NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

Similar documents
NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

Youth Connection - J. Addams Alter HS

Explain in writing if the address of the building is different than the address on this form:

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

Explain in writing if the address of the building is different than the address on this form:

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and

DULANEY HIGH SCHOOL FEASIBILITY STUDY

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

ASBESTOS ROOF INSPECTION REPORT

LIMITED INDOOR MOLD ASSESSMENT

New High School Concept

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content

Average Life Span of Homes, Appliances, and Mechanicals

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Facilities Management State-Funded and Billable Services

RECORD OF FRIABLE AND NONFRIABLE ACM Inspection Date(s) July 31, 2013 (FORM B)

PART 5: HVAC & DHW SYSTEMS

Figure 41. Spermaceti Cove Life-Saving Station, south and east elevations.

PLATTEVILLE MIDDLE SCHOOL

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852

Activities involving little or no risk

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032

Summary of Repairs and Deficiencies

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

DOCUMENT TABLE OF CONTENTS

Lakehead University Asbestos Removals (2014 Audit) Residence:

Shown with optional metal roofs, front door with transom, upgraded porch columns, and landscape package. Yardley Model

ASBESTOS AWARENESS New Employee Training March Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator)

University of Wisconsin-Stevens Point REQUEST FOR ARCHITECTURAL & ENGINEERING DESIGN SERVICES NEALE RESIDENCE HALL RENOVATION PROJECT.

Asbestos Awareness at the University of Toronto

Edward Jenner Elementary Academy of the Arts

FAIRA TRANSPARENCY REPORTS th St SE, #13A, Auburn, WA January 25, 2018

THE HEMLOCK 3 BD 2.5 BA 1371 sq ft

1426 Hinman Ave Evanston, IL

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors


TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

SUNY Oswego Campus-wide Lactation Room Implementation Study. REVISED November 29, 2016

Calmeca Academy of Fine Arts and Dual Language

Designed with the environment in mind.

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

Electric Floor Warming Systems Installation and Operation Instructions. Mat Heating Systems and Cable Heating Systems. UL Listed for USA and Canada

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

LS-1 BID SET KITCHEN RENOVATION AND NEW FREEZER ORANGE PARK ELEMENTARY SCHOOL ORANGE PARK, FL PLAINFIELD AVE, LIFE SAFETY PLAN X X X X X

Safe Removal of Asbestos. Work Safe Week 2013

DMTF: Specific Building Recommendations

National Property Inspections

FIRE SAFETY UPGRADING CONSIDERATIONS for EXISTING SENIOR CITIZEN LODGES

TERRACE VIEW APARTMENTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

The cost of mold sampling which reveals no presence of disaster-related mold is not eligible for reimbursement.

Notice Basic Information Estimated Contract Value (USD) $100, (Not shown to suppliers) Reference Number Issuing Organization

b y C a p s t o n e H o m e s

Joseph Brennemann Elementary School

Regupol SonusClip Installation Guide for Walls or Ceilings with Wood or Steel Framing

Mechanical Inspection Plumbing

AFFORDABLE CANADIAN HOME INSPECTIONS

TERRACE VIEW APARTMENTS

DIVISION 15 MECHANICAL

All Around Home Inspections Ltd 1346 Hurford Ave Courtenay, BC. 123 Sample 6 Plex

Guidelines for Managing Mould Growth in State Buildings

Sidney Sawyer Elementary School

20/20 Home Inspections. Photo Attachments

RW West Consultants. Property Inspection Report NE 199th St, Kenmore, WA Inspection prepared for: FAIRA/ Chris Ellis Real Estate Agent: -

TERRACE VIEW APARTMENTS

FAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092

TERRACE VIEW APARTMENTS

A smarter, healthier way to live.

