Sidney Sawyer Elementary School

Similar documents
Richard Henry Lee Elementary School

Agustin Lara Elementary Academy

Washington Irving Elementary School

Genevieve Melody Elementary School

Edward Jenner Elementary Academy of the Arts

DeWitt Clinton Elementary School

Calmeca Academy of Fine Arts and Dual Language

Josefa Ortiz De Dominguez Elementary School

Francis M McKay Elementary School

Oscar DePriest Elementary School

John Palmer Elementary School

Charles W Earle Elementary School

Joseph Brennemann Elementary School

Alessandro Volta Elementary School

George B Swift Elementary Specialty School

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

2014 Bond Project Guide

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

PLAN REVIEW SUBMITTAL GUIDE

DOCUMENT TABLE OF CONTENTS

Briar Crest Elementary

RECAPP Facility Evaluation Report

Cook - Wissahickon Elementary School

NYC Department of Education

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

NYC Department of Education

NYC Department of Education

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

NYC Department of Education

NYC Department of Education

Mechanical Inspection Plumbing

1354 CHECKLIST for Project Closeout

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

New High School Concept

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

RECAPP Facility Evaluation Report

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

NYC Department of Education

NYC Department of Education

NYC Department of Education

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

GARCIA GALUSKA DESOUSA Consulting Engineers

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Appendix B. Facilities Assessment Report

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

RESERVE DATA ANALYSIS est.1983

NYC Department of Education

NYC Department of Education

Estimated Repair, Replacement, and Upgrade Costs

CONNECTICUT. Downloaded

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Massachusetts School Building Authority

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

Mechanical System Description

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

First Floor. Historic Hall of Waters Assessment and Feasibility Study

NYC Department of Education

NYC Department of Education

DMTF: Specific Building Recommendations

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

NYC Department of Education

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Fabric Canopy Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner Metal Flue 5 6 GRE 6 787 GRE 6 942 5 6 GRE 6 94 2 7 7 787 SF $11,592 942 SF $22,671 $34,263 94 LF $47,047 12 LF $772 $47,819 Assessment Date: 1/25/2013 Page 1 of 19

CORNICE 5 6 7 Cornice - Metal Projecting BLU 5 843 843 LF $249,428 $249,428 DOORS Exterior Steel Door Store Front Door Transom Lite ENTRANCE 5 6 6 GRE 6 30 GRE 6 8 7 16 EA $5,285 30 EA $15,573 8 EA $2,265 $23,123 Concrete Exterior Stairs Entrance Controls - Audio Entrance Controls - Audio and Video 5 6 GRE 6 81 7 GRE 7 2 81 LF $8,687 1 EA $429 2 EA $9,116 FOUNDATION Concrete Foundation 5 6 7 GRE 7 2,103 2,103 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 5 6 8 6 7 18 EA $9,009 26 EA $5,577 $14,586 Assessment Date: 1/25/2013 Page 2 of 19

LINTELS Lintels - Brick Lintels - Steel Lintels - Stone 5 6 07 7 GRE 6 484 1,023 40 107 LF 1,507 LF $18,272 140 LF $18,272 PARAPET Coping - Clay Tile Coping - Metal Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 5 6 GRE 6 635 GRE 6 85 7 GRE 7 1,427 GRE 6 585 GRE 6 915 GRE 6 59 681 46 746 635 LF 85 LF 1,427 LF 585 LF 915 LF $142,490 740 LF $15,313 992 LF $51,078 $208,882 ROOF SYSTEM Exterior Downspouts Interior Downspouts Modified Bitumen Roof PVC Membrane Roof Roof Structure: Heavy Timber Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 5 BLU 5 223 6,069 GRE 6 35,106 BLU 5 25,483 7 GRE 7 5,322 GRE 7 20,161 GRE 7 35,106 223 LF $4,146 1,069 LF 35,106 SF $248,498 25,483 SF $182,203 5,322 SF 20,161 SF 35,106 SF $434,847 SUPERSTRUCTURE Steel 5 6 7 GRE 7 SF Assessment Date: 1/25/2013 Page 3 of 19

