HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

Similar documents
HILCORP ALASKA, LLC KALOTSA PAD

STREAM ALTERATION PRACTICES

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

SECTION EARTHWORK


Construction Progress Report

PROPOSED DRAINAGE PATTERNS

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Illinois Urban Manual

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

PLAN SUBMITTER'S CHECKLIST

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

Information for File # JTF

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Request for an Exception to the Napa County Road and Street Standards

Information for File # ARC

Section Specification for Geotextile Used in Permanent Erosion Control Application

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Bio-Engineering Techniques to Revegetate Streambanks

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

Alternate Green Stream Bank Stabilization Methods

Please make the following changes in your copy of the bid proposal for the captioned project:

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Design and Installation of Embedded Culverts

LET S GET IT DONE STORMWATER MANAGEMENT

SHEET FLOW TO A FILTER STRIP OR CONSERVED OPEN SPACE

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

June Pennsylvania Department of Transportation Engineering District Herr Street Harrisburg, PA 17103

HYDRAULIC DESIGN involves several basic

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

SECTION 6. Routine Maintenance Activity Details

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

Kickapoo Woods Restoration Plan

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Wisconsin Contractors Institute Continuing Education

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

E R O S I O N C O N T R O L

Rule D Wetland and Creek Buffers

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

field note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

ACTIVITY: Geotextiles ES 12

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Geosynthetics for Erosion Control and Reinforcement

Request for Approval of Design Modification

SHEET FLOW TO A VEGETATED FILTER STRIP OR CONSERVED OPEN SPACE

STORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document

JOB CREATION PROJECTS

183

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Butte Creek Canyon. The New Road Built in April of 2015 by Signalized Intersection West, LLC. Presentation slides from December 2015 through June 2016

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

SECTION 5: REACH RECOMMENDATIONS/MAPS

APPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.

4. Contractor (and subcontractors if applicable) certification statement(s)

ARIZONA WATER COMPANY

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

ALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

CLAHS #11 RACR APPENDIX G. SCS Photographic Log, Photographs

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Severn River Sub-Watershed: BMP 09-Retrofit

A: Downtown Diversion Pipe

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434

A. Regional Detention Requirements

Analyzing the Bioretention Construction Sequence

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

STORMWATER MANAGEMENT

Alternatives Analysis Summary Memorandum

LET S GET IT DONE STORMWATER MANAGEMENT

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Chapter 2 Roof Downspout Controls

Attention: Ray Tardiff,

EROSION & SEDIMENT CONTROL

Monica Smith, PE President Robinson Engineering Company

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Structural Storm Water Best Management Practices (BMPs)

The Low Risk Site Handbook

HOW TO CONTROL STREAMBANK EROSION

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

2 ALTERNATIVES AND OPTIONS

Transcription:

, LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1 6 R14W R13W 8 DEEP CREEK UNIT PROPOSED BOUNDARY PAD 9 1 11 12 7 INDEX S 6 VICINITY MAP 1 NO. DESCRIPTION 1 VICINITY MAP 2 MAP 3 GRAVEL ACCESS ROAD PLAN GRAVEL ACCESS ROAD S CROSSING & 4 S CULVERT SECTIONS 5 6 7 8 9 1 11 GRAVEL ACCESS ROAD STREAM CROSSING CULVERT SECTION & TIM AVE. HAPPY CREEK ARCH PIPE TYPICAL SECTION TIM AVE. WIDENING & ARCH PIPE SECTIONS TIM AVE. WIDENING & ARCH PIPE PLAN GRAVEL ACCESS ROAD S IMPACTS (MAP 1 2) GRAVEL ACCESS ROAD S IMPACTS (MAP 2 2) GRAVEL ACCESS ROAD STREAM CULVERT PLAN FILL ACREAGES & VOLUMES : 1" = 6' NO. 1

28 27 26 25 STERLING HIGHWAY HAPPY CREEK 33 34 35 36 + 5+ 1+ 15+ + 233+2 R14W R13W 31 32 TIM AVE. M.P. 142.8 8 STA 118+47 END TIM AVE BEGIN LOGGING ROAD 25+ STA 233+2 TIM AVE BEGIN NEW ACCESS STA + - 118+47 ROAD CONSTRUCTION 5 4 3 2 1 6 STA 57+5 CULVERT REPLACEMENT SEE 7 CROSSING SEE S 8 & 9 STREAM CROSSING SEE 1 STA 354+5 END ACCESS ROAD 9 1 11 12 7 CLAM CREEK 3+ 5 354+5 PROPOSED PAD 3' x 4' 8 5 1 : 1" = 5' NO. 2

