Final Report March, 2008

Similar documents
The Art and Science of Stormwater Retrofitting

The urban parks in Charlottesville include Jackson Park, Lee Park, and McGuffey Park.

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

Chapter 3 Site Planning and Low Impact Development

Draft Rhode Island Stormwater Design and Installation Standards Manual

When planning stormwater management facilities, the following principles shall be applied where possible.

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Update for City Council 7 Years of Progress. May 2013

Green Infrastructure & Low Impact Development

USF System Campus Master Plan Updates Goals, Objectives and Policies

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

4. CONCEPT PLAN DEVELOPMENT

New Development Stormwater Guidelines

Green City, Clean Waters

SECTION A-1: DESCRIPTION

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

VA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Appendix E: Illustrative Green Infrastructure Examples

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Chapter 4 - Preparation of Stormwater Site Plans

Appendix I. Checklists

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Working Group Meeting

WEFTEC.06. ** City of Caldwell, Idaho

2016 WORKSHOP LVR Field Trip

Non-Residential&Multi-Family PropertyCreditManual

Stormwater and Ecological Management Opportunities May 2008

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Rice Lake Subwatershed Stormwater Retrofit Assessment

4.6. Low Impact and Retentive Grading

West Virginia Stormwater Management Manual: Methods.

Pennsylvania Stormwater Best Management Practices Manual

Inspection and Maintenance of Stormwater Best Management Practices

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Bioretention cell schematic key

Post Construction BMPs

Problem Understanding

J. Paul Guyer, P.E., R.A.

FACT SHEET: Pervious Pavement with Infiltration

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Homeowners Guide to Stormwater BMP Maintenance

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Potential Green Infrastructure Strategies May 6, 2015 Workshop

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

ROOFTOP DISCONNECTION VERSION 1.5

FINAL REPORT Stormwater Retrofit Opportunities on Public Lands in Fluvanna County

Coffee Creek Park Development Low Impact Development (LID)

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Camden SMART Initiative Stormwater Management and Resource Training

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Green Infrastructure Overview

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

ROOFTOP (IMPERVIOUS SURFACE) DISCONNECTION

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

DEALING WITH STORM WATER MANAGEMENT

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Green Infrastructure and Low-Impact Development Technologies

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Green Infrastructure Recommendations For Parks and Public Spaces

CHECKLIST FOR PHASE II DRAINAGE REPORT

Stormwater Prevention and Control

Impervious Cover Assessment for Salem City, Salem County, New Jersey

Three Rivers Park District Administration Center Rain Garden

Impervious Cover Assessment for Netcong Borough, Morris County, New Jersey

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Action Plan for Retrofitting Structural BMPs

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

The use of low head weirs to. perennial streams with their floodplains:

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

Case Study: City of San Mateo

Urban Watershed Mentors

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Transcription:

Final Report March, 2008 Charlottesville Stormwater Stewardship on Public Lands

Acknowledgments The project team from the Center for Watershed Protection, Inc. (CWP), would like to acknowledge the substantial and meaningful contributions to this project from Kristel Riddervold and Dan Frisbee from the City of Charlottesville s Environmental Administration Division of the Department of Public Works. In addition, CWP would like to thank the other professionals from the Charlottesville City Schools and the following City of Charlottesville departments who contributed their talents and time: Department of Public Works Department of Parks & Recreation Department of Neighborhood Development Services Funding for this project came from the City of Charlottesville, Charlottesville City Schools, and the Small Watershed Grants Program. The Small Watershed Grants Program is administered by the National Fish and Wildlife Foundation, in cooperation with the U.S. Environmental Protection Agency, Chesapeake Bay Program. The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the opinions or policies of the U.S. Government or the National Fish and Wildlife Foundation. Mention of trade names or commercial products does not constitute their endorsement by the U.S. Government or the National Fish and Wildlife Foundation. The CWP project team consisted of the following individuals: David Hirschman, Project Manager Michael Novotney Lisa Fraley-McNeal Jennifer Zielinski Tom Schueler Kathy Proebstle In addition, the following contractors made significant contributions to the design phase of the project: Eliot Fendig and Rick Artiga, Bent Tree Design Benjamin Sojka, Rainwater Management Solutions

Table of Contents Page # 1. Introduction...1 1.1 Project Background...1 1.2 Overall Process...4 2. Retrofit Scoping & Initial Ranking...5 2.1 Collect Available GIS Data...5 2.2 Delineate Subwatersheds...6 2.3 Delineate Impervious Cover on Each Public Land Parcel...6 2.4 Analyze Subwatershed Context...9 2.5 Analyze Treatment Area Available for On-Site & Off-Site Runoff...11 2.6 Identify Relationships to Trails, Flood Plains, Stream Buffers, Water Quality Management Study...13 2.7 Screen Public Lands for Retrofit Feasibility...14 2.8 Work with City Staff to Identify Initial Performance Goals...16 3. Review of Innovative BMPs...17 4. Retrofit Inventory & Sketch Plans...21 4.1 Process for Retrofit Inventory...21 4.2 Results of Retrofit Inventory...21 5. Retrofit Evaluation & Ranking...27 5.1 Objectives of Evaluation & Ranking...27 5.2 Identification of Screening Factors & Weights...28 5.3 Deriving Data for Pollutant Load Reductions & Costs...29 5.4 Scoring...33 5.5 Ranking of Projects...33 6. Project Design...37 7. Recommendations for Retrofit Implementation & Delivery...41 References...46 Appendix A: Charlottesville Retrofit Field Guide...A.1 Appendix B: Charlottesville Retrofit GIS Attribute Table...B.1 Appendix C: Retrofit Reconnaissance Investigation Form...C.1 Appendix D: Retrofit Scoring & Ranking Table...D.1 Appendix E: Retrofit Projects by Site...E.1 Appendix F: Design Information... F.1 Center for Watershed Protection, Page i

Center for Watershed Protection, Page ii

List of Figures Page # Figure 1. Inspired Stormwater... 3 Figure 2. Typical Retrofitting Activities as Part of Charlottesville Public Lands Stewardship.....21 Figure 3. Examples of Highly Ranked Sites...36 Figure 4. Ways to Maximize Retrofit Delivery throughout the Subwatershed...42 Center for Watershed Protection, Page iii

Center for Watershed Protection, Page iv

List of Tables Page # Table 1. GIS Data Layers used in the Initial Ranking Process...5 Table 2. CWP Delineated Sewersheds...6 Table 3. Public Lands Impervious Cover...8 Table 4. Subwatershed Context...10 Table 5. Minimum Treatment Area for On-Site and Off-Site Runoff...12 Table 6. Public Lands Intersection with Flood Plain, Stream Buffer, Trails, and Water Quality Study Recommendations...14 Table 7. Retrofit Feasibility...15 Table 8. Proposed Performance Goals...16 Table 9. The Six Most Common Storage Retrofit Locations in a Subwatershed...17 Table 10. The Seven Most Common On-Site Retrofit Locations in a Subwatershed...19 Table 11. Projects Identified as Part of the Retrofit Inventory...24 Table 12. Implementation Strategies for the Various Categories of Projects...27 Table 13. Scoring Criteria used for Ranking...28 Table 14. Pollutant Load Calculation Parameters used in the Simple Method...29 Table 15. Unit Costs of Various BMPs...30 Table 16. Pollutant Removal Efficiency of Various BMPs...31 Table 17. Pollutant Load and Cost Data Example from CHS...32 Table 18. Scoring Form Example from Buford School...33 Table 19. Individual Project Ranking...34 Table 20. Projects Selected for Design Work...38 Center for Watershed Protection, Page v

