Centexbel. General certification regulations. Construction products

Similar documents
Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

Technical Bulletin CE marking: from 1st July 2013

Kiwa Regulations for Certification in accordance with the CPR

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

DID YOU GET USED TO THE NEW CPR? HERE S A QUICK REVIEW!

1. Terms defined in the Construction Products Regulation (CPR)

Declaration of Conformity Declaration of Performance Notes

CE marking of fire-resistant doors the right way!

SUPPLEMENTARY REGULATIONS SPECIFIC TO CERTIFICATION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

Conformity assessment procedures for the Alarm Components Scheme

Frequently Asked Questions on the Construction Products Regulation (CPR) - Enterprise and Industry

The Danish Energy Authority to carry out inspections in June and July 2012

Regulation 574_2014: Annex III CPR. and. Regulation 568_2014: Annex V CPR

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

YOUR GUIDE TO UNDERSTANDING CPR

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Guidance Note No 19/1. CE Marking windows and doorsets

Chief Operating Officer Giampiero Belcredi

The New EU-Regulation on Construction Products

The Danish Energy Agency will carry out inspections in June 2013

Europacable FAQ on CPR Status: 26/01/17

Implementing the Construction Products Regulation (EU) 305/2011

ETICS and the EU Internal Market The European framework. G. Katsarakis European Commission, DG GROWTH Unit C-1: Clean technologies and products

Guidelines for designating and monitoring notified bodies in Norway

Your Key to achieving C.E Marking Compliance

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland

Analysis Report

The New EMC Directive 2004/108/EC

The New EMC Directive 2004/108/EC

CE MARKING OF WOOD-BASED PANELS

Construction Products Regulation (EU) No 305/2011

The European Radio Equipment Directive 2014/53/EU

RULEBOOK ON ELECTROMAGNETIC COMPATIBILITY

Belcom Cable excellence engineered through quality. CPR Construction Products Regulation

COMMISSION DELEGATED DECISION (EU) / of XXX

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

EUROPUMP ATEX Guideline Part II

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

The New Generationn of Firedoors

BUSINESS PLAN CEN/TC 164 WATER SUPPLY EXECUTIVE SUMMARY

REACTION TO FIRE CLASSIFICATION REPORT No. RA ACCORDING TO THE EUROPEAN STANDARD NF EN A1:2013

Technical Assessment Guideline Applicable for the Kiwa KQ Certification Scheme:

Guidance Note on the Construction Products Regulation

REGULATION FOR THE CE CERTIFICATION ACCORDING TO THE MEDICAL DEVICES DIRECTIVE

Regulation (EU) No 305/2011 laying down harmonised conditions for the marketing of construction products (EU CPR)

DRAFT COMMISSION DELEGATED REGULATION (EU) / of XXX

AUGUST 2016 CONTENTS:

White paper. Construction Product Regulations* by Multimedia Connect. Which cables are concerned by these new regulations?

CE Marking for Fire Resistant doors. The future EN Agustín Garzón Cabrerizo Technical Director Fire Resistance Lab.

TFI Report Classification

CE marking of noise barriers and foundations

DIRECTIVE 2014/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

GNB-CPR Position Paper: Issuance of certificates under CPR

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Table of Contents for the REGULATION (EU) 2017/745 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2017

New Legal Framework Carlo Casati

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

CERTIFICATION MANUAL FOR NF PROGRAMMES MANAGED BY EUROVENT CERTITA CERTIFICATION: GENERAL PROVISIONS

BUSINESS PLAN CEN/TC 135 EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES EXECUTIVE SUMMARY

EUROPEAN UNION. Brussels, 13 February 2014 (OR. en) 2011/0357 (COD) PE-CONS 54/13 ENT 190 MI 550 CONSOM 128 COMPET 470 CODEC 1481

Council Directive 93/68/EEC of 22 July 1993 amending Directives

FAQs Radio Equipment Directive (RE-D)

REACTION TO FIRE CLASSIFICATION REPORT No. RA ACCORDING TO THE EUROPEAN STANDARD NF EN A1:2013

COMMISSION DELEGATED REGULATION (EU) /... of

REDCA update on the RED. Days to go. 17 May 2017

Guideline Construction Products Regulation (EU) 305/20122

REACTION TO FIRE CLASSIFICATION REPORT No. RA ACCORDING TO THE EUROPEAN STANDARD NF EN A1:2013

COMMISSION DELEGATED REGULATION (EU) /... of XXX

COMMISSION DELEGATED REGULATION (EU) /... of

EN CE instead of approval Opportunities for manufacturers and trading to enter new markets in Europe

