Chilled Beam and Radiant Cooling Basics. Salt Lake City, UT ASHRAE Chapter December 2013 Nick Searle

Similar documents
ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

IDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions

APPLICATION GUIDE BEAMS

UFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas

NOVEMBER 2012 THE EUROPEAN EXPERIENCE

Inffusers. idl20 (2 WAY) ids60 (4 WAY)

Chilled Beams in Labs Eliminating Reheat & Saving Energy on a Budget

Optimizing the use of Chilled Beams for health and comfort GUNNAR SVENSSON

Modular Active. Chilled. Beams

Chilled beams. TRACE 700 incorporates two chilled beam strategies: passive and active.

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

Chilled Beams. Getting a Warmer Reception

NEW AR-L AR-C AND HIGH-CAPACITY LINEAR COOLING PANELS. Higher energy efficiency. Increased thermal comfort

Active Chilled Beams. Technical Data Bulkhead-Mounted Concealed Model With Horizontal Coil and Auxiliary Drain Pan

Active & Passive Beams

DADANCO Technical Paper

7. MECHANICAL SYSTEM DESIGN

Displacement Ventilation

VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Coil Unit with Enhanced Humidity Control

HVAC 101. H V A C S y s t e m s

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

PRODUCTS TAO TAO PRODUCT: ADVANCING THE SCIENCE OF AIR DISTRIBUTION. temperature ambient optimizer. Redefine your comfort zone.

HVAC DISTRIBUTION and DELIVERY SYSTEMS

Technical Assignment 3

Don t Turn Active Beams Into Expensive Diffusers

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

4-Pipe VAV vs. Active Chilled Beams for Labs

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

KLIMA Active Chilled Beams

Selected Laboratory Energy Efficiency Measures

BALANCING ENERGY EFFICIENCY & INDOOR THERMAL COMFORT

Dehumidification: Energy Efficiency Comparisons

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates

Active Chilled Beams. Technical Data Concealed Ceiling Mounted Model With Vertical Coil and Integral Drain Pan

ASHRAE JOURNAL ON REHEAT

Halton CPT Passive Chilled Beam

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

The new ASHRAE-REHVA Active and Passive Beam Application Design Guide

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Chilled Ceilings / Beams Working Principles & Applications

Dehumidifying with Dedicated Outdoor Air

97.501B. Prepared by: (415) Sponsored By: Final Report. Author: Presented at: ASHRAE. Meeting SF Me!

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

Temperature Control and Zoning of UFAD Systems

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

4. OVERVIEW OF MECHANICAL SYSTEM

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

Questions??????? Thank you

HVAC: The Next. Variable-air-volume systems. Outside-the-box thinking suggests the integration of dedicated

b.) Technical Information:

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

Ventilation and Humidity Control in Army Barracks Using DOAS for Better Indoor Air Quality and Energy Conservation

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

MECHANICAL SERVICES 101. Ian White

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

2009 IECC Commercial Mechanical Requirements

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

Raised Access Floor - (AE Breadth Area)

Humidity Control Systems for Civil Buildings in Hot Summer and Cold. Winter Zone in China

Mold/Moisture Control Case Study

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Summary Comparison of Simulation Program Features

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

IAQ Building Education and Assessment Model (I-BEAM)

Technical Report Three

Designing Energy Efficient Outdoor Air Systems

Radiant Heating & Cooling for Commercial Buildings

EarthWise System Seminar

nzeb office building

ASHRAE/IESNA Standard

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

Architectural Engineering Senior Thesis Mechanical System Redesign

August 15, 2013 Page 1 of 19

NET ENERGY WATER LOOPS A clear path to net zero energy buildings

TDSHS Air Change Requirements and the Basics of Psychrometrics. Presented by: Aric Murray December 06, 2013

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Pharmaceutical Facility Design

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

SECTION H. Engineering Guide Radiant Products. Please refer to the Price Engineer s HVAC Handbook for more information on Radiant Heating and Cooling

design brief This design brief provides an introduction into the design and application of DV. It addresses the following issues:

Chapter 6 ALL-AIR HVAC SYSTEMS 6.1 CONTEXT

Do All DOAS Configurations Provide the Same Benefits?

