FIRE IMPAIRMENT NOTICE

Similar documents
HOT WORK PERMIT PROCEDURES

Date Issued: December 14, 2017 Revision: 2.1

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

Management Practices: Fire Protection Impairments November 2015

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

Austin Independent School District Police Department Policy and Procedure Manual

Fire System Impairment Policy

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Procedure DESCRIPTION/OVERVIEW

Fire Protection System Impairment Procedure

FIRE SAFETY LOG BOOK

FIRE SAFETY MANAGEMENT PLANS DEVELOPMENT GUIDE A GUIDE TO DEVELOPING

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

Managing Fire Protection System Impairment

RISK ENGINEERING GUIDELINE.

Mount Laurel Fire Department, Office of The Fire Marshal FIRE WATCH NOTIFICATION

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Request for Lockout. Initiating. Affected Systems and Areas Information

FIRE PROCEDURES 1. APPOINTMENTS

FIRE & EVACUATION PLAN PARADISE LOST

FIRE SAFETY PLAN FIRST & JASPER JASPER AVENUE

BUILDING INSPECTION SAFETY PROGRAM MANUAL CHAPTER 5, REFERENCE # 1.4 August 1, 2009 OUT OF SERVICE (OOS) SPRINKLER AND STANDPIPE SYSTEMS

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Plan Change 56: Fire Fighting Water Supplies Code of Practice

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Sprinkler systems. A presentation for fire brigade staff

ELEVATOR RESCUE PROCEDURE

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

PACDA Application Forms. 5/15/2018 Aman Fire Protection Consultants 1

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

Section 9 THE GUIDELINES FOR DEVELOPING AN EVACUATION PLAN FOR INDIVIDUALS WITH DISABILITIES. Shelton School District Emergency Response Plan

Safety rules & guidelines. for admission and work within cable tunnels in the city

UNIVERSITY. Facilities Management

H&S Forum. Fire Safety Policy Glascote Academy

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch

Fire Safety Policy. Somerville College Woodstock Road Oxford OX2 6HD

BURN NOTICE: KEEP THE HEAT AWAY!

Renovation Program. Renovation Program GENERAL

EMERGENCY EVACUATION PLAN for FIRE

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

Local Rules: Fire Safety

Impairments to Fire Protection Equipment

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

Safety Best Practices Manual

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Facilities Services Utilities Shutdown Request Form

Fire Safety Management

Risk Management Services

Wellsprings Primary School. Fire Emergency Evacuation Plan

a) Establishment of emergency procedures to be followed at the time of an emergency;

Emergency Evacuation Plan. Tiffany Tower Plot W2 Jumeirah Lakes Towers

. a facility with a fixed propane storage capacity of exactly 5,000 USWG and no more than 500

FIRE SAFETY POLICY Page 1 of 15 Reviewed: October 2017

Fire Risk Assessment Safety Checklist

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

HEALTH & SAFETY MANAGEMENT ARRANGEMENTS FOR FIRE SAFETY

2010 FIRE CODE OF NEW YORK STATE

OXNARD FIRE DEPARTMENT Fire Watch Guidelines

FIRE SAFETY PLAN Revised December

Regulatory Reform (Fire Safety) Order 2005 Category of Premises against the FSO 2005: Sleeping Accommodation

Fire Safety Procedures and Associated Training

Emergency Procedures IF YOU DISCOVER A FIRE. Upon discovering a fire: the following steps are to be taken:

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

Fire Prevention Plan

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

FIRE AND EVACUATION PLAN

Demolition Permit Application (Please print and complete ENTIRE form)

The following checklists are to be used during an aerodrome RFFS inspection/ audit.

RAMBLER PARK FIRE SAFETY INFORMATION

University of London

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

EVACUATION PLAN Solvang Retirement 1202 Jacobs Drive Eugene, OR 97402

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

South Australian Regulatory Requirements

Fire Safety Report Fire Protection Management Program and Annual Fire Safety Report on Student Housing

SCALES NW EMERGENCY ACTION PLAN

Low Rise Residential occupancies are required to perform one fire safety training and one evacuation drill annually

Event Management CHECKLIST

EMERGENCY ACTION PLAN

Narrative Reports As Regulated by 780 CMR, Section 903.0

Property Name & Address [ Property Name ] - [ Property Address ]

BUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES

Chapter 18 Welding Table of Contents

A Guide to the Fire Safety Log Book For Small to Medium Business

Fire Safety Plan FOR. Business/Property Name: Address: Phone Number: Occupancy Classification. Approved by Fire Inspector: Date:

CONNECTION, ENERGISING, COMMISSIONING AND PERMANENT DISCONNECTION OF HIGH VOLTAGE APPARATUS

FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS

Fire Risk Assessment 2017

Fire Safety, Procedures and Risk Assessment Policy

Transcription:

