pod Installation, Operation & Maintenance viridian Pod-PV, Pod-ST solar v

Similar documents
THERMAL STORE MAINS PRESSURE SYSTEM

THERMAL STORE MAINS PRESSURE SYSTEM

Installation, Operating and Servicing Instructions

Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors

Installation, Operating and Servicing Instructions

A HOT WATER REVOLUTION

A Hot water revolution

AquaCyl solar system solar water heating solution for the larger home with greater hot water demand (2 or more bathrooms in use simultaneously)

Installation and Commissioning Manual

Atmos EasySolar. Installation Instructions for. Sloping roof and flat roof installation with evacuated tube collector

Commissioning a Solar Thermal Installation

ASSEMBLY INSTRUCTIONS FOR THE PUMP AND CONTROL UNIT ZPS 18a-01

ZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008

ADVANCE ECB ELECTRIC COMBINATION BOILER

ENERSTORE. Vented Hot Water Storage System INSTRUCTIONS PLEASE LEAVE WITH HOUSEHOLDER

SEALED THERMAL STORE

UN-VENTED & VENTED STAINLESS STEEL HOT WATER CYLINDERS

For use with approved Bathstore head kits. Installation guide. Viso Digital installation instructions Page 1

Furrows Business Park, Haybridge Road Wellington, Telford, Shropshire TF1 2FE

Unvented Electric Water Heater 10/15 litre Undersink

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Installation and User Instructions Aquaheat Unvented Water Heaters Models: AH30H

Installation and Servicing Instructions. Alpha FlowSmart

Multipoint Technical Data

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Kills bills. How Vaillant technologies reduce home heating bills

Installation and User Instructions HS10U, HS15U.

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

Risk Assessment and Control Measures for Household Hot Water Systems

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

MEGAFLO HE Iss 1

ADVANCE ELECTRIC THERMAL STORE

DIGITAL MODULATING BOILERS

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring

New Zip AquaFlo. Stainless steel cylinders for mains pressure hot water

INTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.

THERMflow Thermal Store Cylinders

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Autofill wall mounted water. boiler. Getting the best from your water. boiler. Please read and keep these instructions

Peacock Salt. Multisol Pro VA Operation & Training Manual

CUBEflow Thermal Store Tank

For latest prices and delivery to your door visit MyTub Ltd

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

Rise. Digital. Bath with overflow filler. Rise Digital Bath installation instuctions page 1

Aquamixa. Thermo. Thermostatic shower valve with manual bath fill

Components for solar heating systems

unvented indirect & sealed heating systems unvented direct system & electric space heating Hot and cold water supply to all outlets at mains pressure

Installation and Servicing Instructions. Alpha SolarSmart 90

Design, Installation & Servicing Instructions. A total hot water and heating thermal store that can also make the most of renewable energy

Accumulator tank. 1000, 750 and 500 litres Aqualux Teknik Aqualux UB Aqualux 750 CU

water solar heating SOLAR

Combined electric boiler and domestic hot water store

Xcel HEATBANK Thermal Store The solution to multi-fuel heating. Renewable Energy Solutions

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Alpha CombiMax 350 and 600

Installation, operating and. Comfort

Installation & User Instructions

Extreme Domestic Hot Water Loading System TECHNICAL DOCUMENTATION. Issue 11/09

Schuco SS-TC/SC Cylinders

Quartz. Digital. Bath with bath waste filler. Quartz Digital Bath with bath waste filler installation instuctions page 1

Soak in the Sunshine. Solar Hot Water

hxi High Efficiency Heating Only 24hxi hxi High Efficiency Heating Only 30hxi hxi High Efficiency Heating Only 38hxi

Total Hot Water Solutions

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

Zip InLine. Models CEX-O & CEX-U Issued August Installation, Maintenance and User Instructions

HEATBANK Xcel Thermal Store The solution to multi-fuel heating. Renewable Energy Solutions

AquaFlo II. Issue 3 December Please read these instructions carefully before commencing installation of the AquaFlo unvented water heater

INSTALLATION OPERATION MAINTENANCE

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

For the owner. Operating manual. ecotec. Gas wall boilers with condensing appliance technology VU 466/4 VU 656/4

Installation & Technical Guide. Domestic & Commercial.

