RECEIVED. AP 7 2D7 Initiative #21 FINAL TEXT I: P.rt. Colorado Secretary of State. Be it Enacted by the People ofthe State ofcotorado:

Similar documents
2017 General Obligation Bond

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PROPOSED IMPROVEMENTS

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

4.1 Build Alternative 1 Construction Phasing

New Stanton Project Update July 3, 2012

CHAPTER 7: Transportation, Mobility and Circulation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

East Corridor Final Environmental Impact Statement

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

2040 Long Range Transportation Plan

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Special Revenue Funds

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

5.0 IMPLEMENTATION STRATEGIES

WURZBACH PARKWAY WURZBACH PARKWAY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

64 Mineral Extraction Area Rules

Corridor Enhancements

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

4.500 Preston Road Overlay District

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY 2005 TRANSPORTATION CAPITAL PROGRAM

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Southern Gateway Project and Public Green

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

WELCOME TO OPEN HOUSE TWO November 28, 2018

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

Pinal Regional Transportation Plan

1.0 Circulation Element

Places29: List of Implementation Projects

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

Mavis Road Class Environmental Assessment

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

CHAPTER BEAUTIFICATION AND LANDSCAPE MANAGEMENT

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Construction Engineering & Inspection

I-70 Corridor Enhancement Plan

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

US 95 Phase 2B/5 Open House

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Subject: 2014 Regional Transportation Plan Amendment No. 1

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Moving The Metro. A special construction update for the metro Omaha area.

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Henderson County Project Prioritization Discussion

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

ACCESS MANAGEMENT REPORT U.S S.H. 1 TO S.H. 14 S.H U.S. 287 TO I-25

5-Year Street Reconstruction Plan ( )

EXECUTIVE SUMMARY. Introduction

TRANSPORTATION COMMITTEE

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Executive Summary. NY 7 / NY 2 Corridor

Farmersville Parkway Phase III

KITT PEAK LINKAGE WILDLIFE CONNECTIVITY: WILDLIFE OVERPASSES AND FENCING. State Route 86

The Turtle Creek Master Plan- A Summary. July 7, 2011

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

YORK COUNTY GOVERNMENT

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Capital Projects in and near Odenton Town Center

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

Capital Projects impacting Odenton Town Center

AGENDA ACTION ITEMS INFORMATION ITEMS

Creating Complete Roadway Corridors:

SECTION 4(f) DE MINIMIS DOCUMENTATION

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Index to Projects by Project Name

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

List of Priority Projects

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

The transportation system in a community is an

Memorandum CITY OF DALLAS

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Public input has been an important part of the plan development process.

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

State Parks and Wildlife Conservation Trust Fund Act

Transportation Committee

Transcription:

RECEIVED AP 7 2D7 Initiative 2017-2018 #21 FINAL TEXT I: P.rt. Colorado Secretary of State INITIATED STATUTE TO AUTHORIZE BONDING FOR TRANSPORTATION FUNDS WITHOUT RAISING TAXES To Fix OUR DAMN ROADS PROPOSED INITIATIVE 2017-2018 # Be it Enacted by the People ofthe State ofcotorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as follows: PART 11 FIX OUR DAMN ROADS 434-1101. Short Title. THE SHORT TITLE OF THIS ACT IS FIX OUR DAMN ROADS. 43-4-1102. Legislative declaration. (1) THE PEOPLE OF THE STATE OF COLORADO FIND AND DECLARE THAT: (a) COLORADO S ELECTED OFFICIALS HAVE DECREASED FUNDING FOR THE CORE GOVERNMENTAL FUNCTION OF ROAD AND BRIDGE CONSTRUCTION, MAINTENANCE AND REPAIR OVER THE LAST DECADE; (b) REVENUES THAT SHOULD HAVE GONE TO ROADS AND BRIDGES PURSUANT TO STATE LAW HAVE BEEN SYSTEMATICALLY SHIFTED TO PROGRAMS OUTSIDE THIS CORE RESPONSIBILITY; AND (c) WITHOUT RAISING TAXES OR FEES, ThE SALE OF ADDITIONAL REVENUE ANTICIPATION NOTES SHOULD BE AUTHORIZED IN THE AMOUNT OF $2.5 BILLION WITH THE PROCEEDS TO BE SPENT SOLELY ON ROAD AND BRIDGE EXPANSION, CONSTRUCTION, MAINTENANCE AND REPAIR ON THE PROJECTS LISTED IN THIS PART 11 TO ACCELERATE COMPLETION OF THOSE PROJECTS, THAT THE PRINCIPAL AND INTEREST ON THE BORROWED MONEY SHOULD BE PAID USING FEDERAL AND STATE TRANSPORTATION MONEYS THAT THE STATE HAS BEEN USING TO MAKE PRINCIPAL AND INTEREST PAYMENTS ON THE TRANS ISSUED IN 1999, OR USING SAVINGS CREATED

