Ozone Generator Systems

Similar documents
Ozone Generator Systems

PZ2 Series Manual. PROZONE INTERNATIONAL, Inc. Ozone Water Purification Systems. INSTALLATION GUIDE and OPERATION MANUAL. Prozone PZ2 Series

EcoMaster - Residential Pools up to 40,000 Gallons

PZ1, PZ3 & PZ6 Installation Guide

EcoMaster - Residential Pools up to 40,000 Gallons

Vacuum-ultraviolet Ozone Systems. Installation & Operation Manual. Model OZ-SPA

FOR THE RECORD. You should record the model and serial numbers, which can be found on the back of the unit, for future reference.

Next Generation Corona Discharge Installation & Operation Manual

OZONE SYSTEM FOR IN-GROUND POOLS New and Existing

OZONE SYSTEM FOR IN-GROUND POOLS UP TO 18,000 GALLONS

READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Important Safety Instructions

IMPORTANT SAFETY INSTRUCTIONS EC-AG1-25 EC-AG1, EC-AG2 SAVE THESE INSTRUCTIONS.

Copyright. Prozone Water Products,Inc. phone: fax:

Next Generation Corona Discharge Next Generation Corona Discharge Nueva generación Corona de descarga

A2Z Ozone, Inc. PRODUCT MANUAL

READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

register your product at a2zozone.com/pages/warranty SP Series Operating Manual

Ultraviolet Systems UV-C 50 INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

Clear Comfort Residential Pool & Spa Sanitization System Installation, Operations & Maintenance Manual

Installation and Operation Manual. ACF-18 Automatic Chlorinating Feeder

1, 2, & 4. Corona Discharge Ozone Generators INSTALLATION & OPERATION MANUAL. DEL Ozone SAN LUIS OBISPO, CA USA Fax:

Owner s Manual RD432-0 Chemical Controller

TIDALWAVE I/G POOL PUMP INSTRUCTION MANUAL

M770 ph Controller Owner s Manual

M790 ph/orp Controller. Owner s Manual

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

2 SPEED PUMP INSTRUCTION MANUAL READ THIS MANUAL CAREFULLY BEFORE USING YOUR 2 SPEED PUMP

MAXI PUMP INSTRUCTION MANUAL NE6151B /NE6171B READ THIS MANUAL CAREFULLY BEFORE USING YOUR MAXI PUMP

WATER PURIFYING SYSTEM

Owner s Manual. Installation, Operation and Maintenance SC-OZ, SC-OZ/2, S2Q-OZ, S2Q-OZ/2, S8Q-OZ, S8Q-OZ/2. Manufactured in Canada by:

PATENTED APG OZONE CELLS DESTROYS HARMFUL CONTAMINANTS REDUCE CHEMICAL DEMAND

Installation and Operation manual WARNING

Air Preparation System

DEL AOP 25 INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

WINTERIZATION INDUSTRY BEST PRACTICE

OWNER S MANUAL. Vintage Signature Series models: AC750, AC1050, AC1100, AC1250, AC1500, AC1750. Proudly Made in the USA.

Air Preparation System

J-PRO V 230V Dual Voltage Chlorinator Installation & Start-Up Guide

HydroRite UVO 3. Troubleshooting Guide Residential. TSG-UVO158a. Copyright 2015 Hayward Industries Inc.

#300 & #302 CHLORINEIBROMINE FEEDERS

BALLAST REPLACEMENT. Contents WARNING INSTALLATION MANUAL

Arch Feeder: Installation Manual

M820 ph/dual ORP Controller. Owner s Manual

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

HARMSCO INSTALLATION AND OPERATION MANUAL UPFLOW SWIMMING POOL CARTRIDGE FILTER CARTRIDGE CLEANING INSTRUCTIONS HARMSCO CARTRIDGES

Installation Instructions

Installation & Operation Manual. AromaFlo. mr.steam. Feel Good Inc.

J-PRO-22 Pump Proportional Feed Chlorinator Installation & Start-Up Guide

Installation Instructions

NANO TECH UV-C DISINFECTION SYSTEM

Electrical Field. Molecular weight: 48. Color: Solubility: Ozone leaves no telltale taste or odor.