Installation instructions. RECOUP Retrofit+ Shower Waste Water Heat Recover unit

Cistern-fed water heating

Larch house and Lime house review of systems design and implementation

Why Vaillant? Because the ecotec delivers day in, day out. Vaillant ecotec boiler range. The TECHNICAL Brochure

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

AQ150:Midas 10/9/15 14:50 Page 1 AQ150. Thermostatic bar mixer valve with adjustable head. Installation guide

Electronically Controlled Instantaneous Water Heaters Models: CEX-O & CEX-U

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Itho Solar System CombiSolar 150. Installation and service manual

Why Vaillant? Home Heating Guide. Because they can reduce our heating bills and our carbon footprint

Plus. USER and INSTALLATION INSTRUCTIONS. 30,000-9kW for Heating and Hot Water

ECONOPLATE H1-heat only HEAT INTERFACE UNIT. Installation, Commissioning and Servicing Instructions for unvented systems.

GB24 & GB30. User Manual

WATER HEATERS. Simplicity, performance, comfort... Hydraflo. Unvented Cylinders. 125 to 300 litres, directly or indirectly heated.

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data Electrical Details Connection Details Dimensions Standing Losses

Water Heating Systems

High Output Boiler Systems

ir-range 8G /03.15 Changes reserved.

Broag Pressurisation equipment

ZIP AquaFlo II. Models: Direct, Indirect and Solar Compatible. Unvented cylinder water heaters

MEGAFLO Eco Plus Solar Unvented Hot Water Cylinders 400L -570L

Installation and Servicing Instructions

Design, Installation & Servicing Instructions. A total hot water and heating thermal store that can also make the most of renewable energy

Instructions for use Installation and Servicing. Solar Hot Water Cylinders/ Flurocyl

Information Job Sheet 4. Closed-Loop Drainback Systems. Drainback tanks

Electromax. Combined electric boiler and domestic hot water store

Autofill counter top water boiler

Dene Bath Shower Mixer

Transcription:

Installation, Operation & Maintenance Pod-PV, Pod-ST v1.1 80030

16 Solar thermal connections (Pod ST only) 15 1 4 5 14 1 2 3 Hot water connections (Pod ST and Pod PV) 17 1

Clearline PV 7 8 2 3 2 3 6 9 9 ST 4 5 11 4 5 13 2 10 11 3 12 19 20 Pod-ST Pod-PV 18 21 1 2 The Pod Cold water inlet (15mm) 3 Preheated water outlet (15mm) 4 5 6 Solar panel return (10/15mm) Solar panel flow (10/15mm) Heat store fill loop 22 7 8 Heat store fill level valve High limit thermostat (95C) 2x 1x 23 9 10 11 12 13 14 15 16 Immersion heater (3kW) Drainback fill level valve Solar pump Drainback filling hose Solar controller (factory set 80C) Optional pressurised kit Panel signal cable Panel signal cable connector Order V2411 Order V223 Pod-ST Solar controller display 18 Pump test button 19 Power indicator light 20 Error indicator light 21 Pump indicator light 22 Wireless connect button 23 Wireless activity light 17 Combi diverter valve set Where required order V243 2

Operation Contents User Guide Installation 1. Positioning the Pod 2. Connecting to the hot water system 3. Filling the Pod cylinder 4. Pod PV electric heating 5. Pod ST thermal heating 5a. Drainback system 5b. Pressurised system 5c. Insulating the pipes Maintenance Specifications Commissioning Checklist Maintenance ecord 4 5 6 8 8 9 9 11 13 14 15 16 17 3

