Great Hammerton Growth Area: Our Vision August Hammerton Growth Area Harrogate: Our Vision

Similar documents
WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

Former Panshanger Aerodrome, Welwyn Garden City Masterplan Scenarios. Mariposa Investments

Public Consultation. Land at Monks Farm, North Grove. Welcome

Newcourt Masterplan. November Exeter Local Development Framework

Kibworth Harcourt. Introduction. Introduction

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

INTRODUCTION. Land south of Bishopswood Lane, Tadley

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

8.0 Design and Form of Development 43/

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

Neighbourhood Planning Local Green Spaces

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Land at Fiddington Hill Nursery, Market Lavington

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

WELCOME. North East Haverhill. The Planning Process

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

EAST LEEDS EXTENSION: NORTH EAST QUADRANT DEVELOPMENT FRAMEWORK MAY 2012

Welcome to our exhibition

Great Easton Neighbourhood Plan Statement of Basic Conditions

Land at Rampton Road. Cottenham

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017

PROPOSAL FOR NEW HOMES ON LAND OFF WALTON ROAD

Briefing Document of CNP. June 2017

Droitwich Spa 6. Reasoned Justification

Welcome to our public exhibition

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Neighbourhood Planning Guidance Local Green Spaces

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

LOGGERHEADS NEIGHBOURHOOD PLAN LOCAL GREEN SPACE DESIGNATION OCTOBER 2016

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Land East of Cromwell Lane

Planning and Sustainability Statement

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development?

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Welcome to this exhibition which shows emerging ideas for land owned by University of Bristol at Long Ashton.

DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT

TRANSFORMING TUDOR NURSERIES

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

The journey so far. The new masterplan for Dargavel Village

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Examination of South Cambridgeshire Local Plan

GREENBANK DEVELOPMENT MASTERPLAN

Linby Neighbourhood Plan Masterplan Safeguarded Land Top Wighay Farm March Linby Neighbourhood Development Plan Masterplan 1

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.

The Fairfield Partnership Vision for North-East Elsenham

DEVELOPMENT MANAGEMENT REPORT

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Local Allocation LA1 Marchmont Farm Hemel Hempstead. Master Plan

Environmental and Landscape Mapping

Application and Proposals. Part 211

Former North Works, Lickey Road, Longbridge, Birmingham

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

PHASE III: Reserved Matters Submission

7.1.6 The main components of the development strategy for Hertford are as follows:

SITE ASSESSMENT CHECKLIST

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

LETTER OF OBJECTION LAND TO THE SOUTH WEST OF FORGE GARAGE, HIGH STREET, PENSHURST, KENT, TN11 8BU

Herne Hill and North Dulwich Herne Hill and North Dulwich Area Vision Map

1. Local Plan Context

Longbridge Town Centre Phase 2 Planning Application

an Inspector appointed by the Secretary of State for Communities and Local Government

3. Neighbourhood Plans and Strategic Environmental Assessment

Draft Hailey Neighbourhood Plan

Camberwell Camberwell Area Vision Map

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people

What do you like about South Marston?

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

PLANNING STATEMENT (INCLUDING HOUSING, AFFORDABLE HOUSING STATEMENT AND SUSTAINABILITY STATEMENT) TO ACCOMPANY AN OUTLINE PLANNING

Neighbourhood Plan Representation

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

ALLERTHORPE NEIGHBOURHOOD PLAN

ENVIRONMENTAL AND LANDSCAPE MAPPING

CLEVE PARK, THORNBURY

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

PUBLIC REALM STRATEGY

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

WETHERBY TOWN COUNCIL. Neighbourhood Development Plan Basic Conditions Statement

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Planning Statement. Land at Hookstone Road and Hornbeam Park Avenue. Report. Harrogate College. April gva.co.uk

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Sustainability Statement. Whitby Business Park Area Action Plan

17. Coolaney-Rockfield Mini-Plan

Welcome to our Public Consultation

Peckham Peckham Area Vision Map

1. Nantwich - Planning for a Sustainable Future

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

Site ref: AS11 Site Name or Address: Land South of Ermyn Way

Transcription:

Great Hammerton Growth Area: Our Vision August 2015 Hammerton Growth Area Harrogate: Our Vision i