345+ SECTION 36 CIRI OWNERSHIP SECTION 31 STATE OWNERSHIP 233+2 235+ 24+ 245+ 25+ 255+ 26+ 29+ 295+ 3+ STA 251+89-265+84 CROSSING SEE S 8-9 265+ 27+ 275+ 28+ 285+ 35+ 31+ STA 274+41-274+43 STREAM CROSSING SEE 1 315+ 32+ 325+ SECTION 1 STATE OWNERSHIP SECTION 6 STATE OWNERSHIP 33+ 335+ ROAD 34+ 35+ 354+5 PROPOSED PAD 1 : 1" = 1' NO. 3

28' 18' S 2:1 3" MIN. DEPTH KPB TYPE I MATERIAL 2:1 S GEOGRID BX 11 ON NON-WOVEN GEOTEXTILE GEOTEX NW 61 OR EQUAL NATIVE SOIL NOTES: 1. GRAVEL FILL SHALL BE PLACED IN NO GREATER THAN 12" LIFTS AND COMPACTED TO 95% MAXIMUM DENSITY, AS DETERMINED BY AASHTO T 18, METHOD D. 2. TOP 4" KPB TYPE I MATERIAL SHALL BE COBBLE FREE (3" MAX. PARTICLE SIZE). 3. GRAVEL FILL SHALL BE UNDERLAIN WITH NON-WOVEN GEOTEXTILE, GEOTEX NW 61 OR EQUAL OVER BX 11 OR EQUAL. 4. IN AREAS CONTRACTOR MAY NOT PLACE FILL, REMOVE NATIVE MATERIAL, OR RUN EQUIPMENT OUTSIDE DESIGNATED CONSTRUCTION ZONE AS MARKED IN FIELD BY THE ENGINEER. A 4 18' WIDE ROAD SECTION - S : 1" = 1' 18" Ø CORRUGATED STEEL PIPE (CSP) (SEE PLAN S FOR DIMENSIONS) 18' S S GEOGRID BX 11 ON NON-WOVEN GEOTEXTILE GEOTEX NW 61 OR EQUAL NATIVE SOIL PIPE BEDDING KPB TYPE I MATERIAL, 6" MIN. DEPTH 3" MAX. PARTICLE SIZE B 4 1. ALL CULVERTS SHALL BE CORRUGATED STEEL. 2. PRE-LEVEL WITH 6" DEPTH KPB TYPE I MATERIAL PIPE BEDDING. 3. PIPE BEDDING FILL IS 1.1 CUBIC YARDS PER 18" CULVERT. 4. EXCAVATION MATERIAL SHALL BE DISPOSED IN AN UPLAND AREA. 18' WIDE ROAD- W/ CROSS CULVERT SECTION : 1" = 1' : 1" = 1' NO. 4

STREAM CROSSING ROAD EMBANKMENT SEE TYPICAL A/4 24"Ø x 45' CORRUGATED STEEL PIPE (CSP) A 5 GEOGRID BX 11 ON NON-WOVEN GEOTEXTILE GEOTEX NW 61 OR EQUAL PIPE BEDDING KPB TYPE I MATERIAL, 6" MIN. DEPTH 3" MAX. PARTICLE SIZE UNNAMED STREAM CROSSING W/ 24" CULVERT SECTION : 1" = 1' - STA 274+45 1. ALL CULVERTS SHALL BE CORRUGATED STEEL. 2. PRE-LEVEL WITH 6" DEPTH KPB TYPE I MATERIAL PIPE BEDDING. 3. PIPE BEDDING FILL IS 2.5 CUBIC YARDS. 4. EXCAVATION MATERIAL SHALL BE DISPOSED IN AN UPLAND AREA. 5. NO FLOWING WATER PRESENT AT TIME FIELD SURVEY. 6. IF FLOWING WATER IS PRESENT AT TIME CONSTRUCTION USE PUMPED WATER BYPASS WITH APPROPRIATE SCREED INTAKE AND ENERGY DISSIPATION AT DISCHARGE. SIMILAR TO BYPASS AT TIM AVE. & HAPPY CREEK CROSSING. (3. CUBIC YARDS TEMPORARY DISCHARGE.) KPB TYPE I MATERIAL 3" MAX. PARTICLE SIZE EMBANKMENT MATERIAL CORRUGATED STEEL ARCH PIPE 95" x 67" x 45', 12 GAGE 1.' 1.' 1.' PIPE BEDDING KPB TYPE I MATERIAL, 12" MIN. DEPTH 3" MAX. PARTICLE SIZE 95" STREAM CHANNEL BACKFILL NOTES: 1. INSTALL PIPE AT SPECIFIED GRADE AND. 2. PLACE CHANNEL BACKFILL MATERIAL IN PIPE. MATCH UPSTREAM AND DOWNSTREAM CHANNEL CHARACTERISTICS. USE LOCAL GRAVELLY SAND WITH CLUSTERS COBBLES. 3. USE PUMPED WATER BYPASS WITH APPROPRIATE SCREENED INTAKE AND ENERGY DISSIPATION AT DISCHARGE B 5 CORRUGATED ARCH PIPE TYPICAL SECTION : 1" = 5' : N/A NO. 5