Operation About Solar Water Heating The Pod saves you money and helps the environment by converting the light hitting a panel into hot water which reduces energy bills for water heating. Pod ST is heated by heating panels. The heating panel absorbs light and traps the heat generated behind its cover glass. A liquid is pumped through the panel which carries the collected heat to the Pod. An electronic controller inside the Pod decides when to turn on the pump based on the temperature difference between the panel and the Pod. Pod PV is heated by an electric immersion heater. A PV switch (not supplied) is used to divert electricity to the heater when the photovoltaic system is generating more electricity than the property is using. Hot Water Cylinder or Combi boiler Solar Heating Panels Preheated water out or Energy for heating Solar PV Panels The Pod Cold water in Use The Pod operates automatically, with minimal maintenance required (page 14). 4

Installation 1. Positioning the Pod 1250 500 kg 60 500 160 +/-10mm Leave packaging in place during handling to protect connections Without its lid, the Pod will fit through a standard 520 x 520 mm loft hatch. If using a lifting sling, secure it to the Pod as shown. Ensure the installation location can support the weight of the filled Pod. A span of at least three joists, avoiding any that are already supporting loads, is likely to be necessary. Timber bearers can be used to transfer the load to rafter nodes. If in doubt, consult a structural engineer. Best energy performance is achieved by minimising the length of the pipe to the heating system. For Pod-ST in drainback, see also section 5a. In some climates, freeze-prevention measures such as removing loft insulation beneath the Pod, or trace heating with an immersion, may be required. 5

Installation 2. Connecting to the Hot Water System 2a. Vented Hot Water Cylinder >0 For a vented hot water cylinder, connect from the header tank to the cold water inlet (2) and from the preheated water outlet (3) to the cylinder cold inlet. The water level of the header tank must be higher than the Pod cold water inlet. In some circumstances it may be necessary to raise the header tank further or add a shower pump to maintain hot water flow rates. Insulate pipes in unheated areas and between Pod and cylinder. 2b. Unvented Hot Water Cylinder For an unvented hot water cylinder, connect from the inlet control set to the Pod cold water inlet (2) and from the preheated water outlet (3) to the cylinder cold inlet. Insulate pipes in unheated areas and between Pod and cylinder. 6

Installation 2c. Combi-boiler For a combi-boiler connect a cold water feed to the Pod cold inlet (2) and from the preheated water outlet (3) to the combi boiler cold water inlet. Insulate pipes in unheated areas and between Pod and boiler. Confirm the specified maximum inlet water temperature for the boiler The temperature of the preheated water from the Pod should be controlled to suit the specification of the boiler and to maintain a safe hot-tap temperature. See the table below. Boiler Maximum Inlet Temperature ( C) >60 45-60 28-45 <28 ecommended Temperature Control Thermostatic mixing valve set to 60 C Thermostatic mixing valve set to boiler max Combi diverter valve (part number V243) efer to separate documentation Not suitable 7

Installation 3. Filling the Pod Cylinder Once the connection to the hot water system is made you can fill the Pod cylinder. Open the fill level valve (7) and then open both valves on the filling loop (6). Once water over-flows from the fill level valve shut both filling loop valves and disconnect the filling loop. Once water stops flowing out, close the fill level valve (7) 7 6 Close fill level valve (7) after fill loop valves (6) to avoid over-filling 4. Pod PV Electric Solar Heating 8 The Pod PV is heated by a 3kW electric immersion heater (9) wired via a high-limit thermostat (8). Connect the thermostat to a 230V electricity supply controlled by a PV switch (not supplied). 9 8

Installation 5. Pod ST Solar Thermal Heating 5a. Drainback Solar System A B h Panel Area (m 2) 2 3 4 Maximum A+B (10mm pipe) Clearline Highline 57m 46m 48m 40m N/A 19m Maximum h (m) 5.0 (i) The total fluid volume of panels plus pipes should not exceed 4.25 litres. The table above gives maximum pipe lengths to achieve this for 10mm pipe. In addition, the panel outlet should not be more than 5m higher than the Pod. The pipes must have a continuous fall greater than 1 in 30. CLICK CLICK 10mm (ii) Install pipe from the return (4) to the lower panel connection and the flow (5) to the upper panel connection. 10mm copper pipe is recommended to minimise fluid volume (see table above). Use high temperature solder or compression fittings for any connections. 200 C Connect the panel sensor cable to the top of control unit (13) using the panel signal cable (15) and cable connector (16). Clearline Highline 9

