Construction of the A30 Bodmin India Queens Improvement

Similar documents
A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6

Start of works exhibition

NON-TECHNICAL SUMMARY

North Somerset Council Local Development Framework

A737/A738 Trunk Road (Dalry Bypass)

Chapter 9 Route window W18 Slough station. Transport for London

Making the case for Sustainable Transport Project Potential

Infrastructure and the environment

Longbridge Town Centre Phase 2 Planning Application

Over 500,000 of work won by Cornish construction firms

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

Newsletter. Work underway on major east Auckland transport project. Update: Pakuranga to Botany Busway information day.

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

A46 Coventry Junctions Public information exhibitions

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Public Consultation. Land at Monks Farm, North Grove. Welcome

Drainage. Alignment K:\D (D102241) SHERFORD\CONSOLIDATED PLANNING DOCUMENTS\MAIN STREET\SHERFORD MAIN STREET NARRATIVE REVISION

Proposed Stage One Proposed Stage (Pending) Staging. Blenheim CBD Streetscape Final Report 50

Former North Works, Lickey Road, Longbridge, Birmingham

Local Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road

20. Ballysadare Mini-Plan

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Welcome to the Public Consultation Exhibition

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

Appendix 2 Waterbeach Greenway Review

A30 Chiverton to Carland Cross Consultation booklet 29 January - 12 March 2018

A417. The Missing Link Preferred Route Announcement

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

Key Principles. 290 Phasing Principles and Programme

Welcome to our public exhibition

RADAR BASED AUTOMATIC INCIDENT DETECTION FOR HIGHWAYS

The London 2012 Olympic Park and Green Network Legacy

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

University Park, Worcester Non Technical Summary December 2011

Tiane Ltd Submission on Draft National Planning Framework Ireland 2040

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

The Fairfield Partnership Vision for North-East Elsenham

Inspiring Technovation

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

8.0 Design and Form of Development 43/

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

28. Coolaney-Rockfield Mini-Plan

Research Road Map. 4. Quiet Pavements

Improving the effectiveness of mitigation and monitoring for bats on roads and railways in the UK. Anna Berthinussen & John Altringham

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Overview Report. Proposed Development

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

A63. Castle Street. Improvement Scheme. Public Consultation Exhibition April Safe roads, Reliable journeys, Informed travellers

A5-M1 Link (Dunstable Northern Bypass) Successful delivery of a major road improvement

South Fraser Perimeter Road (SFPR)

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Non-Technical Summary

c. DTAH Toronto Complete Streets Guidelines

Improving the A1 in Northumberland Public consultation. November December Morpeth to Ellingham

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

NON TECHNICAL SUMMARY

UK-GBC Project Case Study Smithfield, Manchester

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme

Experiences of dealing with Lesser Horseshoe Bats (Rhinolophus

and also to consider how Luas Line A1 will contribute to good planning and sustainable development in the area it serves.

THE MERSEY GATEWAY PROJECT (MERSEY GATEWAY BRIDGE) NATIONAL ALLIANCE AGAINST TOLLS Mr Dave Loudon (NAAT/2/1P) REBUTTAL BY Steve Nicholson

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Barton-under-Needwood Village Improvement Scheme

Moat Lane Regeneration Project Environmental Statement

Environmental Statement Review for Infrastructure

The Site. Welcome to the public exhibition for Boothferry Road, Hessle.

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

Welcome to our exhibition

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

elbridge Core Strategy

7.4 Maintenance and Storage Facility

31 Bucklands View, Nailsea, BS48 4TZ

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

2015/1020 Mr Edward Cockburn Caravan storage on hardcore base (Retrospective) Ranah Stones, Whams Road, Hazlehead, Sheffield, S36 4HT

Appendix 3 Horningsea Greenway Review

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

BREEDON NORTHERN LIMITED

Proposed Amendment to the

Sheffield Victoria Station Development Prospectus January 2014

PART 2 SOUTH DOWNS NATIONAL PARK AUTHORITY SECTION 1 SCHEDULE OF APPLICATION RECOMMENDATIONS

Energy Efficiency Rating

Cambridge to Cambourne Busway (A428) Planning Appraisal. Prepared by Strutt & Parker LLP & Atkins on behalf of Greater Cambridge Partnership

Rannoch 132 / 33 kv Substation Extension

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

WANSFORD. Village Design Statement. Supplementary Planning Guidance adopted by Peterborough City Council on 22 nd August 2003

ALLERTHORPE NEIGHBOURHOOD PLAN

The Old Rectory Combpyne, Axminster, Devon EX13 8SY

Site Option 3: Te Matai

Scotswood to North Brunton improvement scheme

DESIGN & ACCESS STATEMENT

The River Hub: NEW BUILDINGS

BACKGROUND INFORMATION DOCUMENT

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

Wednesbury to Brierley Hill Extension

SUSTAINABLE SoLUTIoNS

Transcription:

Construction of the Bodmin India Queens Improvement This case study involved the construction of the Bodmin-India Queens Improvement Scheme. The scheme upgraded this section of the to dual carriageway and removed the previous height restrictions, easing congestion in the area. The project team undertook very effective resource efficiency measures to make the most of site won and locally available materials.

