Stormwater Control Plan: Small (Tier 1) Land Development Project

Similar documents
Preparing a Stormwater Control Plan for a Small Land Development Project

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

City of Vallejo. Stormwater Control C.3 Compliance Information. Addendum to C.3 Guidebook by Contra Costa Clean Water Program

Stormwater Technical Guide

6.2 Flow-Through Planter

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Standard Specifications for Lot-Scale Measures for Small Projects

Homeowners Guide to Stormwater BMP Maintenance

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Selecting Appropriate Stormwater Control Measures for Your Development Project

The following general requirements will be met for all planter box installations:

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

New Tools/Resources for

J. Paul Guyer, P.E., R.A.

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Green Infrastructure and Low-Impact Development Technologies

6.1 Bioretention Areas

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

Appendix G. Detailed Design

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Appendix D - Technical Design Criteria for BMPs

Site Design Requirements for Small Projects

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

City of Petersburg, Virginia Stormwater Utility Program Residential Fee Credit Manual (Revised March 2014)

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Green Infrastructure & Low Impact Development

Bioretention cell schematic key

4. CONCEPT PLAN DEVELOPMENT

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

WQ-07 INFILTRATION TRENCH

New Development Stormwater Guidelines

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Green Infrastructure Overview

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

Structural Stormwater Best Management Practices

Planning, Design, and Construction of Green Infrastructure.

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Appendix B DETAILED DESIGN

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Technical Guidance for Stormwater Treatment and Site Design Measures

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Low Impact Development Site Design

From and

What Are We Inspecting? Stormwater Treatment Measure Type and Design

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Permeable Pavement Systems

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Introduction Post Construction Stormwater Management Performance Requirements

Low Impact Development Practices

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Small Town Sustainable Stormwater Solutions

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Chapter 2 Roof Downspout Controls

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA

Humboldt Low Impact Development Stormwater Manual

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Chapter 14. Stormwater Quality Introduction

SMALL PROJECTS SIMPLIFIED APPROACH

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Site Design Measures. Chapter

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Small Project Guidance Document

STORMWATER TOOL. Rain Garden

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

Introduction Post-Construction Stormwater Management Performance Requirements

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

92 Minnesota Stormwater Manual

Huntington Stormwater Utility

Proposed Credit Program

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Sustainable Stormwater Retrofit Best Practices

STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. Example Commercial Project. February 21, 2018

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

2.1.4 Roof Downspout Rain Gardens

APPENDIX G: TOWN ORDINANCE REVIEW

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Attachment 2: Permeable Pavement Design Guidelines

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

MAINTENANCE APPENDIX. G.1 Introduction. G.1.1 Goals and Objectives

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Subsurface Infiltration Bed

GSI Handbook Details Pervious Pavement

Transcription:

Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board) adopted the Post- Construction Requirements (PCRs) in July 2013. As of March 6, 2014, development projects that create or replace 2,500 square feet* or more of impervious surface (roofs or pavement) must incorporate specified measures to reduce runoff. This requirement is part of municipalities comprehensive effort to reduce runoff pollution. Please complete the following form and include it with your land use permit application submittal. Staff will review your site plan to confirm that the following design strategies have been incorporated into your project: Limit disturbance of creeks and natural drainage features Minimize compaction of highly permeable soils Limit clearing and grading of native vegetation at the site to the minimum area needed to build the project, allow access, and provide fire protection Minimize impervious surfaces by concentrating improvements on the least-sensitive portions of the site, while leaving the remaining land in a natural undisturbed state *Projects that create or replace 5,000 square feet or more of impervious surface except for detached single-family homes, and single-family homes that create or replace 15,000 square feet or more of impervious surface, require a more comprehensive Stormwater Control Plan. See Santa Barbara Project Clean Water s Stormwater Technical Guide. Exemption (check if apply) The project creates or replaces less than 2,500 square feet of impervious area. Previous land use approval. The project has received land use approval prior to March 6, 2014. List project number: Step-by-Step Instructions The steps are: 1. Fill out the Project Data Form (Page 2) and select one or more runoff reduction measures. 2. Prepare a site plan or sketch. Specify and design the runoff reduction measures you will use to meet the stated minimum requirements. 3. Complete your submittal, which will accompany your land use application, to include: Project Data Form (including the runoff reduction measures(s) selected) Site Plan or Sketch (showing runoff management from impervious areas) Completed checklist for each Runoff Reduction Measure selected Tier 1 SCP Template January 2015 Page 1 of 8 Stormwater Technical Guide

