Ca 6s and BCa 6s kw INSTALLATION AND OPERATING INSTRUCTIONS. Page 1 31/07/00

Similar documents
GENERAL DESCRIPTION AND INSTRUCTIONS FOR KFG CONTROL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

STREBEL S-CB + Cascade Kits

DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS

Installation and maintenance instructions

This appliance has been CE-marked on the basis of compliance with the Low Voltage and EMC Directives for the voltages stated on the data plate.

INSTALLATION AND MANINTENANCE INSTRUCTIONS

Thermostatic bar mixer valve with adjustable head Installation guide

Installation, operating and servicing instructions

SS-THVD2-1/2 THERMOSTATIC VALVE WITH 2 WAY DIVERTER SS-THVD3-1/2 THERMOSTATIC VALVE WITH 3 WAY DIVERTER

Cast Iron Boilers. G Series ( kW)

Powerstock Storage Tank

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

TECHNICAL INFORMATION Touchtronic Clothes Dryers

E25 CONVECTION OVEN E25MS CONVECTION OVEN SERVICE MANUAL

INSTRUCTION MANUAL FOR OIL BURNER MODELS

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

E32 CONVECTION OVEN SERVICE MANUAL

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

30C, 40C, 50C & 60C open flue gas fired boiler

User, Installation and Servicing Instructions. Silverlink 600 Gas Griddles GS4 and GS7 IS212 ECN3592

Remove the Testing Certificate from inside the combustion chamber and keep together with the instructions manual.

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

breeze easytm model # F100-1W

Dream DCV. Thermostatic Dual control mixer valve range. Installation guide

E32 CONVECTION OVEN SERVICE MANUAL -1- Revision 1/F3508

Assessment Schedule - TS.6

AGA 13 AMP RETRO-FIT WITH AIMS

Installation & Maintenance Manual

Installation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers

Sorrento & Flamevector Fireplace Boilers

INSTRUCTION MANUAL FOR OIL BURNER MODELS

DIVISION FINNED WATER-TUBE WATER HEATERS

INSTRUCTION MANUAL FOR OIL BURNER MODELS

CLM FORCED DRAFT WATER BOILER

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21

MIDAS. Installation instructions 110/220

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

Service manual. Riva Plus HE. M296.28SR/C System boiler. Wall hung, fanflue, roomsealed, high efficiency gas boiler

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017

Wall hung combination boilers. This is a CAT II2H3+ appliance USER, INSTALLATION AND SERVICING INSTRUCTIONS SUPPORTED BY

S-AF Floor Standing Condensing Boiler kW

21 20 LITER GAS FRYER FFA3200 INSTALLATION AND SERVICING.

WHU WATER HEATING UNITS. GENERAL MANUAL MODEL KEY. June 2007 WHU WATER HEATING UNITS


These Appliances must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

SECTION PLUMBING EQUIPMENT

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

INDEX. Page. Page. Section 1

Light oil burners. One stage operation

HAWK GAS STOVE. Installation and Servicing Instructions

INSTALLATION FOR THERMOSTATIC VALVES

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

User's Instructions. Alpha CD25X/28X. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

Installation and operating instructions B1FUV Classic

BAXI BOSTON ALL MODELS FLOOR STANDING OPEN FLUE (OF) CENTRAL HEATING BOILERS INSTALLATION AND SERVICING INSTRUCTIONS. GAS TYPE G20 (Natural Gas)

HORIZONTAL COOKING SERIES: 700 / 900 S.A.V MAINTENANCE & AFTER SALES WORK PPS-3WE711911CH

User's Instructions. Alpha CD24C/32C. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

AQUA PREMIER ELECTRONIC ELECTRIC SHOWER. Installation and User Guide

Design and Construction Standards SECTION PLUMBING EQUIPMENT

DIVISION FINNED WATER-TUBE WATER HEATERS

Installation & Servicing Manual. for the Ultra range of wall mounted fan assisted balanced flue gas boilers

Glow-worm 56/3e Back Boiler Unit

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions

INSTALLATION AND SERVICING

Compact in size; designed to building modular dimensions to blend unobtrusively with other kitchen furniture.