OWNER S MANUAL. Models: AC110, AC125, AC150 made from 2003 through Proudly Made in the USA

Ozone plus UV Sanitation System Installation & Operations Manual

OWNER S MANUAL. Vintage Classic HEAT COOL models. Proudly Made in the USA

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Ozone Systems. Installation & Operation Manual CD15nx CD30nx. Corona Discharge Ozone Generators. ClearWater Tech, LLC. Integrated Ozone Systems

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

Sundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A

OPERATORS MANUAL FOR Mi-T-M CORONA DISCHARGE OZONE GENERATORS

OZONE 101. Alternative Swimming Pool Sanitation Technologies

HAYWARD POOL PRODUCTS, INC. 620 Division Street Elizabeth, NJ Tel:

IMPORTANT SAFETY INFORMATION READ ALL...

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Viking Installation Guide

Ozone + UV Sanitation

AirBath Hydro-Massage Tubs UL1795 Installation and Operating Instructions

geyser spas OWNERS MANUAL

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Installation GUIDE VDWU524SS VDWU524WSSS FDWU524WS FDWU524 VDWU324SS FDWU324

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

O 3 SYSTEM. Taming the elements

A2Z Ozone Inc. Clean Water and Pure Air for ALL around the world! Product Catalog 2014/15

STOP. SAFETY INFORMATION Please read and understand this entire manual before attempting to assemble, operate or install the product.

DRAFT INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

INSTALLATION INSTRUCTIONS

ELECTRIC SPA-PAK HEATER INSTALLATION & OPERATING INSTRUCTIONS

J-PRO V 230V Dual Voltage Hydrogen Peroxide Pump Installation & Start-Up Guide

SYSTEMS for CATALYTIC FILTERS

Water Technologies. Strantrol System 3i. Technical Guide

INSTALLATION, OPERATION AND MAINTENANCE

Professional Series. Chemical Feed System Model # US Patent No. 6,752,930 B2

COPPER FREESTANDING TUB

RIVERSOFT Water Softener System

Remote Water Quality System Standard Equipment (supplied by EPI) Remote Water Quality System Optional Equipment (supplied by EPI)

Installation Instructions

HG-1500 Ozone Generator

OptiSoft Softeners Simple Install Steps 1-17

TSS 15/55 Hi-Lift Vacuum

Owner s Manual AQ-RO-BASE. Aquasana OptimH2O Drinking Water System Reverse Osmosis Filtration Technology

L A signature series TA T N E RE O, A L L A T S IN

SWIMMING POOL & SPA HEAT PUMPS INSTALLATION MANUAL

Technical Note # 01.05

WATER FILTRATION SYSTEM (USF3) OWNER S MANUAL

K Specifications. Max. Water Volume

Based in the UK, Triogen is a world leading company with over twenty years experience in the design and manufacture of specialist Ozone and UV

K 3.97 M. Specifications or visit our website: In USA call: Part No

K Specifications. Max. Water Volume

INSTALLATION, OPERATION AND SERVICE MANUAL AERATION SYSTEMS FEATURING AIR COMPRESSOR AND AIR ELIMINATOR TANK

INSTALLATION MANUAL. PP2 Ozone System (No Filter Cartridge) PP3 Ozone System (With Filter Cartridge) nspdevelopment.com

Transcription:

PZ2-1 & PZ2-2 - Commercial and Residential Pools & Spas Ozone Generator Systems INSTALLATION GUIDE and OPERATION MANUAL T. O3 NATURAL TECHNOLOGY Reduces Chemical Usage, Improves Sanitation Produces Crystal Clear Water Copyright 2007 Prozone Water Products: 3004 11th Ave. - Huntsville, AL - 35805 Phone: 256-539-4570 Website: www.prozoneint.com 20348