Contents 1.0 Introduction 1 2.0 Our Vision 3 3.0 Principle of Development 5 4.0 Site Context 7 5.0 Townscape Character 9 6.0 Historic Context 11 7.0 Constraints 13 8.0 Opportunities 15 9.0 Design Concept 17 10.0 Transport and Accessibility 19 11.0 Deliverability and Next Steps 21 All images Nathaniel Lichfield & Partners unless otherwise stated. Designed by Nathaniel Lichfield & Partners Ltd 2015. Trading as Nathaniel Lichfield & Partners. All Rights Reserved. Registered Office: 14 Regent s Wharf, All Saints Street, London N1 9RL. All plans within this document produced by NLP are based upon Ordnance Survey mapping with the permission of Her Majesty s Stationery Office. Crown Copyright reserved. Licence number AL50684A ii

1.0 Introduction This document sets out Commercial Estates Group s emerging vision for a mixed use, residential led development at land around Green Hammerton, to help meet the need for new homes in the Harrogate District over the 21 year Plan Period. It describes the assessments undertaken to date to create an initial illustrative master plan, and provides some background in respect of the planning and environmental matters to be considered moving forward. This document demonstrates firstly that a significant development is achievable at this location and secondly CEG s eagerness to work with the Council and local stakeholders to bring this site forward for development as a sustainable community. Hammerton Growth Area Harrogate: Our Vision 1

2

2.0 Our Vision Our vision is to create a sustainable, mixed use community and infrastructure, with high design and environmental standards, respectful of its local heritage and context and its wider setting. The development will be deliverable, commercially viable and contribute positively to delivering around 5,000 homes, along with new, high quality employment provision. It will build on the existing infrastructure, such as the road and rail links, and provide all of the necessary additional infrastructure required to sustain the community. The following sections set out how this vision translates into a masterplan for the development of Great Hammerton. Hammerton Growth Area Harrogate: Our Vision 3

4

3.0 Principle of Development National Planning Policy The National Planning Policy Framework establishes a presumption in favour of sustainable development. For plan-making this means that Local Planning Authorities should positively seek opportunities to meet the development needs of their area in full. A key requirement of the NPPF is for Local Planning Authorities to boost significantly the supply of new homes. This is reflected by a requirement to seek opportunities to deliver a wide choice of high quality homes, including affordable homes, which widen the choice for home ownership and create sustainable, inclusive communities. The NPPF provides the opportunity for Green Belt boundaries to be reviewed as part of the Local Plans process. Local Policy The Harrogate district does not have an up-to-date plan setting out its housing requirement. Policy SG1: Settlement Growth: Housing Distribution of the Core Strategy (adopted in February 2009) uses the Regional Spatial Strategy for the Yorkshire and Humber (RSS) housing requirement of 390 dwellings per annum (net). The Sites and Policies Development Plan Document Submission Draft (November 2013) (S&P DPD) sought to deliver the Harrogate Core Strategy housing requirement of 390 dwellings per annum. However, following the S&P DPD Examination in Public, the Inspector recommended in a letter to the Council on the 29th April 2014 that they withdraw the S&P DPD on two grounds: 1. Employment Land Requirements; and 2. Housing Requirements. In relation to housing requirements the Inspector specifically states: It is accepted by the Council that the submitted DPD falls considerably short of meeting the objectively assessed need. The DPD seeks to provide 390 dwellings per annum, in line with the Core Strategy, as opposed to the Strategic Housing Market Assessment (2011) projections (sub-national and employment led projections) of 862 and 1,086. Other parties have put forward different but not dissimilar figures. This is a very substantial shortfall. The Harrogate district Local Plan Issues and Options Consultation draft states that there is a need to plan for 13,041 new homes over the period of the Local Plan, based on a figure of 621 new homes per year. Taking into account the recent completions, existing planning permissions, sites identified as suitable for new homes, windfall sites and an overall non-completion rate of 10%, the Councils consultation documents states a requirement to identify future housing land to deliver around 6,364 homes. On behalf of CEG, NLP has prepared an assessment of the housing need in Harrogate district using its Headroom model. This concluded that Harrogate district will actually require at least 800 homes per year, rather than 621, equating to a need for 16,800 homes over the plan period. Taking the above factors into account, the Local Plan would need to identify future housing land to deliver around 10,350 homes. CEG s view is that the district housing requirement could be met in three basic ways: 1. Extensions to existing settlements: This would require development in the Green Belt and would place added pressure on the services, facilities and infrastructure in historic settlements such as Harrogate, Knaresborough and Ripon. 2. One or more new settlements: This would provide an opportunity to create a long term plan for settlements in less sensitive but accessible locations with new infrastructure. It would relieve pressure on the Green Belt, other environmentally sensitive locations and the infrastructure of existing settlements. 3. A combination of extensions and new settlements: This option would provide scope for sustainable extensions to existing settlements in less sensitive locations alongside improvement to local infrastructure. A smaller new new growth area or growth areas could also be provided. Given the extent of the housing requirement and the district s environmental and infrastructure constraints, CEG s view is this final option is likely to be the most preferable in overall planning and sustainability terms. The precise housing requirement for the district will be subject to further discussion, however, irrespective of the final figure, the most sustainable and appropriate solution to delivering the housing needs of the district would be to deliver a settlement of around 5,000 homes at Hammerton. Hammerton Growth Area Harrogate: Our Vision 5

