Operational Costs of Evaporation vs. Rinse Water Recycling. Data compiled by Tim Noble

Similar documents
LIQUID CHILLING PRODUCTS 2019 PRODUCT CATALOG

Reduce Energy Costs with Vapor Degreasing. Mike Jones MicroCare Corp., New Britain, CT

Keep your electricity bill cool this summer

Batch Semi-Aqueous Emulsion Cleaning by

Evaporative-Cooled vs. Air-Cooled Chillers: Kirtland AFB Case Study

An Approach to Energy Efficiency: A Focus on an Increased Operational Efficiency, Natural Resource Conservation and Carbon Footprint Reduction

Use words from the list to complete the following sentences. Words may be used once, more than once, or not at all.

Thomas J.M. Weaver PresidentlCEO PROSYS Corporation

HYDROCARBON REFRIGERANT SYSTEM COMMISSIONING REPORT. Duvel International Trading (China) Limited

Time and water efficiency in tank cleaning

Aqueous Cleaning Design Considerations --us-

Price increases since % 38% 53% 63% 115% Ground Beef. Electricity Eggs White Bread

Outdated Publication, for historical use. CAUTION: Recommendations in this publication may be obsolete. Family Community Education.

A Technical Introduction to Cool Thermal Energy Storage Commercial Applications

Ripped-to-Width Lumber Solves Business Problems

HOME ENERGY DETECTIVES

VENDED. Speed Queen Stack Tumble Dryers. 30 lb Tumble Dryer 45 lb Tumble Dryer

SMART METERS ANSWER BOOK HOW YOU WHY ONTARIO WHAT ARE GETTING SMART ABOUT CAN START TO PREPARE NOW PAGE 6 TIME-OF-USE PRICES? PAGE 4 IS INTRODUCING

safe reliable efficient abundant clean affordable convenient Natural gas is the right choice for your home s energy needs.

Theory of Operation: How Parts Cleaning Works

Lesson #3 Your Energy Budget How much energy are you wasting?

When both switches are on, the heater works at the high power setting. What is the power of the heater when it is switched to the high power setting?

Indoor Climate Control: Challenges, Necessities, and Best Practices. Surna.com

GIRBAU HIGH-PERFORMANCE HARD-MOUNT WASHER-EXTRACTORS FOR ON-PREMISE LAUNDRIES RMG033 RMG040 RMG055 RMG070 OPL WASHER-EXTRACTORS

It won t just meet your hot water needs. It will exceed them. RH180 Hybrid Tank-Tankless Water Heater

Sustainable Hot Water: Better Design, Delivery, and Use

Your Personal Energy Audit Data Table, completed (handwritten is acceptable) A typed paragraph or two addressing each of the following topics.

Keeping Chillers Efficient - Archives - Energy and Power Management

Streamlined Life Cycle Assessment of a Coffee Machine. Gearoid Ryan

H O B A R T F T F L I G H T - T Y P E W A R E W A S H E R. Energy efficient. Water efficient. Cleaning efficient. So you re efficient.

Air-Conditioning Buying Guide

GREEN GUIDE. Comparison of Energy per Use 285,668 ANNUAL SAVINGS 233 KJ GREEN FACTS GREEN CERTIFICATIONS ENERGY REDUCTION COST SAVINGS

Frequently Asked Questions

NOW AUSTRALIA S NUMBER ONE CHOICE IN COMMERCIAL MICROWAVE OVENS FSM

LESSON CLUSTER 8 Explaining Evaporation and Boiling

Rotary Impingement Tank Cleaning Equals Significant Water and Cost Savings

Broiler Ventilation Requirements In Response To Higher Welfare Standards. Bernard Green

Four of the appliances, including the fan heater, are designed to transform electrical energy into heat.

Cooling Load Analysis and Computation Worksheet Answers Part 1 Psychrometrics

It Won t Just Meet Your Hot Water Needs IT WILL EXCEED THEM. RH180 HYBRID TANK-TANKLESS WATER HEATER

All rights for changes reserved that lead to technical improvement. kolb GmbH 2017

Go Greener, with Gas.

Hydroponics Systems Q&A

Save energy Save money

TOTAL SYSTEM EFFICIENCY: AN INTRODUCTION TO CONDENSING BOILERS. David Grassl PE Mechanical Engineer Principal

Leading the Industry in Cleaning Technology for Over 30 Years.

