BUSINESS PARK TOWN OF OKOTOKS

Similar documents
CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

2-B-18-UR. Revised: 3/27/2018

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

L0.1 E BROADWAY TREE MANAGEMENT LEGEND. TREE MANAGEMENT PLAN Scale: 1:100. Vancouver, BC September 2018

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

PART E SPECIFICATIONS

LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.


NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Town of Fuquay-Varina

Construction Specification for Planting

Applicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR:

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

OVERALL LANDSCAPE PLAN

VICINITY MAP 1" = 1000'

DIVISION II PLANTING SECTION 02950

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

DISCOUNT TIRE - IAD 10739

TREE CONSERVATION REPORT

SECTION AMENDED TOPSOIL

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Section 815. LANDSCAPING

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Guelph Humane Society Section PLANTING Page 1


PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

A. Contractor shall provide product data for each type of product indicated.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Milpitas College Extension Milpitas Dry Landscape

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

Vegetation Management

ACTIVITY: Trees, Shrubs and Vines ES 10

Don t Put a $100 Tree in a $10 Hole

CHURCH STREET MAIN STREET CHURCH STREET

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN


This section covers the planting of seed, sod, trees and vegetation.

DRAWING LIST GENERAL NOTES

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS

SECTION LANDSCAPING

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Request for Approval of Design Modification

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Specifications for Using Filtrexx Growth Media Blankets

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

EXTERIOR PLANTS


ISSUED FOR DEVELOPMENT PERMIT

Landscaping Your Development

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.

UNAUTHORIZED CHANGES ACCURACY OF UTILITIES

WMU Tree Care Plan and Policies

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

A. Surface parking areas shall be constructed of bituminous paving.

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

SECTION TREES, PLANTS AND GROUND COVERS

SIUE LANDSCAPE UPGRADE

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

Lawn Solutions Australia. Simple specifications for turf installation

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration


Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Landscape area requirement compliance and landscape plans

January 30, Design Rationale Statement RE: CITY OF KELOWNA REZONING / DP APPLICATION: FORTIS PARKING LOT

HALIFAX REGIONAL MUNICIPALITY

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

SECTION TREE TRANSPLANTING

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

4.0 Concept Plan Implementation

Guidelines for planting within the 100 Ft. Buffer

FIRST SISTER LAKE STORMWATER RETROFIT

Sullivan County Tree Selection Guide

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Tree Pits Construction Guide

5000 Acres Initiative at PCC Sylvania in Portland OR

Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE

Transcription:

@ TOWN OF OKOTOKS LANDSCAPE TENDER DRAWINGS - 31 JANUARY 2016 L1. DEMOLITION PLAN L2. LAYOUT PLAN L3. GRADING PLAN L4. PLANTING PLAN. SECTIONS AND DETAILS File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:26:42 PM by yogeshwar navagrah