A61 A1(M) Killinghall Flaxby Whixley Knaresborough A59 Green Hammerton Goldsborough A59 Harrogate Kirk Hammerton A658 North Deighton Tockwith A1(M) Kirk Deighton Wetherby Google Boston Spa 6

4.0 Site Context Green Hammerton is a new growth area sustainable location for a new settlement with key road and rail links to Harrogate and York, and beyond. The site surrounds Green Hammerton and is north of Kirk Hammerton, separated by the railway line. Whixley lies to the north west. Green Hammerton is located on the A59, 3.6 miles (5.8 km) from junction 47 of the A1(M). The A59 provides a direct road link to Harrogate, 11.9 miles (19.2 km) to the west and York, 10.1 miles (16.3 km) to the east. Kirk Hammerton and Cattal railway stations lie to the south of Green Hammerton on the Harrogate line, providing a regular service between Harrogate and York. Site Characteristics TO NORTH YORKSHIRE A1(M) 1. Proximity to A59 and A1, Harrogate and York 2. Proximity to both Cattal and Hammerton railway stations. HARROGATE KNARESBOROUGH A59 GREEN HAMMERTON RAILWAY LINE A59 YORK WETHERBY A1(M) TO LEEDS Hammerton Growth Area Harrogate: Our Vision 7

8

5.0 Townscape Character Locally distinctive townscape evolves as a place over many years reflected in street layout, built form and character. Both Green Hammerton and Kirk Hammerton have well defined main trees, with a variety of buildings in terms of size and design. The interaction with the surrounding countryside varies. Green Hammerton is a historic settlement which has retained its traditional character within a rural setting. The village green is characterised by a wide open space fronted by houses along a rural lane. Buildings are typically wide fronted framing the open space. Most houses are built in red brick with pantiled roofs, a consistent material palette is accented with distinctive architectural features. Hammerton Growth Area Harrogate: Our Vision 9

10

6.0 Historic Context Hammerton is derived from tun and hamor meaning the homestead by a hill. Boroughbridge Road passes through Green Hammerton and aligns with the Roman road from York to Aldborough. This road was the key route from Harrogate to York before the by-pass A59 was built in 1989. The village developed in linear form along the Roman Road and to either side of The Green, which gave access to the Manor, now long gone. 1895 1910 The East and West Yorkshire Junction Railway opened a route of 15 miles (24km) from York (Poppleton Junction) to Knaresborough in 1848. In 1851 a viaduct over the River Nidd completed the route to Harrogate. Hammerton and Cattal railway stations were stops on the original railway line. As demonstrated by the historic mapping, Green Hammerton has experienced limited growth and remains a compact, linear settlement. 1952 1970 Sources: Kirk Hammerton Parish Council Website Archive page BBC York and North Yorkshire - Archeology - Green Hammerton Dig Green Hammerton Conservation Area Character Appraisal 2015 Hammerton Growth Area Harrogate: Our Vision 11

25m Whixley 30m Green Hammerton 20m 45m 45m 30m 20m Cattal Railway Station Hammerton Railway Station Kirk Hammerton Constraints Plan KEY Settlement area Roman Road (indicative) Parish boundary Listed building Roads Watercourse Public right of way Conservation area Railway line Floodplain Contours A59 barrier Railway station Watermain (potential location) Woodland Johnsons wholesale nursery N Views to Green Hammerton 12