December 6, 2018 Optimizing Solutions through Superior Dehumidification Technology SM

Waterborne Climate Systems

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

RADIANT COOLING SYSTEMS OPPORTUNITIES FOR RADIANT COOLING IN NORTH AMERICAN CONSTRUCTION DALE HANSCOMB, REHAU Sales Manager Building Technology

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae

ADRIATIC VF. Active chilled beam with cooling, heating and ventilation QUICK FACTS

Using Embedded Tube Radiant Cooling Systems to Maximize LEED Points

Transcription:

Chilled Beam and Radiant Cooling Basics Salt Lake City, UT ASHRAE Chapter December 2013 Nick Searle nsearle@dadanco.com

Contents Radiant Ceilings & Chilled Beam Basics Energy & Space Savings First and Lifecycle Costs Maintenance Application Suitability Design Considerations Application Example # Laboratories Case Study 250 S. Wacker, Chicago

Fan Energy Use in Buildings 4.5 Chiller/Compressor 7 Design Load KW/SF 4 3.5 3 2.5 2 1.5 Supply & Return Fans Chilled Water Pump Condenser Water Pump Cooling Tower Fan Condenser Fan Energy Use KWh/SF 6 5 4 3 2 1 0.5 1 0 Central VAV Central CAV Packaged CAV 0 Central VAV Central CAV Packaged CAV Energy Consumption Characteristics of Commercial Building HVAC Systems publication prepared for U.S. Department of Energy

Water = Efficient Transport 10 1 Ton of Cooling requires 550 CFM of air or ¾ diameter water pipe 4 GPM of water

Chilled Ceilings 1980 1990 2000 2010 Chilled Ceilings Many buildings heated only PC s appearing on desks Restricted ceiling cavity

Chilled Ceilings Radiant Effect CW Supply 5962 F CW Return 6266 F 45% Radiant 55% Convective 76 F Dry Bulb 74 F radiant temperature (black bulb)

Chilled Ceilings Advantages Excellent thermal comfort Reduced space requirements Will fit into 6#8 cavity Self regulating Simple controls Low noise Low maintenance Design Issues Low cooling output 20 to 25 BTUH/ft 2 100% coverage 14 to 18 BTUH/ft 2 70% coverage High cost Separate air system required

Chilled Sails

Chilled Sails

Chilled Sails Advantages Good thermal comfort Reduced space requirements Freely suspended Self regulating Simple controls Low noise Low maintenance Design Issues Cooling output 40 to 50 BTUH/ft 2 Separate air system required High cost Cannot heat Need good acoustic treatment to avoid hard spaces Many connections Aesthetics?

Passive Chilled Beams Chilled Ceilings Passive Chilled Beams 1980 1990 2000 2010 Increased cooling loads Equipment Occupancy Day#lighting Inadequate perimeter cooling

Passive Chilled Beams 1 Operation Principle Soffit Suspension rod Water coil Fabric skirt Perforated tile

Passive Chilled Beams 1 System Highlights Good thermal comfort Cooling capacity up to 40 BTUH/FT 2 floor space Up to 500 BTUH per LF of beam Reduced ductwork, riser and plant sizes Water transports most of sensible cooling Self regulating simple two position controls Low noise Low maintenance

Design Considerations Sensible cooling only Latent gains must be controlled by air system High free area perforated metal ceiling required 28% free area minimum Exposed beams (no ceiling) are an option Beams cannot be installed tight against slab Typically 40% of beam width required above beam Separate heating system must be installed Separate air system must be installed