Center for Watershed Protection, Page vi

Charlottesville Stormwater Stewardship on Public Lands FINAL REPORT March 24, 2008 1. Introduction 1.1. Project Background Communities across the country are increasingly viewing stormwater management as an opportunity to improve the environment, create desirable public spaces, engage the community in environmental stewardship, and remedy historic errors, when development took place with inadequate stormwater controls. This view of stormwater management represents a departure from the past, when stormwater was considered as an engineering detail, and facilities tended to unsightly and deliberately removed from public view or any aspect of public engagement. It is refreshing these days to see projects across the country where stormwater is harvested and reused (in an age of increasing water scarcity), practices are landscaped to invite the public in for exploration and learning, and stormwater is integrated with trails, public spaces, and the architecture of green buildings. Figure 1 shows several examples of inspired stormwater from around the country and internationally We are also increasingly aware that the way we manage stormwater reflects on other aspects of environmental stewardship. For instance, if we can harvest and reuse runoff that would otherwise flow downstream as a waste product, then we are not only protecting our downstream resources, but reducing our demand on potable water supplies for non-potable needs (an issue of great import given the Charlottesville area s recent drought conditions and search to fund future water supply needs). If we make better use of open spaces for stormwater attenuation, then we decrease reliance on costly engineering solutions as well as time and money spent maintaining and mowing turf. The City of Charlottesville has acted to promote progressive stormwater management. In addition to other efforts, the City secured a grant from the National Fish & Wildlife Foundation to fund a project entitled, Stormwater Stewardship on Public Lands. The intent of this project is to conduct a comprehensive stormwater management and retrofitting feasibility study for City-owned properties, with a focus on school and park sites. The City is interested in innovative water quality techniques that also have benefits for public education and outreach. Retrofitting refers to the practice of installing stormwater management practices in places where development has already occurred with no or ineffective stormwater treatment. Retrofitting is the principal method to restore urban watersheds where impacts already exist. The City contracted with the Center for Watershed Protection, Inc. ( the Center ) after a competitive selection process. The Center partnered with Bent Tree Design and Rainwater Management Solutions (RMS) for the design portion of the study. The former is an engineering and landscape architecture firm. The latter firm specializes in the design and installation of rainwater harvesting systems. The Center also made extensive Center for Watershed Protection, Page 1

use of its recently released national publication on stormwater retrofitting, Urban Stormwater Retrofit Practices (Schueler et al., 2007). After an initial scoping and ranking process, 24 out of a total of 33 school and park sites were identified for field evaluation based on their subwatershed context and the performance goals identified by City staff and the Center. Fieldwork was conducted from July 9-11, 2007 to identify potential stormwater retrofits and stewardship practices. Retrofits were then evaluated and ranked by a system of screening factors and weights based on the initial performance goals. The ranked list of projects was discussed with City staff and the strongest candidates for design work were selected. Other projects, such as pollution prevention and landscape stewardship, were also identified so that they can be incorporated into existing operation and maintenance activities. Eight projects were selected for more detailed design as the necessary first step in implementation. The Center, Bent Tree Design, and RMS developed design drawings and specifications for the selected projects. Some of the designs were to a concept level, and will require some final engineering details prior to construction. Other designs are more detailed and are ready for construction, pending detailed planting plans. The documents will also help the City secure additional grant and other funding to help pay for construction. Center for Watershed Protection, Page 2

Stormwater Art in Seattle, Washington Rooftop Collection & Scuppers at Sanitation District of Northern Kentucky Street Edge Alternatives Bioswale Retrofit in Seattle, Washington Urban Biofilter Streetscapes in Portland, Oregon? Rain garden in Greenleaf Park Interlocking Concrete Pavers (source: icpi.com) Drop Inlet Art in Sao Paolo, Brazil Inspired Stormwater Japanese Manhole Cover Figure 1. Center for Watershed Protection, Page 3

1.2. Overall Process The project included six overall tasks: Task 1 Retrofit Scoping & Initial Ranking The Center performed a desktop analysis of available data to develop an initial ranking of retrofit potential for City-owned property. A facilitated meeting was held with key City staff to identify performance goals and identify the most critical issues from a stormwater perspective. Task 2 Review of Innovative BMPs The Center provided the City with its recently released manual, Urban Stormwater Retrofit Practices, that contains extensive information on identifying and evaluating potential retrofit locations within a subwatershed, as well as profile sheets on individual retrofit designs that include pollutant removal estimates, and guidance on construction, maintenance, and cost. This manual provides a comprehensive review of innovative practices that was utilized throughout this study. Task 3 Retrofit Inventory & Sketch Designs Fieldwork was conducted from July 9-11, 2007, by the Center and City staff and focused on 24 sites identified in the Scoping & Initial Ranking. The latest Retrofit Reconnaissance Investigation (RRI) form and methods from Urban Stormwater Retrofit Practices were used. Task 4 Retrofit Evaluation & Ranking Retrofit projects were evaluated based on pollutant load reductions, cost-effectiveness, and other screening factors derived from the initial performance goals. Other projects, such as pollution prevention and landscape stewardship, also reduce pollutant loads, but are more difficult to quantify and can more easily be built into existing operation and maintenance activities. The ranked projects were discussed at a meeting in October 2007 to determine the strongest candidates for design work. Task 5 Project Preliminary Design The Center and City staff selected six specific and two conceptual projects based on Retrofit Evaluation & Ranking. The services of Bent Tree Design, a local engineering and landscape architecture firm, were used to assist with design drawings for four projects. Rainwater Management Solutions was contracted to provide specifications for two rainwater harvesting projects. In addition, the Center developed conceptual designs and specifications for two other types of stormwater treatment that may be applied to future projects. Task 6 Final Report, Presentations & Public Outreach The Center will present the Draft Report, as well as the Final Report to the review committee. The Center will also recommend specific public outreach efforts to promote public understanding of and interest in projects. Center for Watershed Protection, Page 4

2. Retrofit Scoping & Initial Ranking This task involved a desktop analysis of available data sets to develop an initial ranking of retrofit potential for City-owned property. This task was essential in focusing the subsequent field work on the best opportunities to make meaningful improvements on the public lands themselves and in the subwatersheds within which they are situated. The task involved the following steps: Collect available GIS data Delineate subwatersheds for public lands analysis Delineate impervious cover on each public land parcel Analyze subwatershed context for each public land parcel Analyze treatment area available for on-site and off-site runoff Identify relationship of public lands parcels to trails, flood plains, and stream buffers Screen public lands for retrofit feasibility Work with City staff to identify initial performance goals 2.1. Collect Available GIS Data Table 1 shows the GIS data layers obtained from the City and utilized during the initial ranking process. Table 1. GIS Data Layers used in the Initial Ranking Process Data Type Layers Hydrology Creeks and Rivers Stream Buffer Areas Streams in Pipes Streams in Culverts Wetlands 100 Year Floodplain Stormwater Stormwater Culverts Stormwater Pipes Storm Structures Storm Sewersheds Topography 2 Foot Contours 5 Foot Contours Infrastructure City Limits Parcels Structures Rivanna Trails Foundation Trails City Trails Aerial Photos 2006 Orthophotos Center for Watershed Protection, Page 5