Steel with Clay Tile Arch WALLS GRE 7 81,550 81,550 SF Brick Stone - Cast WINDOWS Clerestory - Glass Single-Pane Storefront Windows Window - Guards perforated Window - Guards wire guard Windows - Sash Aluminum Double-pane EXTERIOR ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Emergency generator 60 to 100 KW diesel - Outdoor Exit Signs - Auditorium 5 6 GRE 6 81,400 3,111 5 BLU 5 26 6 88,080 97 1,291 5 6 2 GRE 6 6,853 6,041 5,120 GRE 6 4,240 GRE 6 33 GRE 6 5 2 GRE 6 7 7 7 7 81,400 SF $537,777 13,111 SF $187,487 $725,265 26 SF $1,325 188 SF $1,075 1,080 SF 297 SF 11,291 SF $96,877 $99,277 $1,864,878 3 EA $7,293 6,853 SF $9,310 16,041 SF $6,882 15,120 SF $8,000 4,240 SF $1,819 33 EA $3,539 5 EA $536 12 EA $1,287 1 EA $8,151 7 EA $1,632 Assessment Date: 1/25/2013 Page 4 of 19

Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection MAIN SERVICE GRE 6 5 23 5 7 YEL 4 163,995 63,995 33 EA $10,009 8 EA $2,561 1 EA $1,430 163,995 SF $581,592 163,995 SF $152,433 $796,473 Main Electrical service - Live Front - 1000 A and below 120/208/3PH Main Electrical service - Live Front - 1200 A 120/208/3PH Main Electrical service - Live Front - 1500 A 277/480/3PH Main Electrical service - Live Front - 2000 to 3000 A 277/480/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 5 6 5 6 35 GRE 6 5 GRE 6 4 5 6 63,995 YEL 4 81,550 7 7 7 1 EA $6,435 1 EA $7,150 1 EA $11,619 1 EA $30,388 $55,591 37 EA $35,893 2 EA $2,860 5 EA $10,725 4 EA $4,862 2 EA $2,288 $56,628 $908,693 163,995 SF $58,628 163,995 SF $390,328 2 EA $4,290 $453,246 Assessment Date: 1/25/2013 Page 5 of 19

PUMP ROOM ASSEMBLY Fire Pump 25-50hp Fire Pump less than 25hp Jockey Pump SPRINKLER SYSTEM Dry Sprinkler System Sprinkler Heads Wet Sprinkler System FIRE PROTECTION MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Ground Mounted greater than 300 tons Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 201 to 300 tons Condensing - Roof Mounted less than 5 tons AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air Handling Package - Single Zone - Hot Water 12,001 to 20,000 cfm Air Handling Package - Single Zone - Hot Water above 30,000 cfm Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air Handling Package - Single Zone - Steam 20,001 to 30,000 cfm Air intake for all Air Handling s except built up AHU 5 6 BLU 5 1 5 6 GRE 6 81,550 63,995 GRE 6 5 6 BLU 5 1 5 6 BLU 5 1 GRE 6 5 7 7 7 7 1 EA $3,718 1 EA $12,441 2 EA $1,487 $17,646 81,550 SF $58,308 163,995 SF $9,381 SF $47,159 $114,847 $585,740 1 EA $85,800 1 EA $210,210 1 EA $858 $296,868 2 EA $10,010 1 EA $24,310 1 EA $21,450 1 EA $5,005 1 EA $12,870 5 EA $7,150 Assessment Date: 1/25/2013 Page 6 of 19