Construction Products Regulation (CPR)

CERTIFICATION RULES OF THE MARK

Co-ordination of the Group of Notified Bodies for the Construction Products /Regulation 305/2011/EU

DEPARTMENT OF TRADE AND INDUSTRY DEPARTEMENT VAN HANDEL EN NYWERHEID. NATIONAL REGULATOR FOR COMPULSORY SPECIFICATIONS ACT (Act 5 of 2008)

DIRECTIVES. DIRECTIVE 2009/142/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 30 November 2009 relating to appliances burning gaseous fuels

Living with the Construction Products Directive - The Role of the Notified Bodies

COMMISSION DELEGATED REGULATION (EU)

Erik Leider Project Engineer Hazardous Locations, Gas & Oil Underwriters Laboratories

(recast) (Text with EEA relevance) out the conformity assessment procedure. Conformity 20 February 2014.

Georgios Katsarakis European Commission

Valve Manufacturers Association of America

CERTIFICATE. Conformity of the Factory Production Control CPR TÜVRh

Record of Amendments. Version Date Amendment Section/page affected

BUSINESS PLAN CEN/TC 162 PROTECTIVE CLOTHING INCLUDING HAND AND ARM PROTECTION AND LIFEJACKETS EXECUTIVE SUMMARY

+ = FIRE LABORATORY INTRODUCTION. APPLUS+ LGAI - Our company history. High Technology Knowledge. Customer Confidence. Branding

CEN standardization work on refrigerating systems, especially standard EN 378

New Requirements for Placing of Medical Devices on the Market: Conformity Assessment to the Technical Regulations

Procedure for the Approval of New Fire Detection and Alarm Technologies

European Technical Assessment

Achieve Success with European Medical Device Commercialization. By Russ King

Single Market : regulatory environment, standardisation and New Approach Pressure equipment, medical devices, metrology M/327

COMMISSION DELEGATED REGULATION (EU) /... of

Excel User Guide for Data Gathering. Electrolux Chemical Management Web Application

Certification Rules of the Mark AEAS LUMINAIRES FOR EMERGENCY LIGHTING

SD119 Range of Conventional Smoke and Smoke/Heat Detectors (refer to attached appendix for details and conditions)

COMMISSION DELEGATED REGULATION (EU) /... of XXX

CONSTRUCTION PRODUCTS REGULATION MOLEX CES COPPER AND FIBRE CABLE

The new Gas Appliances Regulation (EU) 2016/426

Mandate M/118 WASTE WATER ENGINEERING PRODUCTS

Transcription:

Centexbel Scientific and Technical centre of the Belgian Textile Industry General certification regulations Construction products 22/03/17 blz. 1 / 8

Contents 1 Introduction 3 2 Object 3 3 Definitions 3 4 General 5 5 Certification procedure 5 5.1 Certification application 5 5.2 The application and first verification 5 5.3 Initial type examination 5 5.4 Initial FPC audit 5 5.5 Follow-up FPC-audit 6 5.6 Certification decision 6 5.7 Certification report 7 6 Obligations of the manufacturer 7 7 Sanctions in the event of infringement 7 8 Appeal procedure 7 9 Confidentiality 8 10 Impartiality 8 22/03/17 blz. 2 / 8