2.2. Delineate Subwatersheds The 2007 storm sewershed GIS layer was provided by the City. The term sewershed is used to refer to a drainage area, as modified by the built system of storm pipes, ditches, and other conveyances. In some cases, sewershed boundaries are altered from natural topographic drainage area divides. In order to create meaningful subwatersheds for management purposes, several of the existing sewersheds were combined. In particular, very small sewersheds were combined where all of the drainage flowed to a common stream or outlet point. Table 2 provides the updated list of sewersheds and their areas. Where original sewersheds were combined, the original sewershed ID numbers are noted in parentheses. Table 2. CWP Delineated Sewersheds Name Area (ac) Meadow Creek 854 Greenbrier 288 Rutledge 141 Seminole 124 North Berkshire 209 Copley Hill/UVA Headwaters 488 (combined 7, 10) Meadowbrook Road 158 Oxford Meadowbrook Creek 388 Schenks Branch/McIntire Culvert (combined 1016 11,16,17) St Charles Creek 251 Rivanna 529 Old Ivy Road/Lewis Mtn 401 (combined 14, 15) Fontaine 167 Valley Road/Rockcreek 666 (combined 20, 30, 31, 32, 33) Frys Springs 62 Sunset 53 Old Lynchburg/McElroy 89 Azalea 76 Jackson Via 106 Green Valley/Rockcreek 292 Meade Ave Creek 280 Moores Creek 456 Pollocks Branch 483 Barracks Road/Meadow Creek (combined 6, 37) 482 Fontaine Ave/Stadium Rd 173 2.3. Delineate Impervious Cover on Each Public Land Parcel Impervious cover is defined as the sum of roads, parking lots, sidewalks, rooftops, and other impermeable surfaces of the urban landscape. It is a very useful indicator with which to measure the impacts of land development on aquatic systems. Increased Center for Watershed Protection, Page 6

impervious cover leads to increases in the peak discharge, velocity, and volume of stormwater runoff. Urban pollutant loads are also directly related to imperviousness. During storms, accumulated pollutants are quickly washed off and rapidly delivered to aquatic systems (Schueler, 2000). For the Charlottesville public lands, total impervious cover was not available as an offthe-shelf layer. To develop this layer, the Center combined the existing City structures layer, which accounts for rooftop impervious cover, with Center-delineated impervious surfaces, including roads, parking lots, and basketball and tennis courts for each public land parcel. Table 3 shows the total impervious cover for each of the public land parcels. Center for Watershed Protection, Page 7

Parcel ID Name Table 3. Public Lands Impervious Cover Total Parcel Area (ac) Total Parcel Impervious Area (ac) Total Impervious Cover (%) 33 Azalea Park 19.74 1.26 6% 143 Bailey Park 0.35 0.00 0% 114 Belmont Park 3.21 0.12 4% 7365 Buford School 18.45 4.84 26% 4893 Burnley-Moran School 9.94 2.82 28% 1231 CHS 43.47 16.69 38% 9432/ 9539 Clark School 3.15 1.05 33% 31 Fifeville Park 0.64 0.12 18% 8 Forest Hills Park 7.35 0.37 5% 1 Greenbrier Park 28.30 0.00 0% 216 Greenbrier School 10.11 2.38 24% 3 Greenleaf Park 13.34 0.19 1% 29 Jackson Park 0.41 0.11 27% 12243 Jackson-Via School 19.16 2.63 14% 9208 Johnson School 17.30 2.46 14% 115 Jordan Park 3.17 0.10 3% 28 Lee Park 1.10 0.12 11% 27 McGuffey Park 0.63 0.01 2% 111 McIntire Park - West 55.64 3.86 7% 59 McIntire Park - East 74.95 0.05 0% 142 McIntire Skate Park / Schenk s Greenway 3.97* 1.81* 46%* 7 Meade Park 5.65 0.67 12% 2 Meadowcreek Park 18.52 0.00 0% 4 Northeast Park 5.30 0.11 2% 110 Pen Park 274.32 7.58 3% 25 Quarry Park 9.12 0.23 2% 6 Riverview Park 22.35 0.61 3% 26 Rives Park 4.73 0.34 7% 144 Starr Hill 0.47 0.00 0% 113 Tonsler Park 9.25 1.55 17% 3922 Venable School 6.67 1.38 21% 1121 Walker School 16.05 4.69 29% 112 Washington Park 11.56 1.76 15% *Data only refers to McIntire Skate Park Center for Watershed Protection, Page 8

2.4. Analyze Subwatershed Context Each public land parcel was analyzed within the context of its subwatershed. The drainage area to each public lands parcel was delineated based on sewersheds (drainage areas, as modified by the storm sewer system), topography, and the existing drainage network. The following categories were created for subwatershed context: Contributing Properties are generally located at or close to the upper reaches of a subwatershed. They contribute runoff to the downstream system, but receive little from off-site areas. As such, most of the retrofit potential is to treat runoff from on-site. Receiving Properties are located near the bottom or downstream end of a subwatershed. In contrast to contributing properties, they may receive quite a bit of runoff from upstream, off-site areas. Therefore, there is at least the potential to divert, capture, and/or treat off-site runoff on these properties. The actual feasibility of capturing off-site runoff depends on many site factors, such slope, flow, and area available for treatment. As such, field investigations for receiving properties can consider both on-site and off-site runoff treatment. Mixed Properties are somewhere in the middle of a subwatershed. They have an upstream drainage area, as well as contributing runoff to the downstream system. Similar to receiving properties, mixed properties can be analyzed for the treatment of both on-site and off-site runoff. Table 4 summarizes the results of the subwatershed context analysis for each public land parcel. Center for Watershed Protection, Page 9

Parcel ID Name Table 4. Subwatershed Context Stream Miles Watershed Upstream Downstream Moore's Creek, or (Rivanna River, Drainage Area (ac) From Meadow Creek) Property Subwatershed Context 33 Azalea Park 53.74 0.00 Moore's Creek Receiving 143 Bailey Park 0.99 0.86 Meadow Creek Contributing 114 Belmont Park 0.00 0.39 Moore's Creek Contributing 7365 Buford School 28.42 1.05 Moore's Creek Mixed 4893 Burnley-Moran School 21.32 0.16 Rivanna River Receiving 1231 CHS 84.20 0.51 Meadow Creek Mixed 9432/ 9539 Clark School 0.00 0.69 Moore's Creek Contributing 31 Fifeville Park 0.15 1.32 Moore's Creek Contributing 8 Forest Hills Park 1.64 0.81 Moore's Creek Contributing 1 Greenbrier Park 355.49 0.00 Meadow Creek Receiving 216 Greenbrier School 20.91 0.27 Meadow Creek Mixed 3 Greenleaf Park 103.71 0.96 Meadow Creek Mixed 29 Jackson Park 0.70 1.31 Moore's Creek Contributing 12243 Jackson-Via School 21.95 0.10 Moore's Creek Receiving 9208 Johnson School 0.00 0.98 Moore's Creek Contributing 115 Jordan Park 306.30 0.00 Moore's Creek Receiving 28 Lee Park 0.00 1.76 Meadow Creek Contributing 27 McGuffey Park 0.00 1.67 Meadow Creek Contributing 59 McIntire Park East 13.66 0.23 Meadow Creek Receiving 111 McIntire Park West 16.06 0.75 Meadow Creek Mixed 142 McIntire Skate Park / Schenk s Greenway 846.83 0.78 Meadow Creek Mixed 7 Meade Park 180.27 0.45 Rivanna River Mixed 2 Meadowcreek Park 70.46 0.00 Meadow Creek Receiving 4 Northeast Park 190.10 0.24 Meadow Creek Receiving 110 Pen Park 617.45 0.00 Rivanna River Mixed 25 Quarry Park 152.21 0.00 Moore's Creek Receiving 6 Riverview Park 26.78 0.00 Rivanna River Receiving 26 Rives Park 19.07 0.21 Moore's Creek Mixed 144 Starr Hill 2.43 1.99 Meadow Creek Contributing 113 Tonsler Park 30.24 1.01 Moore's Creek Mixed 3922/4033/ 4370 Venable School 27.96 2.61 Meadow Creek Mixed 1121 Walker School 20.74 1.18 Meadow Creek Mixed 112 Washington Park 85.08 1.68 Meadow Creek Mixed Center for Watershed Protection, Page 10