Initiative 2017-2018 #21 FINAL TEXT BY LEGISLATIVE REALLOCATION AND PRIORITIZATION WITHIN THE STATE BUDGET, OR ANY COMBINATtON THEREOF, THAT THE BORROWED MONEY AND THE INTEREST BE EXCLUDED FROM THE STATE S SPENDING LIMIT, AND FINALLY THAT THE EXECUTIVE BRANCH AGENCIES BE PROHIBITED FROM TRANSFERRING THESE PROCEEDS TO OTHER PROGRAMS. 43-4-1 103. Revenue Anticipation Notes. NO LATER THAN JULY 1, 2018, THE EXECUTIVE DIRECTOR OF THE DEPARTMENT OF TRANSPORTATION SHALL ISSUE REVENUE ANTICIPATION NOTES IN A MAXIMUM AMOUNT OF $2.5 BILLION DOLLARS WITH A MAXIMUM REPAYMENT COST OF $4.0 BILLION. THE MAXIMUM REPAYMENT TERM FOR ANY NOTES SHALL BE 20 YEARS, AND THE CERTIFICATE, TRUST INDENTURE OR OTHER INSTRUMENT AUTHORIZING THEIR ISSUANCE SHALL PROVIDE THAT THE STATE MAY PAY THE NOTES IN FULL BEFORE THE END OF THE SPECIFIED PAYMENT TERM WITHOUT PENALTY. THESE PURPOSES CAN BE ACHIEVED WITHOUT RAISING TAXES. 43-4-1104. Required Action by the general assembly. WITHOUT RAISING TAXES OR FEES, NO LATER THAN JULY 1, 2018, THE GENERAL ASSEMBLY SHALL IDENTIFY AND APPROPRIATE IN EACH FISCAL YEAR SUFFICIENT FUNDS FOR THE REPAYMENT COST OF THE NOTES UNTIL THE NOTES ARE PAID IN FULL BY REALLOCATING PRIORITIES IN THE STATE BUDGET OR USING THE MONEYS THAT THE STATE HAS BEEN USING TO MAKE PRINCIPAL AND INTEREST PAYMENTS FOR THE REVENUE ANTICIPATION NOTES AUTHORIZED IN 1999 KNOWN AS TRANS. To THE EXTENT POSSIBLE, THE STATE SHALL USE AVAILABLE FEDERAL FUNDS. ANY ANNUAL APPROPRIATIONS MADE BY THE GENERAL ASSEMBLY SHALL BE MADE IN ACCORDANCE WITH LAW AND RULINGS ISSUED BY THE COLORADO SUPREME COURT. 2

Initiative 2017-2018 #21 FINAL TEXT 43-4-1105. Restricted use of proceeds. THE PROCEEDS OF SUCH ADDITLONAL TRANSPORTATION REVENUE ANTICIPATION NOTES SHALL BE EXCLUDED FROM STATE FISCAL YEAR SPENDING LIMITS AND SHALL BE USED EXCLUSIVELY FOR ROAD AND BRIDGE EXPANSION, CONSTRUCTION, MA[NTENANCE AND REPAIR AND SHALL NOT BE USED FOR TRANSIT. THE PROCEEDS DISTRIBUTED HEREUNDER SHALL BE IN ADDITION TO OTHER MONEYS APPROPRIATED FOR ROAD AND BRIDGE EXPANSION, CONSTRUCTION, MAINTENANCE AND REPAIR. THE PROCEEDS SHALL BE USED ONLY FOR THE PROJECTS IDENTIFIED IN THIS PART 11. THE EXECUTIVE BRANCH SHALL NOT TRANSFER THE PROCEEDS FOR OTHER PURPOSES. 43-4-1106. Projects. (1) THE COLORADO DEPARTMENT OF TRANSPORTATION AND THE TRANSPORTATION COMMISSION SHALL USE THE PROCEEDS DESCRIBED IN SECTION 43-4-1105 EXCLUSIVELY FOR THE FEDERAL AID TRANSPORTATION PROJECTS LISTED IN THIS SECTION 1106: (a) IN THE NORTH FRONT RANGE TRANSPORTATION PLANNING REGION: (I) US 34 / US 85 INTERCHANGE RECONFIGURATION, IMPROVEMENTS TO THE SAFETY AND CAPACITY Of THE INTERCHANGE AND CORRIDOR IMPROVEMENTS BASED OFF HWY 85 PLANNING AND ENVERONMENTAL LINKAGES; AND (II) 1-25 NORTH, STATE HIGHWAY 7 TO STATE HIGHWAY 14, ADD A LANE IN EACH DIRECTION, INTERCHANGE RECONSTRUCTION, MAINLINE RECONSTRUCTION, SAFETY AND INTELLIGENT TRANSPORTATION SAFETY IMPROVEMENTS. (b) IN THE PIKES PEAK TRANSPORTATION PLANNING REGION: (I) STATE HIGHWAY 21, CONSTITUTION TO NORTH CAREFREE, CONSTRUCTION OF 3