FAIRA TRANSPARENCY REPORTS th Ave SE, Renton, WA June 13 th, 2017

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018

RESIDENTIAL FACILITIES WINTER BREAK WORK PLANS (Residence Halls)

498 E. Bellevue Avenue Reading, PA 19601

Estimated Repair, Replacement, and Upgrade Costs

Introduction 2 QM_0662_CM_V General Waste 3. Recyclates 4. Construction Waste 6. Hazardous Waste 8. Food Waste 10


electric floor heating for everyone Heating mats Heating cables Temperature controllers

Community Streetscape

Standard Features. ashbysbridge.com. Mobile: (757)

A NEIGHBORHOOD BY TRI POINTE HOMES

Francis M McKay Elementary School

Caywood Builders Standard Selections

Transcription:

NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering and Technology was originally constructed in 1913; although specific information is unavailable, several renovations are evident. Engineering and Technology is a two-story, 8,840 ft 2 building which primarily serves as office areas and classroom areas for social science personnel. The interior floor finishes included carpet, floor tile, linoleum, stone flooring, and ceramic tile; the interior ceiling finishes included plaster, ceiling tile, and concrete; and the interior wall finishes included plaster, concrete, gypsum wallboard, and wood paneling. The roofing system is a flat rubber-membrane roof and the exterior of the structure is brick. The piping systems were insulated; fiberglass insulation (with and without hard fittings) and aircell insulation (with hard fittings) are located in the building. Steam and domestic water enter the building in a pit in room 105. HVAC systems located in the building consisted of steam radiators and forced air furnaces equipped with heating/cooling coils. 2.0 ASBESTOS SURVEY INFORMATION Engineering and Technology was surveyed as part of a larger project on NDSU s Fargo, ND Campus. This report is part of Volume 2 of a nine volume series. This report includes building specific information only; please refer to the opening section of Volume 2 for methodologies, definitions, and other pertinent supporting information. A total of 75 samples were collected from suspect asbestos-containing materials () from Engineering and Technology on June 18, 2007, an additional 9 samples were collected on May 13, 2008, and an additional 3 samples were collected on May 16, 2008. Laboratory analysis results indicate 13 of these samples tested positive for asbestos. 2.1 Suspect Materials Identified and Sampled Floor Tile (6 types) Linoleum Floor Filler Material Wall Patch Material Concrete Hard Plaster- Monocoat Joint Compound Sink Undercoating (2 types) Baseboard Adhesive Hard Fitting on Fiberglass Stair Tread Adhesive Exterior Window Glazing Exterior Building Seam Caulk (2 types) Exterior Window Caulk (3 types) Floor Tile (6 types) Underlayment Paper for Linoleum Ceiling Tile (4 types) Textured Paint Gypsum Wallboard Wall Texture (4 types) Tar Paper (under floor tile) Carpet Encapsulant on Fiberglass Aircell Pipe Ceiling Texture Exterior Door Caulk Exterior Penetration Putty The Asbestos Bulk Sample Results Table includes asbestos sampling data. LEGEND No. 0700048 ENGINEERING & TECHNOLOGY (A017) Page 1 of 2

2.2 Asbestos Containing Materials 12 Peach Floor Tile with Brown and White Marks and Underlayment Paper for Green and White Square Pattern Linoleum for 12 Gray Floor Tile with White/Dark Gray Marks for 12 Gray/Green Floor Tile with White/Black Marks Gritty Wall Texture Black Sink Undercoating Aircell Pipe Pipe (assumed) (assumed) The Locations/ Friable Materials Assessments Table include locations data. 2.3 Cost Estimates Legend Technical Services Inc. estimates abatement costs (removal & disposal) of for Engineering and Technology as follows: UNIT COST TOTAL COST Asbestos Floor Tile and/or 3,711 ft² $4.00/ft 2 $14,844.00 Asbestos Underlayment Paper for Linoleum 235 ft² $4.00/ft 2 $940.00 Asbestos Sink Undercoating 2 ea $150.00/ea $300.00 Asbestos Wall Texture 6,280 ft² $7.50/ft² $47,100.00 Asbestos Aircell Pipe 214 ft $25.00/ft $5,350.00 Asbestos 25 ea $60.00/ea $1,500.00 Total Estimated Abatement Costs: $70,034.00 2.4 Survey Notes LEGEND identified and sampled 4 separate types (homogeneous areas) of wall texture in Engineering & Technology; 1 type, a Gritty Wall Texture, tested positive for asbestos. LEGEND noted several walls in the building with multiple wall textures applied over each other. For example, the north wall in room 103 has 3 layers of wall texture applied; the different layers are readily identified by looking above the ceiling tile. The bottom layer of texture, a texture paint, is visible all the way up to the ceiling; the middle layer, the gritty wall texture, is visible as overspray as far up as approx. 1 from the ceiling tile; and the top layer, a heavy wall texture, is visible below the ceiling tile only. The middle layer is, LEGEND has identified this material on the Locations Diagrams and the Locations Tables. LEGEND No. 0700048 ENGINEERING & TECHNOLOGY (A017) Page 2 of 2