2.5. Analyze Treatment Area Available for On-Site & Off-Site Runoff While the subwatershed context provides an insight into whether a particular property can potentially treat on-site runoff, off-site runoff, or both, an additional analysis is needed to determine whether there is adequate area on each property to provide meaningful treatment. For this analysis, several assumptions were made for runoff capture and treatment depth to determine how much land is needed on each parcel to provide a reasonable level of water quality treatment. The analysis required impervious cover estimates for both the property and its contributing drainage area. Impervious cover for on-site treatment was calculated based on the procedure described in Section 2.3. The approximate off-site impervious cover for the contributing drainage area was obtained from the November 2005 Water Quality Management Study (URS, 2005). That study provides impervious cover estimates based on subwatershed zoning classifications and associated impervious factors. Table 5 contains the estimated treatment area to treat on-site and off-site runoff for each public land parcel. The table also notes the percentage of the available parcel needed for treatment. The available parcel was defined as the total parcel area minus total on-site impervious area. The assumptions used for runoff capture depth and treatment area depth are documented below. Treatment Volume = Runoff Capture Depth x Impervious Cover Treatment Area = Treatment Volume / Treatment Area Depth Where: Treatment Volume = target volume to be treated by stormwater retrofit Runoff Capture Depth = the depth of rainfall that can realistically be diverted to retrofit Impervious Cover = the total area of impervious surfaces Treatment Area = the surface area needed to accommodate the retrofit practice Treatment Area Depth = the depth of water that is ponded temporarily within the retrofit practice Treatment of On-Site Runoff: Target Runoff Capture Depth = 1 inch Assumed Treatment Area Depth = 1 foot Treatment of Off-Site Runoff: Target Runoff Capture Depth = 0.5 inch Assumed Treatment Area Depth = 3 feet Center for Watershed Protection, Page 11

Parcel ID Table 5. Minimum Treatment Area for On-Site and Off-Site Runoff % of Treatment Treatment Available Area for Area for Parcel Area Name On-Site Off-Site needed for Runoff (1' Runoff (3' On-Site deep) (ac) deep) (ac) Treatment % of Available Parcel Area needed for Off-Site Treatment 33 Azalea Park 0.10 1% 0.18 1% 143 Bailey Park 0.00 0% 0.00 1% 114 Belmont Park 0.01 0% 0.00 0% 7365 Buford School 0.40 3% 0.13 1% 4893 Burnley-Moran School 0.24 3% 0.05 1% 1231 CHS 1.39 5% 0.29 1% 9432/ 9539 Clark School 0.09 3% 0.00 0% 31 Fivefille Park 0.01 2% 0.00 0% 8 Forest Hills Park 0.03 0% 0.01 0% 1 Greenbrier Park 0.00 0% 1.33 5% 216 Greenbrier School 0.20 3% 0.08 1% 3 Greenleaf Park 0.02 0% 0.36 3% 29 Jackson Park 0.01 3% 0.00 2% 12243 Jackson-Via School 0.22 1% 0.10 1% 9208 Johnson School 0.21 1% 0.00 0% 115 Jordan Park 0.01 0% 2.04 67% 28 Lee Park 0.01 1% 0.00 0% 27 McGuffey Park 0.00 0% 0.00 0% 111 McIntire Park West 0.32 1% 0.06 0% 59 McIntire Park East 0.00 0% 0.06 0% 142 McIntire Skate Park / Schenk s Greenway 0.15* 7%* 3.41* 158%* 7 Meade Park 0.06 1% 1.25 25% 2 Meadowcreek Park 0.00 0% 0.26 1% 4 Northeast Park 0.01 0% 0.90 17% 110 Pen Park 0.63 0% 1.72 1% 25 Quarry Park 0.02 0% 0.95 11% 6 Riverview Park 0.05 0% 0.06 0% 26 Rives Park 0.03 1% 0.12 3% 144 Starr Hill 0.00 0% 0.02 4% 113 Tonsler Park 0.13 2% 0.16 2% 3922/4033/ 4370 Venable School 0.12 2% 0.16 2% 1121 Walker School 0.39 3% 0.07 1% 112 Washington Park 0.15 1% 0.34 3% *Data only refers to McIntire Skate Park Center for Watershed Protection, Page 12

As Table 5 shows, all of the properties potentially have enough area to treat on-site runoff. However, several (e.g., McIntire Skate Park, Jordan Park, Meade Park) would have limitations for treating off-site runoff. Much of the available land would be needed just to provide stormwater treatment for off-site runoff. 2.6. Identify Relationship to Trails, Flood Plains, Stream Buffers, Water Quality Management Study Public lands parcels were overlaid with trails, flood plains, and stream buffers in GIS. Parcels included in the water quality management study were also noted. This additional analysis screened for potential community benefits of retrofit projects. Table 6 shows the public lands parcels and each of the features they contain. Table 6. Public Lands Intersection with Flood Plain, Stream Buffer, Trails, and Water Quality Study Recommendations Parcel ID Name Flood Plain (Y/N) Stream Buffer (Y/N) Trails (Y/N) WQ Study Recommendations (Y/N) 33 Azalea Park Y Y Y Y 143 Bailey Park N N N N 114 Belmont Park N N N Y 7365 Buford School N N Y N 4893 Burnley-Moran School N N N N 1231 CHS N Y Y Y 9432/ 9539 Clark School N N N N 31 Fifefille Park Y N Y N 8 Forest Hills Park N N Y Y 1 Greenbrier Park Y N Y Y 216 Greenbrier School N N Y N 3 Greenleaf Park N Y Y N 29 Jackson Park N N N N 12243 Jackson-Via School Y N Y N 9208 Johnson School N N Y N 115 Jordan Park Y Y Y Y 28 Lee Park N N N N 27 McGuffey Park N N N N 111 McIntire Park West N N Y Y 59 McIntire Park East Y Y Y Y 142 McIntire Skate Park / Schenk s Greenway N Y Y N 7 Meade Park Y Y Y N 2 Meadowcreek Park Y Y Y Y 4 Northeast Park N Y Y N 110 Pen Park Y Y Y Y 25 Quarry Park Y Y Y Y 6 Riverview Park Y Y Y Y Center for Watershed Protection, Page 13

Table 6. Public Lands Intersection with Flood Plain, Stream Buffer, Trails, and Water Quality Study Recommendations Parcel ID Name Flood Plain (Y/N) Stream Buffer (Y/N) Trails (Y/N) WQ Study Recommendations (Y/N) 26 Rives Park N N Y Y 144 Starr Hill N N N N 113 Tonsler Park N N Y Y 3922/4033/ 4370 Venable School/bldg N N N N 1121 Walker School N N N N 112 Washington Park N N Y N 2.7. Screen Public Lands for Retrofit Feasibility Initial screening identified parcels with high, medium, and low retrofit potential (Table 7). This screening was based on parcel size, impervious cover, available treatment area (see Section 2.5), intersection with trails, flood plain, and stream buffers, and whether the property was specifically mentioned in the Water Quality Management Study (URS, 2005). High and medium retrofit potential properties were priorities for fieldwork. Other sites were excluded for the purposes of focusing time and resources to the most critical areas from a stormwater perspective. Based on the initial screening, there were 24 priority sites 1 (high and medium retrofit potential), and eight lower priority sites (see Table 7). 1 In Table 7, there are 25 high and medium retrofit potential sites. Of these, Greenleaf Park was considered to be already treated, leaving 24 priority sites. Center for Watershed Protection, Page 14

Table 7. Retrofit Feasibility Description Contributing properties with adequate treatment area and good intersection with trails, flood plains, and stream buffers. Receiving or mixed properties with adequate treatment area and good intersection with trails, flood plains, and stream buffers. Description Receiving or mixed properties where available treatment area may be limited for off-site treatment. Other properties with adequate treatment area, but less intersection with trails, flood plains, and stream buffers Description Contributing properties that are generally small with low impervious cover. Receiving or mixed properties where available treatment area may be limited for both on-site and off-site treatment. Johnson School Forest Hills Park High Retrofit Potential Azalea Park CHS Pen Park Rives Park Greenbrier Park Greenleaf Park McIntire Park Jackson-Via School Riverview Park Meadowcreek Park Schenks Greenway (substituted for McIntire Skate Park) Walker School Medium Retrofit Potential Meade Park Northeast Park Jordan Park Quarry Park Buford School Burnley-Moran School Clark School Greenbrier School Venable School Tonsler Park Washington Park Lee Park Jackson Park Belmont Park Fifeville Park Bailey Park Starr Hill McGuffey Park McIntire Skate Park Low Retrofit Potential Center for Watershed Protection, Page 15