Notification of Fire System Isolation FIN NORA No. Complete Fire Impairment Notice (FIN) before any impairment. Note 3 business days notice is required. Submit the FIN to the BAC Airport Facilities on fire.notification@bne.com.au, Attach a site drawing showing area to be isolated and affected works area. Impairment 1. No Impairments are to be carried out unless this form is signed off by the Airport Facilities Representative 2. Airport Facilities Representative will email the FIN to the following: - risk.compliance@bne.com.au and email or fax to FM Global redtagau@fmglobal.com Fax (03) 9602 5882 3. Fire Contractor at the time of isolation to take the completed FIN to the Duty Terminal Managers Office to advise DTM of the Fire Impairment and then the actual FIN to be displayed on the Fire Panel-Terminal Isolations Only. For all outer buildings, FIN to be displayed at FIP De-isolation 1. Complete Section (E) of this notification following De-isolation and send to email as above 2. Place the FIN in the Completed display FIN area on the FIP. 3. Airport Facilities Representative will email the closed out FIN to the following: - risk.compliance@bne.com.au and email or fax to FM Global redtagau@fmglobal.com Fax (03) 9602 5882 Call BAC Terminal Compliance Coordinator (07) 3068 6675 for any questions or further clarification on the Impairment Procedures in normal business working hours Monday to Friday. SECTION A - To be completed by Company requesting isolation Company Name Name of person requesting isolation Include contact details Type of impairment NOTE Maintenance Repair Building Works 1. Simultaneous isolations are not allowed: e.g. Sprinkler & Detection, without a risk assessment. 2. Simultaneous isolations and Hot Works are not allowed Sprinkler - Provide Sprinkler System number below Refer block plan Fire pump Fire Hydrant Alarm/detection system Special extinguishing system - CO2 or Gas system Other Building, Location of Impairment, List Detectors/Systems to be Isolated: Refer iserver specific Be Reason for and description of impairment Be specific (3).doc Page 1

Time shut off: a.m. p.m. Date: Expected duration of impairment: Will system(s) be fully restored daily? Yes No SECTION B - To be completed by responsible person ie Project Manager, Maintenance Co-ordinator, Retail Manager, Property Manager OR Tenant Facility Manager Responsible Person Mobile Email Date Precautions being taken Hot work prohibited? Has a Hot Works Permit been completed? Area Vesdas Smoking controlled? Hot Works Permit Number if applicable: Work during i Fire extinguishers or small hose available? Is a Fire watch or watchmen required? Hazardous op Contractor is aware of Emergency Procedures and has contact information on site in case or accidental fire system activation. Note: If Hot Works Permit is required a copy of the HOT Works Permit is to be included with the FIN along with NORA details (If hot work is being carried out as part of the isolation a 4hr minimum fire watch is required following completion of hot works) Comments The responsible person acknowledges that they have reviewed the FIN application, and have considered the impact of the works on the Fire System, and Building Operations. All reasonable steps have been taken to ensure no impact to occupants or BAC Operations Name: SECTION C - To be completed by BAC Airport Building Facilities Representative Name: Mobile: Email: Date: Comments: Airport Facilities acknowledges that they have reviewed the FIN application, and have approved the isolation to proceed. (3).doc Page 2

Airport Facilities Rep : Section D To be completed by BAC approved Fire Contractor carrying out isolation at the time of the isolation Technician Name Date Time Company Log Book Updated? Aviation Rescue & Fire Fighting (ARFF) notified? Phone 07 3860 3210 Duty Terminal Manager Notified? Signed DTM (NA for outer buildings) For non-terminal buildings, FIN must be placed In FIP (Fire Indicator Panel) BAC Project Manager Notification? Section E To be completed by BAC approved Fire Contractor carrying out de-isolation Time restored: am pm Date: Your name: Log Book Updated? Aviation Rescue & Fire Fighting (ARFF) notified? Phone 07 3860 3210 Duty Terminal Manager Notified? Signed DTM (NA for outer buildings) For non-terminal buildings, completed FIN must be placed In FIP (Fire Indicator Panel) BAC Project Manager Notification? Other Notification? (3).doc Page 3

1. Company Requesting isolation to complete their section (A) in consultation with BAC Project Manager 2. BAC Responsible Person / Project Manager to review section A and then complete their section acknowledging that they have considered the impact of the works on the Fire System, and Building Operations. All reasonable steps have been taken to ensure no impact to Operations. The FIN is then sent to the BAC Airport Facilities Representative fire.notification@bne.com.au 3. The BAC Airport Facilities Representative will then: Review the FIN and reconcile the areas requested to be isolated against existing fire impairment notices. Review the FIN to ensure it has been completed satisfactorily and that the control measures that have been put in place will reduce BAC residual risk to an acceptable level If the FIN process is unsatisfactory, it will be returned to the BAC Responsible Person / Project Manager with the appropriate comments 4. Once the BAC Airport Facilities Representative is satisfied that the FIN has been satisfactorily completed, it will be sent to the following: BAC Responsible Person / Project Manager BAC Risk & Compliance risk.compliance@bne.com.au BAC Insurer FM Global redtagau@fmglobal.com 5. The BAC Responsible Person / Project Manager will then forward the FIN to the BAC approved contractor and formally request the fire isolation to be conducted 6. The BAC approved contractor will arrive on site at the agreed time. Prior to conducting the fire isolation, the BAC approved contractor will notify the following: Aviation Rescue & Fire Fighting (ARFF) 07 3860 3210 that fire protection systems or water supplies is out of service ITB Duty Terminal Manager on 07 3406 3171 and Alarm Monitoring Office 07 3406 3312 for all BAC building isolations The BAC approved contractor must display the FIN in the following location ITB To be displayed on the front of the mimic EWIS panel in the Duty Terminal Managers office. The Duty Manager must sign the FIN DTB - To be displayed on the front of the mimic EWIS panel in the Alarm Monitoring Offices office. The AMO must sign the FIN 7. De- Isolation. At the agreed time the BAC approved contractor must advise the following: Aviation Rescue & Fire Fighting (ARFF) 07 3860 3210 ITB Duty Terminal Manager on 07 3406 3171 and Alarm Monitoring Office 07 3406 3312 (3).doc Page 4

The BAC approved contractor will then conduct the de-isolation ensuring all systems are normal. all systems are normal the contractor will complete Part B of the FIN and will place the FIN in the completed FIN folder within located at the Duty Managers Office or AMO Once 8. The BAC Airport Facilities Representative will collect all completed FINS weekly and will forward to BAC Insurers (3).doc Page 5