Installation and maintenance instructions

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Providing sustainable energy solutions worldwide. Installation- and maintenance instruction B 10 E R

R e m e h a P Technical Information. Remeha P 300. Pressurized boiler. Heat output: kw

OPTIMA RADIANT TUBE HEATING SYSTEMS. Operation, maintenance and servicing manual

Osprey 2 CFL

Providing sustainable energy solutions worldwide. Installation- and maintenance instruction B 30 A

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Baxi Solaire Super Gas Fire Natural Gas Comp N o /95

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

HX Field Replacement Kit

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

Installation and maintenance instructions

Parts Available from

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

Heating Equipment. gas boilers RX GB. installation and servicing instructions

Installation Instructions

Installation and Servicing Instructions. Alpha CB50

Installation and maintenance instructions

anti-condensation valve

EDENA CLASSIC E. Model : kw INTALLATION AND SERVICING INSTRUCTIONS. Gas Fired Floor Standing Boiler. Réf. : CH I EN 09/05

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

Installation and maintenance instructions

COAL EFFECT BALANCED FLUE GAS FIRE

User's Instructions. Alpha CB50

OG7302 Salamander Grill

Transcription:

Ca 6s and BCa 6s 33-64 kw INSTALLATION AND OPERATING INSTRUCTIONS Page 1

CONTENTS: General specification Dimensions for Ca6s and BCa6s boilers. Boiler room clearance requirements Boiler block assembly Boiler connections and jacket assembly Diagram BCa6s assembly BCa6s electrical connections and jacket assembly Diagram Instrument control panel description Continued Control module options Control module diagrams Installation of electronic control modules Terminal wiring diagram Schematic wiring diagram Important notes & burner connection information. PAGE: 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Page 2

Ca 6s / BCa 6s General Specifications The STREBEL Camino 6s is a special boiler for oil or gas fired pressure jet burner. In the BICALOR construction a calorifier for the supply of hot water is built onto the boiler. CSH-S type calorifier are manufactured from 1.4571 high tensile steel with an incorporated heating coil of galvanised copper ribbed pipe. Triple pass block of cast iron sections. The first pass is the combustion chamber. From there the flue gases pass between the rear section and the last intermediate section through the second pass to the front of the boiler. They are then diverted into the third pass and flow back to the rear through the flue spigot into the chimney. Calorifier: Maximum operating pressure 10 bar Maximum test pressure 13 bar The boiler can be delived in individual sections or as a boiler block. The accessories are packed seperately. There are different orders of assembly depending on the condition of supply. when assembling and connecting the boiler, all relevant instructions should be observed. The boiler is to be erected on a base, or a level floor which is capable of supporting the weight of the boiler, water content and any ancillary equipment. Refer to base details opposite. Assembly, connections and the initial set-up operation should be carried out by a qualified heating engineer. Flue baffles of cast iron can be introduced into the flue passes in order to influence the flue gas temperature depending on chimney conditions. The boiler can be used with an oil or gas burner. Brief description. Corrosion resistant block of cast iron sections. Triple pass boiler with optimised use of energy. High efficiency. Built-in instrument panel with multiple control possibilities and retro-fit control options. Easy erection and cleaning. Modern design. Operating conditions B A Boiler: Maximum operating temperature up to 110ºC Maximum operating pressure 4.0 bar Maximum test pressure 5.2 bar Min thickness = 60mm Dimensions A B Ca6s-4 940 760 Ca6s-5 1090 760 Ca6s-6 1240 760 Page 3

Boiler Dimensions Ca6s LK Combustion chamber depth Ca6s-4 840 600 Ca6s-5 990 750 Ca6s-6 1140 900 BCa6s LK LB CSH 175S CSH 235S CSH 305S Ca6s-4 840 1010 1310 Ca6s-5 990 1310 1610 Ca6s-6 1140 1310 1610 Page 4

Diagram showing clearances required in boiler room. The clearance details shown above are required for access to the boilers for maintenance purposes. Slight variations may apply, depending on the specific installation. Page 5

Boiler Block Assembly The boiler block is assembled by pulling-up each section in turn starting from the rear section (1). All other sections (2)(3)(4) are mounted individually using the pulling-up tools. One face of the adjoining sections must have a length of mastic sealing strand placed into the mastic groove. Each of the boiler nipples must be inspected to ensure there is no damage apparent. The nipples and nipple ports should then be kept free from dirt and checked at each stage of assembly. Particles of dirt which are not removed lead to leakage. The accompanying nipple jointing oil serves as a lubricant as well as a waterproof seal and must be used. Boiler nipples and nipple ports must align exactly at all stages of assembly. An inclined, retracted nipple leads to leakage. The clearance between the sections throughout the pulling-up stages should always be even. If the clearance is uneven, a flat chisel should be inserted into the narrower point and the sections pulled up until the clearance is even again. Once assembled, the boiler block is to be secured with the tie bars (2 at the top, and 2 at the bottom). Prior to screwing nuts up ensure the two disc springs (5)&(6) are slotted on with concave sides facing each other. The nuts can now be tightened until the disc springs flatten. The burner door hinges should now be fitted on the left or right hand side of the front section depending on requirements. Ensure the eyelet screws (door hinge) are at the same depth and when the door is closed it should press flat with the front section. Diagram showing nipple & boring Page 6

