Tuesday, 18 November Video Links. Oil Blow Through 13 November BLOW THROUGH ON BOILER UNIT 6 BEGINS.

Medupi Unit 6 ACC hot cleaning: Method and results

2x58 MW Coal Fired Power Plant at Mauritius

CHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F

Boiler. Fire tube Boiler:

Document Code: 1 (13) Issuing date: Status:

OPTIMISATION OF SOOT BLOWER OPERATION IN BOILER TO IMPROVE EFFICIENCNY

Boiler Basics. Design and operation

Document Code: 1 (15) Issuing date: Status:

MODEL ANSWER FOR ELEMENTS OF MECH.ENGG.(17413) 1) steam boiler- It is a closed vessel in which steam is produced from water by combustion of fuel.

AUTOMATION OF BOILERS USING LABVIEW

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Changing mercerising waste water into money. Caustic recovery for mercerising lye

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

FLUIDIZED BED BOILERS

Efficient Steam System Design

Steam Fundamentals. (in heating & processing applications)

Design and analysis of the piping systems

BENSON Boiler Technology

Steam Generator (Boiler) & Steam Turbine. Steam Generator (Boiler) ME 268. Model Lab

Industrial Dust Aspiration Solutions. For optimal protection of plant and environment.

Modification of Condenser Nozzle and Cooling Tower Exit Screen to Increase Condenser Performance

PZ35RL BIOTECH THE FUTURE OF HEATING PZ 35 RL

"HC" AIRFLO. In-duct firing line burner

Importance of Auditing/Reviewing Your Company s GADS Events

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

TEPZZ 87_ 6A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

Owner s Manual for. PennStoker

NOx REDUCTION EXPERIENCE ON NATURAL GAS FIRED TURBO FURNACES

AIM OF THE EXPERIMENT:- Study of boilers (fire tube, water tube) APPARATUS REQUIRED: - SL.NO NAME OF THE APPARATUS SPECIFICATION QUANTITY 01 Fire tube

Boiler Draft Equipment

ASH MEASUREMENT AT NRG HUNTLEY USING HIGH TEMPERATURE STRAIN GAUGES

ENERGY RECOVERY SOLUTIONS. Recover wasted energy to increase efficiency and save money immediately.

SONIC CLEANING. for Power- and Heatingplants

PRESENTATION ON PAT TARGET & HEAT RATE IMPROVEMENT

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

2. Sketch and describe a steam drum internal feedwater pipe. 3. Identify and describe a steam drum continuous blowdown line.

FIFTH CLASS POWER ENGINEER S

PESIT-Bangalore South Campus

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Case studies of air cooled vacuum steam condensers performance improvements ACCUG Meeting October 14-17, 2013

Reactor-Boiler and Auxiliaries - Course 433 BOILER STEAM AND WATER SYSTEMS

OPERATING INSTRUCTIONS with safety features

Document Code: 1 (5) Issuing date: Status:

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

Schust Engineering, Inc. 701 North Street P.O. Box 128 Auburn, IN (260) Fax: (260)

Efficient Vacuum Conveyors Deliver Cost-Effective Solutions Pick-up, conveying and feeding of powders, granules and other bulk materials

CLASS POWER ENGINEER S CERTIFICATE

WATER TUBE SOLID FUEL SERIES YOSHIMINE CO., LTD

Precipitator Solves Dryer Problem

MX RANGE PACKAGED STEAM BOILERS

R A N G E C O N C E P T

A CASE STUDY ON BOILER TUBE FAILURE AT JPL

INSTY-PAC EXTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

What to Expect from Your EtaPRO Investment

INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

The equipment and materials shall be designed and constructed in accordance with the ASME code section I 2001 ED A02 and Chinese Standards.

Continuous Commissioning: A Valuable Partner to Retrofit Projects

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

Appendix B Index to System/Component Cause Codes

Energy recovery from exhaust gases using Heat Pipe technology

COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating

Appendix B9 Geothermal Unit Cause Codes

HOW TO SELECT AN INDIRECT THERMAL TECHNOLOGY FOR INDUSTRIAL MATERIALS PROCESSING

When you complete this module you will be able to: Describe various watertube boiler designs, including large generating units.

OFFICINE MINUTE VILLORBA - TREVISO

Gear Unit Condition Monitoring. Portfolio overview

DUST SUPPRESSION HOPPER TARDIS MODEL OVERVIEW

Blowdown Separator & Aftercoolers Installation, Operation, & Maintenance

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued

Boiler Technical Specifications (2013)

BENSON Boilers Experience in Nearly 1000 Plants and Innovative Design Promise Continuing Success Manfred Klein, Rudolf Kral, Eberhard Wittchow

Köllemann GmbH Page 1 / 16

ULTIMATE INSET LIVE FUEL EFFECT GAS FIRE MODEL 417 OWNER GUIDE

Annex A-7 FOSSIL STEAM UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Rotary Metal Parts Treatment System; Rotary Metal Parts Treater RMPT Effluent Heater MPT Quench Tower Rotary Metal Parts Treater

Figure 1: Overview of Rovinari Power Station FGD project planned situation.

