BURN NOTICE: KEEP THE HEAT AWAY!

Similar documents
Management Practices: Fire Protection Impairments November 2015

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

Risk Management Services

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

UNIVERSITY. Facilities Management

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Ls Vegas, NV (702) FAX (702)

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Renovation Program. Renovation Program GENERAL

Impairments to Fire Protection Equipment

FIRE PROTECTION PROGRAM

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

Electrical Safety Program

Fire Prevention Plan

Managing Fire Protection System Impairment

Fire Protection System Impairment Procedure

Fire System Impairment Policy

Muskogee Public Schools. Lockout/Tagout. Program

Austin Independent School District Police Department Policy and Procedure Manual

FIRE SAFETY AND PREVENTION POLICY

Chapter 18 Welding Table of Contents

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

PROTECTING YOUR PROPERTY INVESTMENT BEFORE DISASTERS OCCUR ARE YOU PREPARED?

Builders Risk - Fire Prevention Inspection Checklist

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

Date Issued: December 14, 2017 Revision: 2.1

Local Rules: Fire Safety

FIRE IMPAIRMENT NOTICE

Title: Fire Prevention During Welding, Cutting and Other Hot Work Plan (formerly the Cutting & Welding Policy)

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

Facilities Management

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

F&S Control of Hazardous Energy Program

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

Safe Operating Procedure

Fixed Fire Protection Getting it right, Ensuring Performance and Value

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

Fire Prevention Plan Program

Stationary Engineer 11 Month (Non-Exempt) HVAC - Maintenance Assistant Manager or Designee

Written Fire Safety Plans

Hot Work Program & Operational Guidelines. Environmental Health, Safety and Emergency Management (828)

HOT WORK SAFETY PROGRAM:

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Phase 2 Security Response

Fire Prevention Plan

EC 5.10 FIRE PREVENTION MANAGEMENT

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

Emergency Response Plan

Freezing of Water-Based Fire Protection Systems

FIRE PREVENTION PLAN EMERGENCY ACTION

Property Name & Address [ Property Name ] - [ Property Address ]

Environmental Health & Safety (EHS) and Public Safety s General Requirements for Contractors

Evacuation Fire Safety Program

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

Cold weather regions where temperatures can fall below freezing present a threat to any building housing water-filled systems.

Safety Manual: Emergency Response

RE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT

Fire Watch Program. Building Administrators Building Administrators will inform building occupants about fire watch events and building evacuations.

2010 FIRE CODE OF NEW YORK STATE

Safety & Security Services Services de Sûreté et Sécurité. Hot Work Protocol

Emergency Action Fire Prevention Plan

PROTECTING AGAINST ARC FLASH HAZARDS

WEST VIRGINIA UNIVERSITY

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days.

Maintenance of Fire Systems

Emergency Evacuation Plan South Patterson Building (SPB)

The following departments are responsible for preservation oflife and fire safety at the University of Toledo.

HOT WORK PERMIT PROCEDURES

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

RISK ENGINEERING GUIDELINE.

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

FIRE SAFETY MANAGEMENT PLAN

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Office of Risk Management EHS Hot Works Program

Hot Work Policy and Procedures

Lock Out/Tag Out: Control of Hazardous Energy (LOTO) Environmental Health &Safety / Risk Management

General Safety Training

Xavier Field Office Fire Prevention Plan. for. Xavier Field Office Dana Avenue

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Model Policy On Portable Fire Extinguishers (Ontario Version)

Emergency Evacuation Plan. Kettering Labs. School of Engineering

Fire Prevention Plan. California State University, Chico

SPECIAL AMUSEMENT OCCUPANCIES HAUNTED HOUSE, SCARE HOUSE OR MAZE

Hospice of Rutherford County Policies and Procedures

polyurethane & polyisocyanurate foam Six Steps for

a) Establishment of emergency procedures to be followed at the time of an emergency;

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

Transcription:

BURN NOTICE: KEEP THE HEAT AWAY! 2019 MHEC MPP LOSS CONTROL WORKSHOP MARCH 8, 2019 Jared Stolin Property Risk Consultant, Marsh Risk Consulting Mike Fairfield Sr. Risk Engineering Consultant, Zurich

Objectives Discuss strategies for implementing and/or improving the following key programs for higher education facilities: Hot Work Management Fire Protection Impairment Management

Use of contractors continues to increase Fires and other property losses involving contractors is at higher education facilities is trending up Remember that contractors are allowed to work in your facilities Over the past 10 years, contractors have been responsible for 30% of the number of fires and 55% of the amount of fire loss* *FMDS 10-4

Fire Statistics

Key areas of the Policy: Assign who is responsible to oversee the contractors for each job Require contractors are up to date on their heath and safety training Contractor Job Orientation Contractor Employee Certification Disciplinary Protocol