IMPORTANT SAFETY INSTRUCTIONS Read and Follow All Safety Instructions Read and be familiar with this manual before installing, operating, or performing maintenance on the PZ2. Voltage must be determined before unit is installed. Replace damaged cord immediately. Do not bury cord. Connect only to a properly grounded, grounding type receptacle. Install at least 5 feet from the inside wall of the pool using non-metallic plumbing. The ozone generator is to be located one foot above the maximum water level to prevent water from contacting electrical equipment. Install to provide drainage of compartment for electrical components. A pressure wire connector is provided in the control box inside the unit to permit connection of a minimum No. 8 AWG solid copper bonding conductor between this point and any metal equipment, metal enclosures of electrical equipment, metal water pipe, or conduit within 5 feet of the unit as needed to comply with local requirements. Wear safety glasses when drilling and tapping holes for installation of unit. WARNING: Short term inhalation of high concentrations of ozone and long term inhalation of low concentrations of ozone can cause serious harmful physiological effects. Do not inhale ozone gas produced by this device. WARNING: Disconnect all power to pool equipment prior to installation, maintenance, or removal of the PZ2. WARNING: Do not permit children to operate this product WARNING: To avoid risk of electric shock, fire, or injury, service should only be performed by a qualified pool service professional. WARNING: Installation must be performed in accordance with the National Electric Code and any applicable local or state installation codes. WARNING: When mixing acid with water, ALWAYS ADD ACID TO WATER, NEVER WATER TO ACID. NOTE: The instructions in this document provide general installation guides. Consult your dealer for specific installation instructions. Additional information is available at www.prozoneint.com. Check system for any visible shipping damage. If damage has occurred, contact the delivery company and your dealer immediately. Before beginning installation, please turn to the Installation Kit Inventory Section and verify that all listed parts are on hand. Tools Needed: Cordless Power Drill, Screw Driver, Adjustable Wrench, Pliers, Wall Mount Screw Anchors, Knife SAVE THESE INSTRUCTIONS 2

Installation INTRODUCTION TO OZONE Ozone (O 3) is generated by irradiating air or oxygen (O 2) with ultraviolet radiation. Ozone is a molecule of oxygen that is formed when three atoms of oxygen are bound together instead of the normal two atoms. The extra oxygen atom makes ozone the most powerful oxidizer and sanitizer readily available. Since ozone is unstable and quickly decomposes to normal oxygen under normal conditions, it cannot be shipped or stored. Therefore, it must be manufactured on site for immediate use. In normal air it lasts about an hour. In normal pool water it lasts just long enough to purify the water - less than 1 second. Although ozone is mainly thought of as a sanitizer, it acts primarily as an oxidizer in the pool environment. In a typical pool run on chlorine only, up to 90 percent of the chlorine may be used up in reactions unrelated to disinfection. The byproducts of these reactions are combined chlorines. Combined chlorines are the cause of eye irritation, odor, and the other unpleasant side effects of chlorination. When ozone is used, it oxidizes a large portion of the contaminants (usually referred to as bather load) which result in the formation of combined chlorines. The result is that more chlorine is available for disinfection and less chlorine is required to maintain the pool. Ozone also provides some disinfection, but an ozone residual cannot be established, so the use of chlorine or bromine is always recommended. PREPARING FOR INSTALLATION 1. Install your PZ2-1 or PZ2-2 Ozonator so that dust, sand, debris, chemicals, or other foreign objects are not sucked into the compressor's intake fan or hose (if equipped with Noise Attenuator). 2. Check electrical system: 240VAC double switched per N.E.C. standards; 120VAC single switched. 3. Check for Suction Line Check Valve. Equipment may draw if no check valve is present. 4. Balance the ph. 5. Backwash the filter. 6. Shock the pool with a non-lithium-based material. The use of Calcium Hypochlorite or Sodium Hypochlorite is recommended. The Table below summarizes the levels that are recommended by The Association of Pool and Spa Professionals (APSP). It is important to maintain these levels in order to prevent corrosion or scaling and to ensure maximum enjoyment of the pool. Test your water periodically. Take a water sample in to be professionally tested by a Pool and Spa Professional at least once a month. See our web site for more information on Basic Pool Water Chemistry. ph 7.2 7.6 Alkalinity 80 120 ppm TDS < 1,000 Cyanuric Acid Free Chlorine Calcium Hardness Metals Nitrates / Phosphates 30 70 ppm 0.5 1.5 ppm 60 400 ppm 0 ppm < 30 ppm SADDLE CLAMP ASSEMBLY Venturi Injector (600207) PVC Pipe (20314) For bypass Entrance, (before Ball Valve) Using 1-1/2 pipe, Assemble: Venturi Injector (Note direction) Saddle Clamp Top & Bottom Top & Bottom Adapters Bushing (Note direction) Screws (2) Nuts (2) Screw (2) (201863) Saddle Clamp Top (201155-4) Bushing (201155-5) Top Adapter (201155-2) (400076) For bypass Exit, (after Ball Valve) Using 1-1/2 pipe, Assemble: PVC Pipe Saddle Clamp Top & Bottom Top & Bottom Adapters Bushing (Note direction) Screws (2) Nuts (2) Screw (2) (201863) Saddle Clamp Top (201155-4) Bushing (201155-5) Top Adapter (201155-2) (400076) 7/8" Dia. Hole Bottom Adapter (201155-3) Note: For 2 pipe, do not use 1-1/2 adapters and gasket and turn Bushings so small end points toward Injector (for Entrance) or PVC Pipe (for Exit). 7/8" Dia. Hole Bottom Adapter (201155-3) Saddle Clamp Bottom (201155) 1/4-20 Nut (2) (20703) 3 Saddle Clamp Bottom (201155) 1/4-20 Nut (2) (20703)

