THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Similar documents
MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

SECTION 4(f) DE MINIMIS DOCUMENTATION

Index to Projects by Project Name

Capital Projects impacting Odenton Town Center

CITY OF SIMI VALLEY MEMORANDUM

Spring 2018 Construction Update

Capital Projects in and near Odenton Town Center

2040 Long Range Transportation Plan

Planning Districts INTRODUCTION

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

CITY OF VALPARAISO STORMWATER MASTER PLAN

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Engineering Department

9 th Street Sub Area Plan

Fall 2017 Construction Update

Location. Served. Category. Units Start Year. Previous Appropriations

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Cottage Grove Road Reconstruction. City of Madison Engineering

Rezoning Transportation Analysis Petition Number: General Location Identifier:

PROJECTS UNDER CONSTRUCTION

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

The transportation system in a community is an

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

[Leveraging & Improving Neighborhood Connections] Area A Riverfront

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Project Descriptions for FY 15

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Roads Plan

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Index to Projects by Project Name

Public input has been an important part of the plan development process.

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

Public Works Annual Report FY

8 October 14, 2015 Public Hearing

Rutherford County Projects

Public Works Project Delivery Report

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Waukee. City of. The Key to Good Living

2017 General Obligation Bond

Clay Street Bridge Replacement Project

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

Places29: List of Implementation Projects

CTH C RESURFACING Douglas County, Wisconsin

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

ROAD PAVING VARIOUS LOCATIONS LANE KM

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

University Park Subdivision Street Assessment Report

1 PURPOSE AND NEED 1.1 PURPOSE OF THE PROPOSED ACTION 1.2 NEEDS FOR THE PROPOSED ACTION

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Portage Parkway Environmental Assessment Public Information Centre No. 1

BAGBY STREET RECONSTRUCTION PROJECT OCTOBER 2, 2015

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

APPENDIX F: DETAIL DRAWINGS

FDOT D4 Complete Streets

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

City of Bristol Route 6 Corridor Implementation Program

Prince William Street Project (Grant Avenue to Wellington Road)

Proposed Capital Improvement Program and Capital Budget FY & FY

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

DESIGN CRITERIA PACKAGE

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

5-Year Street Reconstruction Plan ( )

Victoria Bridge Municipal Class EA Civic Works Committee

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

FY Capital Improvement Program Parks and Landscaping. 8 - Summary

A G E N D A Council Update Training Room September 26, :45 p.m.

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Transportation Committee

Goals and Objectives. Garfield Blvd. Washngton Park

North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Henderson County Project Prioritization Discussion

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run

Regional and Local Perspectives

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

Public Information Centre. Welcome

Parapet/Formliner/Fencing

Transcription:

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018

Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering Performs Continuous Review of Capital Needs and Infrastructure Condition Assessment Director of Public Works & Engineering meets with Division Heads to Rank Project Needs and Prepare DRAFT CIP Village Board Approves Annual Operating Budget and CIP Public Works & Engineering Submits DRAFT CIP to Village Administration for inclusion in Village Budget Village Board holds public hearings on proposed annual budget and CIP seeking community stakeholder feedback

CIP Project Lifecycle Project Initiation/Development Public Outreach Needs Analysis & Prioritization Preliminary Engineering Design & Permitting Advertise and Award Construction Project Close Out Advertise & Award Preliminary Engineering & Design, Environmental, & Permitting Construction & Project Close-Out Service Life (O&M)

FY2016 Projects FY2016 Street and Infrastructure Construction FY2016 Pavement Preservation Program IL 176 60/83 Schank Improvements Hawley Street Construction Diamond Lake Road US 45 Sanitary Sewer IDCEO Traffic Signals at Community Park Safe Routes to School Improvements Midlothian Road Multi Use Path Design Allanson Rd. Washington Blvd. Traffic Signals McKinley Ave. Pedestrian Overpass FY2017 Street & Infrastructure Improvements Design Loch Lomond Storm Outfall Improvements North Hills Subdivision Watermain Design Sanitary Lift Stations #5 and #6 Upgrades FY2017 Projects

