Packaged Coldroom. Installation Instructions. Operating instructions

Similar documents
FX BLAST CHILLER ISO ISO 9001

POWER SHOWERS Models 4500M 5002M 4500T 5002T

Installation. Leveling

Controller & Display - Versions FD1-11 & FD1-14

INSTALLATION. Glass Panel Doors (select models) CAUTION

Assembly instructions

Quartz. Thermo. Concealed shower valve with adjustable head. Quartz Thermo installation guide page 1

Installation Manual PS-200 & PS-201

Quartz. Digital. Bath with bath waste filler. Quartz Digital Bath with bath waste filler installation instuctions page 1

FOSTER. Commando Packaged Coldrooms. Where there s food there s Foster COLDSTORES

Installation Manual PS-225 & PS-275

Quartz. Digital. Concealed with adjustable height and fixed head. Quartz Digital concelaed adjustable/fixed installation instuctions page 1

EH0533 Indoor Climate Control

INSTALLATION and OPERATION INSTRUCTIONS

CEILING FAN OWNER'S MANUAL

Puro Mini Dual Control Shower Mixer PU90010CP

Deluge Shower Mixing Valve 10045CP

OWNERS INSTRUCTION MANUAL

MIDAS. Installation instructions 110/220

Inta City Concealed Shower Mixing Valve CT80010CP

Inta City Shower Mixing Valve CT20010CP

MK 8706 / MB 8706 CONCEALED THERMOSTATIC SHOWER VALVE INSTALLATION GUIDE

Aquamixa. Thermo. Thermostatic shower valve with manual bath fill

INSTALLATION INSTRUCTIONS

Walk-in Refrigerated Rooms. An Overview of Requirements, Options and Construction Details

INSTALLATION INSTRUCTIONS

Orrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

Installation guide Sahara & Sahara Plus

GT842 INSTALLATION MANUAL. ATTENTION INSTALLERS: These instruc ons must be le with the customer

DOUBLE DISHDRAWER TM DISHWASHER

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

Mio Concealed Shower Mixing Valve MI40010CP

CEILING FAN OWNER'S MANUAL

airooncentre.co.uk irconcentre.co.uk Xpelair Low Energy Wall/Window Fan Range GX6 EC2 GXC6 EC2 Quick Order Hotline or

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

INSTALLATION MANUAL FOR MODELS: SOVANNA, BREZZA, TERRACINA, VENADO

INFRARED IP55 HEATER INSTRUCTIONS FOR: MODEL:- QZWP45N 1. SAFETY INSTRUCTIONS

Recirculating Chiller RC350G-RC400G RC1400G-RC3000G. Operating Manual

Telo Shower Mixing Valve TL10016CP

INSTALLATION GUIDE Dual Fuel Ranges

LV100 Standard LV100PC Pull Cord LV100T Timer LV100H Humidistat LV100HP Humidistat and Pull Cord LV100PIR

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Gen II Entree Bath - All Models

Plus Bath Shower Mixing Valve CP and PL30020CP

TOUCHDOWN 48 CEILING FAN

Enzo Concealed Shower Mixing Valve

Deluge Concealed Shower Mixing Valve DL40010CP

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

ValkyrieTM. Instruction Manual. Includes our new CoolTouch TM 6 Speed DC Control System Looks permanent, but goes wherever you go! U.S.

Internal/External Wall/Window Fan Range GX6. Installation and maintenance instructions Retain for future use

EH0554 Indoor Climate Control

C-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS. FAN RATING AC 120V. 60Hz

Concepts Serving Systems

CEILING FAN OWNER'S MANUAL

ARIN THERMOSTATIC SHOWER SYSTEM

AUTOMATIC GRANULAR ICE FLAKER

Undercounter Refrigeration

LaceyTM. Instruction Manual. Includes our new CoolTouch TM 6 Speed DC Control System Looks permanent, but goes wherever you go! U.S.

