HILCORP ALASKA, LLC KALOTSA PAD

Similar documents
HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.


SECTION EARTHWORK

Analyzing the Bioretention Construction Sequence

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Information for File # JTF

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

PROPOSED DRAINAGE PATTERNS

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

field note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

EROSION & SEDIMENT CONTROL

Request for an Exception to the Napa County Road and Street Standards

SHEET FLOW TO A FILTER STRIP OR CONSERVED OPEN SPACE

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Wisconsin Contractors Institute Continuing Education

Geosynthetics for Stabilization and Reinforcement

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

CONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

South Fraser Perimeter Road (SFPR)

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Basic Geosynthetics: A Guide to Best Practices in Forest Engineering

III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

Geosynthetics for Erosion Control and Reinforcement

Florence County Small Commercial Land Disturbance Permit Application

2018 Annual Landfill Inspection Report

Request for Approval of Design Modification

Kittson Parkway / Watershed Park Parking Lot

JOB CREATION PROJECTS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

ACTIVITY: Geotextiles ES 12

AASHTO M Subsurface Drainage

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Case Study Bioretention Installation and Maintenance

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

STREAM ALTERATION PRACTICES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Structural Storm Water Best Management Practices (BMPs)

STANDARD DETAILS QUICK REFERENCE

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

The proper use of erosion and sediment controls will allow the following objectives to be met:

CONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING

Pondless Waterfall Vault

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

MILL PONDS. Tel:

E R O S I O N C O N T R O L

SLOPE STABILIZATION. A number of methods have been used to stabilize slopes, each of them found to be appropriate for a particular set of conditions

Acronyms. TRI TRI Environmental, Inc. Table of Contents. iii

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Geosynthetics and Their Applications

STORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document

SHEET FLOW TO A VEGETATED FILTER STRIP OR CONSERVED OPEN SPACE

The Low Risk Site Handbook

SHEETFLOW TO CONSERVATION AREA OR VEGETATED FILTER STRIP

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

Technical Specification Guidelines

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs)

HYDRAULIC DESIGN involves several basic

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Piles, Trenching, Inverters, Cables, Material Deliveries

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

John F. Kennedy STEM High School Green Infrastructure Information Sheet

LET S GET IT DONE STORMWATER MANAGEMENT

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Chapter 2 Roof Downspout Controls

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Cedar Niles Future Park Site Wetland #1

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

H841:02 Deep and severe erosion of roadside ditch to form gullies. H837:02 Deep erosion of roadside ditch

Section Specification for Geotextile Used in Permanent Erosion Control Application

ALOW VOLUME ROAD is considered a road

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

CONSTRUCTION DRAWINGS MODULE 6 LINER SYSTEM MONTEREY PENINSULA LANDFILL

DITCH BANK STABILIZATION TECHNIQUES

Landscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

Bio-Engineering Techniques to Revegetate Streambanks

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

PLAN SUBMITTER'S CHECKLIST

Technical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007)

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Transcription:

, LLC ACCESS ROAD, PAD & FLOWLINE FLOWLINE END SEC 7 T1S R13W SM NINILCHIK, ALASKA FLOWLINE & ACCESS ROAD START PROPOSED 200' x 300' DRILL PAD M.P. 130 STERLING HWY ACCESS ROAD END INDEX S 0 1000 VICINITY MAP 2000 NO. 1 2-6 7 8 9-16 17-18 DESCRIPTION COVER TYPICAL SECTIONS DITCH FILL PLAN PAD PLAN VIEW PLAN VIEWS TABLES : 1"=1000' NO. 1 143123

VARIABLE WIDTH 28' MIN 3% 18' 3% 2:1 30" MIN. KPB TYPE I 2:1 GEOGRID BX 110 ON NON-WOVEN GEOTEXTILE GEOTEX NW 601 OR EQUAL A 2 18' WIDE ROAD TYPICAL SECTION - : 1" = 10' - STA 0+00-22+70 TRANSITION 50' TRANSITION 100' 50' PULLOUT 18' 28' 28' ROAD 18' ROAD SHOULDER NOTES: 1. ADDITIONAL PULLOUTS WILL BE CONSTRUCTED WHERE HILLY TERRAIN AND LIMITED SITE DISTANCE ARE PREVALENT TO ASSIST TRANSPORTATION NEEDS. 2. GRAVEL FILL SHALL BE PLACED IN NO GREATER THAN 12" LIFTS AND COMPACTED. 3. GRAVEL FILL SHALL BE UNDERLAIN WITH GEOTEXTILE. B 2 18' WIDE ROAD W/ 10' PULLOUT : 1" = 40' : VARIES NO. 2 143123

