COSMETOLOGY September 30, 2010

Similar documents
MEDIA CENTER September 30, 2010

ENVIRONMENTAL HORTICULTURE: AGRISCIENCE AND BIOTECHNOLOGY September 30, 2010

CULINARY OPERATIONS September 30, 2010

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: CHILD CARE

Bid Response: Formal Sealed Bid

Bethlehem University 2008 Projects Summary

TRADITIONS 2017 COLLECTION SINGLE SECTION HOMES

New Home Country Living

SPACE TYPES & REQUIREMENTS

EQUIPMENT GUIDE LIST - CHAPTER

TRINITY LUTHERAN SCHOOL RENOVATIONS

Platinum Features - Multi Section

Bath Planning Worksheet

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS

room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Special Features 3638 Quail View Road Charlotte, NC ,076 SF Heated Living Area Acre Lot July 14, 2009

TERRACE VIEW APARTMENTS

Number of persons with a disability that live with a disability in your community?

room data sheet MARR HOTEL 401 POWELL STREET, VANCOUVER, BC 1/9 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS

Damaged Item Replacement Price List

SPACE NEEDS PROGRAM. Leicester Fire Department. Leicester Fire Station. July 27, 2009

SCOPE OF WORK. 506 N. Chadbourne Ave, San Angelo, TX. 1. Build and outfit kitchen are in accordance with established drawing

room data sheet GASTOWN HOTEL 110 WATER STREET, VANCOUVER, BC 1/11 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

MOLSON S BANK BUILDING 166 EAST HASTINGS STREET, VANCOUVER, BC

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Custodial Guide

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

FEATURES. Space-saving, full-size front-loading two piece energy efficient stacking washer and dryer In-suite security system

DIVISION 10 SPECIALITIES

Tillamook High School Bond Projects

LIVE WORK SHOP PLAY WESTGATE AT THE GLEN

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Coquille Indian Housing Authority Maintenance Report February 2017

Bedroom Front / Middle / Back Right / Left Side Charges $5 $10 $5 $5 $10 $5 $5 $5 $5 $5/ea $10 $5 $3/ea

MODEL ERH-44G041 2 BEDROOM, 2 BATH NOMINAL SIZE: 24 X44 TOTAL AREA: 933 SQ. FT.

Chapter 6: Plumbing Elements and Facilities. 603 Toilet and Bathing Rooms Wheelchair Accessible Compartment

room data sheet MARBLE ARCH HOTEL 518 RICHARDS STREET, VANCOUVER, BC 1/14 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Use a minimum loading pad 6' curb length of a hard surface to connecting curb and sidewalk.

ATHENS PARK MODEL SERIES

2017 OPTION PICTURE GUIDE Heritage Collection

TheHeritage COLLECTION SINGLE SECTION HOMES

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

The Ultimate Home Value with Quality, Durability & Flexibility in Design

TERRACE VIEW APARTMENTS

Damaged Item Replacement Price List

PORTFOLIO SARAH NG

bold/italic items are revisions to the previous program notes

TERRACE VIEW APARTMENTS

ATTACHMENT A - ITEM DETAIL

Taylor Oaks. Architecturally Enhanced Exterior Features: Efficient Kitchens Designed for the Gourmet Chef or the Busy Family: Luxurious Master Suites:

TERRACE VIEW APARTMENTS

A heritage of excellence. Lifestyle. Choice. For you. For life.

Library stacks and records storage 150 LB/SF live load

Calmeca Academy of Fine Arts and Dual Language

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

PATIENT CARE Single Wardrobe, Open Single Wardrobe, Door Double Wardrobe, Open. Double Wardrobe, Doors (shown) 5232 (reversed)

TERRACE VIEW APARTMENTS

PALM HAVEN. We measure our success. by the size of your smile! San Jacinto Division

Forest Hills Facilities Plan

Facilities Management Services

MEDICAL MEDIA SERVICE (248)

Beaufort County Community College. Maintenance and House Keeping Plan

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

CENTRAL GREAT PLAINS SERIES

CLINICAL SERVICES ADMINISTRATION (214)

SUNSET RIDGE. We measure our success. by the size of your smile! San Jacinto Division

Bradford 20 Wide Series

Large format glazed porcelain tiles as selected by designer Washable low sheen acrylic paint

Please keep in mind that check-out time is 12:00 Noon on the last day of the month!!!!!

OPTION PICTURE GUIDE Heritage & Elite

Maintaining Seniors Independence Through Home Adaptations A SELF-ASSESSMENT GUIDE

4.0 SERVICES AND SCHEDULE

AMBER COVE. We measure our success. San Jacinto Division. By the size of your smile!

C.U.S.D. Elementary Education Specifications. Facility Services. Dr. Janet Young, Ed.D. District Superintendent

Move In Report. Report Information

Home Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI

Landscape Includes sprinkler system Irrigation, system maintenance, and landscape upkeep are all included in H.O.A. dues

KCKHA PRICE LIST 2015

CHARGES FOR REPAIRS AND SERVICES Please note prices are subject to change without prior notice.

Electrical Inspection Special Electrical

Arlington Public Schools Purchasing Office

Proudly made in. Canada. to Canadian Standards. The CJ Series. 20 Wide Homes

Agustin Lara Elementary Academy

Checklist for Housekeeper / Home Cleaning Service / Cleaning Maid

Celebrating 75 years of Schult excellence.