Lo-Carbon T-series Window & Roof Models

INSTALLATION INSTRUCTIONS

SHOT BLAST CABINET USER INSTRUCTIONS. Model No: CSB20B. Part No: GC05/13

ELSTON 52 CEILING FAN

T-SERIES. Window & Roof Models. Installation, Set-up and Operating Instructions. 230V/1/50Hz

INSTALLATION INSTRUCTIONS

CEILING FAN OWNER S MANUAL

USER MANUAL. Pharmacy Refrigerator Range. Applicable models: PSR353/PGR353 PSR273/PGR273 PSR151/PGR151

Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors

Merloni Elettrodomestici. Technical Fitting Manual DISHWASHER. Language Issue/Edition Page GB /

Greenstar Xtra. Installation instructions. Passive flue gas heat recovery device. For use with Greenstar CDi Compact, Si Compact and i combi boilers

UBBU60LFA. Built-under Fridge Manual for Installation, Use and Maintenance IM UBBU60LFA_

Closomat Lima Vita installation & user guide

LUCCI AIRFUSION FRASER DC CEILING FAN

Icemaker Accessory Kit

Dishwasher Installation Instructions DW 24XT/DW 24XV

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

Refrigerator BRFB1920SS BRFB1900FBI BRFB1920FBI

Installation Instructions

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

FerronTM. Instruction Manual A Kichler Decor ceiling fan

SS1095 Ice Maker.

DOMESTIC STEAM GENERATOR Installation Instructions

User and Installation Instructions C6R/75, C6R/100, C6R/105, C6R/125, C6R/130, D6R/100, D6R/125, D5R/100, D5R/125, D3R/100

PRELIMINARY INSTALLATION. Operation & Service Manual. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #1/56

Hatteras BayTM. Patio. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

Enzo and Enzo Deluxe Safe Touch Thermostatic Shower EN10031CP & EN10035CP

Thermostatic bar mixer valve with adjustable head Installation guide

Installation Instructions

DOUBLE DISHDRAWER TM DISHWASHER

Owner s Guide and Installation Manual

Ambassador. Installation guide & user instructions. Please ensure that this document is handed to the user after installation is completed

USER MANUAL. Laboratory Refrigerator Range. Applicable models: LSR151 LSR288

Sanitise Syrup Lines & Valves. Taylor PH61 Cleaning every 14 days

Trouble Shooting and Help Guide TT / TTB 1840

CEILING FAN OWNER'S MANUAL

CEILING FED RISER RAIL KIT. Installation Guide. tritonshowers.co.uk/digital

READ AND SAVE THESE INSTRUCTIONS

Installation Instructions

INSTALLATION MANUAL FOR MODELS: TERAZZA, TRACCIO, MILANO, CERRATO

GCG-10. Instruction Manual. G-Series Cooler. Manual is for the following models: GCG-10-N33EB G-10-N33EB UPRIGHT COOLER

Transcription:

