Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. Ramiro Andrés Cremaschi Julia Alejandra Perinetti Repsol YPF

Similar documents
KBC Petro-SIM Design Tools Integrated Equipment Operations. Al Shelton - KBC

2007 KBC Advanced Technologies plc. All Rights Reserved.

DELAYED COKER UNIT (DCU)

Moving to the Cloud: The Potential of Hosted Central Station Services

Field Products. Experion LX. Proven DCS for a wide range of industrial applications

Protect your investment with Safety Manager

Dynamic Solutions. Endless Possibilities. Steve Padasack, Finch Paper LLC Rick Van Fleet, Honeywell

Protect your Investment with Safety Manager R160 and Integrated Fire and Solutions

Steam Temperature. HanPHI Catches at KNPC: Naphtha Unit. Early Warnings Generated by HanPHI

Functional Versus Schematic Overview Displays: Impact on Operator Situation Awareness in Process Monitoring

AP1000 Advanced Control Room

Pre-engineered Sample Systems for TALYS ASP400 series with fiber optic interface

DeltaV Operate. Product Data Sheet DeltaV Operate December 2006 Page 1. Introduction. Benefits

Fired Heaters Key to Efficient Operation of Refineries and Petrochemicals

DEHYDRATION AND DESALTING

THE LOGICAL SELECTION FOR YOUR SYSTEM INTEGRATION

Industrial Security Capabilities. Honeywell Proprietary

L automazione al servizio della manutenzione

Critical Condition Management on a Corporate Scale. Lyondell Is a Major Global Chemical Company

For Complete Fire and Gas Solutions

Controllers, Indicators & Set Point Programmers

Experion LX Direct Station Specification

Gas Value Chain Solutions. Randy Miller

Compact Product Suite Compact HMI 6.0 Overview ABB

This series is utilized for waste streams which are not prone to hardening in the presence of liquid solvent, and provides ease of residue removal.

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION

Oil Stabilization Optimization

DeltaV Analyze. Introduction. Benefits. Continuous automated DeltaV System alarm system performance monitoring

DON T JUST REPORT ON ALARMS, TAKE

WACKER SILICONES IN THE OIL & GAS INDUSTRY

DeltaV Live. Introduction. Benefits. Modern, built-for-purpose operations experience

Driving Field Productivity and Safety

Technical Development Program. Honeywell Training Services

Turbomachinery Control on the Honeywell Experion PKS Platform

2015 Honeywell Users Group Europe, Middle East and Africa

DIPL Solutions and Services

PETROKEMYA (SABIC) Control Loop Performance Monitoring and Assessment

White Paper. Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System

B. M/s. Yokogawa and C. M/s. Honeywell

Martin Huber 26September 2017 F&G SOLUTIONS FOR THE PROCESS INDUSTRY

PRODUCT REVIEW Honeywell HC900 Hybrid Vacuum Furnace Control System

Real-Time Root Cause Analysis for Complex Technical Systems

FACILITY CONTROLS BUILDING AUTOMATION SYSTEM (BAS) DESIGN AND CONSTRUCTION STANDARD

Universal Tag Locator. Operations management software for process facilities

Design Benefits and Advantages:

GMS GRAPHICAL MANAGEMENT SYSTEM

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

ENERGY OPTIMIZATION IN THE MAA GAS PROCESSING FACILITIES

A formula for success

API RP 1175 PIPELINE LEAK DETECTION- PROGRAM MANAGEMENT WORKSHOP APRIL 26 TH AND 27 TH, 2017

MaxiCoking Technology Breakthrough Technology for Improved Existing Delayed Coker Performance

AmpLight Lighting Management System

2013 Honeywell Users Group Americas. Joe Bastone. Experion PKS Slick Tricks

DeltaV Operate. DeltaV Operate. Introduction. DeltaV Product Data Sheet. Robust and secure plant operations

SAFETY MANAGER SC Ensure safety, simplify operations and reduce lifecycle costs

AERATION AND GRAIN CONDITIONING FANS AND HEATERS PROVEN & DEPENDABLE

Improving the Performance and Reliability of Fired Heaters and Boilers

Designing the Right Access Control System A Case Study. 12 th May 2010

SYNERGY IN LEAK DETECTION: COMBINING LEAK DETECTION TECHNOLOGIES THAT USE DIFFERENT PHYSICAL PRINCIPLES

F&G detection system for LNG plants

L automazione al servizio della manutenzione nell industria di processo

Honeywell Romania HPS Bucharest

Saman Afzar Instrumentaion Procurement & Engineering Co. INSTRUMENTAION & CONTROL SYSTEM.

Introduction. Introduction

2013 Honeywell Users Group Europe, Middle East and Africa. Erik de Groot. Safety and Fire & Gas Solutions

Tyco Integrated Security Monitoring Services. Helping you secure your business 24 hours a day, 365 days a year. Safer. Smarter. Tyco.