Initiative 2017-201 $ #21 FiNAL TEXT INTERIM CONTINUOUS FLOW INTERSECTION; (II) US 24 WEST, 1-25 TO WOODLAND PARK, DRAINAGE AND INTERSECTION IMPROVEMENTS ON US 24 FROM 1-25 TO WOODLAND PARK; (III) 1-25 SOUTH, WIDENING S. ACADEMY TO CIRCLE/LAKE (1-25 EA THROUGH COLORADO SPRINGS), WIDENING OF ROADWAY TO SIX LANES; AND (IV) STATE HIGHWAY 21, RESEARCH PARKWAY INTERCHANGE (PHASE OF THE STATE HIGHWAY 21 WOODMEN TO STATE HIGHWAY 83 EA), CONSTRUCTION OF NEW GRADE- SEPARATED INTERCHANGE AT STATE HIGHWAY 21 AND RESEARCH PARKWAY. (c) IN THE PUEBLO AREA TRANSPORTATION PLANNING REGION: (1) US 50B, WIDEN TO FOUR LANES, SHOULDERS, PASSING LANES AND OTHER SAFETY IMPROVEMENTS TO THE KANSAS BORDER; AND (II) US 50, WEST Of PUEBLO, WIDEN THE DIVIDED HIGHWAY FROM TWO LANES TO THREE LANES. (d) IN THE SOUTHEAST TRANSPORTATION PLANNING REGION: US 287 LAMAR RELIEVER ROUTE, CONSTRUCTION OF RELIEVER ROUTE, REALIGNMENT Of US 50 TO FUTURE US5O/US 287 INTERCHANGE. (e) IN THE UPPER FRONT RANGE TRANSPORTATION PLANNING REGION: (I) 1-76, FORT MORGAN TO BRUSH, PHASE 4 RECONSTRUCTION OF ROADWAY AND INTERCHANGES BETWEEN FT. MORGAN AND BRUSH; (II) 1-76, FORT MORGAN TO BRUSH, PHASES RECONSTRUCTION OF ROADWAY AND INTERCHANGES BETWEEN FT. MORGAN AND BRUSH; AND INTERCHANGE. (III) STATE HIGHWAY 52 INTERCHANGE EN HUDSON, RECONSTRUCTION Of 4

