THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

Similar documents
ENVIRONMENTAL IMPACT ASSESSMENT

I539. Smales 2 Precinct

Slough International Freight Exchange Proposals, Colnbrook+

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

BACKGROUND INFORMATION DOCUMENT

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Northeast Corner of Steeles Avenue West and Jane Street, City of Vaughan

BASIC ASSESSMENT PROCESS

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Linden Homes Proposals for land off Ringwood Road, Verwood

ENVIRONMENTAL IMPACT ASSESSMENT

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

HARTENBOS NORTH (population: Census 2011)

Development Brief Ursuline Convent, Blackrock, Cork

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

University Park, Worcester Non Technical Summary December 2011

Has there been interest in the site from other parties since St. Modwen owned it? No

Please take time to view our latest plans, speak to the development team and ask any questions you may have. EALING BROADWAY A4020

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PUBLIC PARTICIPATION REPORT MINUTES OF PUBLIC MEETING

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Land at Fiddington Hill Nursery, Market Lavington

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Implementing sustainable water strategy through development industry engagement

PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE; 4700 OVERLAND DR (MKM)

HS2 Interchange Station Design

The Dreispitz in Basel / Switzerland: New economy on old sites

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Cape Flats Wetland Forum Ecological rehabilitation and public green space projects for social development.

Welcome. Walk Around. Talk to Us. Write Down Your Comments

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

Public Workshop #2 Summary

March 21, 2018 ALCA Meeting. March 21, 2018

Services Department F May 28, 2007

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

CALA HO ME S WELCOME

Warren Farm, Ampthill

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

Northeast Corner of Steeles Avenue West and Alness Street, East of Keele Street, City of Vaughan

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

WRITTLE PARISH COUNCIL

Faversham Creek Neighbourhood Plan Steering Group Meeting Minutes Wednesday 23 rd May pm pm. The Guildhall, Faversham

ENVIRONMENTAL IMPACT ASSESSMENT

Waverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018

EAST VILLAGE STRATEGIC SITE NOVEMBER 2017

Public Consultation. Land at Monks Farm, North Grove. Welcome

Re: London Borough of Bexley Local Government Boundary Review

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

MID SUFFOLK DISTRICT COUNCIL

A DRAFT ALLOTMENT POLICY FOR STIRLING COUNCIL

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

Director, Community Planning, Etobicoke York District

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

Linden Homes Proposals for land east of Glebe Farm, Sawtry

Overview Report. Proposed Development

Welcome. /The Design Companion 4. /Planning London 7. /Getting Homes Built 8. /Transport & Streets 10. /Tech & The City 12

SECTION 4(f) DE MINIMIS DOCUMENTATION

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

Application Recommended for Approval Hapton with Park Ward

What progress have we made so far? NEWSLETTER PROPOSED IONA RESIDENTIAL DEVELOPMENT UPDATE

Guidance Notes Completing an AEE

Land at Rampton Road. Cottenham

Heritage Resources Management

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary

Welcome to our public exhibition

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Figure 3-1: Public Realm Plan

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA

Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10th August 2016

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

Beatties Ford Road & Mt. Holly-Huntersville Road Small Area Plan

1) Masterplan and design principles

Ashbridges Bay Erosion and Sediment Control Project

10.0 Open Space and Public Realm

Red Fox Commercial Outline Plan

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Further input invited as Colchester Growth Strategy nears final phase

Leduc Industrial Outline Plan SE W4

Revised Planning Rationale in Support of an Application for Site Plan Control Leitrim Road City of Ottawa

Heritage Markham Committee Meeting City of Markham

HAMLET OF KINGMAN AREA STRUCTURE PLAN

5 PLANNING ANALYSIS 5.1 THE SITE AND ITS DEVELOPMENT CONTEXT

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

Transcription:

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI DATE: Monday, 26 th November 2012 VENUE: John Jacobs Room, City of Cape Town offices, Constantia TIME: 17h30 19h00 FACILITATOR: Sadia Chand CLIENT AND PROJECT TEAM ATTENDEES Mike Vietri Derek Chittenden Tommy Brummer Izak Burger Sadia Chand Elizabeth Dudley Mellissa McJames KEY STAKEHOLDERS IN ATTENDANCE Penny East Jenny Dickerson Michael Scott Louise Kinrade Jean Fillis Guenter Reuels Hutch Hutchings The Tokai Trust (Faircape) BlueGreen Planning & Design Tommy Brümmer Town Planners MLB Architects Chand Environmental Consultants Chand Environmental Consultants Chand Environmental Consultants Ward Councillor Tokai Residents Association (TRA) Tokai Residents Association (TRA) 1

INTRODUCTION AND THE PURPOSE OF THE MEETING: SC welcomed all the key stakeholders to the Focus Group Meeting and explained that the purpose of the meeting was to gather initial comment and concerns from key stakeholders. It was also explained that as representatives of their organisations, it would be important for the key stakeholders to disseminate the information presented at the meeting to other interested parties. SC requested that all the attendees introduce themselves. SC noted that Chand Environmental Consultants is an independent environmental company appointed to conduct the legislated Basic Assessment process. PRESENTATION: SC and presented to the key stakeholders. described the design informants and conceptual proposal and SC explained the Basic Assessment process that is being undertaken. AGENDA: Introduction and Aim of the Meeting Description of the Site Design Informants Conceptual Proposal Environmental Impact Assessment Process and Public Participation Activities Discussion DISCUSSION: COMMENTATOR COMMENT RESPONDENT RESPONSE GR Is the site considered to be in Tokai? Why is it the Tokai Estate? We understand the M3 to be the boundary and that east of the M3 is considered to be Kirstenhof. The name creates confusion. TB Technically, the greater area falls within Constantia. However, the City was approached for confirmation and it was indicated that there appears to be confusion around this and that residents in the area consider themselves to be in either Kirstenhof or Tokai depending on the individual. There is also an understanding that east of the M3 but north of Tokai Road is considered Tokai. Blue Route Mall is considered by many to be in Tokai. 2

GR Perhaps the use of Dreyersdal in the development name should be considered to avoid confusion. The rich history associated with the farm adds to this name. People usually refer to the Blue Route Mall as being in Tokai. The farm owner will not allow for the farm name to be used. An official name for each of the developments has not yet been decided. LK Are you aware of the source to sea project? A lot of work has been done on the Keysers River channel both up and downstream of the proposed site and this project should be used to inform the rehabilitation work proposed. It is suggested that you engage with Mandy Noffke of WESSA, who has been involved in this project. I have received an electronic copy of the Source to Sea project. Initial input received from Dr Liz Day and frog specialist James Harrison was used to inform the design of this development and it is understood that Liz Day was also involved in the Source to Sea project. I would however be happy to also consult with Mandy in this regard. GR How will the development be rolled out e.g. as units are bought or upfront? It has not been decided as yet. JF Does the Keysers River fall inside the property boundary? No, the river falls outside the property boundary. There is a 25m long servitude between the property boundary and the land on the opposite bank which accommodates the river channel as well as a sewer line. JF What is the setback of buildings from the river edge? 20-25 metres, it varies with each river-side unit. LK Although the majority of the site is flat, it slopes steeply towards the river channel. How will you handle construction of buildings in this area? The setback line proposed in the current layout means that no construction would occur within this sloped area, building lines would stop before the steep slope towards the river channel. Initial work with Liz Day on the potential river rehabilitation measures that could be undertaken suggested that the river bank should be adjusted to a more natural gradient which would change the gradient of this slope in places. How will you preserve the permeability of the site? Stormwater design is compliant with the City s stormwater 3

