HELLO & WELCOME. Prior/Venables Replacement A NEW PLAN FOR THE FALSE CREEK FLATS PLANNING PROCESS OVERVIEW

Similar documents
Removal of the Georgia and Dunsmuir Viaducts

General Manager of Planning and Development Services in collaboration with the General Manager of Engineering Services

Welcome. Rezoning Application: 1002 Station Street and Prior Street New St. Paul s Hospital and Health Campus

General Manager of Planning and Development Services and Acting General Manager of Engineering Services. Removal of the Georgia and Dunsmuir Viaducts

Phase 1 Update: Summary of Public Input

Town Center (part of the Comprehensive Plan)

4.1.3 LAND USE CATEGORIES

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

WELCOME TO OPEN HOUSE TWO November 28, 2018

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Welcome to the Oakridge Centre Open House

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Community Meeting November 18, 2015

St. Clair Avenue West Area Transportation Master Plan

Shift Rapid Transit Public Participation Meeting May 3, 2017

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

DOWNTOWN GEORGETOWN PLANNING STUDY

Vancouver Towers + Podiums. West End to Abu Dhabi

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

The West Vaughan Employment Area Secondary Plan Policies

Public Meeting #3 May 9, 2009 MVVA Team

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Purpose of Open House #3

CHAPTER 7: Transportation, Mobility and Circulation

TORONTO COMPLETE STREETS GUIDELINES

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

include playgrounds, sports fields, community gardens and picnic areas.

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Sustainable Road Design And Multimodal Roads. Presented by: Sheina Hughes

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

BRADENTON RIVERWALK EXPANSION MASTER PLAN

38 Queen s University Campus Master Plan Part 1

SOUTH UNIVERSITY Street Design Alternatives in Progress

Grandview-Woodland Neighbourhood Transportation & Parking Stakeholder Advisory Group. Meeting Notes

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

UBC Athletics + Recreation Facilities Strategy

The transportation system in a community is an

This Review Is Divided Into Two Phases:

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Potential Green Infrastructure Strategies May 6, 2015 Workshop

11 GUIDING PRINCIPLES:

Chapter 22. Alternatives to the Proposed Project

REVIEW AND EVALUATION OF REGIONAL LAND USE

Southern Gateway Project and Public Green

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Access Management: An Overview

City of Toronto. Emery Village Transportation Master Plan

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Waterfront Development Master Plan

Further input invited as Colchester Growth Strategy nears final phase

MOUNT PLEASANT COMMUNITY PLAN

Transportation. Strategies for Action

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

Midtown Greenway Land Use and Development Plan Executive Summary

appendix and street interface guidelines

Planning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE

Northeast False Creek : Past, Present and Future

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

Portage Parkway Environmental Assessment Public Information Centre No. 1

New St. Paul s Hospital and Health Campus. PHASE 1: Guiding Principles CONSULTATION SUMMARY. April 2016

Mississippi Skyway Preliminary Engineering Report

Building Great Neighbourhoods. Strathcona

WELCOME and introduction

WELCOME TO OPEN HOUSE # 3

CITY CORE 2050 A VISION FOR THE HEART OF THE REGION

Complete Neighbourhood Guidelines Review Tool

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

V. Vision and Guiding Principles

WHAT IS THE PURPOSE OF THIS OPEN HOUSE?

REGIONAL ACTIVITY CENTER

North York Centre South Service Road

FDOT D4 Complete Streets

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

Green Line North Centre City Alignment

Glenborough at Easton Land Use Master Plan

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Engagement Summary Gastown Streets: Local Business Visioning Workshop

What We Heard Report: Westmount Architectural Heritage Area Rezoning Drop-in Workshop

MAYFIELD WEST SECONDARY PLAN PHASE 2

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Tacoma Mall Neighborhood Subarea Plan & EIS. Planning Commission January 18, 2017

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Southeast Extension to RidgeGate Parkway Scoping Booklet

Toronto Complete Streets Guidelines

Cambie Corridor Planning Program Phase One. Standing Committee on Transportation and Traffic January 19, 2010

MURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis

Transcription:

HELLO & WELCOME. A NEW PLAN FOR THE FALSE CREEK FLATS Since last May, City staff have been working with you to identify the key issues, desires and directions for the future of the False Creek Flats. Throughout this process we have heard overwhelmingly about the need for better connections to unlock the true potential of the area in becoming a greener and healthier place to work in Vancouver. Today s conversation regarding a suitable alignment for a new Prior- Venables replacement is only one piece of a broader transportation network. This larger network will form a critical component of a new plan for the future of the False Creek Flats. For more information on this process, and to receive any ongoing email updates please visit our website, and sign up to our email list serve at: vancouver.ca/falsecreekflats PLANNING PROCESS PRE-PLAN Preparation & Analysis VEC INTERVIEWS Fall 2014 PHASE 1 Framework & Principles LAUNCH EVENT May 27 2015 VEC WORKSHOPS Fall/Summer 2015 WORKSHOP SERIES June 2015 ONSITE OFFICE June - Sept 2015 PHASE 2 Emerging Directions EMERGING DIRECTIONS OPEN HOUSE February 2016 PHASE 3 Draft Plan We are here PHASE 4 Finalize Plan Final Plan to Council BUSINESS SURVEY Fall 2014 PHASE 1 REPORT-BACK Nov 2015 P/V REPLACEMENT DRAFT PLAN OPEN HOUSE TO PUBLIC Mar 2016 June 2016 SUMMER 2016 FALL 2016 ONLINE SURVEY May 27 - Aug 27 Completed Ongoing ST. PAUL S HOSPITAL; REPORT TO COUNCIL Sep 2016

PRIOR & VENABLES TODAY TRUCK ROUTES - EXISTING Since the construction of the viaducts in the early 1970s, Prior and Venables Street, between Gore Ave and Clark Drive, has functioned as an arterial and truck route in the City s network of streets. This means that it serves a dual role of providing safe and convenient local access to residents and businesses, as well as playing a regional role efficiently moving people and goods from the east into downtown. AN ARTERIAL OVERPASS? Recommended East-West Movement Across the Burrard Inlet Rail Line (BI Line Rail Grade Separation Study 2008) With the goals of improving rail efficiency into the Port, and minimizing the number of heavy trucks on our streets, the City conducted a Rail Grade Separation Strategy Study in 2008. This strategy aimed to support the broader economy by better utilizing the rail yards in the Flats; reducing train related traffic disruptions; improving public safety; and supporting rail as an alternative to trucks for goods movement. Through that study, the strategy recommended that all arterial roads be separated from rail with a grade-separated crossings or overpass. The last remaining arterial which crosses the Burrard Inlet Rail Line at grade is Prior/Venables. S POWELL HASTINGS PRIOR/VENA BLES TERMI NAL CHALLENGES WITH PRIOR/ VENABLES Since the 2008 study s original conclusion that Malkin was the most logical route, subsequent work has reconfirmed that the existing alignment along Prior/Venables is poorly suited to accommodate an improved link due to proximity to residential uses, a limited right-of-way to improve the existing conditions, the challenging geometrics and natural topography of the alignment making a future grade-separated route along Prior/ Venables less supportable than others. DOWN-GRADING PRIOR/ VENABLES In October 2015, during the decision regarding the removal of the viaducts, Council provided direction to staff that the False Creek Flats Plan would identify a new alignment for a Prior and Venables arterial replacement. Once constructed, this new arterial would allow for the eventual downgrading of Prior to a locally serving collector street. OVERPASS CROSSING CLOSED CROSSING PEDESTRIAN/BIKE UNDERPASS STRATEGY RECOMMENDATIONS The 2008 Rail Grade Separation Strategy identified the following priorities for grade separated crossings and street closures: 1. Powell Street is the top priority for grade separation. (completed in 2014) 2. Malkin Ave was proposed as a better alignment for grade separation than Prior/Venables, subject to further technical analysis and community consultation. (since the time of this report, City staff have identified other alternatives than Malkin for consideration) 3. Prior/Venables as a potential location for an underpass crossing for pedestrians and cyclists; and 4. In the long term, secondary crossings at Parker, Union, and East Cordova will be closed to ensure public safety.