VARIABLE WIDTH 28' MIN 18' CORRUGATED STEEL PIPE GEOGRID BX 110 ON NON-WOVEN GEOTEXTILE GEOTEX NW 601 OR EQUAL NATIVE SOIL PRE-LEVEL WITH 6" PIPE BEDDING MATERIAL A 3 1. ALL CULVERTS SHALL BE CORRUGATED STEEL. 2. PRE-LEVEL WITH 6" PIPE BEDDING MATERIAL. 3. CROSS CULVERTS IN UPLANDS SHALL BE INSTALLED WITH AN ENLARGED (BELL HOLE) DITCH SECTION ON THE INLET END. FILL TO 6" DEPTH WITH DITCH LINER MATERIAL. 4. CULVERT PLACEMENT FILL IS 2.3 CUBIC YARDS PER CULVERT. 18' WIDE ROAD- W/ CROSS CULVERT TYPICAL SECTION : 1" = 10' MOUND 6" TO 12" TO ALLOW FOR SETTLEMENT DOZER TRACK SURFACE 3.0' 30" (MIN) COVER COMM. & POWER LINES 4' WARNING TAPE (2) 6" Ø GAS FLOWLINES B 3 TRENCH TYPICAL SECTION : 1" = 2' : 1" = 10' NO. 3 143123

SILT FENCE TRENCH MOUND 6" TO 12" TO ALLOW FOR SETTLEMENT DOZER TRACK SURFACE 10' TEMPORARY STORAGE AREA GEOTEXTILE OVERLAP 12" UP SILT FENCE 2.0' PROPOSED ACCESS ROAD SEE TYPICAL SECTIONS A/2 FLOWLINE TRENCH SEE TYPICAL SECTION B/3 A 4 TRENCH & TEMPORARY STORAGE TYPICAL SECTION : 1" = 5' - STA FL0+00 - FL19+70 A 4 10' TEMPORARY STORAGE AREA 4' WIDE FLOWLINE TRENCH VARIABLE WIDTH - 5' MIN SHOULDER SHOULDER 18' PROPOSED ACCESS ROAD VARIABLE WIDTH - 5' MIN TOE B 4 TYPICAL ROAD, TRENCH, & TEMPORARY STORAGE PLAN : 1" = 40' : 1" = 5' NO. 4 143123

PROPERTY LINE 25' EXISTING ROAD EXISTING GROUND FLOWLINE TRENCH SEE TYPICAL SECTION B/3 DITCH W/ OPEN FLOW NOTE: ALL TRENCH FROM STATION FL30+10 TO THE SUSAN DIONNE PAD (STA FL58+20) WILL BE STORED IN AN UPLAND AREA ONSITE. SEE 13. A 5 TRENCH TYPICAL SECTION - EXISTING ROAD : 1" = 10' - FL30+10 - FL56+95 MOUND 6" TO 12" TO ALLOW FOR SETTLEMENT DOZER TRACK SURFACE FLOWLINE TRENCH SEE TYPICAL SECTION B/3 B 5 NOTE: ALL TRENCH FROM STATION 28+65-55+45 WILL BE STORED IN AN UPLAND AREA ONSITE. TYPICAL TRENCH TYPICAL - : 1" = 5' - STA FL56+95 - FL57+82 : VARIES NO. 5 143123