Step 1: Project Data Form Project Name / ID Number Application Submittal Date [to be verified by staff] Applicant Information: Name: Mailing Address: Phone Number: Email Address: Project Location [Street Address if available, or intersection and/or APN] Project Type and Description [Examples: Single Family Residence, Parking Lot Addition, Retail and Parking ] Total Project Site Area (Square Feet) Total New Impervious Surface Area (Square Feet) [Sum of currently pervious areas that will be covered with new impervious surfaces] Total Replaced Impervious Surface Area (Square Feet) [Sum of currently impervious areas that will be covered with new impervious surfaces.] Total Pre-Project Impervious Surface Area (Square Feet) Total Post-Project Impervious Surface Area (Square Feet) Runoff Reduction Measure(s) Selected (Check one or more and include Measure Checklist from below) 1. Disperse runoff from roofs or pavement to vegetated area 2. Permeable pavement 3. Cisterns or Rain Barrels 4. Bioretention Facility or Planter Box Step 2: Delineate impervious areas and locations of runoff reduction measures Delineate the impervious area. On an attached site plan or sketch, show the impervious area for example, a roof, or portion of a roof, or a paved area that will drain to your runoff reduction measure. Typically these delineations follow roof ridge lines or grade breaks. Alternatively, show the type and extent of pervious paving. An example sketch is attached. Indicate the location and type of runoff reduction measure you ve selected. At least one measure, designed to manage runoff from some amount of impervious area or to avoid creating runoff is required. For each measure selected, fill out the brief checklist to demonstrate how your design and submittal meet minimum standards. Tier 1 SCP Template January 2015 Page 2 of 8 Stormwater Technical Guide

Runoff Reduction Design Standards Checklist Measure 1: Disperse runoff from roofs or pavement to vegetated areas. This is the simplest option. Downspouts can be directed to vegetated areas adjacent to buildings, or extended via pipes to reach vegetated areas further away. Paved areas can be designed with curb cuts, or without curbs, to direct flow into surrounding vegetation. On the site plan, show: Each impervious area from which runoff will be directed, and its square footage. The vegetated areas that will receive runoff, and the approximate square footage of each. If necessary, explain in notes on the plan how runoff will be routed from impervious surfaces to vegetated areas. Confirm the following standards are met: Tributary impervious square footage in no instance exceeds twice the square footage of the receiving pervious area. On your sketch, show rough dimensions that will confirm this criterion is met. Connecting a roof leader to a vegetated area. The head from the eave height makes it possible to route roof drainage some distance away from the building. Roof areas collect runoff and route it to the receiving pervious area via gutters and downspouts. Paved areas are sloped so drainage is routed to the receiving pervious area. Runoff is dispersed across the vegetated area (for example, with a splash block) to avoid erosion and promote infiltration. Vegetated area has amended soils, vegetation, and irrigation as required to maintain soil stability and permeability. Any area drains within the vegetated area have inlets at least 3 inches above surrounding grade. Additional comments: Tier 1 SCP Template January 2015 Page 3 of 8 Stormwater Technical Guide

