Ball Corporation 140,000 Square Feet on 27 Acres Birmingham, Alabama
PRELIMINARY BALL CORPORATION 124 CARSON ROAD BIRMINGHAM, ALABAMA 35215 SIZE: NUMBER OF BUILDINGS: GROUND: BUILDING DIMENSIONS: Approximately 140,000 square feet One single story industrial building Approximately 27± acres Approximately 338 x 422 see drawing CONSTRUCTION: Floors: Reinforced concrete with minimum of 10 Walls: Front office area is brick over block; manufacturing and warehouse areas are 10 masonry with insulated metal sandwich panel above Roof: Centimark PVC Sprayed Roof System Office/Tank Room New 2013, 20-year warranty, may transfer Cyclone/Valley 1995 Roof Area 1994 Metal Area 2003 Columns: Steel I beams and 5 round pipe columns DATE OF CONSTRUCTION: CONDITION OF PROPERTY: Original construction in 1953 with two later additions Very good CEILING HEIGHTS: Original Building: 17 clear to bottom of structural steel, 22 to roof deck Expansion Area: COLUMN SPACING: Manufacturing Area: 20 x 50 Warehouse Area: 20 x 50 23 at the center with 18 eaves (approximately 40,000 square feet) POWER: Supplied by Alabama Power; one 277/480 volt 3,500 KVA pad mounted transformer, one 277/480 volt 3,750 KVA pad mounted transformer, total of 9,000 amps to Cutler Hammer switchgear, 480/277 volt, 3-phase distributed via multiple 2,000 amp overhead buss duct. Ball Corporation owns the transformers on-site. The existing 12kV feed that serves the plant is fed from Alabama Power s Green Station Distribution Substation. A redundant feed to the facility could be provided if a customer requested it. The information contained herein is from sources deemed reliable but no warranty of representation is made as to the accuracy thereof.
BALL CORPORATION 124 Carson Road Birmingham, Alabama 35215 Page 2 NATURAL GAS: Supplied by Trussville Utilities; 2 line WATER: Supplied by Birmingham Water Works; 2 city water line, 12 industrial water line SEWER: SPRINKLER SYSTEM: LIGHTING: OFFICE FACILITIES: Supplied by Birmingham Water Works; 6 line 99% wet system; two small areas have a foam system or a dry system (oil storage and computer room) T-5 fixtures (some have sensors) Approximately 2,600 square feet of front office space plus several plant floor offices and meeting rooms. The office space was renovated in 2015. PARKING: Paved and marked parking; north side of the building has 92 spaces, east side of the building has 60 spaces. The parking lot was re-sealed in 2014. RESTROOMS: Office Men: 2 toilets, 2 urinals, 2 sinks Women: 1 toilet, 1 sink Locker Rooms Men: 1 large circular wash basin, 5 toilets, 3 urinals, 4 sinks, 99 lockers Women: 4 sinks, 5 toilets, 34 lockers HVAC: VENTILATION: TRUCK LOADING: Office area only is heated and cooled by six roof mounted gas fired package units. The maintenance areas are cooled by two 10-ton electric roof mounted package units. Roof and wall mounted exhaust fans. The production area is also ventilated by exterior ground mounted gas fired air make-up units. Rear Wall Six (9 x 10 ) dock high doors with locks, hydraulic levelers and trailer lights West Wall 20 x 20 electric garage door with internal screen door for SQF requirements East Wall 20 x 20 electric garage door with internal screen door for SQF requirements East Wall Exterior 12 x 175 covered loading dock with dock leveler The information contained herein is from sources deemed reliable but no warranty of representation is made as to the accuracy thereof. 10-02-18
BALL CORPORATION 124 Carson Road Birmingham, Alabama 35215 Page 3 RAIL: CRANES: ZONING: The building was originally served by two rail spurs. Potential for spurs to be re-installed. CSX Railroad. Two gantry cranes at 1-ton and ½-ton; one DeShazo 3-ton bridge crane I-4, Industrial Park 2017 TAXES: $28,200 FORMER USE: Manufacturing of aluminum can lids and ends. Plant ran 24/7 with 4 days on and 4 days off. Employed approximately 100 on average. TRANSPORTATION: The facility is located less than 10 miles from I-65, I-59 and I-20; approximately 13 miles from Birmingham International Airport. MISCELLANEOUS: Fire alarm system monitored by Centerpoint Fire Department and Tyco Integrated Security Building has a controlled entry security system in place AVAILABILITY Approximately mid-october 2018 The information contained herein is from sources deemed reliable but no warranty of representation is made as to the accuracy thereof. 10-02-18