Choose environmentally. friendly technology. designed for hygiene

VARIABLE SPEED PUMP The most energy-efficient pump ever

MACH CI. (Condensing-Indirect) Water Heating

EVAP Project BACKGROUND EVAP UNIT

SOLVENT CLEANING OPERATION EQUIPMENT SUMMARY FORM-44 Page 1 of 7

...WHY WAIT? IT S TIME TO SWITCH TO A NORITZ TANKLESS

What Is Liquid Subcooling?

INTELLIFLO INTELLIFLO. VARIABLE SPEED PUMP More Pools. More Savings. Worldwide. pentairpool.com

Battery Operated Orbital Scrubber Technology. Orbital Scrubbers.

Cooling Load Analysis and Computation Worksheet

CITY OF BARTOW (COB)

Selecting an Environmental Test Chamber

The Complete Guide to the Commercial Deep Fryers. Fry like a Pro with our Deep Fryer Buying Guide

Metal Finishing Workshop March 4, 2010

INTEGRATED CLEANING SYSTEM TOUCHLESS CLEANING SOLUTIONS

Whole of Home ADD ON. Add some cool comfort to your life. That s better. That s Actron.

Q.: I liked our single stream recycling. It was easier and more convenient. This is a step backwards. Why?

COMMERCIAL DEEP FRYER BUYING & MAINTENANCE GUIDE

The iqe Boiler Range. Combination and System T Boilers.

More Vibrant Colors. Higher Level of Graphics, More Detailed Pictorials. Better Color Consistency. UV and Aqueous Coatings/Varnishes

COOLING SYSTEM ECONOMICS. How much is my water treatment really costing? Is Bon Aqua treatment the right choice?

Double Wall Oven FPET3085PF. 30" Electric. Signature Features. More Easy-To-Use Features. Product Dimensions

Module 2: Farm Practices to Improve Energy Efficiency

End-Use Data Collection Requirements Data Trend Type

Alphasense Application Note AAN 106 HUMIDITY EXTREMES: DRYING OUT AND WATER ABSORPTION

Your floor to ceiling guide

INTELLIFLO VARIABLE SPEED PUMP

Home Energy Audit. Overview. Objectives. Time Requirements. Materials. Procedure CON EDISON WEB-BASED MIDDLE SCHOOL ACTIVITY

Control. Complete Comfort Control and Energy Savings, Plus Exceptional Service From Your Bryant Dealer

Lake County Recycling Survey. February Highlights

Draft Control D R A F T C O N T R O L G U I D E w w w. f i e l d c o n t r o l s. c o m August 2007

Task 3a: Goods Analysis Waste Audit

Welcome to dishwashing paradise

imagine a world of soft water

INDUSTRIAL GRADE WATER SOFTENERS LWT INDUSTRIAL SERIES

T H I N K I N S I D E T H E B o x

Humidification. Facts For Total Indoor Air Comfort

EVOLUTION CONNEX CONTROL

COMPARING PLASTIC STAKING TECHNOLOGIES

INTELLIFLO VARIABLE SPEED PUMP WATER SOLUTIONS THE MOST ENERGY-EFFICIENT PUMP EVER

, A Product Catalog

Use each of the terms in the box to explain how heat is lost from inside a house through the window. conduction convection radiation

Wine & Spirits Labeling with Pressure-Sensitive Materials. Turn Heads, Attract Attention

Pressure Washers (courtesy of Mi-T-M Corp.)

M U L T I - H YT O U S I N G

Energy Management and Controls

BEST DRAFT CONTROL: MANUAL DAMPERS IN MULTIPLE BOILER SYSTEMS

YEARLY VIEW. 6/28/2016

WHERE THE WATER IS FLOWING

GIRBAU ON-PREMISE LAUNDRY HIGH-PERFORMANCE SOFT-MOUNT WASHER-EXTRACTORS EH030 EH040 EH060 EH080

Vacuum in the laboratory. products and solutions

Industrial Applications

iq751/iq1001/iq1501 Specifications (Floor-standing units)

FOR DRYING DEWATERED SEWAGE SLUDGES

Transcription:

Operational Costs of Evaporation vs. Rinse Water Recycling Data compiled by Tim Noble

Evaporation? Recycling? What is the best choice? This is a question that will require a little digging and analysis of cost vs performance data. In this presentation I have assembled some data for you, to help assist you in making the right choice given your application. Each method has its own benefits and its own drawbacks. Switching from one process to the other can often mean a tradeoff. It ultimately will be determined by what is most critical to you, the end user. I will highlight some positives and negatives first and then show how they tie into the cost performance of your process. This way you know why you are trading one benefit for another and that there is complete understanding of this scenario. I thank you for letting me share my experience of the equipment involved in this study. Take note, that this study is not a direct endorsement of any specific equipment or brand, it simply uses equipment that I have experience with and represent real life examples of which I may speak.

