Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Similar documents
SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Request for Proposal

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Town of Oakville Streetscape Strategy

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

April 22, 2011 PART I

Route 1 Corridor Study

SCTPO Project Summary September 2014

Implementation Guide Comprehensive Plan City of Allen

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Q:%4~ Memorandum CITY OF DALLAS

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Roundtable Meeting #1

Executive Summary. NY 7 / NY 2 Corridor

Chapter 1.0 Introduction

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

I. INTRODUCTION. Project Background and Study Area

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

CITY OF PUYALLUP. Background. Development Services

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

TOWN OF NEW CASTLE - Master Plan Update

Sustainable Development Call for Projects Western Infrastructure Project Submissions

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Downtown Streetscape Manual & Built Form Standards

Independence Boulevard Area Plan Planning Committee Public Comment May 18, 2010

COLVER ROAD INDUSTRIAL CONCEPT PLAN

hermitage town center

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Palm Beach County (University Drive Removal) and Broward County (Transportation Element) Remedial Amendments

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Streets for People, Place-Making and Prosperity. #TOcompletestreets

PART 1. Background to the Study. Avenue Study. The Danforth

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Evaluation Criteria. Detailed Evaluation Criteria

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

This page left intentionally blank.

EXECUTIVE SUMMARY. Introduction

Public input has been an important part of the plan development process.

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

State Highway 5 Corridor Context Sensitive Master Plan

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

6 Growth Management Challenges and Opportunities

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Elfrida Growth Area Study

Urban Planning and Land Use

JASPER PLACE. Area Redevelopment Plan

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

Report to: Development Services Committee Report Date: April 24, 2017

26/Old Dominion Task Force

City of Toronto. Emery Village Transportation Master Plan

Atlanta BeltLine Subarea 3 Master Plan Update

Introduction and Overview

Lesson 6. Corridor Planning

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

INDEPENDENCE BOULEVARD AREA PLAN. Economic Development Committee Overview May 25, 2010

Welcome. Walk Around. Talk to Us. Write Down Your Comments

North Fair Oaks Community Plan Summary and Information

Richmond Road Complete Street Meeting #1, April 25, 2016

Local Growth Planning in North Central Green Line Communities

ARTICLE 6: Special and Planned Development Districts

St. Clair Avenue West Area Transportation Master Plan

The Project. In 2013, construction was completed between 100 Street and 102 Street.

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

The Trinity River Corridor, offering Dallas areas of natural

Hockessin Community Redevelopment Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Issues Requiring Future Study

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

City of Hermosa Beach Administrative Policy #

Toronto Complete Streets Guidelines

Waverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018

S C O P E O F W O R K A P R I L

Beachside Redevelopment Committee

Rapid Transit Implementation Working Group September 14, 2017

The transportation system in a community is an

TAC/CAC, TPO Project Update February 2016

Miami Valley Regional Planning Commission Regional Land Use Planning

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Introductions Project overview Scope of work Schedule. Agenda. Community/Stakeholder Input Process Discussion Summary/Next Steps

SECTION E. Realizing the Plan

TORONTO COMPLETE STREETS GUIDELINES

Acknowledgments. City of East Peoria. City of Washington. Aldermen. Commissioners. Staff. Staff. Planning Consultant. David Mingus, Mayor

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

METRO Gold Line BRT CBAC Meeting. August 23, 2018

BUDGETING FOR OUTCOMES TRINITY RIVER CORRIDOR

Transcription:

Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity River to the south (approximately 1.9 miles). The width of the corridor will vary from one to two parcels in depth on either side of the roadway. The intersection of SH 183 and SH 199 is not part of this scope of work and will be included in a future SH 199 Corridor Master Plan. PROJECT DESCRIPTION For the past several years, the City of River Oaks has participated in a sub-regional planning study referred to as Planning Livable Military Communities (PLMC). This effort consisted of a series of planning studies that identified strategies related to transportation, housing, land use, and economic development to enhance livability in several communities surrounding the Naval Air Station Fort Worth, Joint Reserve Base. Through the PLMC effort, River Oaks Boulevard (SH 183) in the City of River Oaks was identified as a vital regional transportation facility that primarily serves as an access corridor for commercial development and nearby major employers. Significant opportunities exist to evaluate the addition of multimodal capacity while also promoting economic development along the corridor. Visionary concepts to balance mobility and accessibility improvements with economic development were developed for the corridor during a week-long PLMC visioning charrette. The next step is to produce a corridor master plan to identify costs and constraints associated with implementing these Page 1