WHAT ARE THE OPTIONS? On the basis of analysis completed over the last two years, including engagement with a number of stakeholders, City staff are recommending two leading options for further consideration by stakeholders, the public and Council Malkin Ave and National Ave. Each option would connect either to the viaducts or the viaducts replacement arterial street network at Gore Avenue to the West and would T into Clark Drive at the East (vehicles would be required to make a left or right hand turn onto and off of the arterial at Clark to discourage commuter traffic from using local streets in Grandview Woodlands). EAST-WEST ARTERIAL OPTIONS MALKIN NATIONAL East-West Arterial Study OBJECTIVES To guide development of alternative alignment options for an east-west arterial and rail overpass, the following study objectives were developed: Maintain an efficient east-west arterial route: Ensure a goods movement, transit and vehicular connection to downtown, while improving pedestrian and cyclist conditions throughout the False Creek Flats. Seismically resilient and reliable connections: Collaborate with Providence Healthcare to ensure safe and reliable access to and from the new hospital from both Downtown and the east. Support Vancouver s economy by improving the Burrard Inlet connection between the False Creek Flats rail yards and the Port: Implement grade separation of the BI Rail line from east-west vehicular traffic, improving goods movement by rail. Minimize impacts on existing uses: Respect the existing community gardens, residential properties, businesses and city facilities as much as possible. Mitigate disturbance to parks: Explore opportunities to increase the overall park size; protect eagle nesting habitat. Explore opportunities to reallocate road space on adjacent routes: Rerouting East-West arterial traffic and trucks provides an opportunity to reallocate road space and potentially implement public realm improvements on parallel streets. Create an urban structure and street design suitable for the long term development aspirations of the False Creek Flats study area: Creating a regularized block pattern with development lots of sufficient size will support future industrial and office uses. Seek cost effective rail overpass design solutions taking into consideration both up-front capital costs and on-going maintenance costs.

KEY IDERATIONS Relocation of the arterial requires careful consideration of the impact to the local communities, businesses, landowners and the needs of the city as a whole. As with any infrastructure project, short and medium term impacts must be balanced with long term requirements and benefits Providence Health Care is an important stakeholder in this regard. Translink approval is required for any modifications to the City s truck route network and the City will need to be able to demonstrate equivalent or improved capacity for the efficient movement of people and goods accessing areas within the flats and the downtown. VIADUCTS STUDY AREA 16 12 15 8 13 10 2 5 11 9 6 4 17 7 3 14 FALS LSE CREEK FLATS > SITES 1 2 3 4 5 6 7 8 9 City Facilities City Works Yards Fire Hall #1 Fire Rescue Training Facilities City Animal Control Community Gardens Strathcona Community Garden Cottonwood Community Garden Purple Thistle Community Garden Parks Trillium Park Strathcona Park Prior Street / Venables Street 10 Prior Street / Venables Street Produce Row 11 Produce Row Providence Land 12 Providence Land Atlantic Street Residents 13 Atlantic Street Residents Industrial Businesses (East of Tracks) 14 Industrial Businesses Industrial Businesses (West of Tracks) 15 Industrial Businesses Left Bank 16 Left Bank Canada Post 17 Canada Post Civic Facilities Fire Hall #1, Fire Training Facility, Animal Control Shelter, and City Works Yard on National are all located in the study area. Any changes to the arterial need to ensure emergency services can continue to be delivered at existing levels of service. In some cases new facility locations or redevelopment may be required. Community Gardens There are three community gardens that could be impacted: Cottonwood Community Garden, Strathcona Community Garden, and the Purple Thistle. Both Cottonwood Garden and the Purple Thistle are located within the street right of way. Industrial Businesses To construct a rail overpass on any alignment, a number of businesses between Raymur & Clark Drive, and Main & Malkin could be impacted. Parks (Strathcona Park and Trillium Park) There are significant public parks within the study area. Strathcona Park is 21 acres (excluding Cottonwood Garden) and Trillium Park combined with the newly planned northern portion is 7.5 acres. Prior Street / Venables Street With the construction of the viaducts, Prior Street and Venables Street became part of the City s arterial street and goods movement network through the Strathcona neighbourhood. Residents are excited about the future downgrading, once an alternate arterial is complete. Produce Row Currently, 6 of the City s 9 produce wholesalers are found along Malkin Avenue, representing approximately 450 local jobs. These businesses combined receive approximately 4,000 truck deliveries a week, and often block traffic on Malkin while manoeuvering. Providence Lands The site owned by Providence Health Care, is currently being planned for the re-located St. Paul s Hospital, and any road alignments will need to consider the design and function of the new health campus. Transportation/Goods Movement Performance The new arterial will need to be a minimum of 4 lanes, with a direct connection between Clark and Main Street and function in a similar capacity to Prior/Venables. It also will need to accommodate commercial goods movement (large trucks). Atlantic Street Residents Any changes to the arterial need to ensure access to the neighborhood and mitigate impacts due to increased traffic. Rail & Port Port expansion planned in the near future, rail activity will increase, likely with the desire for increased rail yard space. A well planned overpass location would keep options open for market factors to determine the future of rail along the BI Line.