Initiative 201 7-2018 #21 FTNAL TEXT (f) IN THE GREATER DENVER AREA TRANSPORTATION PLANNLNG REGION: (I) 1-25 SOUTH, MONUMENT TO CASTLE ROCK, EXPAND CAPACITY MONUMENT TO CASTLE ROCK AS OUTLINED IN PLANNING AND ENVIRONMENTAL LINKAGES STUDY; (II) 1-25 CENTRAL, SANTA FE To ALAMEDA, VALLEY HIGHWAY PHASE 2.0 IMPROVEMENTS, COMPLETE ALAMEDA INTERCHANGE [NCLUDING RECONSTRUCTION OF LIPAN, RECONSTRUCTION OF ALAMEDA BRIDGE OVER THE SOUTH PLATTE AND FINALIZE RAMP CONFIGURATION; (III) 1-25, VALLEY HIGHWAY PHASE 3.0, SANTA FE TO BRONCO ARCH, REPLACEMENT OF BRIDGES AND INTERCHANGES AND ROADWAY WIDENING, CONGESTION RELIEF, SAFETY, AND MOBILITY IMPROVEMENTS; (IV) US $5, WIDENING FROM C-470 TO 1-25 IN CASTLE ROCK (LOUVIERS TO MEADOWS), RECONSTRUCTION OF TWO LANE ROADWAY TO FOUR LANES WJTH A DIVIDED MEDIAN, ACCELERATION/DECELERATION LANES AND FOOT TRAIL; (V) STATE HiGHWAY 66 CORRIDOR IMPROVEMENTS WEST, WIDENING, SAFETY, AND INTERSECTION IMPROVEMENTS; (VI) STATE HIGHWAY 119, EXPAND CAPACITY; (VII) 1-25 NORTH, US 36 TO 120TH, IMPROVEMENTS ON 1-25 BETWEEN US 36 AND 120TH. POTENTIAL IMPROVEMENTS INCLUDE AUXILIARY LANES, ADDITIONAL LANE BETWEEN 84TH AVE. AND THORNTON PARKWAY AND RECONSTRUCTION OF 88TH AVE. BRIDGE; (VIII) 1-25 NORTH, US 36 TO STATE HIGHWAY 7, TOLLED EXPRESS LANE IMPROVEMENTS, EXPAND TOLLED EXPRESS LANES FROM CURRENT PLANNED END AT E-470 TO STATE HIGHWAY 7. COMBINE WITH LOCAL FUNDS TO REBUILD 1-25/STATE HIGHWAY 7 INTERCHANGE; S

Initiative 2017-2018 #21 FiNAL TEXT (IX) 1-70 WEST, WESTBOUND PEAK PERIOD SHOULDER LANE, MIRROR EASTBOUND PEAK PERIOD SHOULD LANE FROM TWIN TUNNELS (EXIT 241) TO EMPIRE JuNcTIoN; (X) 1-70 WEST, FLOYD HILL, RECONSTRUCT WESTBOUND BRIDGE AT KERMIT S AND CONSTRUCT THIRD LANE DOWN FLOYD HILL TO BRIDGE. CONSTRUCTION OF THIRD LANE TO TWIN TUNNELS, EITHER PEAK PERIOD SHOULDER LANES OR PERMANENT; (XI) 1-225, 1-25 TO YOSEMITE, COMPLETE NATIONAL ENVIRONMENTAL PoLIcY ACT DESIGN, REMOVING BOTTLENECK AT YOSEMITE, RAMPS, LANES, INTERCHANGES AND BRIDGE REPLACEMENT AT ULSTER; (XII) 1-270, WIDENING FROM 1-76 To I- 70, RECONSTRUCTION TO IMPROVE CAPACITY, SAFETY, AND ECONOMIC COMPETITIVENESS. CAPACITY IMPROVEMENTS, REPLACEMENT Of BRIDGES, AND RECONSTRUCT CONCRETE PAVEMENT; (XIII) US 6, WADSWORTH INTERCHANGE, RECONSTRUCT INTERCHANGE TO IMPROVE SAFETY AND RELIEVE CONGESTION; (XIV) I-2701US 85, 1-270 TO 62ND AVE. INTERCHANGE, RECONSTRUCT INTERCHANGE AT 1-270 INTERSECTION AT 60TH AVE. TO IMPROVE SAFETY AND CAPACITY; (XV) 104TH GRADE SEPARATION, CONSTRUCTION OF GRADE SEPARATED INTERCHANGE AT lo AND 104TH/US $5 AND RAILROAD CROSSING GRADE SEPARATION; (XVI) 120TH GRADE SEPARATION, CONSTRUCTION OF A GRADE SEPARATED INTERCHANGE AT l2o AND US $5/RAILROAD CROSSING GRADE SEPARATION 120TH AND (XVII) US 285, RICHMOND HILL TO SHAFFER S CROSSING, WIDEN ROADWAY TO FOUR LANES WITH MEDIAN AND CONSTRUCTION Of GRADE SEPARATED INTERCHANGE AT KING S VALLEY. (g) IN THE CENTRAL FRONT RANGE TRANSPORTATION PLANNING REGION: 6