2.8. Work with City Staff to Identify Initial Performance Goals A kick-off meeting was held on May 31, 2007 with Center and City staff to present a review of retrofitting and the results of the desktop analysis. Group discussion, as well as subsequent meetings with City staff, resulted in the performance goals presented in Table 8. These performance goals were used during the field work to evaluate potential retrofit projects. Table 8. Proposed Performance Goals Description Primary Performance Goals 1. Retrofits/BMPs shall achieve at least a 25% reduction from existing, on-site Pollutant Removal total phosphorus loads for areas treated by retrofits/bmps. Provide retrofit/bmp designs that also address removal of sediment and bacteria loads as priority pollutants. 2. For retrofit/bmps designed to treat on-site runoff, the target capture volume shall be 1 of rainfall multiplied by the on-site impervious area being treated. For Target Runoff retrofits/bmps that also capture and treat off-site runoff, the target capture volume Capture Volume shall be 0.25 multiplied by the off-site impervious area being treated (this may be in addition to the on-site treatment volume). Runoff Reduction 3. Retrofits shall promote infiltration and overall reduction in runoff volume to the extent achievable. 4. Retrofit/BMP designs shall work towards alleviating existing drainage Drainage Problems problems when feasible. The off-site capture volume noted in #2 may be modified based on the needs of a particular subwatershed. Education and 5. Provide outdoor learning and community outreach opportunities on public Outreach lands. Description Secondary (Community Benefits) Performance Goals Tree Canopy 6. Support the Comprehensive Plan s City-wide tree canopy goal of 40% where possible. Habitat 7. Create desirable wildlife habitat areas. Naturalization and 8. Support existing greenway, trail, and stream corridor naturalization efforts, Recreation while not interfering with existing active recreational uses. Land Acquisition 9. Identify potential land acquisition opportunities (upstream and/or adjacent) that would promote the treatment train approach and public lands stewardship. Quick Implementation Projects 10. Identify several quick implementation projects (constructed by May 2009) based on existing CIP projects, availability of funds, plans underway, etc. Examples include Forest Hills Park, Meade Park. Center for Watershed Protection, Page 16

3. Review of Innovative BMPs Urban Stormwater Retrofit Practices (Schueler et al., 2007) is a recently released publication from the Center that contains extensive information on identifying and evaluating potential retrofit locations within a subwatershed, as well as profile sheets on individual retrofit designs that include pollutant removal estimates, and guidance on construction, maintenance, and costs. Table 9 provides examples of common storage retrofit locations (most relevant for treating off-site runoff) and Table 10 provides examples of common on-site retrofit locations in a subwatershed that are presented in the manual (Schueler et al., 2007). Field teams searched for these types of retrofit opportunities on each public land parcel. Table 9. The Six Most Common Storage Retrofit Locations in a Subwatershed Where to Look How to Get Storage SR-1 Add Storage to Existing Ponds Add water quality treatment storage to an existing pond that lacks it by excavating new storage on the pond bottom, raising the height of the embankment, modifying riser elevations/dimensions, converting unneeded quantity control storage into water quality treatment storage and/or installing internal design features to improve performance. SR-2 Storage Above Roadway Culverts Provide water quality storage immediately upstream of an existing road culvert that crosses a low gradient, non-perennial stream without wetlands. Free storage is created by adding wetland and/or extended detention treatment behind a new embankment just upstream of the existing roadway embankment. SR-3 New Storage Below Outfalls Flows are split from an existing storm drain or ditch and are diverted to a stormwater treatment area on public land in the stream corridor. Works best for storm drain outfalls in the 12- to 36- inch diameter range that are located near large open spaces, such as parks, golf courses and floodplains. SR-4 Storage in Conveyance System Investigate the upper portions of the existing stormwater conveyance system to look for opportunities to improve the performance of existing swales, ditches and non-perennial streams. This can be done either by creating in-line storage cells that filter runoff through swales and wetlands or by splitting flows to off-line treatment areas in the floodplain/stream corridor. Center for Watershed Protection, Page 17

Table 9. The Six Most Common Storage Retrofit Locations in a Subwatershed Where to Look How to Get Storage SR-5 Storage in Road Right of Ways Direct runoff to a depression or excavated stormwater treatment area within the right of way of a road, highway, transport or power line corridor. Prominent examples include highway cloverleaf, median and wide right of way areas. SR-6 Storage Near Large Parking Lots Provide stormwater treatment in open spaces near the downgradient outfall of large parking lots (5 acres plus). Center for Watershed Protection, Page 18

Table 10. The Seven Most Common On-Site Retrofit Locations in a Subwatershed Where to Look How OS-7 Hotspot Operations Install filtering or bioretention treatment to remove pollutants from confirmed or severe stormwater hotspots discovered during field investigation. OS-8 Small Parking Lots Insert stormwater treatment within or on the margins of small parking lots (less than five acres). In many cases, the parking lot is delineated into a series of smaller on-site treatment units. OS-9 Individual Streets Look for opportunities with the street, its right of way, cul-de-sacs and traffic calming devices to treat stormwater runoff before it gets into the street storm drain network. OS-10 Individual Rooftops Disconnect, store and treat stormwater runoff close to residential and commercial rooftop sources. OS-11 Small Impervious Areas Convert or disconnect isolated areas of impervious cover and treat runoff in an adjacent pervious area using low tech approaches such as a filter strip. Center for Watershed Protection, Page 19

Table 10. The Seven Most Common On-Site Retrofit Locations in a Subwatershed Where to Look How OS-12 Hardscapes Landscapes Reconfigure the plumbing of high visibility urban landscapes, plazas and public spaces to treat stormwater runoff with landscaping and other urban design features. OS-13 Underground Provide stormwater treatment in an underground location when no surface land is available for treatment. Use this as a last resort at dense ultra-urban sites. Center for Watershed Protection, Page 20

4. Retrofit Inventory & Sketch Plans 4.1. Process for Retrofit Inventory Fieldwork was conducted from July 9-11, 2007, and focused on the 24 sites identified in the Scoping & Initial Ranking. Teams consisted of the Center and the following City staff: Kristel Riddervold and Dan Frisbee (Environmental Administration, Department of Public Works), and Chris Gensic and Susan Pleiss (Department of Parks and Recreation). Each team was led by a Center staff person experienced with retrofitting. The latest Retrofit Reconnaissance Investigation (RRI) form was used, and methods outlined in the Urban Stormwater Retrofit Practices were used as guidance (see steps 3 and 4 in Chapter 4 in the manual). Appendix A contains the field guide used by the teams, and Appendix C contains the RRI form used as part of this investigation. Figure 2 shows some representative photos from the retrofit fieldwork. Figure 2. Typical Retrofitting Activities as Part of Charlottesville Public Lands Stewardship. 4.2. Results of Retrofit Inventory Several categories of public land stewardship were identified as part of the retrofit inventory. Table 11 shows the types of projects, number identified, and sites where they are located. Center for Watershed Protection, Page 21

