Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Similar documents
Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

BIORETENTION FACILITY

Town of Essex Small Site Erosion Control Guide

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Structural Stormwater Best Management Practices

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

The following general requirements will be met for all planter box installations:

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

Analyzing the Bioretention Construction Sequence

Inspection and Maintenance of Stormwater Best Management Practices

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Tree Pits Construction Guide

Subsurface Infiltration Bed

6.1 Bioretention Areas

Erosion Control for Home Builders in the. City of Jacksonville

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Homeowners Guide to Stormwater BMP Maintenance

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

Case Study Bioretention Installation and Maintenance

4.6. Low Impact and Retentive Grading

Besides performing this function, they also look really nice

Low Impact Development Practices

Post Construction BMPs

Tips for Maintaining and Enhancing Stormwater Management Areas

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Appendix G. Detailed Design

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Residential Rain Gardens. Dr. Cathy Neal Extension Specialist Landscape Horticulture

SECTION 6. Routine Maintenance Activity Details

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Rice SWCD Rain Garden Cost-Share Program

SUSTAINABLE DRAINAGE AND LANDSCAPE MANAGEMENT PLAN FOR ROBINSWOOD PRIMARY SCHOOL

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

Small Town Sustainable Stormwater Solutions

EROSION & SEDIMENT CONTROL

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

WQ-07 INFILTRATION TRENCH

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Wisconsin Contractors Institute Continuing Education

Berm and Swale Complex

Building a Rain Garden in Colorado. Created By:

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

Low Impact Development for your homes, businesses & streets

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Rain Gardens. A Welcome Addition to Your Landscape

Small Project Guidance Document

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

2.1.4 Roof Downspout Rain Gardens

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?


Operations & Maintenance for Bioretention Stormwater Practices

EROSION PREVENTION BMP SUGGESTED USES MATRIX

3/26/2011. David Dods URS Corp., Overland Park, KS. Year 5. Photos: David Dods

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Use of Best Management Practices

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Appendix D - Technical Design Criteria for BMPs

Guidance on Preparation of Construction and Maintenance Costs

2008 SWMM, 2010 Revision City of Tacoma

West Norriton Township

Please make the following changes in your copy of the bid proposal for the captioned project:

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

USDA Rain Garden Video fluid_planet.html

Kittson Parkway / Watershed Park Parking Lot

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Invasive Plant Removal, Slope Stabilization, and Native Planting Manual

EROSION & SEDIMENT CONTROL

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Single most pervasive problem: Polluted runoff from watershed development

East Coast Erosion Blankets

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

5.0 Storm Water Landscape Guidance Introduction

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Rain Garden Maintenance Manual

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

7. SITE DESIGN, RETAINING

City of South Portland Stormwater Manual

Transcription:

0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st Version: 3/3/206 Revision: EXISTING CONDITIONS To Drain Outfall MXD: µ To Catch Basin MMI#: To Swale Map By: Y:\\Maps\EXISTING CONDITIONS\SeniorCenter_ExistingConditionsMap_V3.mxd Drainage Area Boundary 2'-Elevation Contour, 202 Lidar Stormwater Flow

Stormwater Flow Swale Pipe Drainage Area Boundary To Swale To Bio-Retention Area 2'-Elevation Contour, 202 Lidar Parcel Boundary, Approximate Culvert 02 Scale: "=20' 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA PIPE INVERT FROM 2000 SITE PLAN ON RECORD WITH TOWN SOURCE(S): 50 Feet st Version: Revision: Stone Check Dam Bio-Retention Area MXD: Vegetated Buffer LAYOUT 25 2.5 MMI#: µ Overland Map By: à Y:\\Maps\\SeniorCenter_LAYOUT_v2.mxd 0 To Hydrodynamic Separator

