NELSON HEAT TRACING SYSTEMS

Similar documents
NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS ALT-BC STANDARD POWER CONNECTION KIT

NELSON HEAT TRACING SYSTEMS INSTALLATION

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

SERGE BARIL HEAT TRACING SYSTEMS

Principle of Operation:

SERGE BARIL GTKB GUT TRACE KIT BAG

C Electrical Connection Kit

JBM-100-LBTV2 Power Connection, Powered Splice, Dual Power Connection, or Splice with Junction Box

C A Heating Cable Gland Kit

JB-RTD-STAND RTD PIPE STAND FOR COMBINATION POWER CONNECTION BOX AND ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

Toll Free:

KE-Series Constant-Wattage Heating Cable

Toll Free:

Consignes d installation

1SC-SSC Splice Connection Kit Installation Instructions

HWT-P HWAT POWER CONNECTION KIT WITH END SEAL INSTALLATION INSTRUCTIONS

PLSRR Heat Trace Cable Data Sheet

JBS-100-ECP-A COMBINATION POWER CONNECTION BOX AND DIGITAL ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

HEATING CABLE RATINGS APPROVALS* Drexan Energy Systems, Inc. Kelowna, BC, Canada, V4V 1S5

Self-regulating Roof Heat and Gutter Trace Cable

HS-TSPLICE - HEATSHRINK TEE / SPLICE. Installation Instructions

FTC-HST WARNING: CAUTION:

Self-regulating Roof Heat Cable

Toll Free:

Heat Tracing Sales Mt. Airy, Maryland Heating Cable. Cut to Length in Field. Description

DESTU. Direct Entry Sealed Termination Unit. Installation Instructions. Suitable for use in either safe or hazardous areas.

INSTALLATION INSTRUCTIONS

RayClic Connection System

XL-Trace System Application and Design Guide

Thermal Devices, Inc. Mount Airy, Maryland USA Heating Cable. Cut to Length in Field

H908 WinterGard Plug-in Power Connection Kit with End Seal

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Installation & Maintenance

Pipe Freeze Protection. Flow Maintenance. Introduction. XL-Trace System

Silverware Pre-washing System INSTALLATION

Raychem Heating System

Electric Floor Warming Systems Installation and Operation Instructions. Mat Heating Systems and Cable Heating Systems. UL Listed for USA and Canada

F1202 TRACE HEATING. Road & Ramp

PVC Ductwork Model. Installation and Maintenance for

Documentation. Parallel Heating Cable. Type: ELP

Fast and Easy Cooler Mash Tun Build

SELF-REGULATING PIPE TRACING HEATER CABLE

Cable Connectors For Armored Cable, Flexible Metal Conduit, Interlocked AC-38 Cables, NM and SE Cable

TECK-40 Series 1000V Class Splice for 4/C Armored Teck Power Cables

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

SWIVEL HEAD WASTE AND OVERFLOW INSTALL

JBS-100-EC Electronic controller replacement kit for JBS-100-ECP-A and JBS-100-ECW-A Installation Instructions

Data Sheet. Self regulating process heating tapes RS stock numbers ,

INSTALLATION MANUAL FOR MODELS: TERAZZA, TRACCIO, MILANO, CERRATO

TT3000 and TT5000 Series

Data Sheet. Self regulating heating tapes. RS stock numbers

Design Guide and Installation Details for Self-Regulating Heating Cable

QAA 142 Termination instructions Self-regulating trace heaters type ELSR-NA and -HA in Div1 with heater entry kit EL-HAZELECT Kit part No: 09CA051

breeze easytm model # F100-1W

VACUUM VALVES AND HOSES

Product Support Bulletin

The DEF-System by BRUGG. The Best Way to defeat the problem of DEF heat Installation Instructions

Frost Heave Protection System Installation and Operation Manual

FireSystems PROTECTOWIRE. Installing Protectowire Linear Heat Detector

HEATRACE. Young Chang Silicone Ltd, Co. SELF-REGULATING PIPE TRACING HEATER CABLE. Installation, Operation & Maintenance Manual

Pellet Stove. Flex Pipe. Appliance Connector

FIRE SPRINKLER SYSTEM FREEZE PROTECTION XL-TRACE SYSTEM

Hot Water Temperature Maintenance. HWAT System. Product Selection and Design Guide

