CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012

Similar documents
AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide

Title: CHA E-Beam Evaporator Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 01/13/2011

1.0 Denton Thermal Evaporator

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Custom Products Gallery

Kurt J. Lesker in the Cryogenic Community. Dr. Glynn Dyson Cryogenics Cluster Day 19 th September 2014

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Manual Physical Vapour Deposition System

Denton Thermal Evaporator SOP. UNT Cleanroom

University of Minnesota Nano Fabrication Center Standard Operating Procedure

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky

Standard Operating Procedure Glovebox and Thermal Evaporator

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

OXFORD PLASMALAB 100 PECVD

PDS 2010 Parylene Coater SOP

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7

C19 UNIVEX. High Vacuum Experimentation Systems UNIVEX 300, UNIVEX 450 UNIVEX 350, UNIVEX 450 B Special plants

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

Operating Instructions for the SAMCO RIE800iPB

Operating Instructions for the STS ICP Metal Etcher

Compact Laser MBE system

Standard Operating Manual

Standard Operating Procedure: Sputter

NMOS Fabrication Process Description

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide

Chapter 3.1, 43 is subdivided into the following sections. System overview (Chapter 3.1.1, 43) and

University of Minnesota Nano Fabrication Center Standard Operating Procedure

EFM Evaporators. Electron Beam Evaporator for Ultra-Pure Submonolayer and Multilayer Thin Film Growth. Evaporation from Wires, Rods or Crucibles

Process Equipment Division Overview

YES-3DR HMDS OVEN USERS GUIDE

CRU-S Series Stainless Steel Condensate Recovery Unit

NANO 703-Notes. Chapter 8-Vacuum systems and TEM holders

O PE R AT I ON HO851G REVOLVING TRAY OVEN. MODEL HO851G GAS ML Pan ML Pan ML Pan ML Pan

BACK SCATTER ELECTRON (BSE) Rev. 0313

Figure 1-1 Furnace Front Elevation

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

OPERATING INSTRUCTIONS FOR THE TP18SX-HP

Standard Operating Manual

E6700 Bench Top Evaporator Turbo Pumped Operating Manual

General. Applications and Accessories for Oil Diffusion Pumps. leybold. Application. Accessories LEYBOJET 630 DIP DIP DIP DIP 30000

Operating instructions

MECHANICAL VACUUM BOOSTERS:-

4.8 FARADAY CUP ASSEMBLY OPTION

OPERATION MANUAL Model 800 Nanoimprint Controller

Troubleshooting Thermo Scientific LevelPRO Gauges

Leica EM ACE600 Carbon & Iridium Coating System

WHEN TROUBLESHOOTING, PERFORM THE STEPS IN ORDER.

HG DI

Vacuum Pumping process for Large Camera Dewars supplied by PixelVision of Oregon

0. Table of contents. Author: M.C.Martens

UF424 and UN324. Technical Service

Arizona State University NanoFab PARYLENE COATER. Rev D

Saintech Ion Beam Systems - Ion Current Monitor

Standard Operating Procedure: Spinner

GAS RACK OVENS WITH ELECTRONIC OVEN CONTROL

Rules for Safe Operation

Light oil / kerosene burner

Maintenance and Troubleshooting of Oil Diffusion Pumps

Standard Operating Manual

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Always keep this manual in a safe readily accessible location. MODEL SERIAL SERVICE COMPANY TELEPHONE NUMBER

OWNER S MANUAL. High-Wall Fan Coil Unit CONTENTS

TYCO VALVES & CONTROL Dual Painting System

IMPORTANT CONSIDERATIONS

REDI CONTROLS, INC. Installation, Operation & Maintenance Manual

Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures

Waste Oil Fired Heater. Installation, operation and service instructions OWH v Manual

Thermo 230 / 231 / 300 / 301 / Troubleshooting

Brandon Barrel Asher. Standard Operating Procedure

Labconco Small Stoppering Chamber

Filabot EX6 Extruder. Operation Manual. CAUTION! Read Carefully. Filabot Vermont, USA, Earth