Installation Clearline c 10 (iii) Open the drainback fill level valve (10) and the drainback filling hose (12) valve. d a Holding the filling hose above the outlet fittings (4) & (5), pour in fluid until fluid overflows from the fill level valve (approximately 5 litres). Close all valves. 12 b USE ONLY VIIDIAN SOLA FLUID Do not dilute Code: V225 1 sec 1 +1 +1 4 min 12 h Automatic control (iv) Switch on the power. Check for error flashes on indicator light (20). Two pump test modes are accessible by pressing the pump test button (18). The mode is indicated by the pump indicator light (21) blinking off. Press the pump test button (18) and hold for one second to run the pump for 4 minutes. Briefly open fill level valve (10) to check for good flow back from top of panel(s) to Pod. If there is no flow check for airlock or adjust speed setting on the pump (11) 10 C SCALD ISK 10

Installation 5b. Pressurised Solar System Clearline Highline 15mm CLICK CLICK (i) Install pipe from the return (4) to the lower panel connection and from the flow (5) to the upper panel connection. 200 C Use high temperature solder or compression fittings for any connections. 14b 14c 14a V2411 kit includes pressure gauge (14a), expansion vessel (14b) with connecting hose and fixing bracket and flow indicator, non-return valve and filling set (14c). These should be fitted into the return pipe. Connect the panel sensor cable to the top of control unit (13) using the panel signal cable (15) and cable connector (16). 5 min C SCALD ISK USE ONLY VIIDIAN SOLA FLUID Do not dilute Code: V225 (ii) Connect an external filling pump to the filling set (14c). Ensure the flow is towards the panel(s). With the inlet valve closed, switch on the external pump. Gradually open the valve to achieve a good flow rate at the outlet. Continue pumping until the return flow is bubble-free. 11

Installation 3.1 bar a b (iii) Close the outlet valve and continue pumping to pressurise the system to 3.1 bar. Close the inlet valve and switch off the external pump set. Open the intermediate valve. 1 sec 1 +1 +1 4 min 12 h Automatic control (iv) Switch on the power. Check for error flashes on indicator light (20). Press the pump test button (18) and hold for one second to run the pump for 4 minutes. Check the flow rate on the indicator (14c) against the table. Adjust the speed setting on the pump if necessary. 14c Two pump test modes are accessible by pressing the pump test button (18). The mode is indicated by the pump indicator light (21) blinking off. L/min Panel Area Target Flow 2 (m ) (L/min) 2 2.0 3 2.5 4 3.5 12

Installation 5c. Insulating the Solar Pipes Fully insulate the pipes with high temperature insulation. Avoid foamed polyethylene, use foamed rubber (e.g. Armaflex), Polyurethane, mineral fibre. If fixing the panel sensor cable to the pipe, secure it outside the insulation. >9mm >13mm 10 mm 15 mm Now complete and sign the Commissioning Checklist on page 16. 13

Maintenance Maintenance With regular simple maintenance, your Viridian Solar water heating system should provide years of trouble-free operation. It is not necessary to clean the panel, the action of rain will keep it clear. Annual : Service A All models: Inspect the pipe work and insulation for leaks or damage. Top up the Pod cylinder by reconnecting the filling loop (6) and following installation step 3 on page 8. Pod ST Drainback: Check for error messages. Press the pump test button, and check for flow. See installation step 5a.(iv), page 10. If there is no flow follow installation step 5a.(iii). Pod ST Pressurised. Check for error messages. Press the pump test button, and check for flow. See installation step 5b.(iv), page 12. Check the pressure indicator (14c) which should indicate a pressure close to the set pressure noted in the commissioning record (page 16) or around 3 bar. If pressure is low, or in the case of no flow, recharge following installation steps 5b.(ii) to (iv) on page 11-12. Every 5 Years : Service B As for Service A plus system fluid replacement (Pod ST only). Pod ST Drainback. Switch off the power and drain the system from the filling hose (12) by opening the fill level valve (10) and the filling hose valve. Follow installation steps 5a.(iii) to (iv), page 10. Pod ST Pressurised. Switch off the power and drain the system. Follow installation steps 5b.(ii) to (iv), page 11. Use only system fluid from Viridian Solar (Product Code V225). Failure to use correct system fluid will invalidate your warranty and put the system at risk of freeze damage and corrosion. Dispose of the system fluid at your local waste disposal centre. Propylene Glycol Solution. 14