TYPE Now 199M Room 101 Underlayment Paper for Square Pattern Linoleum 30% Chrysotile 110 ft 2 Non-Friable Aircell Pipe 50% Chrysotile 12 ft Friable N/A* N/A* N/A* The asbestos underlayment paper is under the green and white square pattern linoleum. ceiling tile along the west wall. Room 102 for 12 Gray Floor Tile with Dark Gray Marks 8% Chrysotile 253 ft 2 Non-Friable Aircell Pipe 50% Chrysotile 30 ft Friable Assumed 1 fitting Friable N/A* N/A* N/A* The mastic for the 12 gray floor tile contains asbestos, only. ceiling tile along the north and west walls. Room 103 Abated April 2011 Aircell Pipe 50% Chrysotile 26 ft Friable Assumed 3 fittings Friable Gritty Wall Texture <1-3% Chrysotile 816 ft² Friable ceiling tile along the north wall. and west walls. * = Non-Friable materials were not assessed Page 1 of 9

TYPE Room 104 Abated April 2011 Aircell Pipe 50% Chrysotile 40 ft Friable Assumed 6 fittings Friable Gritty Wall Texture <1-3% Chrysotile 600 ft² Friable ceiling tile along the north and east walls. and east walls. Room 107 Abated April 2011 Aircell Pipe 50% Chrysotile 45 ft Friable Assumed 5 fittings Friable Gritty Wall Texture <1-3% Chrysotile 792 ft² Friable ceiling tile along the south and east walls. and east walls. Room 107A Gritty Wall Texture <1-3% Chrysotile 150 ft² Friable 7 The asbestos wall texture is behind the gypsum wallboard in the southeast corner of the room (visible above the ceiling tile). Room 108 Abated April 2011 Aircell Pipe 50% Chrysotile 16 ft Friable ceiling tile along the south and west walls. * = Non-Friable materials were not assessed Page 2 of 9

TYPE Assumed 3 fittings Friable Gritty Wall Texture <1-3% Chrysotile 672 ft² Friable and west walls. Room 109 for 12 Gray/Green Floor Tile with White & Black 8% Chrysotile 267 ft 2 Non-Friable N/A* N/A* N/A* The mastic for the 12 gray/green floor tile contains asbestos, only. Room 109A Assumed 128 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s. Aircell Pipe 50% Chrysotile 14 ft Friable Significantly ceiling tile, wrapped in fiberglass insulation along the west wall. Room 109B for 12 Gray/Green Floor Tile with White & Black Black Sink Undercoating 8% Chrysotile 267 ft 2 Non-Friable 3-5% Chrysotile 1 ea Non-Friable Abated Fall 2014 N/A* N/A* N/A* The mastic for the 12 gray/green floor tile contains asbestos, only. N/A* N/A* N/A* The asbestos undercoating is on a sink along the east wall. Aircell Pipe 50% Chrysotile 30 ft Friable ceiling tile along the south and west walls. * = Non-Friable materials were not assessed Page 3 of 9