INSTALLATION MANUAL FOR MODELS: SOVANNA, BREZZA, TERRACINA, VENADO

JGK-MS-2/3 Jacketed Concentric Neutral Cable Mid-Span Grounding Kit

Installation, Operation and Service Manual

an ISO 9001:2008 Registered Company

DISHWASHER. Models DW2432 and DW2432SS. Installation Manual. Write Serial Number (on inner door of unit) here:

BlueHeat AirTop 2000 Heater

DRAFT INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

HOT WATER TEMPERATURE MAINTENANCE HWAT SYSTEM

STAINLESS STEEL TUB INSTALLATION

R B10 Series : SMB CARLOCK

First Trace Heating Product Details

Installing Protectowire Linear Heat Detector

INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP

Installation and Maintenance Instructions

Remote Water Quality System Standard Equipment (supplied by EPI) Remote Water Quality System Optional Equipment (supplied by EPI)

CHAPTER 11 HEATING AND VENTILATION

Chevrolet Impala Condenser Kit with Drier (021062)

Series SFN Unbraided Flexible Hose Assemblies Series SFB Braided Flexible Hose Assemblies

Helically wound resistance wire coil made

INSTALLATION OF VENTING SYSTEM COMPONENTS WARNING

INSTALLATION INSTRUCTIONS Model FH-2071-UM Enclosure

Heating cable solutions for temperature-related problems

AquaBlox Water Matrix

Ribbon Breakout Kit Installation Instructions

HOTFOIL HB MODULE HEATING SYSTEM INSTALLATION, OPERATION & MAINTENANCE MANUAL HB.IOM.R3

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

1964 ½-66 Ford Mustang Condenser Kit with Drier with Driver Side Connections (011065)

Manual No: Revision: D. Sump Sensor. Installation Guide

Replacement Parts List

pushing the tube into the rear of the water outlet housing with a slight twisting motion to evenly distribute the adhesive. After cleaning off any ext

Speedlock AMC Connectors...KA1. Armored Cable Connectors...KB1-KB5 Metal Clad Cable Connectors...KB1-KB5 Flexible Metal Conduit Connectors...

Transcription:

DESCRIPTION The ALT- continuity monitor device is used to monitor bus continuity on a parallel type heater cable. After the heater cable is installed on the pipe, connect the ALT- to the opposite end of the power connection kit. KIT CONTENTS 1 Device 1 Power Termination 1 Conduit Locknut 1 Box Adapter 1 Sealing Grommet 1 Gasket 1 Stand-off 1 Tube of Silicone 1 Label 2 Pipe Clamps 2 Wire Nuts Device Silicone Box Cover Gasket Power Termination Conduit Locknut Gasket Label Sealing Grommet J-Grommet - Overjacket Product B-Grommet - Base Product U-Grommet - non-standard construction Stand-off Box Adapter *Heater Cable (see warning below) *Fiberglass Tape Pipe Clamps *ITEMS NOT INCLUDED IN KIT Note: This detail shows Braided CB Products only. For Overjacket J or JT Products see diagram on sheet 8. Article 427-22 of the National Electrical Code requires that all heaters shall have metal coverings and be provided with branch circuit ground-fault protection. Sheet 1 of 9

STAND-OFF POSITIONING Section View A A (recommend installing at the 4 or 8 o'clock positions.) 8 o'clock 4 o'clock Do not place pipe clamps over the heater cable. 254mm (10") A Pipe Clamps Fiberglass Tape (not included in kit) Stand-off A Fiberglass Tape (not included in kit) Stand-off Sealing Grommet Box Adapter Power Termination Mark pipe where stand-off will be mounted. Push heater cable through bottom opening of stand-off. Slide the sealing grommet over the heater cable and position inside stand-off opening: for Braided CB Products: See Grommet Installation for Braided CB Products, sheet 3. for Overjacket J or JT Products Proceed with step 4 below. Apply silicone around the heater cable on top of the sealing grommet and fill any voids in sealing grommet. Slide the box adapter over the heater cable and tighten securely to stand-off. Prepare heater cable for power termination: for Braided CB Products, see sheet 3. for Overjacket J or JT Products, see sheet 4. Terminate heater cable, see sheet 7. GA-2075 Rev. 1 Sheet 2 of 9