CLEARING LIMIT TOE PAD TOE TO TOE WIDTH VARIES CLEARING LIMIT TOE PAD 212' 200' 2:1 KPB TYPE I 36" MIN PAD FG 126.5' 2:1 GEOGRID BX 110 ON NON-WOVEN GEOTEXTILE GEOTEX NW 601 OR EQUAL 18" BERM 2:1 SIDE SLOPES (TYPICAL) A 6 PAD TYPICAL SECTION : 1" = 40' - FACING NORTHEAST CLEARING LIMIT TOE PAD TOE TO TOE WIDTH VARIES CLEARING LIMIT TOE PAD 334.5' 310.5' 2:1 KPB TYPE I 36" MIN PAD FG 126.5' 2:1 GEOGRID BX 110 ON NON-WOVEN GEOTEXTILE GEOTEX NW 601 OR EQUAL 18" BERM 2:1 SIDE SLOPES (TYPICAL) B 6 PAD TYPICAL SECTION : 1" = 40' - FACING NORTHWEST : VARIES NO. 6 143123

117 500' MHWL SETBACK PROPOSED ACCESS ROAD SHOULDER 48" x 35' CSP w/ END SECTIONS STREAM 18.0' 118 FILL SLOPE DAYLIGHT 119 6 A 120 121 18" BERM 2:1 SIDESLOPES 18" BERM 2:1 SIDESLOPES PROPOSED PAD 60000 SF FG = 126.5 122 339.5' 124 237.7' 200.0' 310.5' B 6 0 60 120 : 1"=60' NO. 8 143123

0 100 200 : 1"=100' NO. 9 143123

0 100 200 : 1"=100' NO. 143123 10 18

0 100 200 : 1"=100' NO. 143123 11 18

0 100 200 : 1"=100' NO. 143123 12 18

0 100 200 : 1"=100' NO. 143123 13 18

0 100 200 : 1"=100' NO. 143123 14 18

0 100 200 : 1"=100' NO. 143123 15 18

0 100 200 : 1"=100' NO. 143123 16 18

PAD DATA FOOTPRINT IMPACTED AREA FILL FILL 77464 SF 77464 SF 0 CF 0 CF 409381 CF 409381 CF 1.78 AC 1.78 AC 0 CY 0 CY 15162 CY 15162 CY ACCESS ROAD DATA FOOTPRINT IMPACTED AREA FILL FILL 94476 SF 67091 SF 7182 CF 0 CF 199229 CF 154216 CF 2.17 AC 1.54 AC 266 CY 0 CY 7379 CY 5712 CY ACCESS ROAD DATA: LENGTH = 2986.2 LF (2270 LF ); MIN. WIDTH = 28'; MIN. FILL DEPTH 2.5' FLOWLINE TRENCH DATA FOOTPRINT IMPACTED AREA FILL FILL 23292 SF 8228 SF 69876 CF 24684 CF 0 CF 0 CF 0.53 AC 0.19 AC 2588 CY 914 CY 0 CY 0 CY FLOWLINE TRENCH DATA: LENGTH = 5823 LF (2057 LF ); TRENCH AREA = 12 SF, TRENCH WIDTH = 4' : N/A NO. 143123 17 18

FLOWLINE TEMPORARY STORAGE DATA FOOTPRINT IMPACTED AREA FILL FILL 30100 SF 19700 SF 0 CF 0 CF 36120 CF 23640 CF 0.69 AC 0.45 AC 0 CY 0 CY 1338 CY 876 CY NOTE: FILL QUANTITY IS TEMPORARY STORAGE EXCAVATED TRENCH MATERIAL. MATERIAL WILL BE PLACED ON GEOTEXTILE FABRIC IN AREAS. LENGTH = 3010 LF (1970 LF ); WIDTH = 10'; AREA = 12 SF EXISTING DRAINAGE FILL FOOTPRINT IMPACTED AREA FILL FILL 1766 SF 1766 SF 0 CF 0 CF 6156 CF 6156 CF 0.04 AC 0.04 AC 0 CY 0 CY 228 CY 228 CY NOTE: FILL = 228CY (220 CY PEAT & 8 CY GABION ROCK) QUANTITIES FOOTPRINT IMPACTED AREA FILL FILL 227098 SF 174249 SF 77058 CF 24684 CF 650887 CF 593393 CF 5.21 AC 4.00 AC 2854 CY 914 CY 24107 CY 21985 CY NOTE: AN ADDITIONAL 7.3 CY (2.3 CY 18" CSP * 5.0 CY 48" CSP) BEDDING FOR CULVERTS (CSP) IN. : N/A NO. 143123 18 18