TYPE Assumed 5 fittings Friable Hallway 188 12 Peach Floor Tile with Brown & White Marks and 3-10% Chrysotile 243 ft 2 Non-Friable Gritty Wall Texture <1-3% Chrysotile 348 ft² Friable N/A* N/A* N/A* The 12 floor tile and mastic contain asbestos and is on the west end of the building, only. 7 The asbestos wall texture is in the east end of the hallway (visible above the ceiling tile; refer to the Locations Diagrams. Hallway 188A Assumed 60 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s. Room 201 Assumed 236 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 202 Assumed 149 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 203 Assumed 91 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; * = Non-Friable materials were not assessed Page 4 of 9

TYPE Room 204 Assumed 88 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 205 Assumed 130 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 206 Assumed 160 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 206A Assumed 262 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Room 206B Assumed 115 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Now 299W Room 207 Underlayment Paper for Square Pattern Linoleum 30% Chrysotile 125 ft 2 Non-Friable Gritty Wall Texture <1-3% Chrysotile 460 ft² Friable N/A* N/A* N/A* The asbestos underlayment paper is under the green and white square pattern linoleum. * = Non-Friable materials were not assessed Page 5 of 9 7 The asbestos wall texture is on all the walls.

TYPE Room 208 Assumed 161 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s. Room 208A Assumed 36 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s. Room 209 Assumed 253 ft 2 Non-Friable Gritty Wall Texture <1-3% Chrysotile 680 ft² Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; they are under the carpet and on the west end of the room, only. east, and west walls. Room 209A Black Sink Undercoating 3-5% Chrysotile 1 ea Non-Friable N/A* N/A* N/A* The asbestos undercoating is on a sink along the east wall. Gritty Wall Texture <1-3% Chrysotile 520 ft² Friable 1 The asbestos wall texture is on the north, south, east, and west walls. Room 209B Gritty Wall Texture <1-3% Chrysotile 210 ft² Friable 7 The asbestos wall texture is on the north and east walls. * = Non-Friable materials were not assessed Page 6 of 9

TYPE Room 209C Gritty Wall Texture <1-3% Chrysotile 240 ft² Friable 7 The asbestos wall texture is on the south and east walls. Room 209D Gritty Wall Texture <1-3% Chrysotile 80 ft² Friable 7 The asbestos wall texture is on the south wall. Room 209E Gritty Wall Texture <1-3% Chrysotile 80 ft² Friable 7 The asbestos wall texture is on the south wall. Room 209F Assumed 188 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Gritty Wall Texture <1-3% Chrysotile 210 ft² Friable 7 The asbestos wall texture is on the west end of the north wall and the south wall. Room 209G Assumed 171 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Gritty Wall Texture <1-3% Chrysotile 340 ft² Friable and west walls. * = Non-Friable materials were not assessed Page 7 of 9

TYPE Room 210 Assumed 159 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Gritty Wall Texture <1-3% Chrysotile 350 ft² Friable 7 The asbestos wall texture is on the south, east, and west walls. Room 211 Assumed 140 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; Gritty Wall Texture <1-3% Chrysotile 290 ft² Friable 7 The asbestos wall texture is on the north, east, and west walls. 2 nd Floor Hallway (hallway by rooms 209C-209F) Assumed 30 ft 2 Non-Friable Gritty Wall Texture <1-3% Chrysotile 350 ft² Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s (they are under the carpet); refer to Locations Map for further information. 7 The asbestos wall texture is on the west end of the north wall and the south wall; refer to Locations Map for further information. Hallway 288A Assumed 124 ft 2 Non-Friable N/A* N/A* N/A* The 9 floor tile and mastic are assumed s; * = Non-Friable materials were not assessed Page 8 of 9

TYPE 1 Assessment Categories: 1) or Significantly 5) with Potential for Damage 2) Friable 6) with Potential for Significant Damage 3) Significantly Friable 7) Any Remaining Friable or Friable Suspected 4) or Significantly Friable End * = Non-Friable materials were not assessed Page 9 of 9