Measure 2: Permeable Pavement Permeable pavements may include pervious concrete, pervious asphalt, porous pavers, crushed aggregate, open pavers with grass or plantings (turf block), open pavers with gravel, or solid pavers with open (non-grouted) joints. Show on your site plan: Location, extent and types of pervious pavements. Confirm the following standards are met: No erodible areas drain on to permeable pavement. Subgrade compaction is minimal. Reservoir base course is of open-graded crushed stone. Base depth (3" or more) is adequate to retain rainfall and support design loads (more depth may be required). No subdrain is included or, if a subdrain is included, outlet elevation is a minimum of 3 inches above bottom of base course. Subgrade is level and slopes are not so steep that subgrade is prone to erosion. Rigid edge is provided to retain granular pavements and unit pavers. Solid unit pavers, if used, are set in sand or gravel with minimum 3/8 inch gaps between the pavers. Joints are filled with an open-graded aggregate free of fines. Permeable concrete or porous asphalt, if used, are installed by industry-certified professionals according to the vendor s recommendations. Selection and location of pavements incorporates Americans with Disabilities Act requirements (if applicable), site aesthetics, and uses. Additional comments: Check with local Fire Department for applicability criteria using permeable pavement. Tier 1 SCP Template January 2015 Page 4 of 8 Stormwater Technical Guide

Measure 3: Cisterns or Rain Barrels Use of cisterns or rain barrels to comply with this requirement may be subject to municipality approval. Planning and Building Permits may be required for larger systems. Show on your site plan: Impervious areas tributary to each cistern or rain barrel. Location of each cistern or rain barrel. Confirm the following standards are met: Rain barrels are sited at or above grade on a sound and level surface at or near gutter downspouts. Gutters tributary to rain barrels are screened with a leaf guard or maximum ½-inch to ¼-inch-minimum corrosionresistant metallic hardware fabric. Water collected will be used for irrigation only. Openings are screened with a corrosion-resistant metallic fine mesh (1/16 inch or smaller) to prevent mosquito harborage. Lids are secured to prevent entry by children. Rain barrels and gutters are to be cleaned annually. Additional comments: Tier 1 SCP Template January 2015 Page 5 of 8 Stormwater Technical Guide

Measure 4: Bioretention Facility or Planter Box An above-ground planter box may be appropriate if the development site lacks level landscaped areas for dispersion and pervious pavements are not practical. Planter boxes and bioretention facilities can treat runoff from impervious surfaces 25 times their area (sizing factor of 0.04). Detailed design guidance for bioretention facilities is in the Santa Barbara Project Clean Water s Stormwater Technical Guide. Show on your site plan: Impervious areas tributary to the facility. Location and footprint of facility. Confirm the following standards are met: Ponding depth is 4"-6" minimum. Flow-through planter built into a hillside. Flows from the underdrain and overflow must be directed in accordance with local i t Minimum 18" depth soil mix (60%-70% sand; 30%-40% compost) with minimum long-term infiltration rate of 5"/hour. Surface area of soil mix is a minimum 0.04 times the tributary impervious area. Class 2 permeable (Caltrans specification 68-2.02(F)(3) drainage layer 12" deep. No filter fabric. Perforated pipe (PVC SDR 35 or approved equivalent) underdrain. Connection with sufficient head to storm drain or discharge point. Underdrain has a clean-out port consisting of a vertical, rigid, non-perforated PVC pipe, connected to the underdrain via a sweep bend, with a minimum diameter of 4" and a watertight cap. Overflow outlet connected to a downstream storm drain or approved discharge point. Planter is set level. Emergency spillage will be safely conveyed overland. Plantings are suitable to the climate, exposure, and a well-drained soil. Irrigation system, if any, controlled as a separate zone. Additional comments: Tier 1 SCP Template January 2015 Page 6 of 8 Stormwater Technical Guide

Useful Resources The following references may be useful for design. Designs must meet the minimum standard specifications herein. Santa Barbara Project Clean Water Stormwater Technical Guide. Available at http://www.sbprojectcleanwater.org Start At the Source: Design Guidance Manual for Stormwater Quality. Bay Area Stormwater Management Agencies Association, 1999. California Nevada Cement Association, www.cncpc.org Specifier s Guide for Pervious Concrete, Colorado Ready Mixed Concrete Association. www.crmca.org Interlocking Concrete Pavement Institute http://www.icpi.org/ Porous Pavements, by Bruce K. Ferguson. 2005. ISBN 0-8493-2670-2 Tier 1 SCP Template January 2015 Page 7 of 8 Stormwater Technical Guide

Example Sketch The example below illustrates the level of detail required. Not to Scale 16 10 25 Tier 1 SCP Template January 2015 Page 8 of 8 Stormwater Technical Guide