MODEL 421 NUCLEAR POWER PLANT TRITIUM MONITOR

VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH

Installation Instructions

Standard Operating Manual

MODEL 321/421 NUCLEAR POWER PLANT TRITIUM MONITOR

Motorised Infrared Optical Beam Smoke Detector. User Guide

Operation Manual R205BV, R209BV

FOR VETERINARY USE ONLY

AOYUE 968A+ INT. Deluxe Repairing System INSTRUCTION MANUAL

Tornado Operations & Maintenance Manual

Oil burners fuel unit with solenoid valve

17 GALLON PROFESSIONAL RESTROOM CLEANER

Motorised Infrared Optical Beam Smoke Detector. User Guide

STEAM MOP INSTRUCTION MANUAL CATALOG NUMBER BDH1765SM PLEASE READ BEFORE RETURNING THIS PRODUCT FOR ANY REASON. SAVE THIS MANUAL FOR FUTURE REFERENCE.

ACORE Filtration Co.,Ltd provides engineering,

Standard Operating Procedures

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual

YP7999A1000 ControLinks Fuel Air Ratio Control Panel

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions

T-Series Air Conditioner T53 Model

SHOT BLAST CABINET USER INSTRUCTIONS. Model No: CSB20B. Part No: GC05/13

Fisher Scientific Isotemp Muffle Furnace 550 Series. Instruction Manual

Power Flame Incorporated

Specification Sheet. Equipment Model: BVAC-1200 Vacuum Furnace. Type. Chamber. Maximum Temperature 1250 C. Hot Zone

DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

120V CAUTION: DO NOT OPERATE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THIS INSTRUCTION MANUAL IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

Transcription:

CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility

TABLE OF CONTENTS 1.0 DESCRIPTION.... 3 2.0 SAFETY....... 3 3.0 REQUIREMENTS/RESTRICTIONS........ 3 4.0 STARTING THE CRYO PUMP.. 5 5.0 LOADING A SAMPLE.. 7 6.0 PROGRAMMING THE XTC THICKNESS MONITOR. 9 7.0 BRINGING UP THE ELECTRON BEAM FOR EVAPORATION...... 10 8.0 SYSTEM SHUTDOWN..... 13 2

1.0 Description The CHA Industries Electron Beam Evaporator uses a four pocket carousel crucible selector. Users are allowed to evaporate/deposit Al, W, Ti, Ni, Ge, Au, Ag, Pt, Cr, Co, Fe and Cu. Any other materials will need NanoFab staff permission. Single or stack films can be evaporated on 1-6 diameter wafers, glass slides and small samples. 2.0 Safety 2.1.1 This machine is connected to HIGH VOLTAGE. If any ARC FAULT, OVERLOAD, or SYSTEM FAULT lights come ON call NanoFab staff immediately. Be very careful and aware of electrical hazards. If you encounter any electrical malfunctions contact NanoFab staff immediately. 2.1.2 This machine uses HIGH VOLTAGE. DO NOT operate this machine with any cables disconnected, or component enclosures/panels open. 2.1.3 This machine uses HIGH VOLTAGE. DO NOT operate this machine with any cables disconnected, or component enclosures/panels open. 2.1.4 This machine has use water flow to prevent over heating the cryro pump, carousel source crucibles and quartz crystal.if you encounter any water flow malfunctions or leaks notify NanoFab staff immediately. 2.1.5 This machine has an EMO (Emergency Off) switch/button mounted on the top panel. The EMO switch should be pressed only in an emergency. An emergency would be fire, smoke, electrocution hazards, and an injury to anyone using this particular piece of equipment. If the EMO is pressed notify NanoFab staff immediately. 2.1.6 Use sunglasses when viewing the material heating/ evaporation process to prevent eye damage 3.0 Requirements/Restrictions 3.1.1 You must be a qualified user on the CHA E-beam evaporator. 3.1.2 Users must supply their own deposition supplies on this system. See the Kurt J Lesker page below (Fig. A) for more details. 3.1.3 Substrate heating is limited to 500 o C maximum. 3.1.4 The evaporator can be used to deposit metal or oxide film on 1-4 diameter wafers, glass slides, and small samples by using the substrate holder clips. Extremely small pieces can be processed by using longer holder clips or bonding to larger carrier wafer (bond with drop silver paint, drop of baked photo resist, MUNG II paste or other approved bonding material) 3.1.5 No substrate heating allowed if using bonding material. 3