2012 Honeywell Pacific Users Group. Sus tain.ability.

A New Approach to ESB Migration Building a foundation for Digital Business

WEBs AX Security. Integrated Security With Simple, Web-Based Management

LOW-NOX BURNER RETROFIT CHALLENGE

Efficiency & Savings through On-Line Chemical Cleaning

FactoryTalk Alarms and Events. System Configuration Guide

Stavros Chrysanthou Madrid DynAMo Alarm Management Secrets to unlocking complete Operational Integrity

Thermo Scientific Smart-Vue Wireless Monitoring Solution obsessive is SMART

Gencoa Limited, Physics Road, Liverpool, UK 2. Gencoa USA, Davis, CA, USA 3. Nano4Energy, Madrid, Spain 4. Universidad Autonoma de Madrid, Spain

Datasheet Crowd Management

Applying Buncefield Recommendations and IEC61508 and IEC Standards to Fuel Storage Sites

Facility Commander Complete, Integrated Command and Control

Security & Communications INTRUSION AND ALARM COMMUNICATIONS

DynAMo Alarm & Operations Management

Radiometric Level Measurement in DCU Challenges, Solutions and Interpretation Author: Dr. Jan Sielk Process Control

DeltaV Connect Solution for Honeywell Systems

RLDS - Remote LEAK DETECTION SYSTEM

SmartVFD HVAC and BYPASS

Fully redundant and customizable alarm, monitoring & Control system

armfield COMPUTER CONTROLLED HEAT EXCHANGER SERVICE MODULE HT30XC series issue 2

Complete Security Solution

International Association of Certified Practicing Engineers

Home center Interface Server. Technical sheet

THE SIGNIFICANCE OF RELIABLE PRESSURE CONTROL IN OILFIELD BURNER SYSTEMS

The benefits of modern Integrated Control and Safety Systems architectures for FPSO facilities.

IEC Functional Safety Assessment

POWER BOILER TRAINING SIMULATOR ESB, LOUGH REE POWER

EC PARTS CERTIFICATE GB-1432

Facility Commander Wnx

Heat Exchanger Solutions For the oil and gas industry

Safety Instrumented Fire & Gas Systems

Honeywell Video Systems Product Guide

2013 Honeywell Users Group Americas. Jeff England & Dal Vernon Reising Successes & Challenges for Designing Effective Level 1 and Level 2 Displays

Security Management System - Configuring Video Analytics

Transcription:

Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. Ramiro Andrés Cremaschi Julia Alejandra Perinetti Repsol YPF

Introduction - What is Repsol YPF? A multinational company leader in Spain and Argentina. Business activities in Exploration, Production, Refining, Distribution, Marketing, Chemicals, Gas and Power. Operations in four continents One of the world s ten most important private oil companies. 2 2004 Users Group Americas Symposium Partners in Innovation

Introduction - What is Repsol YPF? LPG business Sales over 3 millions tones/year Third largest company in the world. Over un million barrels of oil per day. Oil and gas reserves: more than 5 billion barrels of oil equivalent. Refining capacity: 1.2 million barrels per day Nine refineries. 3 2004 Users Group Americas Symposium Partners in Innovation

Introduction - Where is the Luján de Cuyo Refinery? Next to Mendoza City in Argentina, South America, at the foot of the Andes mountains. 4 2004 Users Group Americas Symposium Partners in Innovation

Background A lesson learned. Two [DMC] controllers in 1992: Fluid Catalytic Cracking Unit #2 (FCC II) Delayed Coker Unit #2 (Coker II) Units operation conditions changed Lack of knowledge transfer System abandoned and dismantled Mixed feelings in console operators 5 2004 Users Group Americas Symposium Partners in Innovation

Background A lesson learned. Reinstrumentation project in 1997 Implementation of five multivariable control projects Developement of a group of specialists Work and training with Honeywell Growing responsibility and higher participation 6 2004 Users Group Americas Symposium Partners in Innovation

Connecting Honeywell and ABB DCS Hardware and Software provided by Honeywell Hi-Spec Solutions Profit Viewer Profit Controller PHD SERVER PHD Client and Profit Viewer Station Hardware provided by Repsol YPF PHD Client Profit Viewer NT Client Workstation Repsol YPF LAN (ongoing project) OPC RDI PHD API PHD API HCI API Local Area Network (LAN, Ethernet) OPC Server Enterprise Historian USER API Software provided by Matrikon Hardware platform provided by ABB AdvaInfo software provided by ABB ABB DCN (Distributed Control Network) 7 2004 Users Group Americas Symposium Partners in Innovation