Fan Power Box With Hot Water Coil Make Up Air - Indoor Mounted - Electric 10,001 to 20,000 cfm Make Up Air - Indoor Mounted - Electric 6,000 to 10,000 cfm Make Up Air - Indoor Mounted - Electric less than 6,000 cfm Make Up Air - Roof Mounted - Electric less than 6,000 cfm Multi Zone Built Up Air Handling - Steam above 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam above 35,000 cfm Return Duct Work - Indoor - Vertical Shaft and Ducts Return Duct Work - Sheet Metal - Exterior Vertical Shaft and Ducts Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor greater than 20,000 CFM Return Fans - Outdoor greater than 20,000 CFM BOILER SYSTEMS GRE 6 51 GRE 7 100 ORA 3 50 YEL 4 1 51 EA $19,691 1 EA $3,861 1 EA $2,431 1 EA $1,430 1 EA $2,288 1 EA $17,160 1 EA $4,290 100 LF 50 LF $31,460 1 EA $1,716 2 EA $6,578 1 EA $42,900 $214,600 Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 1,001MBH-2,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 76-100 HP Boiler Auxiliary - Steam Boiler 76-100 HP Boiler Auxiliary Non-Condensing Hot Water Boiler 1,001MBH-2,000 MBH Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Gas Boosters Glycol Feed System HEATING DEVICES 5 YEL 4 1 3 ORA 3 2 YEL 4 2 6 GRE 6 4 GRE 6 4 BLU 5 2 1 YEL 4 1 YEL 4 2 YEL 4 1 1 7 4 EA $196,625 2 EA $237,380 2 EA $40,040 4 EA $20,020 2 EA $4,290 4 EA $1,201 3 EA $3,432 1 EA $31,460 2 EA $26,026 2 EA $5,577 $566,051 Cabinet Heaters With Hot Water Coils Radiators - Hot Water Radiators - Steam 5 6 0 7 GRE 7 15 YEL 4 12 10 EA $5,005 15 EA 12 EA $16,817 Assessment Date: 1/25/2013 Page 7 of 19

Heater - Gas Heater - Hot Water Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Pumps - Chilled Water 10 to 20 HP Pumps - Chilled Water 21-50 HP Pumps - Hot Water 11 to 20 HP Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers VENTILATION BLU 5 1 7 YEL 4 1 5 6 GRE 6 4 5 6 63,995 12 GRE 6 36 7 7 1 EA $4,290 2 EA $2,860 8 EA $1,750 $30,722 1 EA $28,600 2 EA $5,148 2 EA $11,440 2 EA $5,148 4 EA $5,720 $56,056 163,995 SF $164,159 112 EA $16,016 36 EA $5,148 $185,323 Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL 5 6 BLU 5 3 2 GRE 6 6 7 GRE 7 1 GRE 7 1 5 EA $6,578 6 EA $2,574 1 EA $157 1 EA 1 EA $9,309 $1,358,930 Assessment Date: 1/25/2013 Page 8 of 19

PLUMBING HOT WATER 5 6 7 Hot Water Heater - Gas 150,000-300,000 BTU/HR BLU 5 1 1 EA $11,440 Hot Water Heater - Gas less than 150,000 BTU/HR ORA 3 1 1 EA $14,872 Hot Water Heater - Gas more than 300,000 BTU/HR YEL 4 1 1 EA $32,032 $58,344 PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 5 6 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 BLU 5 81,550 7 GRE 6 81,550 BLU 5 81,550 GRE 6 81,550 163,995 SF $36,254 163,995 SF $65,446 163,995 SF $30,461 163,995 SF $50,286 163,995 SF $57,283 163,995 SF $213,613 163,995 SF $177,436 163,995 SF $106,262 163,995 SF $78,133 163,995 SF $75,993 163,995 SF $46,647 $937,813 PUMPS Domestic Booster Pump duplex Sump Pump PLUMBING 5 BLU 5 1 6 7 1 EA $15,730 1 EA $1,359 $17,089 $1,013,245 Assessment Date: 1/25/2013 Page 9 of 19

INTERIOR ADMINISTRATIVE SUITES Ceiling - Exposed Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 5 6 58 7,528 1,459 GRE 6 391 1,031 GRE 6 391 2,546 1,141,010 113 GRE 6 360 GRE 6 31 21 GRE 6 46 GRE 6 6,097,839 4,844 158 SF $298 3,987 SF $5,423 1,422 SF $5,133 4,078 SF $5,039 1,123 SF $1,444 360 SF $2,718 52 SF $22 46 SF $33 6,097 SF $17,437 7,683 SF $24,827 $62,374 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System DOORS 5 6 50 GRE 6 540 7 150 EA $5,521 540 EA $19,876 1 EA $35,750 2 EA $22,651 1 EA $114,400 $198,199 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 5 6 GRE 6 75 BLU 5 105 69 7 66 144 GRE 6 4 GRE 6 466 75 EA $21,236 174 EA $69,086 410 SF $4,945 4 EA $944 466 SF $8,663 $104,873 Assessment Date: 1/25/2013 Page 10 of 19