Passive Chilled Beams 1 Airflow Pattern

Passive Chilled Beams 1 Recessed Type

Passive Chilled Beams 1 Exposed Type

Active Chilled Beams 1980 1990 2000 2010 Chilled Ceilings Passive Chilled Beams Active Chilled Beams Higher space loads Higher occupant densities Combined ventilation/cooling preferred Integration into fiber tile ceilings required

Active Chilled Beam 1 Operation Principle Primary air nozzles Primary air plenum 1 Part Primary Air Suspended ceiling Heat exchanger 4 Parts Room Air

Heat Removal Ratio Airflow requirement reduced by 70% 70% of sensible heat removed by chilled beam water coil

Active Chilled Beam 1 Airflow Pattern

Active Chilled Beams 1 System Highlights Very high cooling capacity Up to 100 BTUH/FT 2 floor space Up to 1500 BTUH per LF Integrated cooling, ventilation and heating All services in the ceiling cavity Suitable for integration into all ceiling types Reduces ceiling costs compared to Passive Beams

Active Chilled Beams 1 System Highlights Significant space savings Smaller ductwork saves space in shafts, plant rooms and ceiling Can be installed tight up against the slab Reduced floor to floor heights Reduced construction costs on new buildings Low noise levels Low maintenance No moving or consumable parts

Energy Savings 1 Compared to VAV Source Technology Application % Saving* US Dept. of Energy Report (4/2001) Beams/Radiant Ceilings General 25#30 ASHRAE 2010 Technology Awards Passive Chilled Beams Call Center 41 ACEE Emerging Technologies Report (2009) Active Chilled Beams General 20 ASHRAE Journal 2007 Active Chilled Beams Laboratory 57 SmithGroup Active Chilled Beams Offices 24 *Compared to VAV Energy Consumption Characteristics of Commercial Building HVAC Systems publication prepared for U.S. Department of Energy

Active Chilled Beams 1 First Costs Office Building, Palo Alto, CA 80,000 ft 2 Thermostat in each office for beam design costs were in line with VAV * *HPAC Engineering Article European Technology Taking Hold in the U.S.: Chilled Beams, Peter Rumsey, PE, CEM, FASHRAE, FRMI

Active Chilled Beams 1 First Costs Office Building, Denver, CO 600,000 ft 2 design/build renovation Elimination of two air handlers per floor due to beams the chilledbeam system was equal to the VAV system * *HPAC Engineering Article European Technology Taking Hold in the U.S.: Chilled Beams, Peter Rumsey, PE, CEM, FASHRAE, FRMI, January 1 st 2010

Active Chilled Beams 1 Lifecycle Costs 100,000 ft 2 Office Building, Cincinnati, OH 15 year lifecycle study 15% Energy Savings Compared to VAV $0.79 versus $0.93 ft 2 22% reduction in mechanical installation costs $19.50 versus $25.00 per ft 2 Lifecycle costs analysis over 15 years Favored chilled beam system by 20% $32 ft 2 versus $40 ft 2 HIXSON ARCHITECTURAL INTERIORS Spring 2009

LEED Certification 1 LEED NC V3.0 Optimize Energy Performance # up to 48% (new) or 44% (existing) more efficient than ASHRAE 90.1 (EA Credit 1) # up to 19 points Increased Ventilation # 30% more outdoor air than ASHRAE 62 (IEQ Credit 2) # 1 point Controllability of Systems # individual temperature control (IEQ Credit 6.2) # 1 point Thermal Comfort # meet ASHRAE 55 (IEQ Credit 7.1) # 1 point (Minimum 40 points needed for certification out of 100 maximum)

Maintenance No moving parts No filter No condensate pumps No consumable parts Up to 4 year inspection & clean Easy maintenance access