9333 Ehler Avenue SE Delano, MN

sjvhomes.com Quality Pfister chrome plumbing fixture Refrigerator space plumbed for ice-maker Quality Pfister chrome plumbing fixture

9 BERRYMAN STREET. Approximately 2,980 sq. ft. (on all levels) Closing Date: Two parking spaces

SOCI AL WORK SERVI CE (282)

HIGH SCHOOL SPACE REQUIREMENTS AND SPECIAL CONDITIONS. New School and Facility Planning August 2006 MALL CONCEPT PROTOTYPE 2000 HIGH SCHOOL

MAINTENANCE STANDARD LABOR CHARGE ESTIMATE AMOUNTS

34 Delhi Street Belfast BT7 3AJ

Strongroom elements EH-series

Transcription:

COSMETOLOGY September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements listed below: 1 1 1 1 Facial 1 Locker 1 Toilet 1 Reception Area 1 Teacher Planning/Material Storage Rm. II. PROGRAM FURNITURE AND EQUIPMENT Refer to the Furniture and Equipment List for Owner-provided furniture and equipment. III. SPECIAL CONSIDERATIONS 1. Heating/Ventilation/Air Conditioning Provide exhaust fans the and to assist in the removal of fumes. 2. Acoustical 3. Floor 4. Walls 5. Ceiling 6. Lighting 7. Windows Exterior windows should be provided with a sill height above 5-0. Provide an observation window, 36" wide x 48" high, from the into the Related Classroom. Provide an observation window, 36" wide x 48" high, from the Teacher Planning/Material Storage into the. Cosmetology1

8. Doors Provide an exterior door into the Reception Area, for use as a public entrance. Provide a dutch-type door with shelf between the and the. Provide a half-glass door from the into the Teacher Planning/Material Storage. Provide a half-glass door from the into the Facial. Provide a half-glass door from the into the Reception Area. 9. Water Provide eight (8) black porcelain shampoo bowls with hot and cold water. Provide a 2" water supply line to the shampoo bowl area to insure adequate pressure at each fixture. Provide a water heater, sized to supply a minimum of 100 gallons per hour at 140. Toilet Provide one (1) toilet and one (1) wall-mounted lavatory with cold water. Provide one (1) double sink with hot and cold water and drainboard. Facial Provide one (1) sink with hot and cold water. 10. Communications Provide a clock, speaker and intercom handset in the,, and Teacher Planning/Material Storage. Provide a data outlet with adjacent power outlet in the, and Teacher Planning/Material Storage, in accordance with the General Design Requirements section and SDHC standards. Provide a voice/data outlet in the Reception Area of the, in accordance with SDHC standards. Provide a TV bracket with DVD/VCR bracket, CCTV jack, and adjacent power outlet in the, in accordance with SDHC standards. 11. Electrical Provide a duplex outlet at each Owner-provided workstation ( dresserette ), number and location as directed. Provide two (2) duplex outlets above the countertop. Reception Area Provide a duplex outlet at the reception counter. and Facial (each) Provide three (3) duplex outlets above the countertop. 12. Gas and Air Not Applicable Cosmetology2

13. Safety 14. Fencing 15. Service Drives 16. Parking 17. Contractor-Provided Equipment and Casework Provide a base cabinet, 12 deep x length as required. The shampoo bowls are to be mounted 36 apart on the face of this cabinet. In the space between the bowls provide storage units, each consisting of a 12 high sliding door on top and an 18 high hinged door below. Countertop to be 36 above the floor. Provide nine (9) linear feet of base cabinets, countertop to be 36" above the floor. Provide approximately twenty-four (24) 10 x 10 open cubbyholes within the base cabinet. Provide nine (9) linear feet of lockable base cabinets, to include the sink and one (1) adjacent bank of lockable graduated drawers, countertop to be 36" above the floor. Locker Provide twenty four (24) lockers, 12" wide x 15" deep x 30" high, supported on a 4 high concrete pedestal with a vinyl base. Reception Area Provide one (1) reception counter, to consist of a 36" high x 24" deep x 72" long base cabinet. This cabinet is also to include a 30 wide knee space, one (1) adjacent bank of graduated drawers and a lighted display case with glass shelves. Facial Provide six (6) linear feet of lockable base cabinets, to include the sink and one (1) adjacent bank of lockable graduated drawers, countertop to be 36" above the floor. 18. Contractor-Provided Instructional Aids Provide a 12' wide x 4' high markerboard with a 4 wide x 4' high tackboard on one (1) side, bottom to be mounted 36" above the floor. Provide a wall-mounted audio-visual projection screen, approximately 70 x 70, centered over the markerboard. Locker Provide an 18 wide x 60 high framed mirror, bottom to be mounted 18 above the floor. Cosmetology3

19. Other Considerations This is to be located on the ground level, easily accessible to the public. Locate the Reception Area near the Teacher Planning/Material Storage. Locate the near the Toilet near the Reception Area. Cosmetology4

SPACE RELATIONSHIPS Toilet Reception Area Locker Facial Teacher Planning/ Material Storage Related Classroom Cosmetelogy Cosmetology5