OPTION / MALKIN AVENUE HASTINGS A ATLANTIC RESIDENTS AT COMMUNITY GARDENS NI COMMUN RO ROW UCE PRODUCE Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. The Malkin Avenue option would connect from Main Street and T into Clark Drive (no through route to or from Grandview Woodlands). The railway overpass would start at Raymur Street, pass overtop of Glen Drive, the railway tracks, Vernon Drive and align with Charles Street to connect with Clark Drive. To minimize impacts to adjacent uses, this alignment would be constructed predominantly within the existing paved surface of Malkin Ave between Chess and Raymur Streets. Arterial Spacing Northerly alignment relative to National Ave option, providing 1. better balance between proximity to First Ave and Hastings St arterials 2. 1. better access and local service to Strathcona community. Wider average available road right of way than National Avenue Building land uses and street connections to the north and south of the entire alignment Avoids impact to City s National Works yard and Fire training facilities. Significantly lower cost as compared to National Ave option Better soil conditions as compared to National Ave alignment (approx. 5m of fill compared to 10m for National Avenue options Significant impact to operations of Produce Row business between Chess St and Raymur Ave. The current operations are incompatible with arterial use of Malkin Ave (truck manoeuvring on street. Property acquisition and resultant business impact to industrial business East of Glen Drive (narrow cross section). Impact to City s Animal Control Facility. Narrow paved roadway area east of Chess Street requires interim street cross-section compromises to avoid property acquisition or impact to Cottonwood community gardens e.g. no northern sidewalk adjacent to the Curb. Concerns with adjacency to Cottonwood Community Gardens. Bicycle Network Potential Project Costs Overpass Structure $35-60,000,000 Bike Underpass $10-15,000,000 Land Acquisition $20-35,000,000 Roadway Design & Construction $15-20,000,000 Total Cost $80-130,000,000

OPTION / NATIONAL AVENUE PARKS CITY FACILITIES RAIL Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. The National Avenue option would connect from Main Street and T into Clark Drive (no through route to or from Grandview Woodlands). The railway overpass would start just east of Chess Street, pass through and over the Fire Training Facilities, the railway tracks, Vernon Drive and align with Grant Street to connect with Clark Drive. This option would protect existing uses along Malkin Avenue east of Thornton. Arterial Spacing Avoids impact to Cottonwood Community Gardens Avoids impact to produce row east of Thornton Avoids impact to Animal Control Facility Avoids significant impacts to Providence Lands as opposed to the National Avenue Diagonal Maintains the same roadway alignment as the Malkin Avenue option along the North side of the Providence Healthcare site, providing consistency in the leading E-W options for concurrent hospital planning work Significant impact to Fire training facility which would require relocation (challenging due to space requirements and uses e.g. burn tower) Moderate impact to operations at the City s National works yards. Property acquisition and resultant business impact to industrial business East of Glen Drive (narrow cross section). Significantly higher cost as compared to Malkin Ave option (increased property acquisition e.g. Fire training facility and significantly longer overpass). Southerly alignment relative to Malkin Ave option, providing 1. poorer balance between proximity to First Ave and Hastings St arterials 2. poorer access and local service to Strathcona community. No buildings, land uses or street connections to the south for a significant portion of the alignment (Via Rail). Poorer soil conditions as compared to Malkin Ave alignment (approx. 10 m depth to competent soils) Concerns with adjacency to Trillium Park (east and north sides) Concerns with performance and safety of the required road curvatures at Thornton (comparable to current condition at McGill/Nanaimo) Bicycle Network Potential Project Costs Overpass Structure $50-90,000,000 Bike Underpass $10-15,000,000 Land Acquisition $75-105,000,000 Roadway Design & Construction $15-20,000,000 Total Cost $150-230,000,000