Cleaning Access

Active Chilled Beams 1 Typical Installation

Active Chilled Beams 1 Typical Installation

Active Chilled Beams 1 Typical Installation

Concealed Active Beams

Bulkhead Active Chilled Beams

ACTIVE CHILLED BEAM DESIGN CONSIDERATIONS

Building Suitability Building Characteristics that favor Active Chilled Beams Zones with moderate#high sensible load densities Where primary airflows would be significantly higher than needed for ventilation Sensible Heat Ratio s (SHR) of 0.8 and above Buildings most affected by space constraints Hi rises, existing buildings with induction systems Zones where the acoustical environment is a key design criterion Laboratories where sensible loads are driving airflows as opposed to air change rates Buildings seeking LEED or Green Globes certification

Building Suitability Characteristics that less favor Active Chilled Beams Buildings with operable windows or leaky construction Beams with drain pans could be considered Building pressurization control should be used Zones with relatively low sensible load densities Zones with relatively low sensible heat ratios and low ventilation air requirements Zones with high filtration requirements for the re# circulated room air Zone with high latent loads

APPLICATION EXAMPLE: LABORATORIES

Laboratory Design Issues Sensible heat gains of up to 70 BTUH/ft 2 Space ventilation requirements of 6 to 8 ACH Laboratories where chemicals and gases are present require 100% outdoor air Air systems require 15 to 20 ACH of outside air to satisfy sensible load

Cooling Load and ACH

Benefits of Active Beams in Labs Eliminated or reduced reheat Reheat can account for 20% or more HVAC energy costs Water more efficient transport medium Reduces fan energy costs Smaller space requirements System sized for 6 ACH instead of 15 ACH

Active Chilled Beam Design Cooling Load = 65 BTU/H ft 2 Ventilation Rate = 6 Air Changes VAV Solution = 15 Air Changes Chilled Beam Solution = 6 Air Changes Active Chilled Beam Solution = 6 x 6 Long, 130 CFM each

Reheat Reduction VAV System Minimum Airflow 6 ACH = 760 CFM Cooling Load 65 BTU/H ft 2 41,000 BTU/H Peak Maximum Airflow 1,860 CFM (15 ACH) Minimum Cooling without reheat 6 ACH @ 55 F 16,600 BTU/H Turndown without reheat 16,600/41,000 59% ACB System Minimum Airflow 6 ACH = 760 CFM Cooling Load 65 BTU/H ft 2 41,000 BTU/H Peak Maximum Airflow 760 CFM Minimum Cooling without reheat 6 ACH @ 65 F 8,300 BTU/H Turndown without reheat 8,300/41,000 80%

CASE STUDIES

250 South Wacker Chicago, IL

250 S. Wacker, Chicago 1Case Study 16#story tower 215,000 sq. ft. 1st floor retail 2 16th floor offices Separate HVAC systems for 1st and 16th floors Perimeter induction system with floor#mounted units serving 2 #15th floors Interior constant volume/ variable temperature system serving 2 15th floors

250 S. Wacker, Chicago Case Study Building Renovated with 1 100% glazing with E#glass (190 Btuh/Ln.ft. heat loss) Single duct cooling only VAV interior system Evaluated fan#powered VAV or active chilled beam perimeter system Seeking LEED certification

250 S. Wacker, Chicago Case Study Perimeter System Type Existing Induction System Proposed Fan#powered VAV System ** Proposed Active Chilled Beam System ** Design Cooling Load 262 tons (382 sq.ft./ton) 156 tons (641 sq.ft./ton) 156 tons (641 sq.ft./ton) Primary Airflow 25,600 cfm (0.5 cfm/sq.ft.) 86,270 cfm (1.7 cfm/sq.ft.) 15,880 cfm (0.3 cfm/sq.ft.) Fan Energy at Design Fan Energy at 70% of Design 64 kw 182 kw 22 kw 64 kw 116 kw 22 kw Pump Energy 28 kw 8 kw 12 kw Combined Fan & Pump Energy 92 kw 190 kw @ Design 124 kw @ 70% 34 kw ** Required larger ductwork/risers ** Used existing ductwork/risers

250 S. Wacker, Chicago Case Study

25 250 S. Wacker, Chicago Case Study

QUESTIONS?