Connections and jacket assembly The diagram over the page shows the assembly of the Ca6s connections and jackets. The order of assembly from (1) to (24) must be observed. Key to components: 1. Left hand lower insulation. 2. Right hand lower insulation. 3. Left hand jacket with insulation. 4. Right hand jacket with insulation. 5. Front bottom bracing angle. 6. Lower door jacket bracing. 7. Upper front insulation. 8. Upper front jacket panelling. 9. Calorifier blanking flange. 10. Top jacket insulation. 11. Inner rear insulation. 13. Burner connection. 14. Capillaries. 15. Top Jacket. 16. Flow header and flange. (Fitted eccentrically upwards). 17. Return header and flange. (Fitted eccentrically upwards). 18. Calorifier blanking flange. 19. Drain cock connection. 20. Rear jacket angle. 21. Outer rear insulation. 22. Rear insulation retainer. 23. Rear insulation retainer. 24. Flue gas spigot. 25. Front Jacket & front shroud. Important points: The burner door can be fitted to swing from either the left or right. Fit hinge bolts accordingly and ensure there is even pressure around door seal by adjusting the depth of the eye holes for the hinge. Note: The burner plug must be mounted on the opposite side. When assembling the floor insulation (1) & (2) as well as the side jackets (3) & (4) care should be taken to ensure they are in the correct position (with burner cable holes facing the front). The water temperature sensors (14) must be pushed with the pressure spring into the immersion sleeves (max. 3 per sleeve) and then secured with the protective guard. Note: The sensor leads (capillary tubes) should not be kinked. Cold water pressure test: The assembled boiler is to be subjected to a cold water pressure test of 1.5 times the operating pressure. The maximum test pressure of the boiler is 5.2 bar. In addition, at the time of testing for water pressure, no pressure control fittings or safety fittings may be assembled which cannot be separated from the water area of the boiler. Only fill, slowly from the bottom via the filling and draining cock. Ventilate during the filling procedure from time to time, until the water emerges. If a nipple connection is leaking then drain off the water via the filling and draining cock. Separate by driving flat wedges around the perimeter of the join between sections. New nipples MUST be used for reassembly. Assemble and repeat test. Page 7

Ca6s Page 8

BCa7s Assembly Follow the steps below for completion of the assembly. The diagram shows the calorifier connections and mounting brackets. Key: 1. Flow connections 2. Return connections 3. Mounting bracket 4. Calorifier primary flow connection 5,7,8 Calorifier primary return connections 6. Non-return valve and charging pump. 9. Drain cock connection Page 9

BCa6s electrical connections and jacket assembly. The diagram over the page shows the assembly for the BCa6s including electrical connection and final jacket assembly. 1. Angled bracket with pipework slots. 2. Jacket alignment bracket. 3. Left hand side jacket. 4. Right hand side jacket. 5. Calorifier top insulation. 6. Top jacket. 7. Jacket mounting bracket. 8. Instrument control panel. 9. Calorifier door. 10. Sensor capillaries. 11. Boiler sensors. 12. Thermostat sensor. 13. Calorifier thermometer. 14. Burner cable outlet. 15. Alternative burner cable outlet (depending on hinge placement) 16. Rear boiler insulation. 17. Insulation retaining brackets. 18. Lower rear calorifier insulation. 19. Rear calorifier insulation. 20. Rear insulation retainers. 21. Flue gas spigot. 22. Front calorifier insulation. 23. Boiler front jacket. Note: Mains connection should be made via the rear of the boiler through to the control panel. It must not be connected directly to the front of the boiler via the calorifier jacket door. Page 10