visions. The corridor master plan should address the feasibility of strategies to support modern urban design, improve access, incorporate Context Sensitive Design principles, and enhance economic development along River Oaks Boulevard. It is anticipated that this master plan will be the basis for preliminary design and engineering and will be the first step in a phased approach to making improvements to the corridor. Existing SH 183 River Oaks Boulevard Planning Livable Military Communities SH 183 River Oaks Boulevard Visionary Concept SCOPE OF SERVICES Task 1: Data Collection/Existing Conditions Analysis Overview: The project partners will provide relevant baseline data to the Consultant in order to analyze existing land use, transportation, and urban design conditions along the corridor, beyond what has been documented during the PLMC process. Data will include, but is not limited to: Aerial photography Parcel data Existing land use and demographics Existing zoning code and map Current development plans in progress Current ROW plans and data Utility plans (water, sewer, etc.) Page 2

Existing traffic volumes Traffic projections and demographic forecasts City thoroughfare plans Analysis and concepts developed from the PLMC effort Emphasis will be placed on elements that were not included in the PLMC existing conditions analysis, including ROW plans and data as well as utility plans. Roles and Responsibilities: The City of River Oaks, NCTCOG, TxDOT, and Tarrant County will provide data as appropriate. The Consultant will add to the documented existing conditions from the PLMC effort and identify issues related to the SH 183 corridor. Deliverables: Summary of existing conditions along the corridor, including maps and charts. Timeframe: Approximately 5% of total effort Task 2: Vision Refinement & Public Involvement Overview: Through the PLMC effort, a preliminary vision was developed for the SH 183 corridor. The visionary concepts developed during the weeklong charrette include: Construct bicycle/pedestrian facilities along the corridor Include mixed-use development where appropriate Create a sense of place Delineate driving lanes and parking areas Improve the visual aesthetics along the corridor Public Involvement and Vision refinement will be handled in two ways. 1. Consultant Led Efforts a. The Consultant will work with NCTCOG staff, the City of River Oaks staff, elected officials, and key community groups and property owners along the corridor to further refine the vision for the corridor. The vision should identify preferences towards elements such as street design, access management, bicycle/pedestrian facilities, green infrastructure considerations, and desired redevelopment adjacent to the corridor. The purpose of these targeted stakeholder discussions will be to solicit input, establish priorities among the existing visionary concepts, and build consensus on the objectives of the corridor master plan. Emphasis will be placed on reaching out to existing business owners along the corridor to establish consensus on the priorities of the master plan. b. A Stakeholder Steering Committee will be developed to guide the development of the corridor master plan. Additionally, the consultant must meet with TxDOT, utility providers, Tarrant County, and possible transit groups regarding the feasibility of the Vision Plan and to discuss the process for design and implementation. 2. NCTCOG will take the lead in coordination with the City and consultant on community wide meetings to introduce the project, solicit broader community feedback, and to present the final outcomes. Roles and Responsibilities: The consultant will engage targeted stakeholders to discuss project scoping and visioning and final outcomes of the Master Plan. The Consultant will assist NCTCOG staff to prepare meeting materials for the larger community meetings. NCTCOG in coordination with the City of River Oaks will host, advertise, and conduct meetings. Deliverables: Summary of public involvement efforts and discussions. Timeframe: Approximately 10% of total effort Page 3

Task 3: Streetscape Operation and Design & Drainage Overview: Based on the input received from the vision refinement phase and an analysis of existing conditions, the Consultant will develop roadway and streetscape designs that will serve as the basis for preliminary design and engineering for the corridor. The designs should address elements in the following categories: Structural Alternative roadway design elements Parking and building orientation Bicycle and pedestrian access and improvements Aesthetics Landscape and signage elements Lighting and pedestrian amenities Community gateway features Safety & Operations Intersection safety and operations Access management with attention to driveways conflict points Architectural design controls and utility modifications Public transportation elements The consultant must coordinate with TxDOT on the proposed conceptual design of elements such as medians, streetscape, intersection, and roadway plan. The street and streetscape designs should include the following: Streetscape Master Plan conceptual plan that defines the locations and types of proposed streetscape improvements including street furniture and landscaping for the entire corridor. Roadway Plan provides cross-sections by station, if it is not typical design, including details of proposed roadway section, landscaping, lighting, drainage, and traffic operations improvements. Prototypical Primary Intersection Plan depicts the location, type, and engineering details of proposed landscaping, lighting, drainage, and traffic operation improvements that could be used for primary intersections along the corridor. Provides cross-sections at each primary intersection, if it is not typical design, excluding the intersection of SH 183 and SH 199. Prototypical Secondary Intersection Plan depicts the location, type, and engineering details of proposed landscaping, lighting, drainage, and traffic operation improvements that could be used for secondary intersections along the corridor. Provides crosssections at each secondary intersection, if it is not typical design. Design Implementation Scenarios identifies at least two scenarios for implementation, including an ultimate build scenario in which all recommendations would be constructed and another scenario that outlines short-term, low-cost solutions utilizing excess ROW (especially in relation to the existing slip-lanes within the corridor) that could be implemented if the major corridor improvements aren t immediately funded. An example of lower-cost, short-term solutions could be a demonstration block or catalyst site project showcasing urban design and land use elements that consider Context Sensitive Design. Page 4

