Power Plants with Webel Solar Modules

Similar documents
Quality assurance and safety aspects. Dipl.Ing. Udo Siegfriedt DGS-Berlin Brandenburg

Certificate of compliance

EN50438 TEST REPORT SUMMARY. Requirements for the connection of micro-generators in parallel with public low-voltage distribution networks

The Impact of Marking Requirements. on Design and Performance of Power Converters and Electrical Drives

For Further information please visit our PSIDA DIY PVac500 fully integrated AC system

Consumer Products Services Germany GmbH Türkheim Germany

Totally Integrated Power

For Further information please visit our PSIDA DIY PVac640 fully integrated AC system

Get connected with Xantrex Grid-Tie Inverters

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

PV Standards Activities SEIA Codes and Standards Workshop. Scott Jezwinski Business Development Manager Sep 12, 2016

Training: MED-SOLAR. MODULE 6 Maintenance of PV Power Plants

ISOMETER IRDH375. Insulation monitoring device for unearthed AC, AC/DC and DC systems (IT systems)

Type approval qualification of Photovoltaic Modules Procedures and test experiences

APS-Series 1500VDC OUTDOOR SOLAR INVERTER

Pole Mounting System Installation & Certification Manual

APS-Series 1000VDC OUTDOOR SOLAR INVERTER

Electromagnetic compatibility (EMC)

Constant voltage charger. Type UP 610. »We store the world's energy« Network

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Operating Manual MS220DA

ISOMETER IRDH275BM-7 with coupling device AGH675-7 and AGH675-7MV15

Laboratory Honeywell Technology Solutions, Bangalore-EMC Lab, 19/2, Devarabisanahalli Village, K.R. Puram, Varthur Hobli, Bangalore, Karnataka

PHOTOVOLTAIC HEAT CONTROLER PVHC 2.01 USER MANUAL

BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING

SOLAR PV ARRAY & HEATING ELEMENT SELECTION GUIDE PowerOptimal Elon TM 100 ELON KIT EASY SELECTION GUIDE

SolarEdge commercial solutions. SolarEdge Commercial Offering for Investors & System Owners

PROTECT SRB 200EXi-1A

IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO. IEC Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring

IMM TECHNOLOGY YOUR SOLAR PLANT AT YOUR FINGERTIPS WHAT IS IMM? WHY IMM? PL EN V1.1

SOLAREDGE COMMERCIAL SOLUTIONS FOR INCREASED REVENUE & ADVANCED ASSET MANAGEMENT. SolarEdge Commercial Offering for Investors & System Owners

UDC100 Universal Digital Controller Specifications

Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5

NPS/003/030 Technical Specification for Transformer and Switchgear Cable Boxes and their associated Bushing Assemblies

Installation Manual Universal Side-of-Pole Mount UNI-SP/01A

Testing and certification services for solar products

REGISTER OF NEW NATIONAL STANDARDIZATION INITIATIVES NOTIFIED UNDER SUBSECTORS IN THE SCOPE OF CENELEC. March 2018

Fire Risks and Safety Standards

Speedglas 9002D Welding Filter

This is a preview - click here to buy the full publication INTERNATIONAL ELECTROTECHNICAL COMMISSION

KNX module for smoke alarm devices Dual/VdS and Q-Label (Order no )

TECHNICAL SHEET. About the product

1. Key Features and Benefits

600/1000V SR Insulated Flexibles Control Cables (2-4 Cores & Multicores)

IEC PROJETOS EM VOTAÇÃO. IEC 62256/Ed2: Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement.

Joint CELMA / ELC Guide on LED related standards

IEC PROJETOS EM VOTAÇÃO

EC-Declaration of Conformity Annex

isopv and AGH-PV Ground Fault Detector for Ungrounded Solar Arrays up to 1100 V And Isolation Tester Prior to Array Startup (Grounded and Ungrounded)

Model 784 Remote Power Supply

IAS Accreditation Number UL International Germany GmbH Address Admiral Rosendahl Strasse 23 Neu Isenburg Germany

Here Comes the Sun!!!

4100S. The operation and functions described in this manual are available from Software Version 4100S onwards.