Maintenance Specification Pod-ST Pod-PV Volume litres 100 100 Length mm 1250 1250 Width mm 500 500 Height mm 500 500 Weight (empty) kg 60 55 Weight (empty, lid off) kg 55 50 Weight (full) kg 154 150 Cylinder maximum pressure bar 0.6 0.6 Heat loss per 24h 65ºC EN kwh 1.5 1.5 Solar coil surface area m 2 0.4 - Solar coil maximum pressure bar 10 - Solar coil volume litres 4.6 - Hot water coil surface area m 2 1.6 1.6 Hot water maximum pressure bar 10 10 Hot water coil volume litres 1.2 1.2 Hot water coil pressure loss at xlitres/min bar xx xx Maximum temperature controller ºC 80 - High limit thermostat setting ºC 95 95 Immersion heater power kw - 3 Immersion heater set temperature ºC - 77 Immersion heater safety cutout ºC - 85 15

ecords Commissioning Checklist The Commissioning Checklist is to be completed in full by the person who commissioned the Pod and system as a means of demonstrating compliance with manufacturer s instructions. This booklet should be handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer s instructions may invalidate the warranty, but does not affect statutory rights. Customer Name Address Commissioned by (print name) Name Address Commissioning Checklist OOFING Pitched Flat Protective cover removed from panel? oof fixing kit correctly installed? Frame hold-down adequate? Panel sensor connected? MECHANICAL AND ELECTICAL Pod PV ST Drainback ST Pressurised Location suitable to support filled weight of Pod? Frost protection measures in place? Solar loop pipes of correct diameter and material? Compression fittings, press fit or high temperature solder used in loop? Continuous pipe fall from panels to Pod? High temperature insulation on loop? Pipes from Pod to hot water cylinder or combi boiler insulated? Pipes in unheated areas insulated against freezing risk? Check for leaks / weeping joints? No red flash on controller? Confirm fluid circulation? Drainback resting level at correct height? System pressure 3.0-3.1 bar? bar Expansion vessel pressure 3.0 bar? bar Declaration The system has been installed and commissioned in accordance with the manufacturer s instructions The system controls have been demonstrated and understood by the customer The manufacturer s literature, including Checklist and Service ecord has been explained and left with the customer Installer s 16

ecords Service ecord 1A Technician 2A Technician 3A Technician 4A Technician 5B Technician 6A Technician 7A Technician 8A Technician 9A Technician 10B Technician 17

ecords Service ecord 10A Technician 12A Technician 13A Technician 14A Technician 15B Technician 16A Technician 17A Technician 18A Technician 19A Technician 20B Technician 18

Pod ST Controller Lights Green light on - controller has power Orange light on continuously - the pump is running One flash per second - pump disabled - Pod or panel at maximum temperature An error is indicated by the red light. The number of times the light blinks off per ten second period identifies the error. Blinks per 10 sec. 1 2 3 4 5 10 Error Pump Error Cylinder Sensor Open Circuit Cylinder Sensor Closed Circuit Panel Sensor Open Circuit Panel Sensor Closed Circuit Microcontroller Error emedial Action Check pump, check for airlock or blockage econnect sensor cable to controller econnect sensor cable to controller econnect sensor cable to controller econnect sensor cable to controller Power down 10 seconds, then on again Viridian Solar Atlas Building, 68 Stirling Way Papworth, Cambridge. CB23 3GY T 01480 831 501 F 01480 831 831 www..co.uk