DRINKING FOUNTAINS Double Fountain Single Fountain 5 6 7 GRE 7 3 GRE 7 3 3 EA 3 EA GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Sports Flooring Flooring - Wood Lighting - Metal Halide/Sodium Vapor Lighting - Pendant/Surface Scoreboards Sound System Walls - Concrete Block Walls - Plaster/Drywall 5 6 40 7 GRE 7 4,128 BLU 5 5,875 GRE 6 4,128 GRE 6 5,875 6 GRE 7 27 GRE 6 3,394 BLU 5 6,490 140 EA $3,383 4,128 SF 5,875 SF $58,809 4,128 SF $26,564 5,875 SF $44,359 16 EA $2,860 27 EA 1 EA $2,076 1 EA $5,005 3,394 SF $29,121 6,490 SF $92,807 $264,983 KITCHEN Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Tile Ceramic/Porcelain Lighting - Lay-In Lighting - Pendant/Surface Wall - Concrete Block Wall - Plaster/Drywall 5 6 GRE 6 956 00 GRE 6 956 00 1 GRE 6 4,468 GRE 6 590 7 956 SF $2,734 200 SF $755 956 SF $4,511 200 SF $509 11 SF $8 4 SF $3 1,468 SF $4,198 590 SF $1,392 $14,111 Assessment Date: 1/25/2013 Page 11 of 19

LIBRARY Casework Flooring Carpet Lighting - Lay-In 5 6 8 7 GRE 7 1,215 GRE 7 19 28 LF $859 1,215 SF 19 SF $859 LUNCHROOM Ceiling - Exposed Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Serving Line Wall - Concrete Block 5 6 7 GRE 7 3,312 GRE 6 589,216 GRE 6 5,117 GRE 7 8 5 24 4 GRE 6 8,548 3,312 SF 589 SF $1,263 1,216 SF $3,443 5,117 SF $7,317 8 SF 39 SF $11 24 LF $1,030 8,548 SF $24,447 $37,511 MDF/IDF Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS 5 6 62 7 262 SF $892 2 EA $2,803 $3,694 Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room Vaults 5 6 GRE 6 3,609 2 7 GRE 6 5,631 31,997 303 28 3,609 SF $17,031 12 SF $57 5,662 SF $26,573 3,300 SF $14,143 228 SF $1,076 Assessment Date: 1/25/2013 Page 12 of 19

$58,879 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Water Closet 5 6 42 4,660 98 GRE 6 4,604 GRE 6 30 4 1,303 7 GRE 6 417 1,978 GRE 6 711 GRE 6 369 4 24 18 52 GRE 7 72 GRE 6 34 7 38 5 12 BLU 5 258 GRE 6 504 4,364 GRE 6 4,113 9,432 GRE 6 76 4,802 SF $39,603 198 SF $425 4,604 SF $13,036 30 EA $9,009 1,327 SF $6,262 2,395 SF $2,361 711 SF $1,810 369 SF $528 38 EA $3,039 71 EA $8,551 72 SF 34 SF $24 65 EA $4,842 27 EA $5,577 258 SF $1,948 4,868 SF $12,675 13,545 SF $29,408 76 EA $28,257 $167,355 THEATER Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Wood Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall 5 6 GRE 6 6,853 GRE 6 4,505,348 GRE 6 30 GRE 6 720 GRE 6 7,164 7 6,853 SF $58,603 4,505 SF $21,259 2,348 SF $17,728 30 SF $49 720 SF $3,058 7,164 SF $61,467 $162,165 Assessment Date: 1/25/2013 Page 13 of 19

VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic VOCATIONAL SHOP 5 6 7 1 EA $17,160 $17,160 Work Sink INTERIOR 5 6 7 8 17 35 EA $6,950 $6,950 $1,099,114 ROOM CASEWORK Casework CEILING 5 6,713 7 1,713 LF $61,240 $61,240 Lay-In/Drop Plaster/Drywall 5 6 7 GRE 6 3,027 11,089 22,724 GRE 6 4,447 20,692 36,840 SF $40,927 25,139 SF $83,770 $124,697 CHALK BOARD 5 6 7 Chalk Board YEL 4 402 402 LF $48,863 $48,863 CLASSROOM Laptop Charging Station 5 6 7 GRE 7 1 1 EA Assessment Date: 1/25/2013 Page 14 of 19