Packaged Coldroom Installation Instructions GB Operating instructions

Important It is important that the installation instructions are read through and thoroughly understood before commencing the installation of the coldroom. Follow the step by step guide ensuring that each stage of the installation is followed correctly as failure to do so could effect the operation of the unit and may result in the warranty agreement being invalidated Environmental Management Policy Product Support and Installation Contractors Foster Refrigerator recognises that its activities, products and services can have an adverse impact upon the environment. The organisation is committed to implementing systems and controls to manage, reduce and eliminate its adverse environmental impacts wherever possible, and has formulated an Environmental Policy outlining our core aims. A copy of the Environmental Policy is available to all contractors and suppliers upon request. The organisation is committed to working with suppliers and contractors where their activities have the potential to impact upon the environment. To achieve the aims stated in the Environmental Policy we require that all suppliers and contractors operate in compliance with the law and are committed to best practice in environmental management. Product Support and Installation Contractors are required to: Ensure that wherever possible waste is removed from the client s site, where arrangements are in place all waste should be returned to Foster Refrigerator s premises. In certain circumstances waste may be disposed of on the client s site, if permission is given, where the client has arrangements in place for the type of waste. If arranging for the disposal of your waste, handle, store and dispose of it in such a way as to prevent its escape into the environment, harm to human health, and to ensure the compliance with environmental law. Guidance is available from the Environment Agency on how to comply with the waste management 'duty of care'. Ancillary Items Floor Plugs CMFOS1XT826 GREY Floor Plug Pins CMFOS1XT827 GREY Mastic Hansil 580 Grey 400ML Key Hexagonal 8MM A/F Coldroom Panel Coldroom Warning Label (Roof) Plugs LD POLY White BPLDP1/2" Silicone Sealer White 310ML Silicone Sealer Aluminium 310ML Skeleton Dispenser Gun Cleaning Materials Disposal Requirements If not disposed of properly all refrigerators have components that can be harmful to the environment. All old refrigerators must be disposed of by appropriately registered and licensed waste contractors, and in accordance with national laws and regulations. STEP 1. Preparation Prior to commencing the installation familiarise yourself with the entire assembly procedure including joining methods and sealing. 2 Tools Required 2ft or 3 ft spirit level 1.5 mtr (5ft) long, 50mm (2 ) x 50mm (2 ) straight plank of wood Rubber Mallet Pozi Screwdriver Light weight hammer Flat Bladed Screwdriver Electrical Screwdriver Pair of Pliers Electric Drill c/w 4.2 mm Drill Bit Step Ladder It is important that the following steps are fully understood prior to commencing the installation STEP 2. Uncrating 1. Check the crates or packaging for damage. If damaged inform the lorry driver, note the delivery number, inform the factory immediately (or your insurance company, if outside the UK). 2. Remove crate or packaging carefully. Never use the coldroom panels as a lever point for crowbars. 3. The panels are loaded onto the pallet in sequence for easy assembly with one of the floor panels at the top, beneath that is the door and door jamb. Remove the floor panel and place to one side followed by the door and jamb. 4. It is suggested that the remaining panels be left on the pallet until required. 5. The refrigeration system panel is packed separately and should be left on the panel until required. STEP 3. Floor Preparation The floor that the coldroom is to be erected on must be clean, dry and flat. The floor must be level within ± 3mm. STEP 4. Panel Locks Figure 1 Spirit level on a squared plank If the floor is not level the wall and ceiling panels will not lock correctly. Check the floor using a spirit level on a 2-metre plank, pointing the plank both along and across the floor. Foster coldroom panels lock together with an effective locking system (fig 2). Figure 2 Fosterlok Figure 3 Locking procedure 1. Insert the hexagonal locking wrench into its lock hole, making sure it is fully engaged. 2. Turn the wrench fully anti-clockwise to raise the locking arm (fig 3A) and engage cam action. 3. Now turn the wrench clockwise and the locking arm strikes the pin in the adjacent lock (fig 3B) 4. Continue turning the wrench to lock the panels securely (fig 3C). If the lock fails to engage turn the wrench anti-clockwise and repeat 1-4. NOTE: Do not use unnecessary force as this may impair the locking mechanism and damage the lock ERECTING YOUR COLDROOM NOTE: Only when the previous steps are fully understood should you proceed with the installation. Coldroom Installation Use the 'Coldroom Assembly Detail', found on a separate sheet, to give the correct panel layout for the coldroom you are about to erect. STEP 5. Floor Panels Fit the floor panels with the patterned side up and the smooth side down. Ensure sub-floor is smooth, flat, level and hard. Figure 6 Figure 4 Floor/Floor joint Before laying the first floor panel into position apply a bead of mastic as shown to all outer perimeter edges of the panel, (fig 1) ensuring a moisture seal between the insulated floor panel and the sub-floor. Follow the same procedure for the second and any subsequent floor panels but also apply two beads of mastic to the female extrusion (fig 1) prior to locking panels together. NOTE: Packing is not advised to adjust insulated floor panel levels. Do not use sand as a sub-floor base. Figure 5 Wall/Floor joint STEP 6. Refrigeration System Panel Transport the refrigeration panel on its pallet as close as possible to the point of installation. Apply mastic to the top edge of the floor, female side and the top of the 'L' shaped section of the panel (see fig 5). Manoeuvre the panel into position. Carefully slide the refrigeration system panel approximately into place as the corner, when fitted, will determine the final position. Avoid pressing against the hinged cover as this could result in damage to it. NOTE: the bottom lock is always 150mm (6inches) from the floor on all corner and wall panels