Stormwater Retrofits Stormwater retrofits are projects that reduce existing pollutant loads and runoff volume from impervious cover and other land uses. Storage retrofits treat drainage areas ranging from five to 500 acres. On-site retrofits can treat as little as 500 square feet of contributing drainage area. Various types of stormwater retrofit projects were identified as part of this study: rain gardens/bioretention stormwater planters downspout disconnection impervious cover removal swales catch basin inserts perimeter sand filter green roof rainwater harvesting forested stormwater wetland stream stabilization Landscape Management & Stewardship These projects reduce pollutant load from pervious areas by repairing erosion and/or enhancing the water retention capacity of landscapes by improving soil structure and vegetative cover. Various landscape management and stewardship projects identified as part of this study include: reforestation/tree planting/native landscaping designation of no-mow areas soil amendments repair of bare soil and erosion areas Pollution Prevention Pollution prevention projects reduce potential pollutant loads from sources that should be separated from the storm sewer system. Various pollution prevention projects identified as part of this study include: improved dumpster management improved janitorial practices improved materials storage street sweeping clean up of trash and debris Outfall Repairs These projects reduce an existing pollutant load from an unstable outfall. Outfall repair projects identified as part of this study include: outfall stabilization piedmont outfall retrofit (engineered outfall structure that provides stable conveyance as well as stormwater treatment) Unmapped Features Features identified in the field, but not located in the current GIS layers were classified as unmapped. These features included: stormwater inlets and outfalls stormwater manholes stormwater pipes live stream or flowing spring Center for Watershed Protection, Page 22

Miscellaneous Observations Observations made during fieldwork that were relevant to a public land stewardship project were noted as miscellaneous observations. These observations include: localized drainage problem specimen trees outfalls in good condition eroding/clogged inlet concrete dumping Center for Watershed Protection, Page 23

Table 11. Projects Identified as Part of the Retrofit Inventory Category Type # Identified Sites Bioretention (treat off-site roadway) 1 Greenbrier School Daylight existing storm drain 1 Forest Hills Park Disconnect storm drain to buffer 1 Johnson School Stormwater Retrofits - Storage Stormwater Retrofits On-Site Dry Swale (treat off-site roadway) 1 Burnley-Moran School Stormwater Wetland 2 Tonsler Park Azalea Park Rainwater Harvesting 1 Meadowcreek Park Storage Retrofit (no specific concept) 1 Quarry Park Bioretention/Rain Garden 26 Buford School Burnley-Moran School CHS Clark School Forest Hill Park Greenbrier School Jackson-Via School Johnson School McIntire Park West Pen Park Rives Park Schenk s Greenway Tonsler Park Venable School Washington Park Catch Basin Insert 3 Tonsler Park Downspout Disconnection/Rainwater Harvesting 7 Burnley-Moran School CHS Tonsler Park Venable School Washington Park Green Roof 1 Walker School Impervious Cover Removal 2 Johnson School Tonsler Park Low Flow Outfall 1 Meadowcreek Park Perimeter Sand Filter 1 Pervious Pavement/Porous Pavers 4 Schenk s Greenway/McIntire Recycling Center CHS Johnson School Pen Park Riparian Buffer 1 Azalea Park Stream Stabilization 1 Meade Park Stormwater Planter 3 Clark School Greenbrier School Tonsler Park Water Quality Swale 14 Azalea Park Burnley-Moran School CHS Greenbrier School Center for Watershed Protection, Page 24 Jackson-Via School Johnson School Meade Park

Table 11. Projects Identified as Part of the Retrofit Inventory Category Type # Identified Sites Northeast Park Pen Park Tonsler Park Walker School Stormwater Retrofits On-Site (continued) Washington Park Tree Pit 1 Rives Park Infiltration 1 Schenk s Greenway Landscape Management & Stewardship Pollution Prevention Repair Bare Soil & Erosion 7 Designate No-Mow Areas 4 Reforestation/Tree Planting/Native Landscaping Management of inlets, materials, waste 4 15 Burnley-Moran School Clark School Greenbrier School Johnson School Northeast Park Tonsler Park Venable School Burnley-Moran School Jackson-Via School Northeast Park Riverview Park Buford School Burnley-Moran School CHS Clark School Greenbrier School Jackson-Via School Johnson School Meade Park Meadowcreek Park Pen Park Quarry Park Tonsler Park Venable School Washington Park CHS (2) Jordan Park Quarry Park Clean Trash and Debris 1 Jordan Park Relocate Dumpsters/Street Sweeping 3 Johnson School Schenk s Greenway Walker School Center for Watershed Protection, Page 25

Table 11. Projects Identified as Part of the Retrofit Inventory Category Type # Identified Sites Outfall Repair Piedmont Outfall Repair 9 Buford School Clark School Greenbrier Park Greenbrier School Jackson-Via School McIntire Park West Pen Park Riverview Park Walker School Outfall Stabilization/Repair 3 CHS Walker School Washington Park Drop Structure to Replace Curb Cut 1 Greenbrier Park Center for Watershed Protection, Page 26

5. Retrofit Evaluation & Ranking 5.1. Objectives of Evaluation & Ranking Field work revealed 121 potential projects, 73 of which were stormwater retrofit projects. 2 The evaluation and ranking process puts the potential projects in context and produces a prioritized list. The prioritized list can serve as a guide for implementation because City staff can quickly ascertain which projects best meet the established performance goals. However, it must be understood that a prioritized list is only a guide, and that professional judgment, funding opportunities, and broader City needs also play a strong role in determining which projects should be implemented at a given time. The ranking process only applied to the stormwater retrofit projects, because these could be compared to each other based on pollutant load reductions, cost-effectiveness, and the other screening factors. Other projects, such as pollution prevention and landscape stewardship, also reduce pollutant loads, but are more difficult to quantify and can more easily be built into existing operation and maintenance activities. Table 12 provides the different categories of projects and implementation strategy associated with each. Table 12. Implementation Strategies for the Various Categories of Projects Type of Project Implementation Strategy Projects reduce existing pollutant loads from impervious cover and other Stormwater Retrofits land uses. Implement through CIP, grants, development proffers, and other delivery methods Projects reduce a pollutant load from pervious areas by repairing erosion or enhancing landscapes. Some of these projects can be implemented Landscape Management & through changes in routine activities (e.g., no mow areas). Others can Stewardship be bundled with other CIP or improvement projects (e.g., soil amendments, repair erosion). Projects reduce potential pollutant loads from sources that should be separated from the storm sewer system. The most common example is a Pollution Prevention dumpster leaking solid waste and dumpster juice to a nearby storm drain. These projects should be considered high priority activities that can be implemented through routine O&M activities. Projects reduce an existing pollutant load from an unstable outfall. In many cases, the erosion caused by an outfall extends downstream for a Outfall Repairs long distance. The major impact is the release of large amounts of sediment from eroding channels. These are high priority projects that should be bundled with other CIP projects at the subject properties. 2 Of the 121 total projects, 64 projects had Retrofit Reconnaissance Investigation (RRI) forms completed. These were projects where a retrofit concept was fleshed out. Other projects without RRI forms included landscape management, pollution prevention, unmapped features, miscellaneous observations, simple downspout disconnections, and other projects for which preliminary designs were not conducted. Center for Watershed Protection, Page 27