Preliminary Analysis of Stormwater Issues Conduct a preliminary analysis of stormwater and drainage issues identifying various mitigation strategies including low-impact design and green infrastructure ideas for the corridor. Recommendations should be made for short-term solutions and a longer term, full build out scenario with needs identified and an analysis of priority improvements and impacts of treatments provided. An opinion of probable cost should be provided with an implementation plan for next steps. Roles and Responsibilities: The Consultant will produce the proposed roadway and streetscape designs, conduct the preliminary analysis of stormwater issues, and periodically brief stakeholders and the steering committee to solicit feedback. Deliverables: Streetscape master plan, cross-section plan, prototypical primary and secondary intersection plans, design implementation scenarios and associated computer visualizations such as sections, renderings, site plans, assessment of stormwater/drainage issues, and cost estimates. Short term priority projects should be clearly identified. Timeframe: Approximately 50% of total effort Task 4: Review of Policy/Regulatory Guidelines Overview: The elements considered in Task 3 are standard components conducive to a formbased code area or zone, which could develop a cohesive character along the corridor. In preparation of the City of River Oaks potentially adopting a form-based code, the Consultant will outline a process for implementing form-based codes in the city based on a review of existing land use codes, zoning regulations and/or design guidelines. This will include a highlight of challenges and opportunities and also suggestions for a complete overlay vs target site application. Roles and Responsibilities: The Consultant will conduct this task with assistance from River Oaks staff as appropriate. Deliverables: Summary of steps to implement form-based code in the City of River Oaks. Timeframe: Approximately 10% of total effort Task 5: Financial Considerations Overview: The Consultant will identify the preliminary costs and constraints to implementing the proposed improvements identified in Tasks 3 and 4. The financial analysis should include a summary identifying necessary steps forward and anticipated funding gaps. Roles and Responsibilities: The Consultant will conduct this task with assistance from the other project partners as appropriate. Deliverables: A summary of estimated costs and potential funding sources for the recommended street and streetscape design improvements and any changes to policy/regulatory guidelines. Timeframe: Approximately 10% of total effort Page 5

Task 6: Corridor Master Plan Report Overview: The corridor master plan will incorporate the deliverables from Tasks 1-5 as well as an overall phased implementation plan with estimated timeframes, costs, and proposed responsible entities. The public and other interested stakeholders will be briefed on the components of the corridor master plan at a Council briefing or public meeting led by NCTCOG. Roles and Responsibilities: The Consultant will produce the draft corridor master plan and solicit comments from the other project partners during an official review period. The Consultant will incorporate the comments received into the final corridor master plan. Deliverables: Draft and Final Corridor Master Plans and associated reference and/or presentation materials for final public meeting. Scenarios for short-term, low cost improvements vs longer term, full reconstruction should be included. Short-term wins can be a combination of policy, programs, and project recommendations. Timeframe: Approximately 15% of total effort Project Management NCTCOG and the Consultant will coordinate on items related to project management throughout the development of the master plan including: Progress Reports and Billing Reports Conference Calls (bi-weekly; as needed) Presentations & Stakeholder Meetings Coordinate with any Steering Committees created for the project (e.g. Business and Land Owner Steering Committee) TIMELINE The project is anticipated to take approximately 12 months or less to complete. A proposed timeline is included below. Suggested modifications or adjustments are appropriate. Task Project Initiation Data Collection/Existing Conditions Analysis and Vision Refinement Street and Streetscape Design, Review of Policy/Regulatory Guidelines, and Financial Considerations Corridor Master Plan Final Report Estimated Completion 1 month 3 months 6 months 2 months Page 6