3.1.6 If you are using the substrate heater be careful not to over heat your wafer/samples to prevent any wafer breakage, metal or any other material to flow. 3.1.7 If you are using the substrate heater make sure you wait until the substrate temperature is < 50C before venting the chamber. 4

4.0 Starting the Cryo Pump. 4.1.1 Set the ROTARY Switch to MANUAL (Fig 1). (Fig. 1) 4.1.2 Check the CRYO PUMP CONTROLLER (Fig. 2) to see if the controller power is ON and if the cryo pump is at the proper operating temperature of < 18K. If the Cryo Pump Controller is currently ON and at the proper operating temperature then skip forward to Section 5.0. If the Cryo pump is OFF then proceed to the next step. (Fig 2) 4.1.3 Read the CRYO ROUGHING PRESSURE (Fig. 3), if it is > 100 mtorr go to step 4.1.4. If it 100 mtorr go to step 4.1.6. (Fig. 3) 5

4.1.4 Turn the MECHANICAL PUMP breaker ON (Fig. 4). (Fig. 4) 4.1.5 Open the FORE valve (See Fig. 1) and wait until the CRYO ROUGHING PRESSURE 100 mtorr (Fig. 5). Close the FORE valve and monitor the CRYO ROUGHING PRESSURE, if it rises to > 100mT open the FORE valve again and allow the pressure to drop to < 100mt. Repeat this cycle until the CRYO ROUGHING PRESSURE remains < 100mT when the FORE valve is closed. Leave the FORE valve closed and proceed to the next step. **Warning** Do not leave the system unattended with the FORE valve opened. Allowing the pressure to drop for extended periods of time to levels of < 100 mtorr can result in hydrocarbon oil backstreaming into the cryo and contamination of the system. If you must leave, then close the FORE valve before doing so. (Fig. 5) 6

4.1.6 Turn the CRYO-PUMP CONTROLLER power ON (Fig. 6). Write down in the logbook the cryo starting time. The cryo pump is not going to be operational until it reaches 18 ºK as displayed on the CRYO-PUMP CONTROLLER. This may take up to 2 hours. (Fig. 6) ***Note*** At this time you may load your samples and perform steps 5.1.1 5.1.5 while you wait on the cryo pump to finish cooling to < 18 ºK. 5.0 Loading a Sample 5.1.1 On the PRESSURE GAUGE CONTROLLER, (Fig. 7) press the POWER button. Open the VENT valve (See Fig. 1) and wait until the THERMO GAUGE pressure gets close to 1000 Torr. (Fig. 7) 7

5.1.2 Move the RAISE/LOWER button to the RAISE position to fully raise the Bell Jar. Once the Bell Jar has fully lifted and stops, move the RAISE/LOWER switch to its middle STOP position (Fig. 8) and close the VENT valve (Fig. 8). (Fig. 8) 5.1.3 Load your sample(s) onto one of the Sample Plates (Fig. 9) and then you re your supplies for evaporation into the chamber. Change the microscope slides if necessary. While the chamber is opened inspect the chamber seal and base area for flakes. Clean all flakes from the seal areas. If there are too many flakes within the chamber, vacuum the chamber. You need to be careful around the high voltage electrodes and e-beam gun. Do not touch the vacuum nozzle to any wires or delicate components. If necessary ask a staff member to assist you. If flakes get in the wrong location arcing can occur. (Fig. 9) 5.1.4 LOWER the Bell Jar by moving the RAISE/LOWER switch to the LOWER position (See Fig. 8). Once the Bell Jar has fully lowered and stops moving then move the RAISE/LOWER switch to the middle STOP position. 8