Previously Prior/Venables Considered Replacement Options OPTION / WILLIAM STREET HASTINGS PARKS ATLANTIC RESIDENTS CITY FACILITIES COMMUNITY GARDENS Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. This option seeks to minimize impacts to Cottonwood Community Gardens, Produce Row and the City s National works yard and Fire training facility, by connecting from the intersection of Malkin Avenue and Hawks Street to the intersection of William Street and Raymur Avenue; north of the Cottonwood gardens and through Strathcona Park. The railway overpass would start at Raymur Avenue, pass over top of Glenn Drive, the railway track, Vernon Drive and align with William Street to T into Clark Drive. Avoids impact to Cottonwood Community Gardens Avoids impact to produce row east of Thornton Avoids impact to Animal Control Facility Closure of Hawks Avenue and the street RoW beneath the Cottonwood Community Gardens could net out the property requirement for the new roadway, ensuring no net loss of park space. Cost savings relative to the National and Malkin Options (shorter overpass) could be used to invest in improvements to Strathcona Park and the community gardens. Impacts Strathcona Park. Requires modifications to the established Park property boundaries, which are not supported by the Vancouver Park Board. Introduces an arterial street between Strathcona park and Cottonwood Community Gardens Property acquisition and resultant business impact to industrial business East of Glen Drive (narrow cross section). OPTION / MALKIN AVENUE (North) HASTINGS A RESIDENTS ATLANTIC AT GARDENS COMMUNITY NI COMMUN RO ROW PRODUCE Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. The option seeks to minimize the impacts of a Malkin Avenue alignment on Produce row, by utilizing the northerly portion of the RoW for Malkin Avenue between Hawks and Raymur Avenue, which would require the relocation of the Cottonwood Community Gardens. The railway overpass would start at Raymur Avenue, pass over top of Glenn Drive, the railway track, Vernon Drive and align with Charles Street to T into Clark Drive. Northerly alignment relative to National Ave option, providing Better balance between proximity to First Ave and Hastings St arterials Better access and local service to Strathcona community. Wider average available cross section than National Avenue Buildings, land use and street connections to the north and south of the entire alignment Avoids impact to City s National Works yard and Fire training facilities. Significantly lower cost as compared to National Ave option Better soil conditions as compared to National Ave alignment (approx. 5 m depth to competent soils) Requires relocation of the Cottonwood Community Gardens Significant impact to Produce Row east of Chess St (reduced compared to leading Malkin Avenue option) Property acquisition and resultant business impact to industrial business East of Glen Drive (narrow cross section). Impact to City s Animal Control Facility.

Previously Prior/Venables Considered Replacement Options OPTION / NATIONAL AVENUE (Grid) PARKS * For a full list of Pros and Cons for a National Avenue option, please refer to Page 6. CITY FACILITIES RAIL Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. This option seeks to deliver a more permeable and interconnected urban street grid network through the Providence healthcare site. Permeable and interconnected urban street grid network. * Does not achieve adequate transportation performance requirements (significant reduction in capacity and travel time reliability relative to existing connection on Prior and Venables street). * OPTION / NATIONAL AVENUE (Diagonal) PARKS * For a full list of Pros and Cons for a National Avenue option, please refer to Page 6. CITY FACILITIES RAIL Note: Impacts which are neutral to the options i.e. both impact equally e.g. the need to relocate or reconfigure Firehall #1 are not listed, but are accounted for in cost estimates as applicable. This option seeks to deliver optimal traffic performance for the National Avenue option by bisecting the future Providence Healthcare site. Best traffic performance of the National Avenue options. Reduced impact to Atlantic Street Residents * Significantly jeopardizes the viability of the proposed Providence Healthcare Campus. *