I 5 South Multimodal Corridor Study. Appendix F. I 5 South Multimodal Corridor Study Cultural Resources Constraints Analysis (February 8, 2010)

Similar documents
Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017

COASTAL CONSERVANCY. Staff Recommendation November 9, 2006 WESTERN SALT WORKS SITE ASSESSMENT AND SOUTH SAN DIEGO BAY TRAIL LINKAGES

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Mavis Road Class Environmental Assessment

3.4.5 Roadway System and Infrastructure Phase I (Project) Roadway System Components E Street Extension (Phase I).

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF RATHBURN ROAD, FROM DUKE OF YORK BOULEVARD TO SHIPP DRIVE, CITY OF MISSISSAUGA. Submitted to:

Appendix G. Archaeological and Paleontological Resources Records Searches

2017 General Obligation Bond

Historic and Cultural Resources

Final Initial Study. Chalice Unitarian Universalist Congregation Conditional Use Permit

APPENDIX J SHPO COORDINATION

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Project Description. Dear Ms. Roland-Nawi:

Archaeological Resources Supplemental Survey Technical Report

WELCOME TO OPEN HOUSE TWO November 28, 2018

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Call to Artists Public Art for Los Angeles Metro Stations

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

NOTICE OF PREPARATION

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

V. ENVIRONMENTAL IMPACT ANALYSIS D. CULTURAL RESOURCES

PRIMARY RECORD Trinomial # NRHP Status Code 3S, 3CS, 5S3 Other Listings Review Code Reviewer Date

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

SECTION 4(f) DE MINIMIS DOCUMENTATION

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

California Environmental Quality Act (CEQA) Environmental Review Process

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

11.0 TRANSPORTATION ELEMENT

Right-of-Way Acquisitions and Relocations Technical Memorandum

Appendix C Cultural Resources Analysis for Asphalt Plant No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1

St. Clair Avenue West Area Transportation Master Plan

W.H. Bonner Associates

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

Table of Contents J.2 Cultural Resources - Archaeological Resources

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

McKay Road Interchange and Salem / Lockhart Crossing

4.1 AESTHETICS AND VISUAL QUALITY

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Visual and Aesthetics

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

4/8/2015 Item #10D Page 1

1.0 Circulation Element

Clay Street Bridge Replacement Project

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Transportation. Strategies for Action

7.5 Impacts on the Section 4(f) Properties

Issues Requiring Future Study

WELCOME TO OPEN HOUSE # 3

City Of Sparks Planning Commission Item

ARCHAEOLOGICAL INVESTIGATIONS FOR THE OLD DAVIS ROAD REALIGNMENT PROJECT ON THE UNIVERSITY OF CALIFORNIA, DAVIS CAMPUS YOLO COUNTY, CALIFORNIA

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Appendix G Response to Comments

3.1 AESTHETICS Background and Methodology

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

ONTARIO MUNICIPAL BOARD

Alta Vista Transportation Corridor Environmental Study Report November 2005

Burloak Drive Grade Separation

Cotton Belt Regional Rail Corridor Project

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

4.500 Preston Road Overlay District

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Figure 5. Previously Identified Viable Corridors

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS NOTICE OF PREPARATION OF A PROGRAM ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

The Anaheim Resort Public Realm Landscape Program. City of Anaheim. Adopted September 1994 (94R-239)

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

Mississippi Skyway Preliminary Engineering Report

BROOKE PETERSON, AICP Associate Principal

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009

Los Angeles Department of City Planning RECOMMENDATION REPORT

Planning Commission Staff Report March 15, 2007

UNIVERSITY OF CALIFORNIA, SAN DIEGO

Historic and Archaeological Resources

EXECUTIVE SUMMARY. Introduction

South Davis County COMMUNITY SPOTLIGHT

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

16E. 24 th Street Corridor. A. Background

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

2290+ STADIUM VILLAGE STATION ABOVE FIELD) (T.O "

City of Los Angeles, Bureau of Engineering staff report - dated October 14, 2009 and the Hearing Examiner Report signed October 21, 2009.

Transcription:

I 5 South Multimodal Corridor Study Appendix F I 5 South Multimodal Corridor Study Cultural Resources Constraints Analysis (February 8, 2010)