Page 11

ELECTRICAL CONNECTION Description of Controls and Operation. A On / Off and Operation mode switch Switch position 0 (off) With the switch in this position, the operation of the boiler and burner is off. Switch position (STB) This function is used to check the boiler safety limit thermostat. This is activated by rotating the dial and holding the switch in position until the boiler safety limit thermostat functions. Switch position 1 (manual) The instrument panel is in operation. The burner and any boiler control pumps are operated with out any influence of any other built in control modules. The dial controls the boiler operating temperature within the limits of the decreasing arrow. Mixing valves must be manually adjusted. The instrument panel On lamp (G) is illuminated. Switch position (automatic) In this position, any built in electronic modules are in operation. The boiler temperature and any other equipment connected back to the boiler i.e. pumps and mixing valves are controlled automatically. Attention: The switch marked 0 (off) can only be reached by rotating the switch anti-clockwise through the position marked 1. B Boiler safety limit thermostat (STB) The boiler safety thermostat (STB) turns the boiler off if the boiler water temperature overheats. Once the boiler water has cooled down to about 80ºC, the STB must be manually re-set. This is done by unscrewing the cover cap (B) and pressing the small button. Once reset refit the cover cap again. If the STB functions repeatedly, check the water circulation through the boiler or call a heating engineer. C Fuse (6.3A) A fuse in the front of the instrument panel protects all the controls and any other equipment connected back to the boiler. A defective fuse must be replaced by an identical one. Attention: Before the fuse is replaced, the instrument panel must be isolated from the electrical power supply. Page 12

D Boiler thermometer It shows the actual boiler water temperature and has no influence on the boiler temperature control. E Burner lock out lamp (red) The red lamp will illuminate when the burner has gone out (burner fault), the red lamp will go off once the burner reset button has been pressed. F high limit lamp (orange) Safety instructions Any servicing on the boiler instrument panel (wiring, repairs, changes) should be carried out by a competent person. If any works are carried out the mains supply to the boiler must be isolated and secured against accidental switching on. The proper function of the boiler instrument panel is only guaranteed according to our general guarantee conditions and only if the installation and operation is carried out in accordance with these instructions. If the boiler safety limit thermostat (STB) is activated, the orange control lamp will be illuminated. The orange lamp will go off once the STB button has been pressed and reset. G Instrument panel On lamp (green) This will be illuminated when the instrument panel is switched on, the main On Off switch (A) turned from 0 to 1. H Blank cover The standard version of the boiler instrument panels are supplied with blank covers. Terminal blocks X3 and X4 connect to dummy connection pins on the rear side to prevent short circuits. When using an additional electronic control module, this blank cover should be removed. Terminal blocks X3 and X4 should then be connected to the replacement module along with X1 and X2 (in the designated positions). I Blank cover When a Gamma 1B control module is used, this blank cover must be removed. A Summer/Winter switch is fitted here. Page 13

Control module options Single stage burner operation Gamma 1B HWS control, temperature range 20 80ºC, HWS priority, pump overrun of calorifier primary pump, boiler control thermostat. (illustration on page 7) Gamma 2B Weather compensated control for one heating circuit and HWS control. Gamma 23B Weather compensated control for one heating circuit, one mixing valve and HWS control. Gamma 233B Weather compensated control for one heating circuit, two mixing valves and HWS control. Gamma 233BS Weather compensated control for one heating circuit, two mixing valves, HWS control, temperature difference control for solar units and combination with solid fuel boilers. Gamma 33B Weather compensated control for two heating circuits both with mixing valves. This is an additional control module, suitable only in addition to a basic electronic control module. Two stage burner operation G22K Electronic two stage thermostat for constant temperature boiler operation. (illustration on page 7) Gamma 22B Weather compensated control for two stage operation for one heating circuit and HWS control. Gamma 223B Weather compensated control for two stage operation for one heating circuit, one mixing valve and HWS control. (illustration on page 7) Gamma 2233B Weather compensated control for two stage operation for one heating circuit, two mixing valves and HWS control. (illustration on page 7) Gamma 33B Weather compensated control for two heating circuits both with mixing valves. This is an additional control module, suitable only in addition to a basic electronic control module. Mounting and operating instructions are supplied with the electronic controls. Page 14

Ca 6s / BCa 6s Gamma B1 Control Module. G22K Control Module. Gamma 223B control module. Gamma 2233B Control Module. Page 15