Evaporation Pros and Cons First off, what is evaporation? Evaporation is the boiling off of water leaving you with solids (aka sludge) to dispose of, while the liquids are vented into the atmosphere. Pros: - Minimal dependence on outside services (No media tank replacement) Cons - Bottleneck of your process as throughput is dependant on machine tank capacity and evaporation rate. - Eventually restrictions on what is vented out the stack into our atmosphere will become more strict - Large consumer of energy. Evaporators use holding tanks and large quantities of energy to evaporate water, even so, they can only evaporate so much in a period of time, that they struggle to stay ahead of your cleaning machine and ultimately limit the throughput of your process. In this study I have NOT included the solids disposal costs associated with the maintenance of this equipment.

Rinse Water Recycling Pros and Cons What is rinse water recycling? Rinse water recycling is the process of running the discharge back through a recycling system and through DI Resin and Carbon tanks to polish the DI water for reuse. Rinse water recyclers use no drain, or no exhaust, all waste is removed via the media tanks and this is disposed of with a source capable of handling the disposal appropriately. Pros: - No bottleneck the machine provides DI water virtually on demand - More environmentally friendly (this needs to be considered as a sales point of your process) Cons - Media exchange costs DI Tanks replacement costs can be costly. One aspect to be considered is tank size. Larger tank capacity will give you more cycles, meaning less frequent changeovers and you often get better pricing on higher capacity tanks. This is highlighted, especially when you are evaluating a per board cost of operation.

Cycle Data In our study, we are using an Aqueous Technologies Batch Defluxing System, which discharges approximately 3.5 gallons of DI Water per rinse cycle. We were requiring approx. 7-9 rinse cycles per wash, so we used 8 as our average. We used this data to calculate our data as shown in the chart below. Regarding the Rinse Water Recyclers (RWR), since there is no throughput bottleneck, we calculated based upon how many 40 minute cycles could be ran in an 8 hour work period. We also calculated how many PCBs the systems where capable of with a batch load of 25 PCBs each load. EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks Cycle Data Average Board Load per Batch 25 25 25 25 Average Rinse Count per Wash Cycle 8 8 8 8 DischargeVolume per Rinse Cycle 3.5 3.5 3.5 3.5 Total Discharge per Batch (Gallons) 28 28 28 28 Capacity (Gallons) 85 136 - - Evaporation Rate (gph) 6 13 Daily Batch Capacity 3.035714286 4.857142857 11.994003 11.994003 Total Board Cleaning Capacity (Daily) 75.89285714 121.4285714 299.850075 299.850075 Total Board Cleaning Capacity (Monthly) 1979.990434 3167.984694 7822.874277 7822.874277

Operational Hours The following data gave us the average operational hours of the equipment given a 6 day workweek. We calculated this data as follows: = 365.25 / 12 months = 30.4375 Average Month Length (Days) = 30.4375 x (6 / 7) = 26.089 average days of operation The operational hours were calculated by the amount of time required to evaporate the 85 or 136 gallons capacity of the two evaporators at their respective rates. The rinse water recyclers are calculated upon the regular 8 hour work period. EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks Operational Hours Average Daily Operational Hours 14.16666667 10.46153846 8 8 Operational Days per Week 6 6 6 6 Monthly Operational Days 26.08928571 26.08928571 26.08928571 26.08928571 Monthly Operational Hours 369.5982143 272.9340659 208.7142857 208.7142857

Electrical Costs Electrical Costs are estimated by the following equation: kilowatts = (Volts x Amps x Power Factor x 2)/1,000 The voltage on both evaporators is the same; however, the Amps on the E101 are significantly higher than the EMC, this contributes to the E101 being able to evaporate over twice as fast (13 gph vs. 6 gph). Essentially the E101 uses more power, but also helps reduce the bottleneck faster, allowing you to divide that cost across more PCBs. Power Factor is a gray number that isn t really published on many devices, it s dealing with the efficiency of the equipment and could range from 0.60 1.0, so using 0.85 as a medium is a conservative estimate. You ll notice the high costs associated with evaporation, and these numbers are estimating constant use of the equipment for the operational time period. EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks Electrical Costs Machine Voltage 240 240 110 110 Electrical Phase 3 3 1 1 Amps 40 87 20 20 Power Factor 0.85 0.85 0.85 0.85 Kilowatts 16.32 35.496 3.74 3.74 Monthly kwh usage 6031.842857 9688.067604 780.5914286 780.5914286 kwh Rate 0.07 0.07 0.07 0.07 Monthly kwh Cost $422.23 $678.16 $54.64 $54.64