EXISTING ASPHALT PATHWAY EXISTING CATCH BASIN TO REMAIN EXISTING METAL POST AND CABLE FENCE TO BE REMOVED APPROX. LENGTH - 12M HOLES LEFT OVER DUE TO REMOVAL OF POSTS ARE TO BE FILLED WITH STRUCTURAL FILL IN LAYERS OF 150MM AND COMPACTED TO 98% S.P.D.. PORTION OF THE FENCE NOT USED TOWARDS THE NEW FENCE ALIGNMENT IS TO BE DISPOSED OF. TEST PIT LOCATION 1 TOPSOIL DEPTH AT LOCATION 1 = 16" (406MM) AS PER DATA PROVIDED BY TOWN OF OKOTOKS EXISTING RESIDENTIAL TEST PIT LOCATION 2 TOPSOIL DEPTH AT LOCATION 2 = 16" (406MM) AS PER DATA PROVIDED BY TOWN OF OKOTOKS EXTENT OF PROJECT WORK AREA EXISTING CONCRETE SIDEWALK EXISTING METAL POST AND CABLE FENCE EXISTING FARM FENCE TO BE REMOVED AND DISPOSED OF APPROX. LENGTH OF FENCE- 41M HOLES LEFT OVER DUE TO REMOVAL OF POSTS ARE TO BE FILLED WITH STRUCTURAL FILL IN LAYERS OF 150MM AND COMPACTED TO 98% S.P.D.. ALL S ARE TO BE PROVIDED WITH 50MM OF TOPSOIL PRIOR TO SEEDING. APPROXIMATE LOCATION OF EXISTING TREES EXISTING TREES TO BE MAINTAINED TREE PROTECTION FENCE SEE 4/ FOR DETAILS EXISTING METAL POST AND CABLE FENCE TO BE REMOVED AND REUSED FOR THE NEW FENCE ALIGNMENT APPROX. LENGTH OF FENCE REMOCAL- 34.3M HOLES LEFT OVER DUE TO REMOVAL OF POSTS ARE TO BE FILLED WITH STRUCTURAL FILL IN LAYERS OF 150MM AND COMPACTED TO 98% S.P.D.. PORTION OF THE FENCE NOT USED TOWARDS THE NEW FENCE ALIGNMENT IS TO BE DISPOSED OF. TEST PIT LOCATION 3 TOPSOIL DEPTH AT LOCATION 3 = 9" (229MM) AS PER DATA PROVIDED BY TOWN OF OKOTOKS EXISTING ASPHALT PATHWAY SAWCUT EXISTING ASPHALT PATHWAY AT A DISTANCE OF MM FROM THE END POINT. REMOVE AND SIPOSE OF THE MM WIDE PORTION OF ASPHALT. BEGIN NEW PATHWAY CONSTRUCTION FROM THE SAWCUT LINE. TENDER DEMOLITION PLAN L1 File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:42:51 PM by yogeshwar navag

R6180 27465 4055 LEGEND 7885 R26800 12155 ASPHALT PATHWAY 97030 R49735 0 TYP. 2430 20080 22835 R2795 23200 42430 3400 GRAVEL PATHWAY TO CITY OF CALGARY PARKS GRAVEL SPECIFICATIONS TREE AND SHRUB PLANTING BED EARTH BERM (REUSE OF SOIL EXCAVATED AS PART OF PATHWAY CONSTRUCTION) R49735 25480 24005 54070 R31530 R74520 54920 1200 23355 62560 2800 2735 R34375 2865 SIGNAGE FOR NATURAL AREAS TO BE SUPPLIED BY TOWN AND INSTALLED BY CONTRACTOR. TEST PIT LOCATION 1 SIGNAGE POSTS TO BE MOUNTED IN 1200MM DEPTH, 300MM DIA CONCRETE FOOTING SANDSTONE BOULDERS *** ALL BOULDERS IN PLANTING BEDS TO BE MIN. 1M WIDE X 0.8M LONG X 0.8M HIGH ***BOULDERS IN GRAVEL PATHWAY TO BE BETWEEN 0.3M - 0.5M HEIGHT 1265 21685 67780 3000 R216630 3 SECTION B-B 19525 LOG BENCH TO BE SUPPLIED BY THE TOWN AND INSTALLED BY CONTRACTOR 4140 2955 R11995 70345 R18775 16860 70265 R69820 13660 34885 176935 11045 28580 TEST PIT LOCATION 2 1155 R17850 9950 R68685 25580 4580 R26400 PROPOSED GARBAGE RECEPTACLE (QTY:1) TYPE - HID-A-BAG I MINI WASTE CONTAINER (SINGLE COMPARTMENT) MANUFACTURER: HAUL ALL 8510 6930 R2560 3000 R30270 RELOCATED AND UPD PARK SIGN. DOG BAG DISPENSER TO BE MOUNTED ON THE SIGN POST R16665 0 10300 19520 17880 R4260 12010 11455 4490 33835 5680 2620 2905 5065 38025 12150 R32060 5010 R3995 2 SECTION A-A 1200 1200 LOG BENCH TO BE SUPPLIED BY THE TOWN AND INSTALLED BY CONTRACTOR RELOCATED METAL POST AND CABLE FENCE POST SPACING TO FOLLOW THE POST SPACING AND FOOTING DETAIL AS EXISTING FENCE. CURRENTLY THERE ARE NO AS BUILT AVAILABLE FOR THE EXISTING FENCE AND THE FOOTING DETAIL I.E. WHETHER THE FENCE POSTS HAVE CONCRETE FOOTING OR SIMPLY MOUNTED IN COMPACTED GROUND. 49915 14520 1980 2800 R6875 34790 5190 7290 4020 2800 4650R9190 4810 5570 9980 10030 16850 28020 R34685 6125 SIGNAGE FOR NATURAL AREAS TO BE SUPPLIED BY TOWN AND INSTALLED BY CONTRACTOR. 0 TYP. SIGNAGE POSTS TO BE MOUNTED IN 1200MM DEPTH, 300MM DIA CONCRETE FOOTING 27125 R3715 1465 18890 4380 15550 R12205 27780 17015 R8650 19975 6675 62290 4000 ALL S ARE TO BE PROVIDED WITH 50MM OF TOPSOIL PRIOR TO SEEDING. APPROXIMATE LOCATION OF EXISTING TREES EXISTING TREES TO BE MAINTAINED TEST PIT LOCATION 3 TREE PROTECTION FENCE SEE 4/ FOR DETAILS TENDER LAYOUT PLAN L2 File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:43:08 PM by yogeshwar navag