FY2016 Street & Infrastructure Construction $4,200,000 THE CONSTRUCTION WILL BE SPLIT INTO TWO LETTINGS TO OBTAIN BEST PRICING. Part 1 includes Ambria Subdivision and portions of the Cambridge Country Subdivision. Planned improvements in these areas will be curb and gutter repair and pavement mill, patch and overlay. Part 2 is Carlyle Park Walnut Street and Clearbrook Park Subdivisions. Planned improvements include pavement reconstruction, drainage enhancements, watermain replacement (including a segment along Lake Street) and sanitary sewer replacement. FY2016 Projects

FY2016 Pavement Preservation Program $150,000.00 THE PRESERVATION AREAS MAY BE INCLUDED IN THE ANNUAL STREET PROJECT TO OBTAIN BEST PRICING. This annual program has been established in order to make repairs to streets that are not part of the annual street improvement project. The service life of the selected streets will be extended by grinding off the existing surface and replacing it with new asphalt. The FY2016 program will include: Jeannette Place (176 Charlotte) Courtland (Seymour Hawthorne) Orchard St. (Shaddle Washington) Shaddle (McKinley Dean) FY2016 Projects

FY2016 IL 176/60/83/Schank $5,000,000.00 In collaboration with the Illinois Department of Transportation the IL 176/60/83 intersection will be widened to accommodate turn lanes. Planned work generally includes pavement widening, milling and resurfacing the existing pavement, select curb and gutter installation, minor storm sewer and drainage improvements, traffic signal modernization and interconnect modifications, and site restoration. FY2016 Projects

FY2016 Hawley Street Construction $2,100,000.00 (Village Share) In collaboration with the Lake County Department of Transportation, Hawley Street will undergo a complete reconstruction between Midlothian Road and Seymour Avenue. A new traffic signal system will be installed at the California Avenue intersection and the existing signals at Seymour Avenue will be modernized. New water and sewer infrastructure is also part of the project along with the complete reconstruction of Hawley Court. FY2016 Projects

FY2016 Diamond Lake Lake Street Sanitary Sewer Project $800,000.00 New sanitary sewer infrastructure will replace and relocate critical sewer lines that have deteriorated beyond repair and are prone to surcharge. A $85,000 CDBG grant will be utilized for project funding. FY2016 Projects

FY2016 IDCEO Traffic Signal at Community Park Entrance $333,225.38 Under a $350,000 Illinois Department of Commerce & Economic Opportunity grant, a new traffic signal system will be installed at the Midlothian Road entrance to Mundelein Park & recreation District s Keith Mione (Community) Park. FY2016 Projects

FY2016 Safe Routes to School Improvements $225,000.00 Under a $250,000 Safe Routes to School grant, sidewalk improvements will be made at Carl Sandburg Middle School as well as the Washington Early Learning Center. In addition, several gap areas in the public sidewalk will be filled including: Greenview at Crystal Intersection Emerald at Courtland Intersection Woodlawn between Prairie and Garfield Lincoln between Lakeview and Northshore FY2016 Projects

FY2016 Midlothian Road Multi Use Path Design $26,000.00 The design of a multi use path along Midlothian Road between Hawley Street and IL 60/83. This path will connect the existing sidewalk system with Lake County s Prairie and Millennium Paths. A CMAQ/TAP grant application has been submitted and Phase 1 engineering is underway. FY2016 Projects

FY2016 Allanson Road Washington Blvd. Signal System Upgrade $165,000.00 The Allanson Road Washington Blvd. traffic signal system has reached the end of its service life, replacement parts are no longer supported by the manufacturer and therefore planned equipment upgrades are proposed. FY2016 Projects

FY2016 McKinley Ave. Pedestrian Overpass Design $400,000.00 The design of a grade separated overpass of the CN Railroad tracks connecting the Cardinal Square Development to the Metra Commuter Rail Depot and downtown businesses is planned. Federal grants including CMAQ/TAP will be applied for to provide funding. The Illinois Commerce Commission s 5 Year Crossing Safety Improvement Program includes $2,000,000 in assistance. FY2016 Projects

FY2016 FY2017 Street & Infrastructure Design $125,000.00 The design of the FY17 street and infrastructure improvements will plan for the reconstruction of additional Loch Lomond area streets together with the installation of curb, storm sewer and the replacement of water and sewer mains. This will be paired with the concrete street rehabilitation of Huntington Drive. The full scope of the Loch Lomond portion of the project will be determined prior to awarding design services. FY2016 Projects