Monthly kwh Cost $700.00 $600.00 $500.00 $400.00 $300.00 Monthly kwh Cost $200.00 $100.00 $0.00 EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks

Media Exchange Costs Cost of media Exchange can be pricy, finding a reliable local source is key to managing these costs. In our study, we estimated the media lasted 24 days using a 1.5 cu. Foot tank, which would equate to media exchange 1.09 times per month based upon the operational days as calculated previously. At $290 per tank, with 2 tanks (Resin and Carbon) being changed the total monthly cost is $630.49. Switching to 3.0 cu foot tanks would increase the capacity two fold and you would get a better price break per cu foot, which would reduce your monthly cost to about $407.65 EMC Evaporator E101 Evaporator RWR with 1.5 Cu RWR with 3.0 Cu Foot DI Tanks Foot DI Tanks Media Exchange Media Life Batches (Real) 83 166 Media Life (Days) 24 48 Estimated Tank Replacements per month 1.087053571 0.543526786 Tank Replacement Cost $290.00 $375.00 Total Tanks 2 2 Total Media Exchange Costs $630.49 $407.65

Total Media Exchange Costs 700 600 500 400 300 Total Media Exchange Costs 200 100 0 EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks

Total Costs As you see, the total costs of operation, indicate that the E101 and the RWR with 1.5 cu foot tanks are the least efficient solutions, with the EMC evaporator and the RWR with 3.0 cu foot tanks being the best options. These costs reflect the total operational costs, both electrical costs and media tank replacement of the selected systems. EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks Total Costs Total Monthly Cost $422.23 $678.16 $685.13 $462.29

Total Monthly Cost $700.00 $600.00 $500.00 $400.00 $300.00 Total Monthly Cost $200.00 $100.00 $0.00 EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks

But wait.is that the whole story?

Determining Actual Costs per PCB It is my belief that you also should incorporate the cost of a bottleneck in your process. To do this simply divide the total operational cost of the system(s), by the total throughput capacity of that system to achieve your answer. You will notice that I have made two calculations below. One is the cost per PCB using the TOTAL capacity of each respective system and the other is calculated on cleaning a fixed number of 3,000 PCBs per month. This gives us comparative data, as often we don t have the need to run full bore to max out each system. There often will be down time while you assemble and load the next batch, or while PCBs are being built/reflowed, etc. Plus another topic of conversation is overtime labor costs. If a bottle neck slows you down, you will need to operate the system beyond the normal 8 hour shift to bring the evaporator back up to speed. This may put you at risk to higher labor costs due to hours logged. EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks Cost per PCB (Total Capacity) $0.21 $0.21 $0.09 $0.06 Cost per PCB (3,000 board Estimate) $0.21 $0.23 $0.23 $0.15

Cost per PCB (Total Capacity) $0.25 $0.20 $0.15 $0.10 Cost per PCB (Total Capacity) $0.05 $0.00 EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks

Cost per PCB (3,000 board Estimate) $0.25 $0.20 $0.15 $0.10 Cost per PCB (3,000 board Estimate) $0.05 $0.00 EMC Evaporator E101 Evaporator RWR with 1.5 Cu Foot DI Tanks RWR with 3.0 Cu Foot DI Tanks

Conclusion It is our conclusion that even though there is no one size fits all answer, that ultimately there will be better fits than others, but rarely ever a solution that doesn t include a tradeoff at some point. The best solution available in our study was the RWR with the 3.0 Cu Foot. Increased media tank capacity, gave us better pricing per PCB No bottleneck on our process meaning we have room to expand our operation Provides a Greener solution that adds benefit to our process Even through all of this, there are still other factors to be considered which weren t calculated. For example, the cost of sludge removal from the evaporator, labor costs required to operate beyond the 8 hour standard business hours to fully evaporate the evaporator. All in all, the RWR is the best solution where throughput is any type of factor. Thank you for your time and if there are any questions on this material, please contact us at: For further information please contact: J.D. Noble & Associates, Inc. 720 Industrial Drive, Unit 118 Cary, IL 60013 Phone: 847-639-2440 e-mail: sales@ntech-inc.com Website: www.jdnoble.com