Case Study Presentation of the Downtown Brampton Flood Protection Class EA

Similar documents
WELCOME DOWNTOWN BRAMPTON FLOOD PROTECTION. Environmental Assessment Project DOWNTOWN BRAMPTON FLOOD PROTEC TION - ENVIRONMENTAL ASSESSMENT

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Ashbridges Bay Erosion and Sediment Control Project

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

PORT WHITBY COMMUNITY

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

3. Urban Design in the Central Area

Niagara GO Hub and Transit Stations Study

Portage Parkway Environmental Assessment Public Information Centre No. 1

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

900 ALBERT PLANNING RATIONALE MARCH 21, 2016 TRINITY

Victoria Bridge Municipal Class EA Civic Works Committee

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

Building the transportation network we need for the future

South Bismarck Watershed Model Update and Stormwater Improvement Project

2. Purpose of the Undertaking

South of Eastern Strategic Direction Status Update

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

TRCA Roles and Responsibilities in Planning and Development

The West Vaughan Employment Area Secondary Plan Policies

Port Credit Local Advisory Panel October 20 th Meeting

Master Environmental Servicing Plan & Secondary Plan

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

1 Introduction. Chapter. In this chapter:

TORONTO COMPLETE STREETS GUIDELINES

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

1. Introduction

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Population, Housing, and Employment Analysis

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

CASE STUDY: MCGREGOR COXALL SYDNEY, AUSTRALIA. McGregor Coxall

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

This page has been intentionally left blank.

BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY. Public Open House #1

Edward R. Sajecki Commissioner of Planning and Building

Trafalgar Road Corridor Planning Study Open House

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Emery Village Road 2A Municipal Class Environmental Assessment Study

Getting and Giving the Most

9 North Downtown Master Plan & Saskatchewan Polytechnic

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

Complete Neighbourhood Guidelines Review Tool

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning

TORONTO DISTRICT SCHOOL BOARD SCHOOLS WITHIN MIXED USE BUILDINGS: COMMERCIAL AND CONDOMINIUM BUILDINGS. Planning and Priorities Committee

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Figure 1- Site Plan Concept

SECTION E. Realizing the Plan

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

APPENDIX L3. Table of Contents. SWP EA Information Sheets

Lynn Waterfront Master Plan

Presentation Overview

c. DTAH Toronto Complete Streets Guidelines

St. Clair Avenue West Area Transportation Master Plan

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Growth Area Reviews Preliminary Directions for Midtown Oakville, the Uptown Core and Palermo Village

Director, Community Planning, Toronto and East York District

URBAN DESIGN BRIEF. Terms of Reference. Purpose. When is an Urban Design Brief Required

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

Metro Vancouver. Regional Growth. Strategy. Optimizing the Urban Footprint

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

Mavis Road Class Environmental Assessment

PART 1. Background to the Study. Avenue Study. The Danforth

Toronto s Changing Waterfront Seminar Series Session 2 Dr. Susannah Bunce York University March 3, 2008

WASHINGTON COUNTY OREGON

Background Summary Report

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

1.0 PLANNING MARKHAM S FUTURE CONTENTS

WELCOME TO THE SOUTH OF EASTERN OPEN HOUSE

DOWNTOWN PARKS & PUBLIC REALM PLAN

General Committee Presentation. Paddy Kennedy, MCIP, RPP Dillon Consulting Limited

Public Works and Infrastructure Committee

Edgeley Pond + Park Public Meeting

Urban Design Review Panel Terms of Reference

SUBJECT: Revised proposed new official plan recommended for adoption

6 Growth Management Challenges and Opportunities

BRAMPTON FLOWERTOWN SECONDARY PLAN Area 6

Toronto Waterfront Revitalization

Report to: Development Services Committee Report Date: September 11, 2017

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Transcription:

Case Study Presentation of the Downtown Brampton Flood Protection Class EA Presented by: Kenneth M. Dion, Project Director Port Lands Integration, Waterfront Toronto (formerly Senior Manager, TRCA) At: OAIA 2018 Conference, Planning and Protecting Water Resources October 17, 2018

Presentation Outline Project overview Problems and Opportunities Key challenges EA approach Coordinated planning The information contained in this presentation is copyright Toronto and Region Conservation Authority Toronto and Region Conservation Authority 2

Project overview Parallel project planning and co-proponency Downtown Brampton Flood Protection Project EA (DBFP EA) is a critical first, foundational step toward achieving the City of Brampton s Riverwalk Project and contribute to the larger Brampton 2040 Vision. While the DBFP EA is focused on providing a flood protection solution to Downtown Brampton, it will consider, be informed by, and work in parallel with the City s Riverwalk project. Given the confluence of jurisdiction, expertise and land ownership, the DBFP EA is being undertaken as a co-proponency between the Toronto and Region Conservation Authority (TRCA) and the City of Brampton. Similar foundational, parallel planning approaches have been undertaken by TRCA and Waterfront in the West Don Lands and Lower Don Lands, whereby the development of a preferred alternative for flood protection formed the basis for community intensification and revitalization. Dominion Skate Development (2018 to 2022) Ryerson Academic Building (2020 to 2022) Centre for Innovation (2020 to 2023) Metrolinx Surface Parking Lot (2018 to 2020) Heritage Theatre Block (2020 to 2022) Rose Garden Residences (Post 2022) Downtown Reimagined (2019/20 to 2022) Toronto and Region Conservation Authority 3