21 19 INVERT ELEV. 198.' A 6 ROADBED WIDENING SECTION (WHERE NECESSARY) 24" (MIN) KPB TYPE I MATERIAL SUITABLE MATERIAL FROM EXISTING ROAD EMBANKMENT S EXISTING ROAD EMBANKMENT 95" x 67" x 45', 12 GAGE CORRUGATED ARCH PIPE w/ END SECTIONS ROAD & ARCH PIPE SECTION : 1" = 15' KPB TYPE I MATERIAL, 6" (MIN) DEPTH B 6 2:1 2.% C L TIM AVENUE - 57+ TO 58+75 : 1" = 5' EXISTING SHOULDER 18' 2.% T 19 FG ROAD EMBANKMENT 21 END SECTION TOP ICE INVERT ELEV. 198.' PIPE BEDDING KPB TYPE I MATERIAL,12" MIN. DEPTH 3" MAX PARTICLE SIZE, OVER NON-WOVEN GEOTEXTILE GEOTEX NW61 OR EQUAL MATERIAL FROM EXISTING ROAD EMBANKMENT USED IN ROADBED WIDENING AREA 9' 9' 1' TOPSOIL (4") & HYDROSEED 2' EXISTING ROAD EMBANKMENT NON-WOVEN GEOTEXTILE GEOTEX NW 61 OR EQUAL 2:1 FILL SLOPE COVER w/ EROSION CONTROL MATTING S DRAWN BY: : N/A NO. BGB 6 11

HAPPY CREEK 25 28 29 21 PARCEL ID 159818 E1/2 SW1/4 SEC33 T2S R14W UNIVERSITY ALASKA PUMP INTAKE SUMP w/ SCREEN TEMPORARY DIVERSION DIKE SANDBAGS w/ IMPERMEABLE LINER TOP BANK STREAM FLOW DIVERSION SYSTEM PUMP w/ INLET AND OUTLET SYSTEMS I 26 27 25 SS 26 DIVERSION PIPE BURY IN ROAD EMBANKMENT PUMP 24 23 199 213 212 33' SLE 33' SLE / TIM AVE. R.O.W. 21 21 27 21 22 23 22 FILL TOE EXISTING ROAD SHOULDER 57+ 58+ EXISTING ROAD SHOULDER SECTION LINE 29 27 O 25 24 23 21 199 21 22 24 21 24 STEEL POST (4) REMOVE & DISPOSE CONCRETE SLABS REMOVE & DISPOSE PROPOSED 95" x 67' x 45', 12 GAGE CORRUGATED STEEL ARCH PIPE SEE TYPICAL B/5 & A/6 FILL TOE EXISTING 48" CSP (CRUSHED) EXISTING 6" CSP REMOVE & DISPOSE SILT FENCE 26 28 27 29 18' 21 SILT FENCE 211 211 212 58+75 HAPPY CREEK 22 TOP BANK PUMP OUTLET ENERGY DISSIPATION SYSTEM PASS FLOW THROUGH NON-WOVEN GEOTEXTILE 25 57+ - 58+75 ROADBED WIDENING, 18' WIDTH SEE TYPICAL B/6 23 PARCEL ID 159532 LOT 2 BASHAM SUB'D NO. 5 SEC4 T3S R14W MICHAEL R. BASHAM 3 6 : 1" = 3' NO. 7

