will be analyzed. Erosion potential will also be considered. Hazards and Hazardous Materials Hazardous materials sites, if any, will be identified within and adjacent to the project area. Known areas subject to groundwater contamination will be identified and analyzed. The impact of groundwater contamination on water supply will be addressed in the Water Supply chapter, which is discussed below. Information will be gathered from databases maintained by the State of California s Department of Water Resources and Department of Toxic Substances Control and the County of Sacramento Department of Environmental Management. Hydrology and Water Quality Areas of flooding potential will be identified and drainage patterns will be examined within the watersheds affected by the project. The project will be analyzed for impacts to the existing hydrologic environment, as well as the existing hydrologic environment onto the project as proposed. The potential impacts of the Project on water quality will be examined, which includes construction-related impacts (e.g. erosion of exposed soil) and operational impacts (e.g. stormwater runoff and use of fertilizers/pesticides in the proposed urban farms). Land Use The proposed project will be examined to determine consistency with land use policies/ordinances/plans that have been adopted in order to avoid environmental effects. Land use compatibility between the proposed land uses within the Project plan area, as well as the compatibility of the plan area with the surrounding existing land use environment will also be analyzed. Noise The proposed uses of the Project that have the potential to generate noise will be identified as a new noise source and the noise impact will be analyzed in relation to existing and proposed sensitive noise receptors. An analysis of existing noise sources (such as Mather Airport and Sacramento Raceway) that have the potential to affect the proposed Project will also be included. In addition, this analysis will include modeling of noise generated by transportation sources, relying on data from the traffic study. Notice of Preparation NOP-22 PLNP2008-00240

Public Services The Project will be analyzed for its compatibility with existing public services. The analysis will determine what existing services may need to be extended to the Project area and the impact of such extension. This section will also identify any new public services that may result from project implementation and the impact of constructing new facilities or providing new service. Services analyzed may include, but are not limited to: schools (Elk Grove and Sacramento City Unified School Districts), park services (County Regional Parks, Southgate and Cordova Park Districts), libraries, fire protection (Sacramento Metropolitan Fire District), police protection (Sacramento County Sheriff s Department) and public transit. Public Utilities The Project will be analyzed for its compatibility with existing public utilities. The analysis will determine what may be required to extend service to the Project area. Utilities analyzed may include, but are not limited to: water supply (Sacramento County Water Agency Zone 40 and Cal American Water Company), wastewater disposal and treatment (possible annexation to Sacramento Area Sewer District and Sacramento Regional County Sanitation District), energy services (Sacramento Municipal Utility District and Pacific Gas & Electric) and solid waste disposal (Kiefer Landfill). Water Supply The Project is located within Zone 40 of the Sacramento County Water Agency (SCWA) and within the service area of California-American Water Company (CalAm). SCWA relies on a conjunctive use program utilizing both surface and groundwater as a comprehensive approach to maintain a regional balance of the groundwater basin underlying Zone 40. The CalAm Suburban/Rosemont service area is supplied with water drawn from the Central Groundwater Basin and water purchased from the City of Sacramento. A Water Supply Assessment will be prepared to determine the availability of potable water and to determine configuration and size of water-related infrastructure. In addition, possible groundwater contamination near Mather Airport and the effect on water supply will be addressed. Transportation A Traffic Impact Study is being prepared that will examine the effects of proposed development on the existing and planned transportation network. The cumulative effect of the proposed Project and adjacent proposed master plan projects will also be analyzed. Pursuant to the CEQA Guidelines Section 15206, this is a project of statewide, regional or areawide significance and scoping meetings are required. Meetings between the applicant, County staff and interested residents/general public have been occurring and will continue to be ongoing throughout the preparation of the EIR. Thus, the above descriptions are not exhaustive, and other sections and discussions may be included if further research indicates that the inclusion is warranted. As the analyses progress and the extent of the impacts regarding the above categories are determined, appropriate CEQA alternatives will be included for analysis. Notice of Preparation NOP-23 PLNP2008-00240

INTENDED USES OF THE EIR: The Sacramento County Planning Commission and the Board of Supervisors will use the information contained in the EIR to evaluate the proposed project and render a decision to approve or deny the requested entitlements. Responsible agencies, such as the California Department of Fish and Wildlife, United States Fish and Wildlife Service, United States Army Corps of Engineers, California Regional Water Quality Control Board, and LAFCo may also use the EIR for planning/permitting purposes that include, but are not limited to, the following: Federal Clean Water Act Section 404 Permit (U.S. Army Corps of Engineers) Federal Endangered Species Act Section 7 Consultation (U.S. Fish and Wildlife Service) Section 401 Water Quality Certification (Regional Water Quality Control Board Central Valley Region) California Endangered Species Act Incidental Take Permit (California Department of Fish and Wildlife) Section 402 National Pollutant Discharge Elimination System Permit (Regional Water Quality Control Board Central Valley Region) Annexations (LAFCo) Notice of Preparation NOP-24 PLNP2008-00240