Initiative 2017-2018 #21 FINAL TEXT (I) STATE HIGHWAY 67, DIvIDE TO VICTOR, SHOULDER WIDENING AND SAFETY IMPROVEMENTS; (II) STATE HIGHWAY 115, REPLACE AND WIDEN ROCK CREEK BRIDGE; AND (III) US 285, FAIRPLAY TO RICHMOND HILL, ADDITION OF PASSING LANES AND SHOULDER IMPROVEMENTS. (h) IN THE INTERMOUNTAIN TRANSPORTATION PLANNING REGION: (I) 1-70, GARFIELD COUNTY/NEW CASTLE INTERCHANGE UPGRADE; (II) 1-70 WEST, G SPUR ROAD (EDWARDS INTERCHANGE)., PHASE 2 Of EDWARDS INTERCHANGE; INTERCHANGE AND INTERSECTION IMPROVEMENTS; (III) STATE HIGHWAY 9, FRIsC0 NORTH, COMPLETION OF CORRIDOR INCLUDING MINIMAL WIDENING, WATER QUALITY AND DRAINAGE IMPROVEMENTS, AND TWO INTERCHANGE IMPROVEMENTS; (IV) STATE HIGHWAY 13, RIFLE NORTH, CONSTRUCTION UPGRADES; (V) 1-70 WEST, VAIL PASS AUXILIARY LANES AND WILDLIFE OVERPASS, COMPLETE NATIONAL ENVIRONMENTAL POLICY ACT DESIGN AND PRELIMINARY ENGINEERING FOR RECOMMENDED THIRD LANE (BOTH DIRECTIONS) TO INCREASE SAFETY AND MOBILITY. INSTALL PERMANENT WATER QUALITY FEATURES, AND WIDEN ROADWAY; (VI) 1-70 WEST, EXIT 203 INTERCHANGE IMPROVEMENTS, (VII) 1-70 WEST, FRISCO TO SILVERTHORNE AUXILIARY LANE, IMPROVEMENTS AND UPGRADES; AND (VIII) 1-70 WEST, SILVERTHORNE INTERCHANGE, RECONSTRUCTION OF EXIT 205 INTERCHANGE AND RELATED IMPROVEMENTS FOR FOUR RAMPS. (1) IN THE NORTHWEST TRANSPORTATION PLANNING REGION: 7

Initiative 2017-201 $ #21 FINAL TEXT (I) US 40, KREMMLING EAST AND WEST, PHASED ADDITION OF SHOULDERS AND PASSING LANES ON 14 MILES; (II) STATE HIGHWAY 13, Rio BLANCO SOUTH TO COUNTY LINE, PHASED ADDITION OF SHOULDERS AND PASSING LANES; (III) STATE HIGHWAY 13, WYOMING SOUTH, RECONSTRUCTION OF TRUCK ROUTE AND RELATED IMPROVEMENTS; (IV) STATE HIGHWAY 139, LITTLE HORSE SOUTH, SAFETY IMPROVEMENTS INCLUDING RECONSTRUCTION OF THE SURFACE AND ADDITION OF 4-8 PAVED SHOULDERS; AND (V) US 40, FRASER TO WINTER PARK, CAPACITY IMPROVEMENTS (FOUR LANE FACILITY). (j) IN THE GRAND VALLEY TRANSPORTATION PLANNING REGION: (I) 1-70, BUSINESS Loop, 1-70 B WIDENING; COMPLETE RECONSTRUCTION AND WIDENING TO MEET CURRENT GEOMETRIC DESIGN STANDARDS AND IMPROVE SAFETY, DRAINAGE AND ACCESSES ALONG THE CORRIDOR; ADD LANES IN EACH DIRECTION TO MAKE A THREE-LANE ROADWAY SECTION AND RECONSTRUCT FRONTAGE ROADS 5TH STREET TO EXIT 26 CORRIDOR, NEW CAPACITY; (II) 1-70, PALISADE TO DEBEQUE, RECONSTRUCTION WITH REALIGNMENT Of CURVES AND OTHER SAFETY IMPROVEMENTS; (III) US 6 IMPROVEMENTS MESA COUNTY, COMPLETION OF INTERSECTION STUDIES AND PRELIMINARY ENGINEERING FOR SAFETY AND MOBILITY THROUGHOUT THE CORRIDOR; INTERSECTION, SHOULDERS, AND OTHER SAFETY AND MOBILITY IMPROVEMENTS AT SPECIFIED LOCATIONS THROUGHOUT THE CORRIDOR; AND (IV) STATE HIGHWAY 340, SAFETY AND CAPACITY IMPROVEMENTS INCLUDING 8