1 Introduction The European Construction Products Regulation (CPR) states that CE-marking is mandatory for a number of textile products used in construction. With this CE-marking, the manufacturer attests that the product is in conformity with the applicable technical harmonized specifications. The requirements with which these products have to comply are described in the corresponding harmonized standards. There are different systems for attestation: 1 : Product certification with type examination, initial and follow-up FPC audits 3 : Type examination 4 : Declaration by the manufacturer System 1 necessitates the intervention of a notified body that will issue a certificate of constancy of performance. Centexbel is a notified body with number 0493. 2 Object This document specifies the procedures and rules applied by Centexbel, as a notified body, in processing a certification application for products according to the construction products regulation (CPR305/2011). The harmonized standards for which Centexbel is recognized are described on the NANDO website: http://ec.europa.eu/enterprise/newapproach/nando/index.cfm?fuseaction=notifiedbody.notifi edbody&refe_cd=epos_43815 In the framework of CE-marking in conformity with the standards for which CENTEXBEL is a notified body, CENTEXBEL is committed to perform the initial production control in the factory as well as to monitor the defined product families in respect of the certificates of constancy of performance describing the burning behaviour of the product families. 3 Definitions Applicant Juridical entity applying for the certificate of a product and that engages itself to maintain this conformity. This juridical entity is usually the manufacturer or his legal representative. CE-marking: CPR: a declaration that the product is in conformity with the essential requirements concerning safety environment and health and that it is therefore promoting the free trade within the European Union. Construction Products Regulation 305/2011 22/03/17 blz. 3 / 8

Harmonized standard: European standard established under the mandate of the European Commission Notified body: Accredited independent institute for testing, auditing and certification. CENTEXBEL is a notified body. Initial FPC-audit: Initial control performed by the notified body within the company. It allows to identify and document the production process and serves as the basis of subsequent follow-up audits of the production process Follow-up FPC-audit: Control performed by the notified body within the company to guarantee the conformity with the technical requirements in respect of the initial FPC-audit. FPC-auditor: Collaborator of CENTEXBEL performing the FPC-audits. Product certifier: Collaborator of CENTEXBEL assessing the conformity of a product on the basis of a technical file. Product family(ies): is a group of products defined on the basis of the production method and construction characteristics. Declaration of of performance: declaration drafted by the manufacturer that states that the product or product group complies with the essential requirements and that it applies to the attestation of all systems. Certificate of constancy of performance: CWFT: declaration by the Notified Body stating that the product or product group complies with the essential requirements. Only applicable for system 1. Classified without further testing ; products that, within the imposed criteria, are classified automatically without testing. Systems of assessment and verification of constancy of performance: System 1: Product of product group treated with a flame retardant product and belonging to fire class A1 fl, A2 fl, B fl or C fl. System 2: not applicable System 3: Product of product group not belonging to attestation system 1 or 4. System 4: Product of product group with fire class E fl (within the CWFT-criteria) or F fl (no performance determined), needing no burning behaviour report. 22/03/17 blz. 4 / 8

4 General The aim of product certification is to verify the conformity of a product with the requirements of the Construction Products Regulation and to attest this conformity. 5 Certification procedure 5.1 Certification application If a company desires to certify a product it will contact CENTEXBEL. This preliminary phase mainly consists of providing general information on the procedure, including: the definition of the product families on the basis of the product method and product characteristics. the required documents that have to be put at the disposal of CENTEXBEL. The signing of a mutual agreement establishing the rights and obligations of both parties. 5.2 The application and first verification In this phase, the applicant submits an application for certification to CENTEXBEL and declares to accept the price offer. The product certifier of CENTEXBEL evaluates whether the information provided by the company is complete and asks, if necessary, complementary information to complement the file. The applicant provides the necessary documents with identification and description of the defined product families. 5.3 Initial type examination Tests have to be run on samples that are part of the defined product families and that can be indicated as extremes within the product family, sampling has to be performed by Centexbel. If the test results correspond with the technical requirements described in the standard, the product certifier decides to proceed to an initial FPC audit. 5.4 Initial FPC audit After consultation with the applicant, the initial FPC audit takes place. A FPC checklist is used as a manual, based on the directives established by the Group of Notified Bodies for the Construction Products Regulation 305/2011 Check list for inspection and surveillance of FPC. The FPC auditor drafts an initial report that he hands over to the application and the product certifier. If no immediate corrective action is required, the product certifier will submit a proposal of decision concerning the product families in question to the certification manager of Centexbel. 22/03/17 blz. 5 / 8