CONTECH CDS 205-4-C, TYPICAL DETAIL INSTALLATION NOTES:. INSTALLATION SHALL FOLLOW MANUFACTURERS INSTRUCTIONS. 2. FINAL DESIGN OF UNIT WILL SET ELEVATIONS AND SPECIFIC OF UNIT. A MANUFACTURERS TYPICAL DETAIL IS SHOWN FOR GENERAL REFERENCE. OPERATION AND MAINTENANCE NOTES:. OPERATION AND MAINTENANCE OF THE CDS UNIT SHOULD FOLLOW THE CONTECH ENGINEERED SOLUTIONS CDS OPERATION, DESIGN, PERFORMANCE AND MAINTENANCE GUIDE DOCUMENT IS AVAILABLE FROM CONTECH ENGINEERED SOLUTIONS. 2. SET A REGULAR INSPECTION SCHEDULE. USE A MEASURING TOOL OR ROD TO RECORD SEDIMENT ACCUMULATION. KEEP A RECORD OF SEDIMENT DEPTH AND MAINTENANCE. 3. DURING THE FIRST YEAR OF OPERATION, INSPECT THE SEDIMENT ACCUMULATED IN THE UNIT AFTER EACH LARGE STORM, OR AT MINIMUM EACH MONTH, TO SET A BASELINE FOR FUTURE YEARS. 4. DURING FOLLOWING YEARS, CONSIDER REDUCING INSPECTION SCHEDULE TO A MINIMUM OF 2 TIMES PER YEAR, ONCE IN THE SPRING AND ONCE IN THE FALL, IF MONITORING DURING THE FIRST YEAR INDICATES THAT THIS SCHEDULE WILL BE SUFFICIENT TO ENSURE SEDIMENT ACCUMULATION IS LESS THAN 8 INCHES DEEP BETWEEN CLEANOUTS. 5. CLEAN OUT SEDIMENT WHEN IT AS ACCUMULATED 2 TO 8 INCHES DEEP. USE A VACUUM TRUCK TO SUCK MATERIAL OUT OF THE SWIRL CHAMBER. SKIM FLOATING DEBRIS OFF OF THE WATER. 6. ICE ACCUMULATION MAY TEMPORARILY REDUCE TREATMENT EFFICIENCY, BUT IS NOT EXPECTED AND WILL NOT DAMAGE THE SYSTEM. 7. ENTRY INTO THE UNIT IS TYPICALLY NOT REQUIRED FOR MAINTENANCE. IF ENTRY DOES BECOME REQUIRED ALL LIQUID SHOULD BE EVACUATED PRIOR TO ENTRY. CONFINED SPACE ENTRY PROCEDURES MUST BE FOLLOWED IF THE UNIT IS ENTERED. 8. DISPOSE OF SEDIMENTS REMOVED FROM THE SYSTEM ACCORDING TO STATE AND LOCAL REGULATIONS. SEDIMENT SHOULD BE DISPOSED TO MINIMIZE THE CHANCE OF REMOBILIZING BY RUNOFF. 03