5.00% 20.00% LEGEND PRIORITY AREA I FOR USE OF FILL EXCAVATED AS PART OF PATHWAY CONSTRUCTION TO CREATE GENTLE AND EVEN TRANSITION FROM EDGE OF PATHWAY TO BACK OF PROPERTY. STOCKPILE ALL EXCAVATED FILL AT THIS LOCATION PRIOR TO SPREADING IT OVER THE GIVEN AREA. EXISTING CONTOURS EXISTING CONTOURS PROPOSED CONTOURS 25.00% ALL S ARE TO BE PROVIDED WITH 50MM OF TOPSOIL PRIOR TO SEEDING. TENDER GRADING PLAN L3 File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:43:23 PM by yogeshwar navag

PLANTING SCHEDULE LEGEND ***BOULDERS IN GRAVEL PATHWAY TO BE BETWEEN 0.3M - 0.5M HEIGHT DECIDUOUS TREES CONIFEROUS TREES DECIDUOUS SHRUBS common name latin name size/ spread quantity deciduous trees TREMBLING ASPEN POPULUS TREMULOIDES 50MM CAL. 27 coniferous trees LODGEPOLE PINE PINUS CONTORTA 'LATIFOLIA' 3000MM HT. 6 TAMARACK LARIX LARICINA 3000MM HT. 5 deciduous shrubs CINQUEFOIL POTENTILLA FRUTICOSA 2 GALLON POT 18 CANADA BUFFALO BERRY SHEPHERDIA CANADENSIS 2 GALLON POT 14 SEED MIX 30-35% Creeping Red Fescue 15-25% Chewings Fescue 15-35% Hard Fescue 15-20% Sheep Fescue TO BE APPLIED AT A RATE OF NOT LESS THAN 300 KG/HA. 3 SECTION B-B 2 SECTION A-A ALL S ARE TO BE PROVIDED WITH 50MM OF TOPSOIL PRIOR TO SEEDING. TENDER PLANTING PLAN L4 File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:52:06 PM by yogeshwar navag