7.0 Constraints Understanding the site features that act as potential constraints and opportunities for development is central to preparing a responsive masterplan. The key constraints of the site and its surroundings are illustrated opposite. Landscape Considerations Land to the east of Green Hammerton falls within the low-lying farmland character area within the River Ouse and Lower River Nidd River Corridors. The land is flat to very gently undulating below 20m AOD. The fields immediately surrounding Green Hammerton are bound by a strong hedgerow network which provides an important landscape setting. Land to the west of Green Hammerton falls within the Whixley arable farmland character area. The land is gently undulating from between 20m AOD to 45m AOD. Medium to large sized fields are bound by a mix of hedges and fencing, the Johnsons wholesale nursery covers a large area in contrast with the arable land. New development should respect the local landform with integrated landscaping defining development limits. Heritage and setting Careful design and landscaping will minimise impacts on heritage assets and landscape character; and ensure that both Green Hammerton and Kirk Hammerton s special character and appearance is conserved. The site is adjacent to Green Hammerton and Kirk Hammerton Conservation areas which include clusters of Grade II listed buildings. Providence House is a Grade II listed building located north of the A59 on the approach to Green Hammerton from the west. A Roman crossing point was discovered close to the River Nidd to the east of Green Hammerton. The direction of the road suggests it may align with Boroughbridge Road through Green Hammerton. A59 The A59 is a major road providing links to the A1(M) and Harrogate to the west and to York to the east. This busy route separates part of Green Hammerton and is a barrier between Green Hammerton and Kirk Hammerton. Railway Line The Harrogate to York railway line is located south of the A59 to the north of Kirk Hammerton. Three level crossings provide links over the railway line at Cattal railway station, Hammerton railway station and Parker Lane. The stations lie on the periphery of the settlements and are not readily accessible. Utilities The water pipeline between Marton service reservoir (North Yorkshire) and Acomb Landing water treatment works (City of York), follows the A59 and curves around the north east of Green Hammerton, the exact route of the pipeline is subject of further investigation. Hammerton Growth Area Harrogate: Our Vision 13

25m Whixley 30m Green Hammerton 20m 45m 45m 30m 20m Cattal Railway Station Hammerton Railway Station Kirk Hammerton Opportunities Plan KEY Settlement area Potential new village Watercourse Potential to downgrade A59 Roads Railway station Public right of way Potential development extents Railway line Potential new railway station Potential park and ride Contours Woodland Parkland setting Long distance views N 14

8.0 Opportunities The site presents an opportunity to to positively contribute to meeting housing need and infrastructure, deliver affordable housing, and promote sustainable living in a manner which respects the existing landscape pattern and creates an attractive new settlement. Access and Movement There is an opportunity to downgrade the A59 through Green Hammerton and reroute traffic onto a new by-pass road. A park and ride at one of the stations could encourage sustainable transport use for journeys to Harrogate and York via train. There is also potential to site a new railway station on Parker Lane in a location which is more central and accessible to Green Hammerton. Key Views Key views can help structure the layout of built form and open spaces. Coney Garth Hill provides elevated views towards York and beyond. There are also views of and from Providence Hill to the south west. Within Green Hammerton there are strong views of the open countryside from The Green to the west, connecting the village with its surrounding arable landscape. Beyond The Green there are views from Back Lane and Water Slack Lane across open countryside. There is potential to protect the landscape setting of Green Hammerton with designated parkland and green corridors maintaining views and sense of openness. Landscape Setting The pattern of existing hedgerows provides a well-defined landscape structure to the site which can help to shape a development. There is an opportunity to create greenway linkages following the hedge lines which would provide attractive pedestrian routes and preserve wildlife corridors. Sustainability There are opportunities in conjunction with development and infrastructure to provide new village centres with services and facilities within walking distance for new and existing residents. Hammerton Growth Area Harrogate: Our Vision 15

Concept Plan KEY Settlement area Potential new village Watercourse Potential to downgrade A59 Roads Railway station Public right of way Potential to reroute A59 Railway line Potential new railway station Contours Potential green corridors N Potential park and ride Woodland Parkland setting 16