PASSION FOR POWER. COMPANY PROFILE. More information at made in GERMANY. since 1931

SOLAREDGE COMMERCIAL SOLUTIONS FOR INCREASED REVENUE & ADVANCED ASSET MANAGEMENT. SolarEdge Commercial Offering for Investors and System Owners

ImmerSUN-Frequently Asked Questions

Product Bulletin. VeriSafe Absence of Voltage Tester. The Safe Way to Verify the Absence of Voltage.

Lubrication Systems. Operating Manual Version 1

ISOMETER IR1575. Insulation monitoring device for unearthed AC/3(N)AC systems up to 480 V and DC systems up to 480 V

WS Circular symbol with red border and bar, black pictogram on white background. Used to prohibit specific acts that could be dangerous.

OPTISENS TUR 2000 Technical Datasheet

Technical Data. Dimensions

Dipl.-Ing. W. Bender GmbH & Co. KG Londorfer Str Grünberg Phone: Fax:

DIRECTIVE 98/34/EC REGISTER OF NEW NATIONAL STANDARDIZATION INITIATIVES NOTIFIED UNDER SUBSECTORS IN THE SCOPE OF CENELEC.

Report reference No...: 10TH0052_AS4777_+_ISR_3 Tested by (printed name and signature)...: Urs Seifert. Approved by (printed name and signature)...

RADIO CONTROL SYSTEMS

Technical Data. General specifications Switching element function Rated operating distance s n 4 mm

INTERNATIONAL STANDARD

Double insulated, electron-beam cross-linked, halogen free photovoltaic wire sunlight resistant. Single conductor, flame retardant insulation.

Audible warning devices for external alarm

INTERNATIONAL STANDARD

Operating Manual ECCO/ECG Couch

DIRECTIVE 98/34/EC REGISTER OF NEW NATIONAL STANDARDIZATION INITIATIVES NOTIFIED UNDER SUBSECTORS IN THE SCOPE OF CENELEC.

Regulated Ex-Heater HEX with internal controller, HEX with external controller II 3 G II 3 D

IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO. IEC ED1 - Rotating electrical machines - Part 23: Repair, overhaul and reclamation

Abu Dhabi Conformity Assessment Scheme for Small-scale Solar Photovoltaic Systems

Technical Data. Dimensions

Oil Burner Controls LMO24... LMO44...

Dipl.-Ing. W. Bender GmbH & Co. KG Londorfer Str Grünberg Tel.: Fax:

Industrial fire alarm systems

ACMA mandated EMC standards

Oil Burner Controls LMO24... LMO44...

Technical Data. Dimensions

ISOMETER IR425. Insulation monitoring device for unearthed AC/DC control circuits (IT systems)

CHECKFIRE 210 Detection and Actuation System

Fire / CO Alarm Interface

DSF xx15.xx xhv Ex-Atex Ex-Atex Certified Two wire Hall Effect Speed Sensor

Vari-Cyclone Ceiling Fans

RVP310. Heating Controller. Building Technologies HVAC Products

ISOSCAN EDS460/490 EDS461/491. Insulation fault locators with control and display function for EDS systems (insulation fault location systems)

PHOTOVOLTAIC SYSTEMS

Installation Manual. Top of Pole Mount Edition v1.01. For models:

Vydané medzinárodné normy a iné publikácie IEC za obdobie od do

Installation Manual Universal Top-of-Pole Mount UNI-TP/02

ORIGA-SENSOFLEX Displacement Measuring System for Cylinder Series OSP-P

STT 3000 Series STT250 Smart Temperature Transmitters Specifications Models STT25T EN0l-6091 February 2009

The New Cooling Unit Generation Blue e+

Magnetic-Inductive Flow Velocity Sensor PIT. Device Description

Process Alarm Module RTA 421

METROTEC Systeme zur Messung und Regelung von Sauerstoff

Transcription:

Power Plants with Webel Solar Modules

Power Plants with Webel Solar Modules

17W Nautilus Water Pump imported fm Australia X 2 80Wp Solar Panel X 1 Charge controller X 1 Galvanised Steel Pole (3 meters) Amp and Voltage meter Total cost : USD 3800.00 (with maintenance) Performance: Iavg at 11.9 volt is 4.1 Amps (during day)