Bypass / Venturi Injection Installation PZ2 7/8 Hole Saw Check Valve F l o w ¾ Hose ¾ Ball Valve (If using a DE filter) Filter Heater Saddle Clamp Assembly Saddle Clamp Assembly Pool Pump 1. Turn pump OFF. 2. Locate section of existing plumbing in which you choose to install the ENTRANCE leg of the bypass. Location should be in any accessible area after the pump, but before the filter. 3. Install Saddle Clamp Top & Bottom, (and adapters if needed), without Bushing, (this will be used as a guide for your installation hole). 4. Drill a 7/8 hole through one wall of the pipe, using power drill, being careful not to drill too deep to avoid penetrating the opposite side of the plumbing. 5. Locate section of existing plumbing in which you choose to install the EXIT leg of the bypass. Location should be in any accessible area after the filter, and heater (if equipped). 6. Repeat steps 3 & 4. 7. Remove both Saddle Clamp Assemblies. 8. Using components listed, mount one Saddle Clamp Assembly on Entrance bypass location with the INLET side of the Venturi Injector mounted in the Saddle Clamp Bushing, (ozone ports should be facing upward). 9. Using components listed, mount the other Saddle Clamp Assembly on Exit bypass location with the ½ x 3 PVC pipe mounted in the Saddle Clamp Bushing. 10. Attach one end of ¾ clear hose to Venturi Injector and secure with a metal clamp. Attach other end of ¾ clear hose to ½ x 3 PVC pipe and secure with a metal clamp. 11. Mount the PZ2 Ozone Generator vertically on wall with compressor at lower end, using two holes in rain shield. Place system at or above water level. If unit must be mounted below water level, loop the hose so that at some point it is above water level (a solenoid control valve may be necessary). 12. Apply Teflon tape to the threads of a ½ MPT x ¼ HB fitting, part number 20230, and screw into the end of the Check Valve that has the spring in it, (This is the INLET side of the Check Valve). Mark this end as INLET. 13. Apply Teflon tape to the threads of a ½ MPT x ¼ HB fitting, part number 20230, and screw into the opposite of the Check Valve, (This is the OUTLET side of the Check Valve). Mark this end as OUTLET. 14. Cut a 6 inch length of ¼ hose and connect one end to the OUTLET side of the Check Valve and connect the other end to the open ozone port (Marked #1) on the Venturi Injector. Secure with ½ plastic clamps. 15. Cut a length of ¼ hose long enough to reach between the Ozone Generator and the Check Valve. 16. Attach one end of the ¼ hose to the Ozone Generator and connect the other end to the INLET side of the Check Valve. Secure with ½ plastic clamps. 17. Slip the M09 Noise Attenuator onto the 1 fitting at the rear of the PZ2 (if equipped) (Installation manual supplied with M09). 18. Electrical Installation: System is either 120 or 240 VAC, 50/60 HZ. Wire Prozone Ozone Generator system to circulation pump switch r or timer. Prozone system and circulation pump should be started simultaneously. Use N.E.C. or local code grounding and installation procedures for swimming pool equipment. Note: If using a Diatemateous Earth filter, install a ¾ ball valve in the ¾ hose to the output side of the venturi, as shown. CAUTION: Make sure the voltage is the same as prescribed on the side of the Prozone ozone generator. Overvoltage will void customer warranty. 4