Connecting Honeywell and ABB DCS The interface: ABB: Enterprise Historian (EH) OPC server Honeywell: Process History Database (PHD) 8 2004 Users Group Americas Symposium Partners in Innovation

Connecting Honeywell and ABB DCS ABB DCS: Programs in TCL code to handle: ON/OFF from console stations Watch Dog Set Point validation Mode switching PID loops reconfiguration 9 2004 Users Group Americas Symposium Partners in Innovation

Connecting Honeywell and ABB DCS OPC Server Developed by Matrikon (Canada) Support from Honeywell, ABB and Repsol YPF PHD Windup Status virtual configuration RMPCT Inferential calculations Events detection 10 2004 Users Group Americas Symposium Partners in Innovation

The first five projects December 2000, FCC II Reactor, Regenerator and Main Fractionator March 2001, Coker II Furnaces, Main Fractionator and Gas Plant December 2001, Topping IV Crude Unit and Gas Plant. Vacuum Unit November 2002, Delayed Coker #1 11 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant First in-house project ABB DCS platform Previous successful experience on this unit Interface reconfiguration Point building on the ABB DCS and PHD module 12 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant First in-house project Gas plant hardware: High Pressure Separator (HPS) Naphtha Stripper Primary Absorber Secondary Absorber Debutanizer Depropanizer 13 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant First in-house project Gas Plant Products: Stabilized Naphtha Butane Propane/Propilene Fuel Gas 14 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant First in-house project Advance Control Objectives: Minimize the propane content in the fuel gas stream Minimize the butane content in the propane stream Minimize the propane content in the butane stream. Minimize the Reid Vapor Pressure of the stabilized naphtha Eliminate gas recycle problem Steady the product stream flows 15 2004 Users Group Americas Symposium Partners in Innovation

RDI Execution K2GP_CTL (51") K2_WRITE (55") C2_READ_LO (00") C2_READ_MD (05") C2_READ_HI (10") K2MF_CTL (48") C2GP_CTL (14") K2HT_CTL (44") K2_READ_HI (40") RDI Clock C2RR_CTL (18") K2_READ_MD (35") C2_WRITE (30") K2_READ_LO (25") 16 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant First in-house project 17 2004 Users Group Americas Symposium Partners in Innovation

Inferential Calculations Cromatographer delay: 45 minutes. Inferentials have been built for: Propane content in Fuel Gas stream (C3 in FG). Propane content in Butane stream (C3 in C4). Butane content in Propane stream (C4 in C3). Naphtha s Reid Vapor Pressure (RVP). 18 2004 Users Group Americas Symposium Partners in Innovation

Results Evaluation (C4 in C3) Butane content before controller implementation Butane content after controller implementation 19 2004 Users Group Americas Symposium Partners in Innovation

Results Evaluation (C3 in FG) Propane content before controller implementation Propane content after controller implementation 20 2004 Users Group Americas Symposium Partners in Innovation

Results Evaluation (RPV) Reid Vapor Pressure before controller implementation Reid Vapor Pressure after controller implementation 21 2004 Users Group Americas Symposium Partners in Innovation

Gas recycle: Stripper-HPS-Primary absorber Wet gas composition, to the HPS, change due to: FCC reactor conditions External LPG streams Over absorption of light components in the primary absorber. High temperature at the stripper s bottom: naphtha over stripping. Low temperature of the primary absorber outlet gas Low temperature of the wet gas Low temperature of the absorbent stream (debutanized naphtha). 22 2004 Users Group Americas Symposium Partners in Innovation

Gas recycle: The Solution Manipulation of : Gas flow from the stripper Naphtha absorbent Control: Differential temperature inside the Stripper C3 purge into the FG 23 2004 Users Group Americas Symposium Partners in Innovation

The FCC II gas plant Conclusions Utilization Index: 98% High degree of satisfaction (Operations) All objectives met Nine-month execution period 24 2004 Users Group Americas Symposium Partners in Innovation

Topping III: 2004 Project in progress. Crude Distillation Unit Ongoing work Step Test phase Commissioning before end of 2004 Hands on training of new members of the team 25 2004 Users Group Americas Symposium Partners in Innovation

Summary and Conclusions Clues to Success: High degree of commitment from the Management. Deep knowledge and comprehension of the process. Simulation and off-line tuning. 26 2004 Users Group Americas Symposium Partners in Innovation

Summary and Conclusions Training of console and field operators, supervisors, plant managers and process engineers. A scheduled and systematic monitoring activity. Continuous coaching to other members of the control group. Extensive documentation on each stage of development. 27 2004 Users Group Americas Symposium Partners in Innovation

Questions? You can contact us at: rcremaschil@repsolypf.com jperinettis@repsolypf.com 28 2004 Users Group Americas Symposium Partners in Innovation