SIIRTEC NIGI S.P.A. PRIRAZLOMNOYE FIELD DEVELOPMENT PROJECT SEVMORNEFTEGAZ RUSSIA N. 8 SEPARATORS SKIDS - ASME U STAMP, FOR OIL SEPARATION PLANT, COMPLETE WITH PASSIVE FIRE PROTECTION. 2005 A513 PETROIRAN DEVELOPMENT (PEDCO) NIOC/PETROLEUM ENGINEERING & DEVELOPMENT CO. SIRRY ISLAND GAS COMPRESSION FACILITIES IRAN DESIGN AND FABRICATION OF SLUG CATCHER PACKAGE, COMPOSED BY: - NO. 8 SLOPED FINGERS OD 48", THK 31 MM., LENGTH 344 MT/EACH - NO. 1 MANIFOLD OD 48", THK 52 MM. - NO. 2 MANIFOLDS OD 48", THK 31/ 50 MM. - NO. 1 MANIFOLD OD 32", THK 36 MM. - NO. 1 GAS/LIQUID INLET OD 30" - NO. 1 VAPOUR OUTLET OD 24" - NO. 1 EQUALIZATION LINE OD 10" 2004 A027 MATERIAL: API 5L-X65N (NACE MR 0175) SAIPEM BOUYGUES OFFSHORE SONATRACH - BHP BILLITON - AGIP ROD INTEGRATED DEVELOPMENT ALGERIA DESIGN AND FABRICATION OF GLYCOL REGENERATION PACKAGE - GLYCOL REGENERATION UNIT ITEM 380-XX-302 - GLYCOL CONTACTOR ITEM 310-VE-301 with Sulzer Internal - GLYCOL COALESCER ITEM 310-CQ-302 with Sulzer Internal THE MAIN PROCESS OPERATING CONDITIONS FOR THIS PACKAGE ARE: GLYCOL CONTACTOR -TREATING DESIGN CAPACITY: 211.788 KG./HR (162 MMSCFD) AT 38 BAR. G - WATER CONTENT NOT EXCEED 50 ppm wt AT DESIGN CAPACITY GLYCOL REGENERATION -LEAN GLYCOL CIRCULATION FLOW RATE: 13000 KG/h -LEAN GLYCOL CONCENTRATION: 99.7% (WITH STRIPPING GAS) 2003 A504 AGIP GAS BV AGIP GAS BV LIBYAN BRANCH WESTERN LIBYA GAS PROJECT NC 41 CENTRAL B OFF- SHORE LIBYA DESIGN AND FABRICATION OF GLYCOL REGENERATION PACKAGE (N.2 TRAINS) -. THE MAIN PROCESS OPERATING CONDITIONS FOR THESE PACKAGES ARE: GLYCOL CONTACTORS -TREATING CAPACITY: 489 MMSCFD -WATER DEW POINT OF TREATED GAS: -2 C @ 79 BAR. A GLYCOL REGENERATION -LEAN GLYCOL CIRCULATION FLOW RATE: 12650 KG/h -LEAN GLYCOL CONCENTRATION: 98.7% (WITHOUT STRIPPING GAS) -FLEXIBILITY IN GAS FLOW RATE: 55% 2002 A503 SICES GROUP REFERENCE LIST: TURN KEY PACKAGE PLANTS Page 1
BURULLUS GAS BURULLUS GAS CO. SCARAB SAFFRON PROJECT WEST DELTA DEEP MARINE CONCESSION DESIGN AND FABRICATION OF SLUG CATCHER PACKAGE -, COMPOSED BY N. 1 COMMON INLET HORIZONTAL UPPER HEADER N. 12 SLOPED FINGERS N. 1 COMMON OUTLET HORIZONTAL LOWER HEADER N. 1 BALANCE LINE RUNNING FROM THE TOP LEVEL STANDARD PIPE TO THE GAS OUTLET ALL PIPING SUPPORTS FOR OPERATION 2001 01A523 BURULLUS GAS BURULLUS GAS WEST DELTA DEEP MARINE CONCESSION DESIGN AND FABRICATION OF "MEG RECOVERY UNITS".THE UNIT IS DESIGNED TO OPERATE WITH WATER-GLYCOL MIXTURE. FEED RATE FROM 13.619 KG./h TO 2.182 KG/h. A CORRESPONDING GLYCOL CONCENTRATION FROM 26.5% BY W/W TO 83%. COMPOSED BY THE FOLLOWING PACKAGES: UNIT 100 - SEPARATION SECTION: GLYCOL DISTILLATION COLUMN FLASH DRUM/ VACUUM FLASH DRUM/OVHD SEPARATOR FEED WATER HX/ FEED LEAN MEG HX FLASH DRUM HEATER/ COLUMN REBOILER/ VACUUM FLASH DRUM HEATER FLASH DRUM PUMP/ CENTRIFUGE CHARGE PUMP/COLUMN BOTTOM PUMP/ OVHD PUMP/ VACUUM FLASH DRUM PUMP OVHD CONDENSER/ LP VAPOUR CONDENSER/ LEAN GLYCOL TRIM COOLER UNIT 200 - CENTRIFUGATION SECTION: LEAN MEG BUFFER TANK MEG RECOVERY PUMP, CENTRIFUGE UNIT 300 - VACUUM SYSTEM: VACUUM UNIT FEED SEPARATOR, VACUUM PUMP SEPARATOR, LIQUID RING COOLER VACUUM PUMP, CONDENSATE TRANSFER PUMP UNIT 400 - WATER TREATMENT SYSTEM: WATER COALESCER CARBON FILTER 2001 01A016 KARACHAGANAK PETROLEUM OPERATING BV AGIP - BG TEXACO LUKOIL AKSAI REPUBLIC OF KAZAKHSTAN DESIGN AND MANUFACTURING OF N. 13 "REMOTE MANIFOLD" - 2000 054 PORT FOUAD, SOUTH WEST 2 PROJ DESIGN AND FABRICATION OF INSTRUMENT AND SERVICE GAS SYSTEM - 2000 037 SICES GROUP REFERENCE LIST: TURN KEY PACKAGE PLANTS Page 2