Wall/Corner Panels Prior to positioning and locking the corner and wall panels together: Apply two beads of mastic as shown (see fig 7) to the female extrusion only. Position and lock adjacent wall / corner panels using the same locking procedure as described in Panel Locks (Step 4). Lock the wall panel to the floor panel securing them in to place. NOTE: where access to external wall joints is not possible after installation of coldroom, insert silicone seal at the same time as mastic seals (see fig 7). Do not silicone other joints at this time. Figure 7 Figure 10 Figure 11 Refer to the Coldroom Assembly Detail for selection of the next wall panel and continue to erect the side wall, seal and lock into place but do not fit the front corner (see fig15). STEP 7. Ceiling Assembly 1. Apply two beads of mastic as shown (see fig 16) to the wall panel top recess. 2. Refer to the Coldroom Assembly Detail and select a ceiling panel and place it in position. 3. Select the next ceiling panel seal the edge with mastic and lock it to the first panel. 4. Continue until the whole ceiling is in position (see fig 17 and 18) (on the smaller coldrooms there will be two panels on larger coldrooms more will be required). Front Left Hand Corner Select the left-hand corner and adjacent wall panel apply mastic to the edge of the female side of the wall panel (see fig 7) and lock the corner to the panel. Fit the white buttons into the corner/ wall lock holes and apply a bead of silicon to the internal joint between the wall and corner. Apply mastic to the edge of the floor, female side of the corner and the top of the 'L' shaped section also (see fig 5 and 7). Lift the corner/ wall panel and slot into place. To lock the corner/ wall panel to the refrigeration system panel it is necessary to open the door of the refrigeration system panel (see fig 8). Remove the two screws, one near the top of the door and one near the bottom, from the opposite edge to the hinges securing the door in the closed position. Remove the white buttons from the holes adjacent to the lock holes, Insert the hexagonal locking wrench into its lock hole, making sure it is fully engaged, and lock as described previously. Fit the white buttons into the lock holes and refit the white buttons in the holes in the door. The mains lead for the coldroom is found behind the refrigeration system door. Pass the cable through the slot provided in the top of the door ensuring that it does not get entangled in any of the components. Close the door and replace the screws ensuring they are fully tightened. With the refrigeration system panel and corner locked firmly into place refer to the Coldroom Assembly Detail for selection of the next wall panel. Select the next wall panel (see fig 9, 10 and 11), and any subsequent side wall panel, seal and lock into place until the rear corner is reached. Refer to the Coldroom Assembly Detail for selection of the next wall panel and continue to erect the rear wall, seal and lock into place until the corner is reached (see fig12, 13 and 14). Figure 12 Figure 13 Figure 16 Figure 17 Figure 18 With the sidewalls, rear and ceiling assembled (see fig 18) seal all internal joints with silicone sealer (see fig 19) taking care not to overfill. Figure 8 Figure 14 Figure 9 Figure 19 Figure 15 3