EXISTING CATCH BASIN WILL FUNCTION AS OVERFLOW PLANT WITH SALT TOLERANT APPROPRIATE SPECIES, SUCH AS DAY LILY, BLUE FLAG IRIS, COMMON RUSH, NEW ENGLAND ASTER, ASTILBE, BLACK-EYED SUSAN, BRIDALWREATH SPIRAEA, HIGHBUSH BLUEBERRY, OR OTHERS LISTED IN VERMONT RAINGARDEN MANUAL. FIRE DEPARTMENT STORAGE AREA EXCAVATE DEPRESSION AROUND EXISTING CATCH BASIN TO TEMPORARILY POND STORMWATER SENIOR CENTER ENTRANCE DRIVEWAY 3 2" STORAGE DEPTH EXISTING GROUND INSTALLATION NOTES:. THE VERMONT RAINGARDEN MANUAL IS A GOOD EDUCATIONAL RESOURCE TO ACCOMPANY THIS PROJECT. ALTERNATIVES TO THE PRESCRIBED IN THIS PLAN ARE AVAILABLE IN THAT MANUAL INCLUDING ADDITIONAL APPROPRIATE PLANT SPECIES. 2. PLANTING DENSITIES ARE RECOMMENDED TO BE ONE PERENNIAL EVERY 2.5 FEET ON CENTER OR ONE SHRUB EVERY 5 FEET ON CENTER. 3. THE UNDERDRAIN WILL TIE INTO EXISTING CATCH BASIN. 4. ALTERNATIVELY, MODIFY EXISTING STORM PIPE TO FUNCTION AS UNDERDRAIN TO THE BIO-RETENTION AREA. THIS CAN BE ACCOMPLISHED BY EXPOSING THE PIPE, DRILLING HOLES IN THE PIPE, INSTALLING FILTER FABRIC AND ROCK AROUND THE PIPE AS SHOWN IN THE DETAIL. OPERATION AND MAINTENANCE NOTES:. MAINTENANCE OF THE BIO-RETENTION AREA IS VERY SIMILAR TO PLANTED LANDSCAPED BEDS. REPLACEMENT OF SOME MULCH MAY BE REQUIRED IN THE SPRING. OCCASIONAL WEEDING WILL BE REQUIRED TO MAINTAIN THE SELECTED PLANTS AESTHETICALLY PLEASING. 2. DURING THE FIRST YEAR OF OPERATION, WATERING, WEEDING, AND REPLACEMENT OF DEAD PLANTS IS IMPORTANT FOR PROPER ESTABLISHMENT. 3. PERIODICALLY, INCLUDING AFTER LARGE STORMS AND REGULARLY DURING THE FALL, REMOVE LEAVES AND DEBRIS ACCUMULATED AT CATCH BASIN AND WITHIN THE BIO-RETENTION AREA. 4. THE ACCUMULATION OF SEDIMENT WITHIN THE BIO-RETENTION AREA SHOULD BE MONITORED AND INSPECTED A MINIMUM OF ONCE ANNUALLY. REMOVE SEDIMENT AFTER APPROXIMATELY 3 INCHES OF SEDIMENT HAS ACCUMULATED OR RAKE AWAY WHEN DOES NOT DRAIN WITHIN DAY. THIS IS EXPECTED TO OCCUR APPROXIMATELY EVERY TWO YEARS AND BE DONE WITH A HAND SHOVEL AND WHEELBARROW OR BUCKETS. 5. ANNUALLY INSPECT MAKE SURE NO INVASIVE SPECIES ARE PRESENT. BIO-RETENTION AREA " CRUSHED STONE INFILTRATION TRENCH INSTALL EROSION CONTROL BLANKET ON SIDE SLOPES, SEE DETAIL NATIVE GROUND APPLY 3" DEPTH HARDWOOD MULCH, SHREDDED AND WELL AGED 8" DEPTH OF PLANTING MIX TO CONSIST OF NATIVE TOPSOIL (60%), SAND (30%), AND LEAF COMPOST (0%) 6" DIAMETER PERFORATED UNDERDRAIN PIPE, SDR 35, TIE INTO EXISTING CATCHBASIN WRAP STONE IN NON-WOVEN GEOTEXTILE FILTER FABRIC, OVERLAP AS REQUIRED 04