management policy and promotion of recharge forms part of the design. Permeable paving will be utilized. Originally, stormwater retention ponds were incorporated into the design however the use of permeable materials has eliminated the need for these ponds. Will the Private Open Space be leased or do you intend to buy it? How will it be managed? It has not been confirmed as yet, either we will purchase it or have a long term lease agreement. Regardless, there will be a joint management agreement to control the maintenance of the wetland area and to prevent vagrancy. It is within our interest to ensure that the wetland remains pristine and it is intended that access would be provided to the public in this area. What is the zoning of the land to the north of the site and who owns that land? TB/ The land to the north of the site (where the olive grove is planted) is zoned single residential and therefore has property rights for residential development in the future. This land is owned by the farm owner of Dreyersdal Farm. A road from the northern section of the proposed site has to be provided to this land as an access point should the landowner decide to develop in the future. It is therefore possible that besides the traffic generated by this development proposal, future development of the land to the north would also contribute to the traffic in the area. Correct. The presentation indicates that the proposal is well below the allowable bulk provided for by the zoning of the site. But these property rights are 40 years old, the surrounding area has become increasingly built-up over that time and there has been a huge increase in traffic resulting in gridlock situations. Although the landowner has land use rights, the City of Cape Town needs to accommodate the additional Traffic is as much a concern for the developer as it will affect the future residents of the proposed developments. This is why a decision has been made to undertake a Traffic Impact Assessment. The findings of this study will assist in determining how to address this issue. It should further be noted that the Cape Town Zoning Scheme was promulgated by the City of Cape Town today. This re-entrenches these property rights and as such, they are technically only a day old. 4

traffic that is occurring on the roads as a result of ever increasing development. Furthermore, it was indicated that traffic volumes will be less because of the nature of the development, however the health care centre would not only generate traffic from staff, but also from food delivery, medical waste trucks etc. on a regular basis. In addition, it should be assumed that each household in the retirement village would have at least one car these days the retired community are active and usually have their own transport. Traffic is a big concern to us. How big is the scope of the Traffic Impact Assessment? The scope of the TIA will include: Analysis of service levels of the accesses at the controlled gates to ensure that public roads are not affected negatively; and Changes in traffic on Vans Road and Keyser River Drive due to the development. JF The site is currently used by dog walkers as the only available open land in the area. Will consideration be given to accommodating them when the site is developed? There is currently public open space alongside the southern boundary of the site. However, we would like to accommodate the dog walkers and it is intended that a walkway on the opposite side of the river in the Private Open Space area would be provided for use by the surrounding public. JF Is this land accessible? A small footbridge or similar structure would need to be constructed over the channel. JF There are a number of small plot developments on Park Avenue (off Windsor Road) which face onto the proposed site. Given that the retirement development would comprise two storey units, the design should consider these Noted. The units on this boundary have been designed to be northfacing and as such would not overlook these properties. Furthermore, a 8m wide landscaped buffer with trees is proposed on the western boundary to provide visual screening. 5

neighbouring units, and if possible, the development should not overlook these properties. LK You may be aware of a proposed Meridith Harrington office development in the vicinity of Dam Road, the BP garage and Keysers River Drive which is currently in court. If this development gets approved there will be a huge increase in traffic flow at the Keysers River Drive intersection. It is suggested that you investigate the possibility of extending the current deadend at Brocker Road* which currently ends in the M3 flyover as an access to the residential estate. This would take at least half the traffic load off Keysers River Drive and only vehicles for the retirement village would need to use Keysers River/Windsor and Vans Road as access. The team will investigate this possibility with the appointed traffic specialists. Note: In further discussions which took place after the closure of the meeting, stated that this alternative access would not be a feasible option for a number of reasons; the flyover intersects land that is not owned by the developer and would require a long extension (greater than 500m) across undeveloped land (currently farmed with olive trees) down to the site. Furthermore, it would affect an additional group of residents in the Lizmore Road area. *It was later established that this road is actually an extension of Lizmore Road and not Brocker Road. SC thanked all those present for their attendance and valuable input. The meeting concluded at 18h30. 6