Module: 12V; 80 Wp 320 pcs Battery: 2V; 800 AHr 120 pcs Inverter: 15KVA (1 stand by) -- 3 pcs Charge Controller Unit 1 pc Plant Control Unit 1 pc ACDB 1 pc Installation date: Feb 2001

Examples of failures due to Hotspot

Examples of failures due to poor contact 72,2 C SP01 60 40 (Thermographic Pictures of Modules) 20 7,5 C

Requirements and relevant standards Safety requirements (System and Operator) DIN VDE 0126 IEC 60364-7-712 Ed.1.0 -> safety class II Accident prevention regulation Operator protection measures Lightning and over voltage protection system Components and systems Module: IEC 61215, 61646, 61730 etc. Inverter: EN 50 178, EMC EN 61000-6-3 EN 61000-6-1 CE marking Low voltage directive EMC directive Grid connection Grid utility connection regulations (e.g. cosetc.)

Standards to be used in a PV Power plant -Accident prevention regulation - The EC-Directives 89/336/EWG, EMC-Directive 73/23/EWG und 93/68/EWG, Low Voltage directive IEC 60664 -Insulation coordination for equipment within lowvoltage Systems IEC60364-7-712 - Electrical installations of buildings Requirements for special installations or locations Solar Photovoltaic (PV) power supply systems EN 50110-1:2004 - Operation of electrical installations IEC 6000-3-2:2005 - Electromagnetic compatibility (EMC) Limits for harmonic current emissions (equipment input current < = 16 A per phase) EN 50178: 1997 - Electronic equipment for use in power installations EN 61727: 1995 - Photovoltaic (PV) Systems Characteristics of the utility interface

Standards to be used in a PV Power plant IEC 60364-4-41 - Low voltage electrical installations Protection for safety-protection against electric shock IEC 60364-4-443 - Electrical installations of buildings, Part 4 Protection for safety, Clause 443: Protection against over voltages of atmospheric origin or due to switching IEC 60364-5-52:2001 Electrical installations of buildings Selection and erection of electrical equipment Wiring systems IEC 60364-6 Draft Low voltage electrical installation Tests

Standards to be used in a PV Power plant IEC 64/1123/CD Draft Insulation coordination for equipment within low-voltage Systems. Requirements for special installations or locations Photovoltaic power supply systems. IEC/EN 61140:2002 - Protection against electric shock-common aspects Installation and equipment PrEN 62305-1:2005 Draft Protection against lighting Part 1: General principles PrEN 62305-4:2005 Draft Protection against lighting Part 4: Electrical and electronic systems within structures

Project realisation - Installation and project development Receiving inspection specification for materials and equipments. Monitoring and Quality Control by stages of assembly, technical documentation control (to avoid failures in the assembly). Parameters measurement in partial stages of the installation work. Partial freeing of installations according to the quality control by stages and technical areas like: Structure Assemblies Earth Wiring, Connections and Wires Modules Assembly Electrical Equipment. Security Systems, anti-thefts, Result: Quality controlled assembly procedures

Examples of failures

Examples of failures

After Project Completion Comparison of the PV installation with the specification The following should be checked in detail: PV-module (type, performance date, certificates) inverter (type, performance date, certificates) cabling (type, cross section, data, laying) connections and junction boxes module support construction and mounting general construction and orientation of the PV-generator (tilt angle, distances, shading). check on suitability of installed components according to technical data and requirements on components

After Project Completion Inspection on safety and functionality test The following should be checked in detail: installation concept regarding the fulfilment of safety relevant requirements (protecting against hazard for persons and equipment) visual inspection of the PV installation based on DIN VDE 0100/600 function test of relevant protection units e.g. over/ under voltage monitoring, switches, measurement of insulation resistance of selected module strings

Examples of failures Pictures of different failures

After Project Completion Follow up inspections to ensure a safe and proper operation Yearly: Short inspection (visual inspection, spot check measurements, function tests, inspection on monitoring data (error messages, energy yield)) Every 3 years or as needed: Detailed inspection (visual inspection, spot check measurements, function tests, inspection on monitoring data (error messages, energy yield), insulation resistance measurements, string measurements) Result: Keep functionality and safety of total system according to the initial planning over the plant lifetime