Initiative 2017-2018 #21 FINAL TEXT INTERSECTION IMPROVEMENTS. (k) IN THE EASTERN TRANSPORTATION PLANNING REGION: (I) 1-70 EAST, REPLACEMENT OF ALKALI-SILICA REACTIVITY PAVEMENT AND ASSOCIATED SAFETY IMPROVEMENTS; AND (II) US 385 SAFETY IMPROVEMENTS, INTERSECTION, SHOULDERS, AND OTHER SAFETY improvements at specified locations. (1) IN THE SOUTHWEST TRANSPORTATION PLANNING REGION: (I) US 160 MOBILITY IMPROVEMENTS, CORRIDOR IMPROVEMENTS, PASSING LANES, AND SHOULDER WIDENING AT SELECT LOCATIONS; (II) US 160 TowAoc, ADDITION OF PASSING LANES AND VEHICLE TURNOUTS; (III) US 160 ELMORE S EAST, COMPLETION OF SPECIFIED IMPROVEMENTS; (IV) US 160 PAGOSA, RECONSTRUCTION TO CORRECT WHEEL RUTTING AND ADDITION OF PEDESTRIAN FACILITIES FOR SAFETY; CV) US 550 SOUTH, SUNNYSIDE, MAJOR RECONSTRUCTION REQUIRING WIDENING TO A FOUR- LANE ROADWAY, INCLUDING EARTHWORK, DRAINAGE, IRRIGATION, UTILITIES, PAVING, PEDESTRIAN BRIDGE, SOUND WALL, ANIMAL CROSSINGS; (VI) US 550 CORRIDOR SOUTH, GAP RECONSTRUCTION TO FOUR LANES, INCLUDING DRAINAGE, UTILITIES, ANIMAL CROSSINGS, AND INTERSECTION IMPROVEMENTS; (VII) US 550/US 160 CONNECTION, COMPLETE THE CONNECTION OF US 550 TO US 160 AT THE GRANDVIEW INTERCHANGE; AND (VIII) US 550/US 160 CONNECTION, FINALIZE PRE-CONSTRUCTION, PURCHASE REQUIRED RIGHT-OF-WAY, COMPLETE FINAL DESIGN AND PREPARE ADVERTISEMENT. (m) IN THE SAN Luis VALLEY TRANSPORTATCON PLANNING REGION, US 50 SAFETY AND 9

Initiative 2017-201 $ #21 FiNAL TEXT MOBILITY IMPROVEMENTS BETWEEN SALIDA AND COALDALE, ADDITION OF PASSING LANES AND VEHICLE TURNOUTS. (n) IN THE GUNNISON VALLEY TRANSPORTATION PLANNING REGION: (I) US 50 LITTLE BLUE CANYON, RECONSTRUCTION AND WIDENING OF EXISTING ROADWAY TEMPLATE TO MEET CURRENT GEOMETRIC DESIGN STANDARDS AND IMPROVE ROADSIDE SAFETY, DRAINAGE AND ACCESS ALONG THE CORRIDOR; ADDITION Of PASSING LANES AND MITIGATION Of GEOHAZARD LANDSLIDE WITHIN THE PROJECT LIMITS; PHASED IMPLEMENTATION; (II) US 550 SAFETY IMPROVEMENTS, SPECIFIED STUDY TO REVIEW INTERSECTION IMPROVEMENTS. US 550 REGIoN 3 ONLY; (III) US 550 UNCOMPAHGRE RIVER AND COLONA, ADDITION OF SHOULDERS BETWEEN UNCOMPAHGRE RIVER AND COLONA (BILLY CREEK); CONSTRUCTION OF DEER FENCING AND ANIMAL UNDERPASSES; AND (IV) STATE HIGHWAY 92, SAFETY IMPROVEMENTS INCLUDING RECONSTRUCTION OF THE SURFACE, ADDITION Of 4-8 PAVED SHOULDERS ACROSS ROGERS MESA, AND OTHER SAFETY IMPROVEMENTS INCLUDING ACCESS AND INTERSECTION IMPROVEMENTS. (o) IN THE SOUTH CENTRAL TRANSPORTATION PLANNING REGION, 1-25, STATE HIGHWAY 10/STATE HIGHWAY 160, INTERCHANGE RECONSTRUCTION AT WALSENBURG. (p) US $5 CORRIDOR IMPROVEMENTS, SAFETY, INTERSECTION AND INTERCHANGE IMPROVEMENTS. 43-4-1107. Effective Date THIS PART 11 SHALL BECOME EFFECTIVE UPON PROCLAMATION BY THE GOVERNOR AND SHALL BE SELF-EXECUTING. 10