MAINTAIN VEGETATED BUFFER C L FINISHED GRADE NON-WOVEN GEO- TEXTILE FILTER FABRIC PROVIDE DEPRESSION AT CENTER TO DIRECT FLOW -SEE SECTION VIEW STONE CHECK DAM 8" MIN. SECTION VIEW 8" MIN. SEED WITH VERMONT CONSERVATION MIX, OPTIONALLY PLANT BOTTOM OF SWALE WITH PLANTS SPECIFIED FOR BIO-RETENTION AREA EROSION CONTROL BLANKET, SEE DETAIL APPROXIMATE EXISTING SWALE (SHAPE VARIES) 3 FT MIN. REVEGETATED/RESHAPED SWALE SWALE INSTALLATION NOTES:. SWALE SHAPE PROVIDED HERE FOR FUTURE USE. ONLY REVEGETATION AND APPLICATION OF EROSION CONTROL BLANKET IS CURRENTLY RECOMMENDED. 2. DO NOT COMPACT THE GROUND WHEN GRADING SWALES. SWALE OPERATION AND MAINTENANCE NOTES:. DURING THE FIRST YEAR OR UNTIL VEGETATION HAS BEEN ESTABLISHED, INSPECT THE SWALES AFTER ALL STORMS GREATER THAN 0.5 INCHES. REPAIR ANY EROSION THAT HAS OCCURRED AND SPOT SEED ANY BARE PATCHES. 2. SWALES ARE EXPECTED TO REQUIRE RESHAPING AND REMOVAL OF SEDIMENT EVERY 0-5 YEARS. 3. SWALES SHOULD BE ALLOWED TO GROW TALL PERENNIAL VEGETATION. BLEND RESHAPED CHANNEL INTO EXISTING BANK PROVIDE.5 FT DEPTH MINIMUM MAX. SIDE SLOPE 3:V CHANNEL INVERT (TYP.) MAX. SIDE SLOPE H:V (TYP.) NON-WOVEN GEO- TEXTILE FILTER FABRIC 2" MAX AT CENTER 8" MIN. BELOW CHANNEL INVERT ELEVATION VIEW STONE CHECK DAM STONE CHECK DAM INSTALLATION NOTES:. EXTEND THE STONE A MINIMUM OF 8 INCHES BEYOND THE BANKS AND CHANNEL INVERT OF THE SWALE TO PREVENT CUTTING AROUND THE ENDS OF OR UNDERNEATH THE CHECK DAM. 2. USE TYPE II STONE FILL (D50=2") or 6" -2" EROSION STONE AS PER PIKE INDUSTRIES, NEW HAVEN, VT. 3. USE CONTECH GEOTEX 80 NON-WOVEN GEOTEXTILE FILTER FABRIC OR APPROVED EQUAL ALONG THE BOTTOM OF THE CUTOFF TRENCH AS A FILTER STONE CHECK DAM OPERATION AND MAINTENANCE NOTES:. PERIODICALLY, INCLUDING AFTER LARGE STORMS AND REGULARLY DURING THE FALL, REMOVE LEAVES AND DEBRIS ACCUMULATED AT CHECK DAMS. 2. SWALE IS EXPECTED TO REQUIRE RESHAPING AND REMOVAL OF SEDIMENT APPROXIMATELY EVERY 0-5 YEARS. WHEN RESHAPING IS NECESSARY, USE DETAIL PROVIDED FOR IDEAL CROSS SECTION. 3. RESEEDING OF VERMONT CONSERVATION SEED MIX SHOULD OCCUR AFTER REMOVAL OF SEDIMENT OR RESHAPING OF SWALE. EROSION CONTROL BLANKET EROSION CONTROL BLANKET INSTALLATION NOTES:. USE BIONET SHORT TERM BIODEGRADABLE EROSION CONTROL BLANKETS ITEM NUMBER S50BN, AS MANUFACTURED BY NORTH AMERICAN GREEN, 540 ST. WENDEL-CYNTHIANA ROAD, POSEYVILLE, IN 47633. 2. USE BIODEGRADABLE STAPLES. 3. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF AMENDED SOIL AND SEED. 4. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP BY 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 5. ROLL THE BLANKETS DOWN THE SLOPE IN THE DIRECTION OF THE WATER FLOW. 6. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. 7. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 6" OVERLAP. STAPLE THROUGH OVERLAP AREA, APPROXIMATELY 2" APART 8. REFER TO GENERAL STAPLE PATTERN GUIDE IN NORTH AMERICAN GREEN CATALOG FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS. 05