Project overview Regional context Brampton Toronto and Region Conservation Authority 4

Project overview Study location Existing flood protection (a concrete-lined bypass channel), cannot convey the current Regulatory Flood nor accommodate potential increases in flooding due to climate or upstream land use change. DBFP will consider alternatives to remove existing flood risk and provide additional capacity to address uncertainty in order to unlock the potential for revitalization of the Downtown Core. Regulatory Flood bypass channel In Ontario, this is the extent of the floodplain that is used to regulate development and define risk. It is based on rainfall from Hurricane Hazel the largest storm of record in the area.

Project overview A history of flooding Downtown Brampton Historically, Downtown Brampton experienced frequent flooding until a concrete by-pass channel was built, in 1952. 600m long, the by-pass channel conveys flows from Church St downstream to Centennial Park. The by-pass channel played a major role in preventing significant damage, and loss of life in downtown Brampton during Hurricane Hazel in 1954. Despite the by-pass channel, 31 hectares of downtown Brampton remain vulnerable to flooding during the regulatory flood event. Toronto and Region Conservation Authority 6

Project overview Flooding and the SPA A Special Policy Area (SPA) acknowledges that development already exists in a flood vulnerable area and that to prevent any new expansion of existing uses could negatively impact the local economy. While the SPA will not allow for land use intensification, it does provide flexibility for individual land owners to use and expand their existing uses by a finite amount, often with lot-specific flood-proofing measures. This is the natural path of the river before it was relocated Here is the by-pass channel Toronto and Region Conservation Authority 7

Problem Two routes of flooding and public safety 1 Spill 2 Backwaterl * Secondary Problem Existing bypass channel is a major defining feature in Downtown Brampton. Yet, despite having 3 road crossings, 1 rail crossing and 1 pedestrian crossing, public safety considerations has largely resulted in this major feature representing a major void in the public open space system and for ecological function, since 1952. Toronto and Region Conservation Authority 8

Opportunity Alleviating existing flood risk and facilitating intensification NOW - 31 hectares of land at risk to flooding currently includes residential, commercial, and institutional land uses, including City Hall. Flood protection would alleviate risk to many of these existing areas. FUTURE - Development is restricted in Downtown Brampton because of flood risk. Removing flood risk to areas within the SPA allows for revitalization of the downtown core Riverwalk Parallel Planning Opportunity Consideration of flood protection options, will also provide opportunities to reconnect the public with the river, to enhance associated open spaces and to improve ecological function. Opportunities will be fully explored in the broader, parallel Downtown Brampton Riverwalk Planning process. Toronto and Region Conservation Authority 9

Key challenges a legacy of infrastructure and land use Development and evaluation of alternatives must consider: 1) Existing roads, rail and bridges in the area 2) Future construction plans in development for bridges and transit, including the railway corridor 3) Existing stormsewers, sanitary sewers, watermains and utilities in the area 4) Historical waste disposal areas 5) Existing parks, open spaces and ecological areas 6) How to modify existing concrete bypass channel while maintaining current levels of flood protection during construction 7) Identified heritage resources within the Study Location, including a cemetery 8) City of Brampton aspirations for the Riverwalk project and Brampton 2040 Vision Toronto and Region Conservation Authority 10

Municipal Class EA Fall 2018 We are here Fall 2019 Winter 2020 Spring/ Summer 2019 Fall 2019- Winter 2020? Vast majority of works required for achieving flood protection involve the planning, modification, or relocation of existing or municipal infrastructure. While opportunities will be provided for public realm, open space and ecological enhancements, those will be defined in the parallel, broader scoped, Riverwalk planning process led by the City of Brampton. Thus, the DBFP will be undertaken using a Schedule C procedures pursuant to the Municipal Class EA Toronto and Region Conservation Authority 11

Coordinated planning process DBFP Class EA Consolidate findings of past hydraulic modeling feasibility studies Define a reasonable short list of alternative solutions from work completed to date Develop evaluation criteria to select a preliminary preferred solution Select preliminary preferred solution City of Brampton Riverwalk Process initiates on basis of preliminary preferred solution Design Alternatives are developed the Riverwalk team based on preliminary preferred solution, with input from DBFP team DBFP team further refines evaluation criteria to reflect Alternative Design details Select preferred design alternative for flood protection for the DBFP EA City of Brampton Riverwalk process continues to refine public realm design elements and brings into the broader design process for the rest of the Downtown Brampton. The DBFP EA team develops and submits the ESR for approval. * NOTE: coordinated public, stakeholder, agency and Indigenous engagement will be provided throughout the EA process. External Project Coordination Planning in the Downtown Brampton area is extensive. DBFP team will also work with the following agencies and their associated projects: Metrolinx railway corridor expansion City of Brampton light rapid transit planning City of Brampton Ken Willans Class EA City of Brampton Official Plan and Secondary Plan updates Toronto and Region Conservation Authority 12

www.trca.ca Thank you