STEP 8. Capping Lock Holes Capping lock holes in walls and ceiling. Insert the white plastic caps provided and tap in using the shaft of a hammer ensuring they are tight and flush fitting. Capping lock holes Floors To ensure an adequate fixing the lock hole plugs for the floor are provided as a two part component (see fig 20). Insert the outer body into the hole and tap the central pin in with a light hammer. Figure 20 A. Remove all packaging from the shelves and posts.. B. Determine the position of the lowest shelf (it is recommended that at least a 150mm clearance from the floor is left to allow for cleaning). C. Snap on one half (see fig 23) of the plastic collar onto the post (with the thick end down). Snap on the remaining half of the collar and slide up or down until secured into the groove. Repeat this for all four posts. D. Standing the shelf Figure 23 poles upright, lower the shelf onto the poles until the collars fit inside the corner of the shelves (see fig 24). E. With the shelf in position use a rubber mallet to 'knock down' the shelf until it is completely secured. F. Repeat steps B, C, D & E for the remaining shelves. G. The foot of each pole can be adjusted to compensate for uneven surfaces. STEP 12. Threshold Plate The threshold plate is the stainless steel portion of the door jamb and requires fixing to the coldroom floor (see fig 27). With the jamb locked into position, using the.42mm drill bit, drill three holes in the coldroom floor through the predrilled holes in the threshold plate. Using the zinc platted countersunk screws cut a thread in the drilled holes, remove and discard. Insert the flat headed stainless screws into the threaded holes taking care not to over tighten. Figure 27 STEP 9. Before proceeding further assemble the racking and position inside the coldroom. Refer to the Shelving Arrangement on the separate sheet for the shelving layout for your particular coldroom. Shelving Assembly NOTE: Assemble the first set of racking out of the coldroom and place inside (see fig 21). For rooms FPC 1.8 x 1.2, FPC 1.8 x 1.5 and FPC 1.8 x 1.8 the second and subsequent racks will have to be assembled inside the room (see fig 22). For all of the remaining models the racking can be assembled and placed inside when assembled. Figure 21 STEP 10. Door Jamb Fitting Select the door jamb without the door, apply mastic to the edge of the floor, top of the 'L' shaped section and the left hand side of the jamb (see fig 5 and 7) as described previously, and fit and lock into place (see fig 25). STEP 11. Figure 24 Figure 25 Front Right Hand Corner Select the front right hand corner (see fig 26), apply mastic to the edge of the floor, both sides and the top of the L shaped section of the corner (see fig 5 and 7) as described previously, and lock the corner into place. Detail shows positions of 2 of the screw hole positions, the 3rd is not shown STEP 13. Door Fitting Offer the door up to the door jamb, whilst holding it at a 90 angle to the jamb lower the door so that both portions of the hinge assembly join together. Once in position allow the door to close. If the door does not close lift the door off the hinges and check that the cam is located correctly on both portions of the hinge assembly. If required make the necessary adjustments and refit the door. The door should close with the handle coming into contact with the strike and hold the door firmly against the jamb creating a positive seal with the gasket. If there is movement of the door when in the closed position adjust the strike position using a pozi screwdriver. STEP 14. Sealing Joints Seal all external joints with silicone sealer (see fig 28) taking care not to overfill. Figure 28 4 Figure 22 Figure 26 STEP 15. Cleaning The finished coldroom should be cleaned thoroughly before loading.