5.5 Follow-up FPC-audit Every year, following the initial audit, Centexbel will contact the certificate holder to perform a follow-up audit to monitor the production process of the qualities within these product families. The audit has to take place at least three months before the certificate expires. As a manual for this audit the FPC checklist is used, based on the directives established by the Group of Notified Bodies for the Construction Products Regulation 305/2011 Check list for inspection and surveillance of FPC. The FPC auditor drafts a follow-up audit report that he will hand over to the applicant and the product certifier. During the audit it is verified whether there are any reports that have expired, whether there have been additions to the product family or whether the products have been modified. In these cases, the auditor will demand samples to run tests. For these samples an application form to perform a re-control is filled in. The samples are registered to be performed in the fire lab of CENTEXBEL. If the re-control demonstrates that the envisaged fire classification is obtained for the product family, the product certifier will re-issue the certificate of constancy of performance and apply any possible modification in the description of the product family as indicated during the follow-up FPC audit. The certificates of constancy of performance valid for one year will be drafted. The certification manager takes the decision and signs the certificate of Centexbel. If the re-control demonstrates that the requested quality does not correspond with the required criteria of the certificate ofconstancy of performance, the applicant will be informed hereof by telephone and in writing and the applicant will be requested to take a number of measures. In the event of a modification in the product family, it will be verified whether the test results of a complete test are available on the extremities of a product family. In this case, the modification of a product family may be done without having to perform additional tests. During the yearly controls, one of the new products will be tested by preference. In the event a product family is extended the new extremities shall be tested completely before issuing a certificate of the extended product family. 5.6 Certification decision Depending on the results of the evaluation of the type tests and FPC audit, and possible controls, the certification manager will take one of the following decisions: In the event of a positive decision, the certificates are drafted based on the directives established by the Group of Notified Bodies for the Construction Products Regulation 305/2011 with the number 0493/CPR/XXXX. These certificates are valid for one year. The certification manager will sign the certificate. 22/03/17 blz. 6 / 8

In the event of a negative decision, the applicant will be informed hereof and the certificate will not be issued. 5.7 Certification report On the demand of the client, a certification report may be issued. This is a document containing the following items for a certain product family: Description of the product family Obtained classification Trade names within the product family Test reports on which the classification is based 6 Obligations of the manufacturer Every applicant is supposed to respect the general regulations and the stipulations in the agreement between CENTEXBEL and the manufacturer, concluded at the start of the certification procedure. In addition, the manufacturer is supposed to respect the European Construction Products Regulation 305/2011 and the applicable harmonized standards supporting the 305/2011 Regulation indicating a presumption of conformity with the requirements of the Regulation, and that are mentioned in annexe ZA of the corresponding standard. 7 Sanctions in the event of infringement If an infringement of default is observed, Centexbel reserves the right to take measures to sanction the manufacturer and to undo the infringement. The following measures are at the disposal and will be used according to the gravity of the infringement: Warning Suspension of the certificate Withdrawal of the certificate 8 Appeal procedure The manufacturer or any other interested party may appeal against a certification decision made by CENTEXBEL. This shall be done in writing and will be addressed to the director general. The director general of CENTEXBEL will verify the susceptibility of the appeal. In order to be susceptible, the appeal shall be motivated and refer to the decision taken by Centexbel. The susceptibility concerns by no means the legitimacy of the motivation. 22/03/17 blz. 7 / 8

If the appeal is declared non-susceptible, the director general informs the involved parties in writing of the reasons for this declaration of non-susceptibility. If the appeal is declared susceptible, the director general of Centexbel convenes an appeal committee. This committee is composed of 2 persons assigned by the director general who were not involved in the certification file against which an appeal has been made. The Appellant has the opportunity to clarify and defend his case during the meeting of the committee handling the appeal. The committee examines the case and decides to maintain or to change the decision with respect to the certification. This will be communicated in writing to all parties involved. There is no further appeal against the decision of the appeal committee. The treatment of an appeal against a decision with respect to certification has to take place within four weeks in any way. Whatever the decision of the appeal procedure, the manufacturer cannot claim any indemnity from CENTEXBEL for possible damages. 9 Confidentiality CENTEXBEL will treat all information with respect to the application as strictly confidential and will not disclose it to third parties without the express authorisation of the applicant. This does not apply to the information that, in conformity with the legislation, has to be communicated to the supervising authorities or to the other notified bodies. 10 Impartiality CENTEXBEL has taken all necessary measures to guarantee the impartiality of the decisions in respect of certification. This impartiality is supervised by a Certification Advisory Body assembling in regular intervals. Manufacturers, users, authorities as well as experts are represented by the members of this Certification Advisory Body. 22/03/17 blz. 8 / 8