Which department/supervisor is providing oversight of the contractor? Engineering Maintenance EHS Campus Facilities Athletics Food Service Residential Life

Contractor Orientation Performed prior to every job Scope and limitations of the work Review of general contractor requirements Emergency procedures Termination and Contractor employee expulsion Access and area restrictions Daily Sign On Procedure and Contractor Liaison Hazardous work review List of contractor s employees and verification of Contractor Employee Certification

Contractor Employee Certification Individual Certification Verifies each individual is familiar with campus safety and other requirements Certification that allows that individual to work on your campus Expires after one year

Contractor Employee Certification Confirms the individual is familiar with the campus policies such as: Hot Work Fire Protection Impairments Hazardous Work Confine Space Lock Out/Tag Out Fall Protection Arc Flash

Contractor Employee Certification Example

Contractor Employee Certification Example

Conclusions 1. Oversight of Contractors 2. Contractor s employees should be certified to work on your campus 3. Contracts should reflect this protocol along with disciplinary actions

Loss Examples

Loss Examples

Loss Examples

Loss Examples

Hot work Programs Control over the hot work processes is vital. It is understood that within large educational settings many departments may have the responsibility for performing hot work or controlling contractors which perform hot work within the facilities. It is vital that a formalized program be developed that works within the parameters of the operations and allows for issuing hot work permits. It is recommended that a single entity within the operations controls and provides training to any additional entities within the school that will issue permits and oversees the program.

Hot Work Programs Critical Issues related to the development of an effective hot work program: All persons that will issue a hot work permit should be provided with proper training to evaluate the site of the work and consider all potential sources of ignition and combustibles. Critical is the ability to determine the area which must be maintained free from combustibles. Hot work programs should include the following points, additional evaluations by staff, consultants or insurance safety specialists may be required to identify all potential sources of concern. Hot work should not be attempted till proper evaluation by trained staff has been completed and approval for the process to continue. A policy must have a clear and concise process to follow including a means to contact the department or person responsible for providing the Hot Work review and permit for Hot Work. This process and contact information should be part of any contractor agreements, training and readily visible in locations where contractors sign into the operations.

Hot work Programs Critical Issues (cont.) Provisions in educational institutions should also include for afterhours hot work reviews and permitting. In departments which perform frequent hot work, plumbing shops, it is advisable to train additional staff in this department to issue permits. These staff should be trained annually and spot checks of the process, and work sites completed with an audit of completed tags. Please see NFPA 51B for these duties. In discussions prior to construction, where entire buildings, are controlled in construction by a general contractor, decisions should be made as to who is responsible for hot work safety. In general terms contractors should have a written hot work Program and be required to issue permits taking all responsibility for the program. The program should be randomly checked and audited for compliance with program requirements and contractual agreements.

Hot work Programs Conclusion: Educational campuses are unique in that they may have one to more than 100 buildings on their campus this makes management of a Hot Work Program difficult. With many campuses also including multiple departments requiring use of Hot Work Tags plus new construction control can soon be lost. It is important that there is one department that has ultimate control over the program and decides who can issue permits and if so what process will be instituted. There is a need for common training and education for the issuers of the hot work permits to ensure all precautions are covered and all permits meet the same high standards for fire and life safety.

Fire Protection Impairment Program The program is intended to safeguard investments in fixed fire protection by verifying fixed fire protection system outages are: Limited to the smallest area possible Limited to the shortest duration possible Accompanied by appropriate precautions

Fire Protection Impairments (What is an Impairment) Fire protection impairment is the shutdown of any fixed fire protection system including: Automatic sprinklers Underground fire mains Fire hydrants Fire pumps Fire protection water storage tanks, cisterns, or reservoirs Public water systems supplying fire hydrants or fire systems Special fire extinguishing systems (e.g. foam, carbon dioxide, FM200, dry chemical, or wet chemical) Fire alarm systems

Fire Protection Impairment Management of the impairment is critical to the success of the program. Again as with the other programs the coordination will all departments involved is difficult but must be functional and well thought-out. While the departments which identify, repair and report the impairment are important without including the affected Education Departments an exposure to loss may develop. As with Inspection, Testing and Maintenance Programs there will likely be multiple departments involved with this program to detect, monitor and repair the impairment. These would include: Risk Management and/or Environmental Safety and Health Department Facilities Management and Maintenance Public Safety and Security Construction or Construction Management Department Educational Department Heads

Fire Protection Impairment Program Conclusion: Protect your investment in fixed fire protection systems. Adopt and implement the Zurich Fire Protection Impairment program; limit the number, extent, and duration of impairments; apply appropriate precautions during impairments; and notify Zurich of all impairments.