Construction of the Bodmin India Queens Improvement 2 Construction of the Bodmin India Queens Improvement Summary This case study involved the construction of a new dual carriageway section of the in Cornwall to replace the existing single carriageway road, reduce congestion and improve journey times in the area. The project team worked together to ensure that the environmental and social aspects of sustainability were identified and their impacts minimised within the project. The case study provides good examples of good practice resource management including the use of recycled or secondary materials, the use of local materials and waste minimisation. Introduction This case study provides a good example of a highway construction project team taking full account of resource efficiency issues and aiming to minimise waste and the use of virgin materials. This scheme was commissioned by the Highways Agency: Mouchel was the client, The main contractor was Alfred McAlpine, Scott Wilson was the Designer, and RPS was the client environmental advisor. This scheme was one of the first to be procured on an ECI (Early Contractor Involvement) basis which, at the time (2002) was considered to be a dramatic step highlighting the Highways Agency s (HA) commitment to improving value through effective partnering and procurement arrangements. Description of the scheme The is the most vital trunk road link in Cornwall, linking towns in the far southwest of the county, such as Penzance and Falmouth, to the city of Exeter and the rest of the UK Highways Agency road network. Over the years, most of the

Construction of the Bodmin India Queens Improvement 3 west of Exeter has been upgraded to dual carriageway standard, with the single carriageway section between the town of Bodmin and the village of Indian Queens causing a major bottleneck. Schemes to improve the between Bodmin and India Queens had been examined since the 1970 s as a means of relieving the significant congestion that occurred during the tourist season, which added to the amount of traffic on the road leading to significant delays particularly during bank holidays and school holiday periods. The development of the 11.5 km (7 mile) scheme between Bodmin and Indian Queens faced at least two major challenges: one was the environmentally sensitive nature of the landscape and wildlife in the area which meant that significant environmental issues had to be managed, and the second was a low railway bridge over the at Victoria village which meant that HGV traffic had to be diverted onto local minor roads to get around this obstacle causing significant problems for the drivers of heavy goods vehicles and the local community. These issues meant that it was only in 2002 using a new contract type (Early Contractor Involvement) that plans were finally agreed in consultation with the local authority, local communities and special interest groups to upgrade the road to a dual carriageway. This new scheme required the road to be significantly realigned in places to improve the environmental quality of the landscape; the old single carriageway road had crossed Goss Moor to the east of Indian Queens and the increasing traffic on the had led to the moor essentially becoming separated into two parts for the insects and animals living there. The scheme aimed to build a new dual carriageway to the North of the Moor thus allowing the Goss Moor to become whole again once the old road was closed to vehicle traffic. The old road would be down graded and used for walking, horse riding and cycling; activities which would not significantly impact on the ability of insects and larger animals to cross to the other side of the moor. The scheme commenced in July 2005 and the new carriageway was completed in July 2007. The work comprised the construction of an 11.5km length of new dual carriageway together with the development of around 6.5km of side roads. In addition to this, new structures were built on the including three over-bridges, four underpasses and two grade-separated junctions to improve the flow of traffic. To Exeter

Construction of the Bodmin India Queens Improvement 4 A389 A39 Bodmin B3274 Former route downgraded for walking/cycling A391 Former route Victoria A391 Goss Moor SAC Railway Line B3274 Indian Queens To Penzance Site of Low Railway Bridge on old Route China Clay Quarry areas (Source of Construction Materials) Figure 1: Location Map of Scheme How the resource efficiency issues were addressed The project team focussed on minimising resource use and reducing the amount of material transported to the site from outside the local area. This is in line with the HA s aim for sustainable construction to minimise resource use and waste. Wherever possible, site-won or local materials were used. Advantage was taken of technological developments. Activities undertaken as part of this included: Over 98% of the imported aggregates used for the entire works (over 700,000 tonnes) were sourced as a secondary product from the china clay industry, thereby utilising a secondary product available in abundance in close

Construction of the Bodmin India Queens Improvement 5 proximity of the site. (With the china clay industry in decline in the UK, the use of this readily available secondary material provided an economic benefit to the local community in difficult times). This resulted in a substantial reduction in long distance lorry journeys and their associated carbon emissions. For the first time on a road scheme in the UK, a paving machine was used that could pave across two lanes at a time with great accuracy thus reducing waste, emissions and time taken to complete the task. A mobile asphalt coating plant for producing the new carriageway surfacing was established at the source of the secondary aggregate at the china clay quarry reducing the need for additional lorry movements and minimising transport impacts on local villages. Existing roads that were no longer required (parts of the on the old alignment and associated redundant side roads) were planed and the chippings reused for access tracks. All vegetation and roots cleared during the project were chipped and reused as mulch. The scheme was carefully designed to have an exact balance of cut-and-fill, negating the need to import or export large amounts of soil or other materials. Cornish hedges used locally quarried stone (and local skills) which reduced delivery mileage. Economic benefits of resource efficiency The decision to source over 98% of the imported aggregate for the scheme from the local china clay industry is likely to have had a positive economic benefit on the scheme as well as on the local economy. In addition to this, making use of a double width paving machine will have saved time on this element of the scheme with an associated positive economic benefit. Conclusions This case study on the Bodmin-India Queens improvement illustrates the significant resource efficiency actions that can be taken to reduce the amount of material transported to the construction site and the importance of early involvement of all parties and an awareness of locally available materials from the outset.