5.1.5 Open the ROUGH valve (See Fig 8). After the pressure in the chamber indicates < 100 mt as indicated on the Thermo Gauge (Fig 7 & 9) close the ROUGH valve. You must now wait until the cryo temperature is 18 ºK before proceeding to the next step. Fig 7 5.1.6 Verify that the cryo pump temperature is 18 ºK as indicated on the CRYO PUMP CONTROLLER (See Fig. 6) once this temperature has been reached open the HIVAC valve (See Fig 8). 5.1.7 Wait a few minutes, then go to the PRESSURE GAUGE CONTROLLER (See Fig. 7) and turn the RANGE switch to 4x10 -N and press the FILAMENT button to turn ON the Ionization Gauge. 5.1.8 Wait until the pressure in the Ionization Gauge reaches < 5x10-6 Torr before proceeding. 6.0 Programming the Inficon XTC Thickness Monitor 6.1.1 Turn ON the THICKNESS FILM MONITOR (Fig. 8) and then press the STOP and then START button to clear any errors. (Fig. 8) 6.1.2 Press the XTAL button to check the % of crystal life remaining. If the crystal life is > 15% then it must be changed before deposition. 6.1.3 Press the Pg button then the DOWN ARROW key until DENSITY is highlighted. 9

6.1.4 Enter the material density from the materials selection guide. Once the correct density has been entered continue by pressing the DOWN ARROW again until Z-Ratio is highlighted. Enter the correct Z-Ratio for the deposited material from the materials selection guide. ***Warning***- DO NOT PRESS THE UP ARROW AFTER ENTERING A NUMBER OR THE ENTRY WILL BE LOST. 6.1.5 Once completed press the Pg button again to save the entries and return to the main screen. 7.0 Bringing up the Electron Beam for Evaporation 7.1.1 Turn the e-gun X - Y beam sweep controller ON (Fig. 10) by moving the toggle power switch to the ON position. (Fig. 9) 7.1.2 Turn on the interlock key by turning the key from OFF to MAN, Do not put the key in AUTO or the system will not function properly. All the yellow interlock lights will turn on and the green READY light will be on. If all the lights are not on call NanoFab staff. (Fig. 10) 7.1.4 Turn SOURCE 1 emission control knob on the front of the Interlock panel to 0 by turning knob CCW until it stops. 7.1.5 Turn the REMOTE BEAM CONTROLLER emission current to 0 by turning the EMISSION current potentiometer fully CCW until it stops @ 0. 10

7.1.6 Turn on MAINS power by moving switch/breaker to ON position (SEB-06 e-beam power supply). If any ARC FAULT, OVERLOAD, SYSTEM FAULT lights go on turn OFF MAINS switch/breaker and call NanoFab staff immediately. Only the MAINS ON and INTERLOCK lights should be on. 7.1.7 Turn on high voltage by pressing the white HV ON push-button switch (SEB-06). The HV ON light will turn on. If any ARC FAULT, OVERLOAD, SYSTEM FAULT lights go on press the green HV OFF push-button switch, turn OFF MAINS switch/breaker and call NanoFab staff immediately. Only the MAINS ON, INTERLOCK and HV ON lights should be on. 7.1.8 If necessary adjust the OUTPUT VOLTAGE to 9.0 KV by turning output voltage adjust potentiometer UP or DOWN until the display shows 9.0 KV. 7.1.9 While watching the X Y Beam sweep controller Green LED readouts, adjust both the amplitude and position potentiometers on the Remote Beam Controller to be centered (position pot) and approximately 3 to 5 LED s in width (Amplitude pot). 7.1.10 Check to ensure the Remote Emission Controller emission current is at 0 by rotating emission potentiometer CCW until it stops @ 0. 7.1.11 Turn on the Remote Emission Controller by pressing the EMISSION ON pushbutton switch. The ON light will turn red. 7.1.12 Move the Source shutter switch to its OPEN position (Fig. 11). (Fig. 11) 7.1.13 Slowly increase emission current by rotating EMISSION potentiometer CW to a setting of 2.5 3.0 while looking through the source view port window to monitor the initial heating process (about 15 downward). If necessary use the filter lens when viewing the material heating/evaporation process to prevent eye damage. 11