847 Jamacha Road, El Cajon, California 92019-3206 tel: (619) 441-0144 fax: (619) 441-6421 February 8, 2010 Mr. Bruce McIntyre HELIX Environmental Planning 7578 El Cajon Boulevard La Mesa, California 91941 Reference: I-5 South Multimodal Study Cultural Resources Constraints Analysis Mr. McIntyre: Affinis was contracted to conduct a constraints study with regard to cultural resources for the I-5 South Multimodal Project. This letter report addresses the methods and results of the constraints study and summarizes potential cultural resources issues. No significant constraints have been identified related to cultural resources. Introduction The I-5 South Multimodal Project is located in southwestern San Diego County, from the Sweetwater Channel to Main Street in Chula Vista (Figures 1 and 2). The proposed project is intended to evaluate a series of possible transportation improvements along the I-5 corridor through the City of Chula Vista. The overall goal is to identify specific improvements to be included in the 2050 Regional Transportation Plan (RTP), being prepared by the San Diego Association of Area Governments (SANDAG). The primary focus of the project is on improvements related to the existing freeway and transit systems. Improvements to the existing rail system are also considered as a way to promote freight rail operations. Additionally, improvements to specific surface streets within the I-5 corridor are considered including street widening, sidewalks and bike lanes. A general description of each of the major transportation improvements being considered is provided below and illustrated in Figures 3a and 3b. Freeway Improvements Freeway improvements being considered include adding two high occupancy vehicle (HOV) lanes, interchange improvements (e.g. additional turn lanes, auxiliary lanes and modified ramp metering) and a braided ramp system which would interconnect interchanges to minimize the impact on cars getting on and off at the existing closely space interchanges. The possibility of moving the centerline of the freeway to the west to reduce encroachment from freeway and rail improvements into the existing development to east is also considered. 1

Transit Improvements Transit improvements being considered include enhancements to existing bus and trolley service. The addition of two new forms of transit (Bus Rapid Transit [BRT] or Arterial Rapid Transit [ART]) is also considered. Location of BRT transit stations within the freeway median are also being considered in conjunction with BRT service. Improvements to trolley service include adding an express trolley during the morning and afternoon peak commute hours, decreased headway intervals, and additional parking at trolley stations. Grade separation is also being considered at major intersections to reduce trolley conflicts with surface street traffic. Freight Rail Improvements Improvements being considered for rail operations would be focused on constructing a third track along the entire length or portions of the study area to allow freight operations to occur independent of trolley operations. This third track would also be used by the express trolley being considered as part of the transit improvements. In addition, several at-grade bypass tracks for freight trains are being considered. Surface Streets Improvements are being considered for H Street between I-5 and Broadway include widening the street from four to six lanes along with a raised median, a Class I bike path and a 16-foot parkway. Additional lanes would also be considered at the I-5 interchange. Non-motorized Improvements Non-motorized improvements include additional and/or enhanced sidewalks as well as improved bike lanes/paths. Figure 3 illustrates the study area and the general components of the combined alternatives. Methods In May 2009, Affinis obtained a records search from the South Coastal Information Center at San Diego State University for the study area and the immediate vicinity. The Native American Heritage Commission was contacted for a check of their Sacred Lands Files in May 2009, and letters were sent to the individuals and groups identified by the Native American Heritage Commission in January 2010. A field check of the project study area was conducted in January 2010. Geologic maps were checked to ascertain the potential for buried cultural deposits. Records Search Results As summarized in Table 1, nine archaeological and historic resources have been recorded within the project study area. These resources include two isolated flaked stone tools; a sparse scatter of artifacts and shell in a disturbed context; several flakes in a very disturbed area, which could not be found during a later survey; the Paradise Marsh Dump; three railways; and remnants of a World War I era kelp processing plant. 2

Table 1 Previously Recorded Sites in the Project Study Area Site Number Site Description Recorder, Year Comments (CA-SDI-) 4886 Isolate scraper Toren, 1977 Not a significant resource 4887 Isolate scraper and shell fragment Toren, 1977. Collett and Wade, Not a significant resource. Could not be found in 1990 5512 Sparse scatter of flakes, tools, shell. Heavily disturbed; in fill for transmission tower pad 7941 Three flakes. Heavily disturbed 8873H Paradise Marsh Dump most material from 1930s, also some pre- World War I and post- World War II 13,073H Coronado Belt Line railroad 16,385H Burlington Northern Santa Fe (formerly Atchison, Topeka and Santa Fe) Railway Primary Number (P-37-) 025680 San Diego and Arizona Railroad 1990 Corum 1978. Collett and Wade, 1990 Corum 1979. Collett and Wade, 1990 DeCosta and Kupel, 1981. Collett and Wade, 1990 Laylander 1993. Pigniolo, 1999. Pigniolo, 2000 Ballester and Woodard, 2002 Site Description Recorder, Year Comments Wee and Ferrell, 2000. Iversen, 2005. Pallette, 2006. Combined with CA-SDI-6025 in 1990 Could not be found in 1990. Not a significant resource No surface indications of the site in 1990, apparently buried; potentially significant Not National Register or California Register eligible but listed on City of San Diego Historic Landmarks (No. 640) Not a significant resource Not a significant resource 030176 Hercules Powder Company site World War I era kelp processing plant Craft, 2008 Significant resource National Register and California Register eligible The Hercules Powder Company site (P-37-030176) is eligible for the National Register of Historic Places and the California Register of Historical Resources, making it a significant resource. This site includes 13 features, nine of then associated with the World War 1 era kelp processing plant and four of unknown association. Additional elements of past industrial activities at Gunpowder Point were also identified in historic and recent aerial photographs. The site is west of Bay Boulevard, so impacts from the project are not anticipated, but if impacts to the site do occur, they would constitute significant effects. 3