FY2016 Loch Lomond Storm Sewer Outfall Improvements $130,000.00 Select storm outfalls to Loch Lomond will be repaired/replaced. FY2016 Projects

FY2016 North Hills Subdivision Water Main Replacement Design $65,000.00 The Village maintains the water and sewer mains in the unincorporated North Hills Subdivision. The water main is deteriorating and the replacement design is planned. FY2016 Projects

FY2016 Lift Stations #5 and #6 Improvements $450,000.00 Sanitary Sewer Lift Station #5 (Ambria Drive) and #6 (Armour Blvd.) will be upgraded. These lift stations are beyond their service life and require rehabilitation, with no major maintenance completed on either since their original installation in 1964 (#5) and 1989 (#6). FY2016 Projects

FY2017 Projects Allanson/Butterfield Multi Use Path Design Midlothian Road Multi Use Path Construction Long Meadow Estates Multi Use Path Design East Hawley Street Reconstruction Design FY2017 Pavement Preservation Program FY2017 Street & Infrastructure Construction FY2018 Street & Infrastructure Design Seavey Drainage Way Construction Maple Avenue (IL 176) Watermain Replacement Design North Hills Watermain Replacement Construction Sanitary Sewer Main Lining Program FY2016 Projects FY2018 Projects

FY2017 Allanson/Butterfield Multi Use Path Design $35,000.00 Design of a off street path connecting the Washington Boulevard Bike Path to Midlothian Road commercial and the Greg s Parkway Path in Vernon Hills. It is anticipated that the design effort will be utilized to pursue a federal grant. FY2017 Projects

FY2017 Midlothian Road Multi Use Path Construction $575,000.00 The construction of a multi use path along Midlothian Road between Hillside Drive and Courtland Street. This path will connect the existing sidewalk system with Lake County s Prairie and Millennium Paths. FY2017 Projects

FY2017 Long Meadow Estates Multi Use Path Design $30,000.00 Design of an at grade, off street, hard surface pedestrian bicycle path to provide an alternative to automobile transportation for a neighborhood of more than 325 homes to Mundelein's School District # 75 Mechanics Grove Elementary School. The neighborhood is physically separated from the elementary school by the unimproved State Route 53 Right of Way. It is anticipated that the design effort will be utilized to pursue a federal grant. FY2017 Projects

FY2017 East Hawley Street Reconstruction- Design $250,000.00 The design of the reconstruction of East Hawley Street from Seymour Avenue to IL 176. The expectation is that Lake County will partner with the Village to construct the improvement and ultimately accept a jurisdictional transfer. FY2017 Projects

FY2017 FY2017 Pavement Preservation Program $150,000.00 This annual program has been established in order to make repairs to streets that are not part of the annual street improvement project. The service life of the selected streets will be extended by grinding off the existing surface and replacing it with new asphalt. Exact locations for the program are determined the year prior to the proposed improvements. FY2017 Projects

FY2017 FY2017 Street & Infrastructure Construction $2,700,000.00 The construction of the FY17 street and infrastructure improvements in Loch Lomond and Huntington Drive based upon the scope of work and limits of construction developed in the design phase during FY2016. FY2017 Projects

FY2017 FY2018 Street & Infrastructure - Design $125,000.00 The design of the FY2018 street and infrastructure improvements. Project will include the reconstruction of streets in the Loch Lomond Subdivision together with the installation of curb and storm sewer and the replacement/repair of water and sewer mains. FY2017 Projects

FY2017 Seavey Drainage Way Construction $2,500,000.00 There are various alternatives to accomplishing the goal of proper conveyance of stormwater runoff. The scope of the work will be dependent on proposed development of parcels adjacent to and abutting the drainage channel. FY2017 Projects

FY2017 Maple Avenue (IL 176) Water Main Replacement Design $85,000.00 The water main along Maple Avenue between Midlothian Road and California Avenue is deteriorating and the replacement design is planned. FY2017 Projects

FY2017 North Hills Subdivision Water Main Construction $925,000.00 The Village maintains the water and sewer mains in the unincorporated North Hills Subdivision. The water main is deteriorating and the replacement construction is planned. FY2017 Projects