CORRIDORS Asphalt Concrete Block Concrete Epoxy/Painted Double Water Cooler Drop/Lay-In Exposed Lay-In Pendant/Surface Plaster/Drywall Stair Handrails Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring Wall Mounted 5 6 1,971 7 2,480 19,374 GRE 6 3,450 GRE 6 4 8,353 GRE 6 427 8,353 6,458 BLU 5 22,788 14,120 GRE 6 688 563 79 8,179 GRE 6 325 GRE 6 427 GRE 6 609 11,971 SF $17,119 31,854 SF $35,693 3,450 SF $16,281 4 EA $3,375 18,353 SF $39,367 427 SF $806 18,353 EA $13,122 16,458 EA $11,767 36,908 SF $140,853 1,251 LF 279 EA $39,897 18,179 SF $102,944 325 SF $827 427 SF $611 609 EA $235,135 $657,796 CORRIDORS CEILING Plaster/Drywall FLOOR 5 6 BLU 5 12,925 3,106 7 16,031 SF $81,986 $81,986 Carpet Concrete Tile/Sheet Wood 5 6 7,175 942 GRE 6 875,151 8,496 38,349 0 9,981 2,117 SF $1,680 875 SF $4,129 48,996 SF $133,402 9,991 SF $75,625 $214,836 Assessment Date: 1/25/2013 Page 15 of 19

LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL 5 6,215 7 1,215 SF $2,606 $2,606 Concrete Block 5 6 GRE 6 480 7 480 SF $1,373 Plaster/Drywall GRE 6 760 760 $1,793 LIGHTING $3,166 Lay-In Pendant/Surface 5 6 7 99 258 GRE 6 395 557 EA $21,379 395 EA $28,243 $49,621 MARKER BOARD Marker Board 5 6 7,001 432 1,433 LF $28,629 $28,629 STAIRS Asphalt Terrazzo Tile WALL Concrete Block 5 6 70 44 GRE 6 60 5 6 5,658 7 7 270 SF $1,931 144 SF $1,631 60 SF $453 $4,014 25,658 SF $73,382 Assessment Date: 1/25/2013 Page 16 of 19

Masonry Metal/Folding Panel Plaster/Drywall Structural Glazed Tile ROOM SITE CIVIL/DRAINAGE GRE 6 845 GRE 6 399 9,943 37,583 GRE 6 424 845 SF $10,875 399 SF $941 57,526 SF $182,788 424 SF $3,032 $271,018 $1,548,473 Catch Basin Site Manhole 5 6 7 GRE 7 9 GRE 7 5 9 EA 5 EA FENCING Ornamental Iron LANDSCAPE Asphalt Play Area/Hardscape Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Retaining Wall - Concrete Trash Receptacles 5 6 36 1,351 5 6 5,835 4,729 GRE 6 8,160 GRE 6 48 0,056 GRE 6 432 7 7 1,587 LF $40,202 $40,202 15,835 SF $13,586 24,729 SF $9,901 8,160 SF $15,403 48 EA $13,728 10,056 SF 432 SF $10,193 2 EA $415 $63,227 Assessment Date: 1/25/2013 Page 17 of 19

MODULAR 5 6 7 6-Classroom Modular Building BLU 5 1 1 EA PARKING LOT Asphalt Concrete Concrete Curbs Lights, Pole Mounted Vehicular Screening SIDEWALKS Internal Walks Perimeter Sidewalks SIGNAGE 5 6 GRE 6 42,799 40,853 8 GRE 6 656 5 6,124 4,692 7 7 42,799 SF $36,722 240 SF 1,853 LF $11,182 18 EA $20,592 656 LF $68,496 1,124 LF $10,608 14,692 SF $27,733 $38,341 Flag Pole Monument Sign SITE 5 6 7 GRE 7 2 GRE 7 1 2 EA 1 EA $210,266 Assessment Date: 1/25/2013 Page 18 of 19

Campus Need ² ³ $8,589,337 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 1/25/2013 Page 19 of 19