5.2. Identification of Screening Factors & Weights Screening factors were derived directly from the initial performance goals and refined through several meetings with City staff. Each factor was assigned a weight to produce a 100-point scale for ranking. Table 13 provides the selected screening factors, descriptions, and scoring criteria. Primary Screening Factor Pounds of Total Phosphorus (TP) Removed TP used as indicator for other pollutants Cost Effectiveness (per pound of TP treated) Capture of off-site runoff Runoff Reduction Outdoor Learning & Community Outreach Opportunities Secondary Screening Factor Quick Implementation Promotes Bacteria Removal Supports Tree Canopy Goals Desirable Wildlife Habitat Table 13. Scoring Criteria Used for Ranking Description Scoring Screening factor that combines Top Quartile = 10 influence of total impervious area Second Quartile = 7 treated and removal efficiency of Third Quartile = 5 proposed retrofit. Fourth Quartile = 2 Top Quartile (highest cost) = 2 Second Quartile = 5 Cost per pound of TP treated Third Quartile = 7 Whether any off-site runoff is captured and treated Ability of practice to reduce overall volume of runoff through infiltration, absorption, runoff capture & reuse, etc. Whether practice is strategically located on property and has design features that would be of interest to students & community Description Whether property has current funding or planning process underway where retrofit could fit into larger project Practice contains filtering, dessication, or other processes that can remove bacteria Practice would result in NET gain in trees -- trees planted but not removed for construction Practice includes large enough area that can be planted with wildlifefriendly species or create unique habitats (e.g., emergent wetlands) Fourth Quartile (lowest cost) = 10 Capture >= 0.25" of off-site runoff = 10 Capture >= 0.10" of off-site runoff = 5 No off-site runoff captured = 0 Practice includes soil absorption (bioretention), infiltration, or collection = 10 Practice includes filtering, runoff dispersion, or other practice that provides some runoff reduction = 5 Practice does not include these features = 0 Exceptional opportunity = 10 Moderate opportunity = 5 Marginal opportunity = 0 Scoring Good chance for quick implementation = 1 Not at this time = 0 Practice contains features = 1 Practice does not contain features = 0 Trees planting included = 1 Trees not included = 0 Desirable habitat created = 1 Desirable habitat NOT created = 0 Center for Watershed Protection, Page 28

Low Maintenance Burden No Permitting Issues Few Site & Utility Constraints No Aesthetic, Nuisance, Safety Issues Promotes innovative practices/lid Table 13. Scoring Criteria Used for Ranking Routine maintenance involves mainly vegetation = 2 Practice does not require frequent cleaning, dredging, excavation, etc. Most maintenance activities involve vegetation (pruning, weeding, etc.) Permits for activities in streams, wetlands, flood plains, steep slopes not likely RRI does not identify utility Routine maintenance involves vegetation + some periodic cleaning/unclogging of pipes = 1 Maintenance involves periodic dredging or excavation = 0 Permits not likely = 1 Permits likely = 0 No utility conflicts identified = 1 conflicts at location of practice Utility conflicts identified = 0 Practice does not include standing No issues identified = 1 water, mosquito habitat, steep dropoffs, attractive nuisances, etc. Issues identified = 0 Practice promotes the concept of decentralized runoff treatment and reduction LID promoted = 1 LID not necessarily promoted = 0 5.3. Deriving Data for Pollutant Load Reductions & Costs Appendices B, D, and E of the Urban Stormwater Retrofit Practices manual were used to derive data for pollutant load reductions and costs, and were supplemented with research on additional BMPs. The intent was to use the best available data to produce planninglevel estimates for both pollutant reductions and cost. Pollutant loads were estimated using the Simple Method equation shown in Box 1 and the Virginia-specific parameters in Table 14. Box 1. Simple Method Equation used to estimate Pollutant Loads L = [(P)(Pj)(Rv) (12)](C)(A)(2.72) 12 and 2.72 are unit conversion factors Rv = 0.05 + 0.009(I) Table 14. Pollutant Load Calculation Parameters used in the Simple Method Parameter Parameter Description VA Variables P Precipitation (in/yr) 43 P j Fraction of Runoff Producing Events 0.9 I Site Imperviousness (%) Site Dependent R v Runoff Coefficient Site Dependent Mean Concentration of TP (mg/l) 0.28 C Mean Concentration of TN (mg/l) 2.67 Mean Concentration of ZN (mg/l) 0.15 Mean Concentration of TSS (mg/l) 43 A Area (acres) Site Dependent Center for Watershed Protection, Page 29

The pollutant removal capabilities and unit costs of various BMPs are provided in Tables 15 and 16, respectively. A spreadsheet for each inventoried site was created based on these data to document the pollutant removal and planning-level cost for each identified project. An example of the spreadsheet is provided in Table 17 for the projects identified at CHS. Section 8 contains a detailed catalog of all sites inventoried as part of this study. Table 15. Unit Costs of Various BMPs (Derived from USRM Manual 3, Appendix E, Table E.4, Median Cost, except where noted) Unit Cost Practice Qualifier ($/cf treated) Notes (references to USRM Manual 3) Bioretention/Rain < 0.5 ac Garden treated $30.00 Table E.4 & Section D.1 Bioretention/Rain > 0.5 ac Garden treated $10.50 Table E.4 & Section D.3 Water Quality Swale engineered swale $10.50 same as bioretention Piedmont Outfall similar to Costs not included Manual 3. Cost derived from coastal plain $13.00 sample plan & unit cost estimates outfall Catch Basin Insert $4.00 Downspout Disconnection to Landscaping/Turf Downspout Disconnection to Rain Barrel Rainwater Harvesting 100-900 ft 2 of rooftop, 1" of rainfall, $50/disconn ection 1 or several 55-gallon barrels cistern or larger storage device From EPA Website: http://cfpub.epa.gov/npdes/stormwater/menuofb mps/index.cfm?action=browse&rbutton=detail &bmp=77 $1.00 Derived from programs evaluated in Portland $25.00 $15.00 Impervious Cover Removal $20.00 Perimeter Sand Filter $20.00 Pervious Pavement $120.00 Reforestation/Tree Planting/Native Landscaping $5.00 Stormwater Planter $27.00 Constructed Wetland $7.00 Soil Amendments $7.50 Dry Wells/French Drains $11.50 Based on guidance in the Chesapeake Bay Riparian Handbook and Portland Manual Center for Watershed Protection, Page 30

Table 16. Pollutant Removal Efficiency of Various BMPs (Derived from USRM Manual 3, Appendix D, appropriate table, except where noted) Practice Qualifier TP TN Zn TSS Notes Bioretention/Rain Garden Bioretention/Rain Garden < 0.5 ac treated > 0.5 ac treated 45% 45% 80% 60% 45% 45% 80% 60% TP & TN from proposed VA system for Bioretention #1. Zn & TSS from Appendix D. TP & TN from proposed VA system for Bioretention #1. Zn & TSS from Appendix D. Water Quality engineered 45% 55% 70% 80% Swale swale similar to Remedial strategy that is not C'ville Outfall coastal plain quantifiable. outfall Catch Basin Insert 15% 10% 15% 30% Best professional judgment. Downspout Based on VA volume reduction Disconnection to 20% 20% 20% 20% LID credit. Landscaping/Turf Downspout Disconnection to Rain Barrel Rainwater Harvesting 1 or several 55-gallon barrels cistern or larger storage device 10% 10% 10% 10% 25% 25% 25% 25% Impervious Cover Removal Perimeter Sand Filter 60% 30% 90% 85% Pervious Pavement 65% 40% 65% 90% Reforestation/Tree Planting/Native Landscaping Stormwater Planter 25% 25% 40% 30% Constructed Wetland Based on VA volume reduction LID credit. Based on VA volume reduction LID credit. 90% 90% 90% 90% Best professional judgment. 45% 25% 40% 70% Soil Amendments 20% 20% 20% 20% Dry Wells/French Drains 45% 45% 80% 60% Remedial strategy that is not quantifiable. Assumed to have approximately half the efficiency of rain gardens. TP from proposed VA system for Constructed Wetland #1. TN, Zn & TSS from Appendix D. Best professional judgment - Assumed similar efficiency as disconnection to landscaping/turf Best professional judgment - Assumed similar efficiency as rain gardens. Center for Watershed Protection, Page 31