FY2017 Sanitary Sewer Main Lining Program $250,000.00 Cured in place pipe (CIPP) lining of select sewer mains is planned. FY2017 Projects

FY2018 Projects Allanson/Butterfield Multi Use Path Construction Long Meadow Estates Multi Use Path Construction Lake St Allanson Rd and Diamond Lake Rd Design Maple Avenue (IL 176) Multi Use Path Construction East Hawley Street Reconstruction Construction FY2018 Pavement Preservation Program FY2018 Street & Infrastructure Construction FY2019 Street & Infrastructure Design Lange/Anthony/Prospect Storm Sewer Lining Maple Avenue (IL 176) Watermain Replacement Design Sanitary Sewer Main Lining Program FY2017 Projects

FY2018 Allanson/Butterfield Multi Use Path Construction $425,000.00 Construction of an off street path connecting the Washington Boulevard Bike Path to Midlothian Road commercial and the Greg s Parkway Path in Vernon Hills. A federal grant may or may not be available as a funding source. FY2018 Projects

FY2018 Long Meadow Estates Multi Use Path Construction $225,000.00 Construction of an at grade, off street, hard surface pedestrian bicycle path to provide an alternative to automobile transportation for a neighborhood of more than 325 homes to Mundelein's School District # 75 Mechanics Grove Elementary School. The neighborhood is physically separated from the elementary school by the unimproved State Route 53 Right of Way. A federal grant may or may not be available as a funding source. FY2018 Projects

FY2018 Lake St Allanson Rd and Diamond Lake Rd Design $350,000.00 The intersections of Diamond Lake Road and Allanson Road with Lake Street are within close proximity of one another limiting efficient flow of traffic. Having two collector streets intersect an arterial roadway in such a disjointed fashion creates traffic backups and circulation issues for vehicles traveling along all three routes and impacts access to the adjoining commercial properties. FY2018 Projects

FY2018 Maple Avenue Multi Use Path Construction $250,000.00 Construction of the proposed multi use path (pedestrian and bicycle) link on IL 176 (Maple Avenue) between Midlothian Road (County Highway 73) and US 45 (Lake Street). It will provide a connection to an existing multi use path along Midlothian Road that connects to public schools, a public library and shopping and is the first link in a planned interconnection with the multijurisdictional North Shore Bike Path that presently terminates on the eastern border of Mundelein. The cost represents the anticipated Village share of a 80/20 Federal Grant. FY2018 Projects

FY2018 East Hawley Street Construction $800,000.00 The construction of the East Hawley Street Improvements from Seymour Avenue to IL 176. The expectation is that Lake County will fund the construction with the Village funding the replacement of Village assets followed by the jurisdictional transfer. FY2018 Projects

FY2017 2018 FY2018 Pavement Preservation Program $150,000.00 This annual program has been established in order to make repairs to streets that are not part of the annual street improvement project. The service life of the selected streets will be extended by grinding off the existing surface and replacing it with new asphalt. FY2017-2018 Projects

FY2017 2018 FY2018 Street & Infrast. Construction $2,700,000.00 The construction of the FY2018 street and infrastructure improvements. Project will include the reconstruction of streets in the Loch Lomond Subdivision together with the installation of curb and storm sewer and the replacement/repair of water and sewer mains. FY2017-2018 Projects

FY2018 FY2019 Street & Infrastructure Design $130,000.00 The design of the FY2019 street and infrastructure improvements. Project will include the reconstruction of streets in the Lakewood Heights Subdivision together with installation of curb and storm sewer and the replacement/repair of water and sewer mains as necessary. FY2018 Projects

FY2018 Lange/Anthony/Prospect Storm Sewer Lining $120,000.00 Cured in place pipe (CIPP) lining of select storm sewer mains is planned. FY2018 Projects

FY2018 Maple Avenue (IL 176) Water Main Construction $1,250,000.00 The construction of the replacement of the water main along Maple Avenue between Midlothian Road and California Avenue. FY2018 Projects

FY2018 Sanitary Sewer Main Lining Program $250,000.00 Cured in place pipe (CIPP) lining of select sewer mains is planned. FY2018 Projects