SECTION 36 CIRI SECTION 31 ALASKA DNR STA 251+89 BEGIN BEGIN TYPICAL SECTION A/4 DELINEATION AREA 417 UPLAND 415 412 41 48 41 18.' 28' MIN. 413 415 252+ 253+ 254+ 255+ 256+ 257+ 258+ FILL SLOPE DAYLIGHT / UPLAND TRANSITION STA 253+4 INSTALL 18" x 3' CSP SEE TYPICAL B/4 ROAD SHOULDER 418 42 422 423 ROAD CENTERLINE SECTION 1 ALASKA DNR SECTION 6 ALASKA DNR 1 : 1" = 1' NO. 8

427 8+259+ FILL SLOPE DAYLIGHT 22 423 26+261+ 18.' 424 425 ROAD SHOULDER 426 262+263+ ROAD CENTERLINE STA 259+25 INSTALL 18" x 3' CSP SEE TYPICAL SECTION B/4 428 28' MIN SECTION 6 ALASKA DNR 429 264+ STA 265+ INSTALL 18" x 3' CSP SEE TYPICAL SECTION B/4 43 265+ STA 265+84 END END TYPICAL SECTION A/4 431 432 / UPLAND TRANSITION 266+ 267+ 435 438 UPLAND 44 443 1 : 1" = 1' NO. 9

483 SEC 6 T3S R13W 479 STATE ALASKA 48 ROAD CENTERLINE ROAD SHOULDER 481 INV. ELEV. TO BE MARKED IN FIELD BY ENGINEER FILL SLOPE DAYLIGHT 274+ 275+ 18.' 482 PROPOSED 24" x 45' CSP SEE TYPICAL A/6 INV. ELEV. TO BE MARKED IN FIELD BY ENGINEER FILL SLOPE DAYLIGHT 484 485 GIS UNNAMED STREAM 486 487 488 489 2 4 : 1" = 2' NO. 1 11

ACCESS ROAD DATA IMPACTED AREA EXCAVATION TOTAL FILL FILL 396. SF. CF 8212.5 CF 8212.5 CF.9 AC. CY 297.83 CY 297.83 CY ACCESS ROAD DATA: LENGTH ROAD IN = 1395 LF; WIDTH = 28'; MIN. FILL DEPTH 2.5' STREAM CROSSING - STA 274+45 STREAM LENGTH CULVERT DIA. CULVERT LENGTH (FT) CHANNEL AREA TYPE I FILL IN CHANNEL PIPE BEDDING FILL IN CHANNEL CHANNEL EXCAVATION TEMPORARY DISCHARGE SANDBAGS 45. LF 24. IN 45. FT 33.6 SF 4.86 CY 2.5 CY 2.5 CY 3. CY 131.22 CF 67.5 CF 67.5 CF 81. CF TIM AVE. WIDENING STA 57+ - 58+75 & CULVERT REPLACEMENT DATA IMPACTED AREA TOTAL EXCAVATION FILL PIPE BEDDING FILL KPB TYPE I ARCH PIPE STREAM CHANNEL BACKFILL TOTAL FILL TEMPORARY DISCHARGE (SANDBAGS) 787.1 SF 83.25 CF 83.25 CF 1865.7 CF 49.86 CF 3159.81 CF 135. CF.2 AC 29.75 CY 29.75 CY 69.1 CY 18.18 CY 117.3 CY 5. CY 95" x 67" x 45', 12 GAGE CORRUGATED STEEL PIPE. TOTAL LENGTH PIPE (END PAN TO END PAN) = 59.5' CULVERT LENGTH 3' EACH LF 9' TOTAL LF 18" CULVERT DATA STA 253+4, 259+25, 265+ EXCAVATION PER CULVERT TOTAL EXCAVATION FILL PER CULVERT TOTAL FILL 29.7 CF 89.1 CF 29.7 CF 89.1 CF 1.1 CY 3.3 CY 1.1 CY 3.3 CY (3) 18" CORRUGATED STEEL CULVERTS, 3' LONG EACH. AT STATIONS 253+4, 259+25, & 265+ TOTAL IMPACTS IMPACTED AREA EXCAVATION FILL TEMPORARY DISCHARGE (SANDBAGS) 3988.16 SF 959.85 CF 8366.13 CF 216. CF.92 AC 35.55 CY 398.52 CY 8. CY : N/A NO. 11 11