Table 17. Pollutant Load and Cost Data Example from CHS Site Parameters CHS-06 CHS-07 CHS-09 Total Impervious Cover of Combined Treatment Areas (ac) 1.61 0.46 0.25 2.32 Impervious Percent of Combined Treatment Areas (whole #) 100 100 100 Recommended Retrofits Rain Garden Rainwater Harvesting Swale/Rain Garden TP Removal Efficiency 45% 25% 45% TN Removal Efficiency 45% 25% 45% Zn Removal Efficiency 80% 25% 80% TSS Removal Efficiency 60% 25% 60% Volume Treated (cubic feet) 5,333 1667 920 7,920 Unit Cost ($/cubic foot) $10.50 $15.00 $30.00 Cost per Impervious Acre $34,780 $54,359 $110,400 $46,811 Cost Estimate $55,997 $25,005 $27,600 $108,602 Pollutant Load Calculation Parameters (pre-retrofit) P Precipitation (in/yr) 43 43 43 P j Fraction of Runoff Producing Events 0.9 0.9 0.9 I Site Imperviousness (%) 100 100 100 R v Runoff Coefficient 0.95 0.95 0.95 Mean Concentration of TP (mg/l) 0.28 0.28 0.28 C Mean Concentration of TN (mg/l) 2.67 2.67 2.67 Mean Concentration of ZN (mg/l) 0.15 0.15 0.15 Mean Concentration of TSS (mg/l) 43 43 43 A Area (acres) 1.61 0.46 0.25 TP Pre-Retrofit Load (lb/yr) 3.76 1.07 0.58 5.41 Post-Retrofit Load (lb/yr) 2.07 0.81 0.32 3.19 Load Removed (lb/yr) 1.69 0.27 0.26 2.22 Load Removed Check (lb/yr) 1.69 0.27 0.26 Percent Reduction 41% Cost Per lb Treated $33,124 $93,186 $105,142 $48,890 TN Pre-Retrofit Load (lb/yr) 35.82 10.24 5.56 Post-Retrofit Load (lb/yr) 19.70 7.68 3.06 Load Removed (lb/yr) 16.12 2.56 2.50 21.18 Load Removed Check (lb/yr) 16.12 2.56 2.50 Cost Per lb Treated $3,474 $9,772 $11,026 $5,127 Zinc Pre-Retrofit Load (lb/yr) 2.01 0.58 0.31 Post-Retrofit Load (lb/yr) 0.40 0.43 0.06 Load Removed (lb/yr) 1.61 0.14 0.25 2.00 Load Removed Check (lb/yr) 1.61 0.14 0.25 Cost Per lb Treated $34,780 $173,946 $110,399 $54,199 TSS Pre-Retrofit Load (lb/yr) 576.92 164.83 89.58 Post-Retrofit Load (lb/yr) 230.77 123.63 35.83 Load Removed (lb/yr) 346.15 41.21 53.75 441.11 Load Removed Check (lb/yr) 346.15 41.21 53.75 Cost Per lb Treated $162 $607 $513 $246 Center for Watershed Protection, Page 32

5.4. Scoring Scores were entered for each screening factor by a Center staff person that was familiar with the particular sites. Table 18 provides a scoring form example from Buford School. A master spreadsheet was developed that could be used to view individual site data as well as compare projects across sites. Table 18. Scoring Form Example from Buford School Screening Factor Weight Score (0-10) Weighted Score Total Pounds of TP Removed 3.0 5 15 Cost Effectiveness (per pound of TP treated) 3.0 7 21 Capture of off-site runoff 0.5 10 5 Runoff Reduction 1.0 10 10 Outdoor Learning & Community Outreach Opportunities 1.5 10 15 Quick Implementation 1.0 1 1 Promotes Bacteria Removal 1.0 1 1 Supports Tree Canopy Goals 1.0 0 0 Desirable Wildlife Habitat 1.0 1 1 Low Maintenance Burden 1.0 1 1 No Permitting Issues 1.0 1 1 Few Site & Utility Constraints 1.0 0 0 No Aesthetic, Nuisance, Safety Issues 1.0 1 1 Promotes innovative practices/lid 1.0 1 1 TOTAL 73 Bold = Primary Screening Factor Italics = Secondary Screening Factor 5.5. Ranking of Projects After all the scores were entered into the master scoring spreadsheet, a list of projects was produced with individual and total scores (see Table 19). A meeting was held on October 2, 2007 to review the ranked projects and discuss the strongest candidates for design work. Several factors were discussed at this meeting, including representation of different types of BMPs, representation across parks and schools, sites that had early implementation opportunities and/or ongoing master plans, and staff preferences. Subsequently, site visits were conducted on October 15 to look at the candidate sites in the field. Through a series of discussions, the candidate sites were selected. Detailed scoring for each site can be found in Appendix D. Photographs of several highly-ranked sites are shown in Figure 3. Center for Watershed Protection, Page 33

Table 19. Individual Project Ranking Site Name Description Project ID TOTAL Meadowcreek Park cistern from hotel parking lot MW-01 93 Azalea Park stormwater wetland AZ-02 89 Schenks Greenway rain gardens along path SC-03 84 Buford School bioswale @ pool building BU-02 82 Charlottesville High School rain garden @ MLK PA center CHS-06 82 Johnson School bioswale @ amphitheatre JO-01 77.5 Jordan Park expanded buffer, divert road runoff JR-01 75 Pen Park bioretention at parking lot PP-03 74 Forest Hills Park daylight pipe, create swale FH-01 73 Tonsler Park forested wetland TO-01 73 McIntire Park West bioretention, small parking lot MPW-02 69 Pen Park bioretention at parking lot PP-06 69 McIntire Park West bioretention MPW-01b 68 Tonsler Park rain gardens TO-02a 67 Venable School disconnect downspouts VN-02c 67 Venable School disconnect downspouts VN-02b 65.5 Johnson School IC removal JO-02b 64.5 Burnley-Moran School swale @ asphalt channel BM-02b 64 Jackson-Via School bioretention, swale JV-02a/b 63 Burnley-Moran School swale for roadway BM-01 62 Clark School rain gardens @ playground CS-02b 62 Rives Park rain gardens RI-01 62 Charlottesville High School cistern at track CHS-07 57.5 Venable School downspout disconnection VN-02a 56.5 Greenbrier School retrofit existing grass channel GS-02c 56 Greenbrier School bioretention for roadway GS-01 55.5 Northeast Park retrofit existing grass channel NO-01 55 Buford School rain gardens, improve vegetation BU-05 54.5 Meade Park bioswale for roadway ME-02 53.5 Tonsler Park downspout disconnection TO-02c 53.5 McIntire Park West terraced bioretention MPW-01a 53 Schenks Greenway sand filter @ Recycling Center SC-01 53 Burnley-Moran School rain gardens @ roof BM-02d 52 Pen Park porous pavement PP-05 51.5 Burnley-Moran School downspout disconnection BM-02a 48 Tonsler Park retrofit existing grass channel TO-02d 46.5 Charlottesville High School swale/rain garden near entrance CHS-09 45.5 Venable School bioretention @ driveway VN-02d 45.5 Center for Watershed Protection, Page 34

Table 19. Individual Project Ranking Site Name Description Project ID TOTAL Greenbrier School retrofit existing rain garden GS-02b 45 Clark School rain garden for roof CS-02a 44 Clark School stormwater planters CS-02d 44 Greenbrier School stormwater planter GS-02d 44 Venable School bioretention @ parking lot VN-01 44 Johnson School porous pavement JO-02a 43.5 Burnley-Moran School retrofit concrete channel BM-02c 40 Washington Park roadway bioretention WP-04 39 Clark School terraced bioretention CS-01 33 Tonsler Park hardscape retrofit TO-02e 32 Tonsler Park stormwater planters TO-02b 29.5 Tonsler Park DI inserts TO-02f 23 Projects in Bold are the highest ranked. Projects in Italics are not highly ranked as stand-alone projects, but may support (be bundled together with) other highly-ranked projects for a particular site. Center for Watershed Protection, Page 35

A B C D E F Figure 3. Examples of highly ranked sites: (A) Buford School bioswale at pool building, (B) Forest Hills Park daylighting and bioswale, (C) Azalea Park wetland swale, (D) Pen Park bioretention at parking lot, (E) Burnley-Moran School step rain gardens, and (F) Venable School downspout disconnection. Center for Watershed Protection, Page 36