The Paradise Marsh Dump site (CA-SDI-8873H) is potentially eligible for the National Register and the California Register, that is, potentially significant under the California Environmental Quality Act (CEQA). This site was recorded as a 20 th century dump, with the majority of material from the 1930s; some material predates World War I, and some post-world War II material was also found. There is no record that the site has been tested to assess its significance. The recorded area of this site has been heavily disturbed by various improvements to the area since its initial mapping in 1981, and the site may no longer exist. No surface indications of the Paradise Marsh Dump site were found during a 1990 survey, but the site record noted that the site might be buried. Based on this, there is a potential for impacts to the site. The Coronado Belt Line railroad (CA-SDI-13,073H) has been determined not eligible for the National Register or the California Register; however, it has been listed by the City of San Diego s Historical Resources Board (City Landmark No. 640). Due to this listing, impacts to this resource would be significant effects under CEQA. No other City along the rail route has designated the Coronado Belt Line as a historic resource (BRG Consulting 2007). Portions of the Coronado Belt Line may be affected by the project. There is no record that site CA-SDI-5512 has been evaluated to assess significance, so the site is potentially a significant resource; however, the disturbed context suggests that the site probably does not retain a high degree of significance. It is anticipated that any impacts to the site could be mitigated to below a level of significance. It should be noted there is another significant historic resource just outside the study area. The Western Salt Company Salt Works (South Bay Salt Works) is located just west of the project study area, at the south end of the project. This resource has been determined to be National Register eligible, so any impacts to it would constitute significant effects. Again, this resource is outside the project study area, but its proximity is important to note in case project plans change and include a larger area to the west. The segment of the San Diego and Arizona Railroad (P-37-025680) within the study area does not appear to have been separately addressed, but all other segments of the railroad that been evaluated are not significant resources. This segment also does not appear to be a significant resource. The Burlington Northern Santa Fe (formerly Atchison, Topeka and Santa Fe) Railway (CA-SDI-16,385H) has been determined not to be a significant resource. Impacts to these resources would not constitute significant impacts under CEQA. The isolates and the scatter of three flakes (which could not be found during a later survey) are not significant resources, and impacts to these would not constitute significant effects. Several buildings that are over 50 years old have been recorded in the project study area. These include a group of 10 houses on Dorothy Street, and a house and small gas station at 1196 Industrial Boulevard, all of which have been determined not to be significant resources. There are numerous buildings within the study area that are over 50 years old and have not been evaluated as to historic and architectural significance. While a windshield survey of these buildings suggests that none meet the significance criteria of CEQA, a project specific historic study will be required as part of more detailed environmental review for the project. 4

Native American Concerns The Native American Heritage Commission was contacted for a search of their Sacred Lands File. The file check did not indicate the presence of Native American cultural resources within ½ mile of the project study area. Potential for Buried Resources/Secondary Deposits The vast majority of the project area is mapped as alluvial deposits or undocumented fill soils. There is a potential for subsurface cultural resources in these alluvial soils. Buried sites without surface evidence have been identified in alluvial soils along the San Diego River and the San Luis Rey River and numerous other areas. Undocumented fill soils also have the potential to yield archaeological material. In much of the project area the fill soils are probably dredge spoils, which would not be expected to contain cultural material. However, prehistoric and ethnohistoric Kumeyaay habitation sites are known to have been located along San Diego Bay. If soils from these areas (or other areas with cultural material) were used as fill, there is a potential for encountering archaeological material in the fill. CA-SDI-5512, within the study area, was noted as being in fill soils for the pad of a transmission tower. CA-SDI-4630, located west of the project area, in the South Bay Salt Works property, exhibits both cultural material in fill soils and cultural deposits buried by fill (McGinnis et al. 2006). While context is important for understanding archaeological resources, sensitive cultural materials, such as human remains or culturally significant artifacts, have been encountered in fill soils in the past. As part of project specific studies, the archaeological consultant should review geotechnical studies and work with the geotechnical consultant to determine specific areas that have potential for encountering such secondary deposits in fill soils. Conclusions Several historic and archaeological resources have been identified within the project study area. While most of these are not significant resources, impacts to a few of the resources would constitute significant effects under CEQA and under federal regulations. In addition, there is a potential for subsurface cultural resources in alluvial areas and for cultural material in some undocumented fill soils. No Native American concerns have been identified. Project specific studies should be conducted once alignments are refined, but based on the information available for this study, there do not appear to be any unmitigable impacts associated with cultural resources. If you have any questions, you can reach me at (619) 441-0144 extension 18 or mary@affinis.net. Mary Robbins-Wade, RPA Director of Cultural Resources 5

References BRG Consulting 2007 Environmental Impact Report for the Proposed Bayshore Bikeway Western Salt Segment. BRG Consulting, San Diego. Report prepared for City of San Diego, Development Services Department. McGinnis, Patrick M., Andrew Pigniolo, and Stephanie Murray 2006 Cultural Resources Survey and Testing Report for the Bayshore Bikeway Project, Imperial Beach, California. Tierra Environmental Services, San Diego. Report submitted to City of San Diego, Development Services. Report on file at South Coastal Information Center, San Diego State University. 6