Installation of an electronic control module Gamma B1 First the blank cover on the boiler needs to be removed. Use a screwdriver with light pressure turning anti-clockwise the screws on the left and the right side of the blank cover. Then remove the blank cover carefully as there is wiring connected to the back. Remove the plugs X3 and X4 from the back of the blank cover. Connect the plugs X1, X2, X3, and X4 from the boiler instrument panel to the back of the control module. Insert the electronic control module into the opening and fix it by turning the two screws under light pressure clockwise by 90º. The electronic control module unit is now fixed to the boiler instrument panel. If a further control module is to be added, open the top metal cover of the boiler instrument panel by removing the 6 screws Screw the terminal block X11 that is supplied with the additional control module onto the red marked part of the terminal rail inside the boiler instrument panel, and likewise the X12 onto the blue marked part (2.9 x 19mm screws are supplied with the additional control module). Connect the plugs X9.1 and X10.1 that are on the leads to the boiler instrument panel with X9.2 and X10.2 plugs and leads from the additional control module. If a second extension module is used, connect the clips of the second one. Remove the central blank cover and connect the plugs X1, X2, X3 and X4 to the module. Install the module as described above.. Page 16

TERMINAL WIRING DIAGRAM ** Extension module 1(2) Data extension Connect plugs X10 with X10.1 of the previous module Mains supply extension Connect plugs X9 with X9.1 of the previous module MKP 3/4(5/6) Circulating pumps for the relevant mixing circuit Mixer 3/4(5/6) Mixer valves for the relevant mixing circuit VF 3/4(5/6) Flow sensors for the relevant mixing circuit SLP 2(3) Calorifier primary pump Abbreviation Description L-MV Fuel supply solenoid valve (where applicable) BZ1 Burner run signal, stage 1 BZ2 Burner run signal, stage 2 KKP Boiler circulating pump SLP1 Calorifier primary pump 1 MKP1 Mixing circuit 1 circulating pump MKP2 Mixing circuit 2 circulating pump KF1 Boiler sensor KVT 20/5/6 5m * AF1 Outside sensor AF200 / 1.6k resistor * SF1 Calorifier sensor KVT 20/5/6 5m VF1 Flow sensor VF202 for mixing circuit 1 VF2 flow sensor VF202 for mixing circuit 2 AF2 Outside sensor AF200 KF2 Boiler sensor KVT 20/5/6 5m MKP3/4(5/6) Circulating pumps for the relevant mixing circuit SLP2(3) Calorifier primary pump VF3/4(5/6) Flow sensors for the relevant mixing circuit Data bus For room sensor and room device RS-10 Room sensor MK1 Mixing circuit 1 KK Boiler circulation SK Provision for remote burner cicuit Burner connection cable Stage 1 (terminals 27-32) Burner connection cable Stage 2 (terminals 33-36) ** [1]-[6] Burner cable numbers Boiler flow sensor (KVT) KF1 (terminals 50+51) Boiler flow sensor (KVT) KF2 (terminals 61+58 GND) Calorifier circulating pump sensor (KVT) SF1 (terminals 54+55) Calorifier pump cable (SLP) Terminal 15 live Terminal 16 neutral STREBEL Ltd (01276) 685422 * = 2 stage combination boilers fitted with G 22 BC module but no outside sensor (AF1), should have 1.6 k ohms resistor (supplied) fitted in its place. Page 17

KFG INSTRUMENT CONTROL PANEL WIRING DIAGRAM IN TOTALCAD FILE INSERT HERE Page 18

IMPORTANT: Flue-gas temperatures of below 160ºC can lead to sooting of the flue, when entering a stone or brick chimney. Where flue-gas temperatures are below 160ºC gross, specially adapted chimneys must be available. If after the burner has been set, the flue-gas temperature is too low, the baffles from the 3rd flue pass can be taken out. If necessary, the 2nd flue pass baffles can also be removed. NB: Every change made to the flue baffles requires re-commissioning of the burner settings. Electrical connections must be carried out by qualified personnel in accordance with instructions supplied. Electrical leads and oil pipes should never be fastened to the boiler casing. In the interest of technical progress, we reserve the right to undertake changes and improvements in production without notification. Please refer to Operating and Maintenance information for details on baffles and control panel information. When connecting the burner, make sure the length of the burner cable is such that when the burner door is opened it becomes disconnected. Page 19

THE COMPANY RESERVES THE RIGHT TO CHANGE SPECIFICATIONS AND DIMENSIONS WITHOUT NOTICE STREBEL LTD 1F Albany Park Industrial Estate Frimley Road, Camberley, Surrey, GU16 7PB Telephone: 01276 685422 Fax: 01276 685405 E-mail address: info@strebel.co.uk Website: www.strebel.co.uk E. & O.E Page 20