SEALING GROMMET FOR BRAIDED CB PRODUCTS 13mm (.5") Slide braid back, allowing at least 13mm (.5 ) of heater cable exposed. Cut and remove 13mm (.5 ) of heater cable. Slide braid back over heater cable and twist excess braid into a pigtail. Slide the sealing grommet over the heater cable and position inside stand-off opening. Continue with step 4 on sheet 2. BRAIDED CB PRODUCTS 127mm (5') While bending the heater cable, work it through the braid opening. Secure cable braid with fiberglass tape. Slide braid back 127mm (5 ) to create a bulge. At the bulge, separate the braid to make an opening. cut off excess braid 114mm (4.5") Pull the braid tight. Cut off excess braid. Proceed to LT, CLT & HLT Products, sheet 5 Sheet 3 of 9

OVERJACKET J or JT PRODUCTS DO NOT CUT BRAID 127mm (5") Lightly cut around cable overjacket 127mm (5") from the end. Bend cable to break the overjacket. Lightly cut overjacket up the center between first cut mark and the cable end. Bend cable to break the overjacket. At the bulge, separate the braid to make an opening. While bending the heater cable, work it through the braid opening. Remove overjacket from heater cable. cut off excess braid 114mm (4.5") Move braid back toward the overjacket, creating a bulge. Pull the braid tight. Cut off excess braid. Proceed to LT, CLT & HLT Products, sheet 5. GA-2075 Rev. 1 Sheet 4 of 9

FOR ALL NELSON LT, CLT & HLT PRODUCTS (See sheet 6 for an alternate stripping method for HLT products.) 102mm (4") Lightly cut around cable outer jacket 102mm (4") from the end. Bend cable to break outer jacket. Lightly cut the outer jacket up the center between the first cut mark & the cable end. Bend cable to break outer jacket. Starting at the end, pull each bus wire away from the core material. Remove exposed core material. Remove the jacket from the heater cable. Cut 6mm (0.25") off the end of each bus wire. Proceed to Power Termination, sheet 7. DO NOT CUT BUS WIRES Shave the core material from the outside of each bus wire. Sheet 5 of 9

HLT PRODUCTS ALTERNATE STRIPPING METHOD 102mm (4") Lightly cut around cable outer jacket 102mm (4") from the end. Bend cable to break outer jacket. Lightly cut the outer jacket up the center between the first cut mark & the cable end. Bend cable to break outer jacket. Starting at the end, in the same plane as the cable, pull each bus wire away from the core material. Remove the jacket from the heater cable. Remove the exposed core material. Make a cut inside each bus wire. Remove the remaining core material off the outside of each bus wire. Cut 6mm (0.25") off the end of each bus wire. Proceed to Power Termination, sheet 7. GA-2075 Rev. 1 Sheet 6 of 9

POWER TERMINATION Bus wires must not touch or cross while inserting into power termination. 13mm (.5") apply silicone here Push power termination to overlap jacket. The silicone will set up in about 30 minutes with a complete cure after 24 hours. Proceed to Electrical Connection, sheet 8. Insert bus wires into power termination. Squeeze power termination opening and fill with silicone. Sheet 7 of 9

DEVICE CONNECTION Wire Nut Power Termination Conduit Locknut Box Adapter Note: This detail shows Overjacket J or JT Products only. For Braided CB Products see diagram on sheet 1. Place gasket onto the box adapter. Position the device onto the box adapter and secure it with the conduit locknut. Connect heater bus wires together with the lead wires using the wire nuts. (See diagram above.) Make sure all wires are placed inside the device. Place the box cover and box cover gasket onto the device. See sheet 9 for Cable Connections to CM-1 and CM-2/1. GA-2075 Rev. 1 Sheet 8 of 9

CABLE CONNECTIONS TO CM-1 & CM-2/1 Branches are monitored by current flow on process applications. Short side branch (under 254mm (10")) Long side branch CM-1 JB JB JB (Typ.) Wire & conduit to series connect segments. Long side branch will not work Branch / Tee Piping (single circuit, multiple cable segments) CM-1, CM-2/1 Heater Connection Kit Pipe Heater Cable Field Wiring will not work Grouped Segments (several separate cables through single monitor point) Nelson Heat Tracing Systems products are supplied with a limited warranty. Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.com. Sheet 9 of 9