7.1.14 While looking into the viewport window you should be able to see the blue e-beam spot or the material glowing hot near the center of the crucible. Make fine centering adjustments to the Horizontal and Lateral Position potentiometers. 7.1.15 On the Remote Beam Controller increase/decrease the Horizontal Amplitude potentiometer CW to generate an optimal e-beam sweep without encroaching on the crucible edge. 7.1.16 On the Remote Beam Controller increase/decrease the Lateral Amplitude potentiometer CW to generate an optimal e-beam sweep without encroaching on the crucible edge. 7.1.17 On the Remote Beam Controller increase/decrease the Horizontal and Lateral Frequency potentiometers CW to achieve an optimum sweep frequency/speed. 7.1.18 Very slowly increase emission current by rotating EMISSION potentiometer CW. When you have the desired evaporation rate (2-3A/sec is typical) then press the ZERO button on the Inficon XTC thickness monitor (See. Fig. 8). 7.1.18 Open the Substrate shutter (Fig. 12) to begin the deposition. (Fig. 12) 7.1.19 When you have deposited the desired thickness as shown on the Inficon XTC thickness monitor (See Fig. 8), quickly close both the SOURCE AND SUBSTRATE shutter s by moving both switches to their closed position s (See Fig. 12). 7.1.20 Begin the emission current shut down by SLOWLY decreasing emission current by rotating EMISSION potentiometer CCW until it stops @ 0. This process should take a couple of minutes to allow the crucible and filament sufficient time to cool slowly. 7.1.21 Turn off the Remote Emission Controller by pressing the EMISSION OFF pushbutton switch. The OFF light will turn green. 12

7.1.22 Turn off high voltage by pressing the green HV OFF push-button switch (SEB-06) and then turn off the Mains power by moving the breaker to the OFF position. 7.1.23 Then turn off the X Y Beam sweep controller and turn the Interlock key to the OFF position. 8.0 System Shutdown 8.1.1 If the substrate was heated then you must wait until the temperature displays < 50 deg before proceeding to the next step. 8.1.2 Close HIVAC valve (See Fig. 1) and wait 5 minutes before proceeding to the next step, this allows the crucible sufficient time to cool down. 8.1.3 Open the VENT valve (See Fig. 1) and allow the chamber pressure to rise to approximately 1000 mt as indicated on the THERMOGAUGE display (See Fig. 7). 8.1.4 Press the RAISE button (See Fig. 1) to raise the bell jar. Once the bell jar has fully raised close the VENT valve. 8.1.5 Remove the Sample Carrier from the system, unload your sample(s) from the plate and then reinstall the empty sample plate into the system. 8.1.6 Press the LOWER button (See Fig. 1) to lower the bell jar until it stops moving. Move the Raise/Lower switch back to the middle position. 8.1.7 Move the open the ROUGH valve and pump the chamber to < 100 mt on the THERMOGAUGE display (See Fig. 7). 8.1.8 Close the ROUGH valve and then turn the MECHANICAL PUMP switch off (See Fig. 3). 8.1.9 If another user is going to use the CHA E-beam system after you then skip this step. If no other user will be running the CHA E-beam system then proceed. On the Cryo Pump Controller (See Fig. 5) turn the CRYO-PUMP power switch OFF. 8.1.10 Switch to the system controller from MANUAL to the OFF position (see Fig. 1). 8.1.11 Pick up your belongings, clean and organize the table and complete your log entry in the system logbook. 13