9.0 Design Concept The concept for the site is to create village communities within an overall connecting landscape framework. With the potential for new local centres and large areas of open space. The new communities will benefit both new and existing residents. Key masterplan principles Principle 1: A high quality place Our vision is to create a distinctive, high quality place and an accessible, legible and attractive environment for people to live and work in. The new neighbourhoods could support up to 5000 homes, including affordable housing with local centres and supporting employment and community facilities to meet the day to day needs and some of the high order goods and services. Principle 2: A walkable place The neighbourhoods should be at a scale and form of development which connect by foot at around a 400m radius. Within each neighbourhood there should be a mix of land uses and a compact built form with safe and attractive pedestrian corridors. Principle 3: Respect the setting of Green Hammerton The development will draw on the natural and built environment, heritage and natural assets of Green Hammerton and Kirk Hammerton to create a framework for new development, fostering a sense of legacy and natural evolution. The development will protect the setting of Green Hammerton and key views through the site. The re-routing of the A59 and downgrading of the existing road will integrate Green Hammerton. Principle 4: Integration at countryside boundaries The interface with the countryside around the site will be softened by the provision of buffer landscape treatments at the edges of the development and the extension of green fingers into the development area, to bring the countryside into the new neighbourhoods. Visual integration will be achieved through the retention of key trees and hedge lines within the site and respecting key views. Principle 6: Create a generous landscape framework An extensive network of green open spaces will surround and permeate the heart of the new neighbourhoods, connecting the existing and future communities to the surrounding countryside. Orchards and allotments will provide opportunities for local food production. Woodland planting will help enclose the settlement and community squares and gardens will provide the focal point for new homes. Sustainable Urban Drainage Systems will underpin the network of green spaces reducing the risk of flooding, assisting with sustainable water management and providing rich habitats for wildlife. WEST HAMMERTON GREEN HAMMERTON Principle 7: Local distinctiveness High quality architecture will be used and varied to reflect the local vernacular while allowing for more modern interpretation. Buildings will be adaptable and sustainable. A copy of the initial Illustrative Masterplan is enclosed overleaf. EAST HAMMERTON KIRK HAMMERTON Hammerton Growth Area Harrogate: Our Vision 17

Illustrative Masterplan KEY Employment Primary School site Residential - low density District Centre Local Centre Secondary School site Residential - high density Parks, natural and seminatural open space, amenity green space N Residential - medium density Landscape buffers 18

10.0 Transport and Accessibility It is important that transport and access to the development provides opportunities for sustainable travel choices. We will respect existing Public Rights of Way and think creatively about new pedestrian and cycling networks through the site and connections beyond including making the most of the opportunity created by the existing railway stations. Key improvements could comprise: 1. Improvements to the site access onto the A59 2. Bus routes 3. A park and ride at Hammerton Station 4. A new rail station We will work with the local authority, Network Rail and public transport providers to identify the potential scope to improve public transport connections to the site. It is also critical we ensure that the highways infrastructure can accommodate the development. We will work with the North Yorkshire County Council and Harrogate Borough Council to ensure that appropriate highways improvement works are identified and delivered as part of the scheme. Hammerton Growth Area Harrogate: Our Vision 19

20

11.0 Other Community Infrastructure In addition to the transport infrastructure, it will be crucial that the necessary community infrastructure required to support the new sustainable communities is provided alongside the new housing and at the right times. The delivery of infrastructure is a fundamental objective of CEG s proposal. The community infrastructure provision will initially build upon and improve the existing infrastructure of Green Hammerton and Kirk Hammerton (e.g. primary schools, local shops, post office, village hall, etc) but will quickly result in a wide range of new additional facilities and services to support the new residents living in the area. It is likely that the development of 5,000 homes will result in the delivery of the following facilities and services in central and accessible locations within the development: 1 district centre and 4 local centres, which will include GP surgeries, community halls, post offices, dentists and local shops; 4 new primary schools and 1 new secondary school; A range of types and sizes of public open space throughout the development, including parks, playgrounds and sports pitches. This community infrastructure is shown on the initial illustrative masterplan. Hammerton Growth Area Harrogate: Our Vision 21

22

12.0 Deliverability and Next Steps Deliverability Based on a minimum requirement of 800 homes per year, there would be a total requirement of 16,800 homes over the 21 year plan period and a shortfall of around 10, 350 dwellings. The 2000 homes suggested in the Hammerton and Cattal Area under Option 3 of the Local Plan Issues and Options document would therefore be insufficient to meet the housing needs of the Borough. This shortfall is best accommodated through a combination of some additional urban extensions and significant growth at Hammerton to the order of 5,000 new homes and assoicated infrastructure. Having undertaken initial assessments of the site potential, CEG is confident that it can deliver the significant sustainable growth of Hammerton to help meet the identified local and district housing needs. The vision and its masterplan are an important first step in developing our proposals. Further analysis of these areas will now be undertaken to produce more detailed proposals including the potential mix of uses and associated facilities. The options will be shared with Harrogate Borough Council and promoted through the emerging Local Plan incorporating engagement with local communities, councillors and other stakeholders. Hammerton Growth Area Harrogate: Our Vision 23

Client Commercial Estates Group Planning Consultant and Masterplanning Nathaniel Lichfield & Partners Transport Bryan G Hall 24