STEP 16. Switching On Important Note: If the refrigeration panel has been laid down at any time it must be left in the vertical position for at least one hour before switching ON. (For water cooled models proceed to step 18). Plug the lead into a suitable socket and switch ON the power to the unit. Switch the unit on using the ON/OFF switch on the control panel. Do not load product into the coldroom until it has achieved the correct working temperature. Temperature. High Temperature coldroom +1 C to +4 C. Low Temperature coldroom -18 C to -21 C. 1 Low Temperature Room Control Panel When the unit is switched on the display shows - - - for a period of five seconds, during which the controller performs a self-check. The display then shows the air temperature measured by probe 1. 2 5 6 7 CDC 122 Check Set Point Low point of temperature band. Press and hold button 1 ( ) ALT CDC Controller 3 4 Open the cover of the refrigeration system panel as previously described. Cut the pipes to the required length allowing sufficient surplus so that the pipes are not stretched. Slide the jubilee clip over the end of the flexible pipe. Connect the pipe connected to the top of the condenser (Water Inlet 'A') to the 15mm copper pipe (Water outlet 'A') at the left of the left-hand side of the compartment. Slide the jubilee clip over the connection and tighten securely to avoid leakage. Water Inlet B remote condenser fan electrical connection Water Outlet A Water Fill Pipe STEP 17. Control Panel Temperature controller When the controller is switched on a single line appears on the display for 3 seconds to indicate the autotest period. After this period the air temperature measured by the T1 probe is displayed. Check temperature set point. Mains ON/OFF switch LDU 15 Controller Check set point by pressing the set button To increase set point press set + Interior light switch High Temperature Room Control Panel aux 3:2 set "-# "-# lae aux "-# Increase Set Point Press and hold button 1 ( ). Press button 3 ( ALT ) until required temperature is displayed. Decrease Set Point. Press button. 1 ( ). Press button 4 ( ) until required temperature is displayed. Manual Defrost Press and hold button 2 ( ). Press button 4 ( ) a timed defrost will follow. Indicators LED 5 Compressor on ( ). LED 6 Evaporator Fan on ( ). LED 7 Defrost on ( ) Alarms and Warnings PF1 indicates air probe failure. PF2 indicates evaporator probe failure. STEP 18. Water Cooled Condensing System Connection Procedure Water cooled condensing kit. Heat Exchanger complete with fan and cable. 2 x 30 metres flexible hoses. 4 x jubilee clips. Tools required Flat bladed screwdriver Funnel 5 litre container for water Step ladder Determine the position of the Heat Exchanger (see fig 29) before proceeding further with the installation. Unit can be mounted up to 5 metres vertically away from the compressor and up to 25 metres horizontally. Weather proof housing to the remote system means it is suitable for outdoor location. It should be positioned in a cool area and out of direct sunlight with no restriction to the airflow. Either attach it to a wall by the fixing points, using screws and wall plugs, or position on a flat roof firmly securing it in place. Slide the jubilee clip over the end of the second flexible pipe. Connect the pipe connected to the bottom connection (Water return B ) of the heat exchanger to the 15mm pipe (Water Inlet B ) attached to the stainless steel tank. Slide the jubilee clip over the connection and tighten securely to avoid leakage. Electrical Connection Run the remote condenser fan cable to the condensing unit with the water pipes. Plug the male cable connector attached to the end of the fan wire in to the female cable connector attached to the wire next to the water fill pipe. Leave any surplus cable on the top of the coldroom Filling the system with water Fill the 5-litre container with clean water. Note: Anti-freeze Where pipework to heat exchanger may be at risk of freezing, add anti-freeze at 40% of total liquid requirement. Remove the plastic cap from the end of the Water Fill Pipe. Insert the funnel in to the end of the Water Fill Pipe. Slowly and with care, avoiding any spillage, poor 2 litres of the water into the tank. Plug the mains lead in to the power source and turn the unit ON. After a short period the water pump will start to circulate the water round the system. Leave the pump to run for a further 2 minutes. Switch the unit Off before adding the remaining 3 litres of water. Switch the unit On and leave running for a few minutes to check that the water is circulating correctly. Check the water level in of the tank by placing a hand against the front, the tank if filled with sufficient water will be warm half way up, if not it may be necessary to add more water. Refit the plastic cap to the water fill pipe. On completion return to step 16. Figure 30 To decrease set point press set + Factory Temperature Set Point +1 C. "-# Exit from set up occurs after 10 seconds if no button is pressed. Once positioned connect the flexible water pipes to the Water Inlet (A) and Water Outlet (B) connection, securing them to the pipes using the jubilee clips provided. Alarms and Warnings HI High Temperature Alarm LO Low Temperature Alarm E1 T1 Probe Failure DF Defrosting in Progress CLN Clean Condenser Figure 29 Water Inlet A Water Return B Run the flexible pipes to the refrigeration system panel avoiding any sharp bends that could result in kinks in the flexible pipes therefore impeding the water flow. 5

6

7

Packaged Coldroom Installation Instructions Foster Refrigerator Oldmedow Road, King s Lynn, Norfolk, PE30 4JU England Tel: 01553 691122 Fax: 01553 691447 Website: www.fosterrefrigerator.co.uk Email: sales@foster-uk.com a Division of ITW (UK) Ltd. OP/CONT/GB/4/05 00-599648