DESIGN AND FABRICATION OF DRAIN AND BLOW DOWN SYSTEM PACKAGE, COMPOSED OF: N. 1 VENT K.O. DRUM N. 1 SUMP TANK 2000 061023 TEMSAH GAS FIELD DESIGN AND MANUFACTURING OF LOW TEMPERATURE SEPARATORS PACKAGE, COMPOSED OF: N. 3 LTS SEPARATOR SKIDS N. 3 GAS/GAS HEAAT EXCHANGERS SKIDS N. 3 GAS/LIQUID HEAT EXCHANGER SKIDS 2000 066017 RASHPETCO ROSETTA FIELD DESIGN AND FABRICATION OF "ONSHORE SLUG CATCHER PACKAGE" COMPOSED BY: HEADERS, FINGERS AND SKID SERVICE 1999 900 DESIGN AND FABRICATION OF "MANIFOLD SKID" 1999 889 DESIGN AND FABRICATION "PIG LAUNCHER & RECEIVER TRAPS"- 1999 888 DESIGN AND FABRICATION "FRESH WATER PACKAGE"- 1999 887 ENI SPA MARINA DI RAVENNA ENI S.P.A. - CASALBORSETTI DIRA - MARINA DI RAVENNA DESIGN AND FABRICATION OF N.2 TEG REGENERATION UNITS-200 MC/DAY - COMPLETE OF REFRIGERNANT UNIT- SKID MOUNTED 1999 864 SICES GROUP REFERENCE LIST: TURN KEY PACKAGE PLANTS Page 3
GULF OF SUEZ PETROLEUM GULF OF SUEZ PETROLEUM RAS EL BARR DESIGN AND FABRICATION OF: - PRODUCTION SEPARATOR SKID -SEPARATOR SKID -TEST SEPARATOR SKID -MANIFOLD SKID -INTERCONNECTING PIPING SKID 1998 842 PERMEA MARITIME PROTECTION NORWAY ENI S.P.A. HERA LACINIA (CK) DESIGN AND INSTALLATION OF MEMBRANE GAS DEHYDRATION SYSTEM - 1998 837 BELAYIM PETROLEUM BELAYM PORT FOUAD SOUTH EAST DESIGN, FABRICATION AND INSTALLATION OF N. 1 COMPLETE WATER INJECTION SYSTEM, COMPOSED OF: CHEMICAL DOSING SKID COARSE FILTER SKID DUAL MEDIA FILTER SKID BACK WASH PUMP SKID VACUUM PUMP SKID BOOSTER PUMP SKID CARTRIDGE FINE FILTER SKID 1998 801 BELAYIM PETROLEUM BELAYM PORT FOUAD SOUTH EAST DESIGN AND FABRICATION OF N. 2 INSTRUMENT AND GAS SYSTEM PACKAGES - 1998 789/790 BELAYIM PETROLEUM BELAYIM PETROLEUM DESIGN AND FABRICATION OF PACKAGES: - TEST SEPARATOR SKID - GLYCOLE STORAGE SKID - VENT K.O. DRUM SKID - DRAIN TANK SKID - INTERCONNECTING PIPING SKID 1997 774 BELAYIM PETROLEUM BELAYIM PETROLEUM DESIGN AND FABRICATION OF N. 1 LIVING MODULE COMPLETE OF: - ELECTRICAL GENERATION STATION - LIVING SECTION - SWITCHBOARD & CONTROL PANELS ROOM - EQUIPMENT 1997 773 SICES GROUP REFERENCE LIST: TURN KEY PACKAGE PLANTS Page 4
SAIPEM S.P.A. SHELL SOKU FLOW STATION NIGERIA DESIGN AND FABRICATION OF GAS, OIL, WATER SEPARATOR UNITS -, COMPOSED BY: TEST SEPARATORS V-9001 XXHP SEPARATORS V-9002 HP SEPARATOR V-9003 LP SEPARATOR V-9004 1997 741 AGIP SPA DISTRETTO DI ORTONA AGIP SPA CENTRO OLIO MONTE ALPI (PZ) MONTE ALPI DESIGN AND FABRICATION OF NATURAL GAS SWEETENING/MEMBRANE SYSTEM,, COMPLETE OF:-FEED GAS COOLER-FEED GAS K.O.DRUM -COALESHING FILTER-PREHEATER-COOLING TOWER-COOLING WATER COOLER-EXPANSION DRUM-CIRCULATION PUMPS 1997 737 BELAYIM PETROLEUM BELAYM PETROLEUM DESIGN AND FABRICATION OF GLYCOL REGENERATION UNIT- 1997 710 QATAR GENERAL PETROLEUM CORPORATION QATAR GENERAL PETROLEUM CORPORATION DUKAN ARAB "D" PROJECT DOHA QATAR DESIGN AND FABRICATION OF COMPLETE "GAS RECYCLING" UNIT COMPOSED OF N. 6 SKIDS, COMPLETE WITH PASSIVE FIRE PROTECTION 1997 666 AGIP S.P.A. AGIP CENTRO OLIO TRECATE DESIGN AND FABRICATION OF N.1 DEOXYGENATION AND VACUUM GENERATION UNIT FOR WATER INJECTION PLANT- 1997 664 SICES GROUP REFERENCE LIST: TURN KEY PACKAGE PLANTS Page 5