40MM TO 100MM CALIPER TREE OR CONIFEROUS TREE MULCH 50MM-75MM DEPTH,STARTING 50MM FROM ROOT FLARE. (TRUNK) EXTEND TO THE EDGE OF DRIP LINE OR MM PLACE ROOTBALL ON COMPACTED OR UNDISTURBED SUBGRADE COMPACT CLAY BELOW ROOTBALL 1 EARTH BERM 2 EXISTING NATURAL LANDSCAPE SPACING AS PER PLANTING PLAN 400 TYPICAL TREE PLANTING DETAIL scale - 1:25 SECTION A-A scale - 1:25 13.50 13.00 12.50 50MM DEPTH TOPSOIL FOR 150 MM MIN. GRAVEL TO CITY OF CALGARY PARKS SPECIFICATIONS SINGLE LEADER (UNLESS MULTISTEM SPECIES IS SPECIFIED) 2MM (1/2") BRAIDED NYLON STRAP USE THREE 1800MM PAINTED T-BARS (STAKING OPTIONAL) GRAVEL TO CITY OF CALGARY PARKS SPECIFICATIONS INSTALLED TO 150MM DEPTH ROOT FLARE AT GRADE COMPACT EXPOSED SUBSOIL TO 98% S.P.D.MIN. GRAVEL PATHWAY REMOVE ORGANIC SOILS FOR ASPHALT PATHWAY SUBBASE. RECOMPACT EXPOSED SOIL TO 98% MIN. (IF NECESSARY ADD GRANULAR FILL TO BRING BASE TO APPROPRIATE GRADE. COMPACTED TO 98% S.P.D. MIN.) ***BASED ON THE TEST PITS DUG ON SITE, IT IS ESTIMATED THAT THE AVERAGE DEPTH OF TOPSOIL VARIES FROM 9" - 16" ALONG THE PROPOSED ASPHALT AND GRAVEL PATHWAY ALIGNEMNT 100MM OF 25MM CRUSHED GRAVEL COMPACTED TO 98% 300MM : - EDGE OF BED TO BE STAKED AND APPROVED BY LANDSCAPE ARCHITECT; - DO NOT ALLOW AIR POCKETS TO FORM WHEN BACK FILLING; - IF STAKING, STAKE BEYOND EDGE OF ROOT BALL. BARS SHOULD BE HAMMERED DOWN INTO SOLID FOOTING (AT LEAST 400MM INTO SUB-SOIL BASE). USE 2MM (1/2") BRAIDED NYLON STRAP TO PROTECT THE TREE AT THE POINT OF CONTACT; - IF TREE IS IN WIRE BASKET, CUT AND REMOVE STRAPPING AND THE HORIZONTAL / VERTICAL WIRES OF THE UPPER 1/3 AS A MINIMUM. PULL BACK BURLAP TO THE SAME MINIMUM; - PRUNE DEAD BRANCHES TO MAINTAIN NATURAL FORM OF TREE. DO NOT PRUNE HEAVILY AT PLANTING. GRAVEL PATHWAY INSTALL ROOT BARRIER (POLYSPUN 300 OR APPROVED EQUIVALENT) ALONG ENTIRE LENGTH OF ASPHALT PATHWAY ON RECOMPACTED EXPOSED SOIL. SEE CITY OF CALGARY PARKS - LANDSCAPE CONSTRUCTION - CURRENT EDITION SANDSTONE BOULDER INSTALLED ON COMPACTED GRAVEL BASE BOULDER HEIGHT BETWEEN 300MM -MM PLANTING BED 600MM 4 150 MM MIN. ASPHALT PATHWAY PAVE WITH 75MM OF CITY MIX "B" ROLL/ TAMP ASPHALT EDGES MINIMUM DENSITY 96%. ASPHALT TYPE "B" MIX. REFER TO THE CURRENT EDITION CITY OF CALGARY STANDARD SPECIFICATIONS, ROADS CONSTRUCTION (CURRENT EDITION) REMOVE ORGANIC SOILS FOR ASPHALT PATHWAY SUBBASE. RECOMPACT EXPOSED SOIL TO 98% S.P.D.MIN. (IF