Direct Injection Installation PZ2 7/8 Hole Saw F l o w Check Valve Filter Heater Saddle Clamp Assembly Pool Pump NOTE: There must be at least four feet of return line between the point where the ozone bubbles are injected and the pool. If there is not four feet of return available, a flexible loop can be added to the return line. 1. Turn pump OFF. 2. Locate section of existing plumbing in which you choose to install the Direct Injection Saddle Clamp Assembly. Location should be in any accessible area after the pump, filter, and heater, (if equipped). 3. Install Saddle Clamp Top & Bottom, (and adapters if needed), without Bushing, (this will be used as a guide for your installation hole). 4. Drill a 7/8 hole through one wall of the pipe, using a power drill, being careful not to drill too deep to avoid penetrating the opposite side of the plumbing. Remove the Saddle Clamp Assembly. 5. Apply Teflon tape to male threads of (2) fittings, part numbers 20230 and 20303. Assemble all (3) fittings, 20230, 20303, and 201669, and glue to 3 long PVC pipe, part number 20314. Allow glue to dry for at least 10 minutes. 6. Using components listed, mount the Saddle Clamp Assembly, and insert the 3 PVC pipe assembly, (Step 5), into the Saddle Clamp Bushing and tighten both screws. 7. Mount the PZ2 ozone generator vertically on wall with compressor at lower end, using two holes in rain shield. Place system at or above water level. If unit must be mounted below water level, loop the hose so that at some point it is above water level (a solenoid control valve may be necessary). 8. Apply Teflon tape to the threads of a ½ MPT x ¼ HB fitting, part number 20230, and screw into the end of the Check Valve that has the spring in it, (This is the INLET side of the Check Valve). Mark this end as INLET. 9. Apply Teflon tape to the threads of a ½ MPT x ¼ HB fitting, part number 20230, and screw into the opposite of the Check Valve, (This is the OUTLET side of the Check Valve). Mark this end as OUTLET. 10. Cut a 6 inch length of ¼ hose and connect one end to the OUTLET side of the Check Valve and connect the other end to ozone fitting on the 3 PVC pipe assembly. Secure with ½ plastic clamps. 11. Cut a length of ¼ hose long enough to reach between the Ozone Generator and the Check Valve. 12. Attach one end of the ¼ hose to the Ozone Generator and connect the other end to the INLET side of the Check Valve. Secure with ½ plastic clamps. 13. Slip the M09 Noise Attenuator onto the 1 fitting at the rear of the PZ2 (if equipped) (Installation manual supplied for M09). 14. Electrical Installation: System is either 120 or 240 VAC, 50/60 HZ. Wire Prozone Ozone Generator system to circulation pump switch or timer. Prozone system and circulation pump should be started simultaneously. Use N.E.C. or local code grounding and installation procedures for swimming pool equipment.. CAUTION: Make sure the voltage is the same as prescribed on the side of the Prozone ozone generator. Overvoltage will void customer warranty. PZ2 SERIES OZONE GENERATOR OPERATION The Prozone system works when air is drawn across a high-energy vacuum ultraviolet (VUV) lamp, converting some air to ozone. The ozone is introduced into the water either by direct injection or through a bypass venturi system. For direct injection, the venturi injector is inserted directly into the return line of the pool creating a suction (vacuum) that draws the ozone into the venturi as the water returns to the pool. The bypass venturi system takes water directly after the circulation pump (highest pressure point), bypasses part of the water flow past filters, heater, etc. through a venturi injector, through contact tubing and then returns the water back to the pool return line. A check valve is employed to prevent water backup in the event of system failure. The system should be run 6-8 hours per day for best effect. Run time may vary depending on usage. 5

Inventory Lists & Troubleshooting INSTALLATION KIT INVENTORY P20 Installation Kit PZ2-1 & PZ2-2 Series with Bypass / Venturi Injector D03 Installation Kit PZ2-1 & PZ2-2 Series with Direct Injection Part Number Quantity 20185 4 20260 120 20230 3 20303 1 201669 1 20314 1 20215 1 201155-4 1 201155 1 201155-2 1 201155-3 1 400076 1 201155-5 1 201863 2 20 20703 2 Note: For pools with Diatomaceous Earth filter and Bypass / Venturi Injector installation, add (1) ¾ Ball Valve, (2) ¾ MPT x HB fittings, and (2) 1 ¼ metal clamps. TROUBLESHOOTING GUIDE PROBLEM PROBABLE CAUSE REMEDY No light from Prozone unit Loose wiring No power to unit Defective lamp or other internal component Check all wiring connections Check voltage compatibility Check power source Return unit to dealer No bubbles from injector or no evidence of ozone in pool Excessive back pressure Leak in fitting Filter not working Check for kinks or clogs in hose or plumbing Replace fitting Check filter Water in Ozone Generator Check Valve failure Verify Check Valve in Venturi is operating properly Cloudy water; foamy water; scum Water chemistry out of balance Total Dissolved Solids (TDS) level too high Filter not working Check readings and balance accordingly Refer to dealer for proper water testing Clean or replace filter NOTE: Cloudy water may occur when the ozone generator is started. Filter and backwash as necessary. 6