NECESSARY ADD GRANULAR FILL TO BRING BASE TO APPROPRIATE GRADE. COMPACTED TO 98% S.P.D. MIN.) ***BASED ON THE TEST PITS DUG ON SITE, IT IS ESTIMATED THAT THE AVERAGE DEPTH OF TOPSOIL VARIES FROM 9" - 16" ALONG THE PROPOSED ASPHALT AND GRAVEL PATHWAY ALIGNEMNT FOOTHILLS PREMIUM MULCH TOPSOIL SCARIFY PIT BOTTOM 50MM DEPTH TOPSOIL FOR 100MM OF 25MM CRUSHED GRAVEL COMPACTED TO 98% WOOD POSTS ORANGE SNOW FENCING TREE PROTECTION FENCE DETAIL scale - 1:50 PROTECTED TREE ZONE WARNING SIGN 13.50 13.00 12.50 INSTALL ROOT BARRIER (POLYSPUN 300 OR APPROVED EQUIVALENT) ALONG ENTIRE LENGTH OF ASPHALT PATHWAY ON RECOMPACTED EXPOSED SOIL AS PER CITY OF CALGARY PARKS - LANDSCAPE CONSTRUCTION - CURRENT EDITION EXISTING NATURAL LANDSCAPE EXISTING GROUND 3 EXISTING TREES 2400 TYP. FOOTHILLS PREMIUM MULCH 600MM PLANTING BED SECTION B-B scale - 1:25 1200 MIN. TOPSOIL ALL S ARE TO BE PROVIDED WITH 50MM OF TOPSOIL PRIOR TO SEEDING. ***TREE PROTECTION FENCE TO BE REMOVED UPON COMPLETION OF CONSTRUCTION. 1. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL NOT BE STORED IN THE TREE PROTECTION ZONE. 2. ALL STAGING, HOARDING AND STORAGE OF MATERIALS AND EQUIPMENT SHALL BE AT THE DESIGNATED AREA. 3. TREE PROTECTION FENCE IS TO BE INSTALLED PRIOR TO BEGINNING OF ANY CONSTRUCTION WORK WITHIN THE 34MR. 4. PARKS INSPECTOR SHALL BE CONTACTED TO BE ON SITE AT FOLLOWING STAGES OF TREE PROTECTION FENCE CONSTRUCTION: - COMMENCEMENT - STAKING OF TREE PROTECTION FENCE ALONG THE ER-MR - COMPLETION OF TREE PROTECTION FENCE 5. TREE PROTECTION MEASURES PRIOR TO AND DURING CONSTRUCTION: - PROVIDE SIGNAGE INSTRUCTING NO CONSTRUCTION WORK OR MATERIAL IS TO ENCROACH IN THE TREE PROTECTION ZONE. 6. ON SITE TREE PROTECTION ADMINISTRATOR - TO BE ASSIGNED UPON SELECTION OF GENERAL CONTRACTOR*** THE TREE PROTECTION ADMINISTRATOR SHALL ENSURE ALL CONSTRUCTION WORK ADHERES TO THE APPROVED TREE PROTECTION MEASURES AND THAT ALL CONTRACTED STAFF WORKING ON SITE ARE AWARE OF THE TREE PROTECTION REQUIREMENT AND THE APPROVED TREE PROTECTION MEASURES. FOOTHILLS PREMIUM MULCH SCARIFY PIT BOTTOM EXISTING METAL POST AND CABLE FENCE 50MM DEPTH TOPSOIL FOR EXISTING LANDSCAPE 13.50 13.00 12.50 TENDER SECTIONS AND DETAILS File Location: N:\Projects\. Business Park MR Okotoks\Current\Construction Drawings\_Site Landscape Plan_160131.dwg Plotted: January 31, 2016 1:55:55 PM by yogeshwar navag