Water mist fire suppression systems. Minifog ProCon Low-pressure water mist system

SURGING AND BLOW OUT OF LOOP SEALS IN A CFBC BOILER. By K.K.Parthiban Venus energy audit system

WET POSITION BOOSTER FANS FOR REDUCED POWER CONSUMPTION AND OPTIMIZED ENVIRONMENTAL PERFORMANCE OF POWER STATIONS WITH FGD AND WET STACK

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

Burner Management and Combustion Control. Copyright 2014 Rockwell Automation, Inc. All Rights Reserved.

THERMAL ENGINEERING & GAS DYNAMICS ME-6002

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

Originators of the Flexible Water Tube design

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

Originators of the Flexible Water Tube design

BHEL Steam Generators Material Selection Overview by Veerendar Aluvala DM/BHEL/Trichy

Installation Instructions

Annex A-6 FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Overview of Haarslev s Approach to THP

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

Version /08/2018 USER MANUAL VACUUM FILTER PRESS. All rights reserved Les Équipements d Érablière CDL inc.

MIX Type Blenders. I Application. I Principle of operation

Biomass Pellet Boilers

Redesign of Bennett Hall HVAC System

Transcription:

Smoke from Chimney Tuesday 2 nd December 2014 MILL IN SERVICE FIRST COAL FIRES AT MEDUPI

First Coal Fires On Thursday 27 th November the team at Medupi successfully brought the first mill into service resulting in the First Coal Fires on Unit 6, a major milestone towards 1 st Synchronisation. The next significant milestone will be Steam to Set and then Synchronisation. This milestone marks a particularly important point in that this is the first coal fire achieved in the New Build fleet. Mill Design Part of the commissioning program will be to continue to optimize the operation of this mill and then move onto commissioning the remaining four mills. The project is well on its way to first synchronisation.

First Coal Fires and Blow through Steam Blow through and First Fires (submitted from MHPS) At the moment the steam blow through is in progress on Medupi Unit 6. This activity ensures that all particles (construction debris) are removed from the internal surfaces of the boiler piping, vessels and in-line components. These particles need to be removed to prevent damage to the steam turbine once steam is fed from the boiler to the turbine. The steam blow through is performed after the chemical cleaning, where impurities such as ferric oxides, dirt and silicate have been already eliminated and is therefore a further cleaning step to remove additional debris. Steam blowing effectiveness is dependent on the blow through steam velocity. The velocity is determined using a required disturbance, or K, factor. For adequate cleaning by means of steam blowing a load of roughly 30 % BMCR (boiler maximum continuous rating) is required which is equivalent to a steam mass flow of 700 t/ h. The steam blow through was performed and optimised during the past several days by use of pure oil firing. With pure oil firing, the load is limited to 20 % boiler load. Therefore the operation of a coal mill is required to reach the needed velocities for completely effective cleaning. The DS type burners (swirl stage burners) are located at five different elevations; three on the front wall and two on the rear wall. Each row has six burners. Every burner has an integrated gas igniter after which oil is immediately introduced. The load will gradually be increased from 2.5% to 10% and then to 20 %, where the first coal mill can go into operation. Target plates where inserted General Overview of the furnace design After the coal mill is in operation and the load is increased to 30 % boiler load, the required velocities for steam blow through will be checked. If they are met the load has to be held constant for a minimum of twenty minutes. After that the boiler can be shut-down and allowed to cool to generate what is termed the thermal shock effect which helps to displace impurities further and is in accordance with the published guidelines. The success of removing debris of the boiler is assessed through the use of target plates, which are installed in the piping downstream of the heating surfaces of Superheater and Reheater. The number of indentations on the target plates has to be checked and must fulfil defined requirements in four successive blows. After that the steam blow through is completed and the unit is shut down to allow the permanent piping to be reinstated in preparation for introducing steam to the turbine for the first time, known as steam to set.. The coal mill operation is one important step to increase the load further during the operation and commissioning of the boiler and steam turbine.

Progress on Unit 6 Fabric Filter Plant Target Plate (where it gets inserted) Turbine Hall (1) Turbine Hall (2)

Unit 5 PJFFP Hoppers PJFFP Roof Structure Very good progress is being achieved by DB Thermal Dust Extraction Unit ELB installing dust extraction unit screw conveyor on 48m level. Construction on 48m level is ahead of schedule. Work started on the installation of drains on various systems HVAC Plant room: duct installation resumed this week Condensate Polishing Plant Progress is very good for construction completion of the main ring and platforms are still on target for the 10 th December 2014.

Units 4 & 3 Lube oil room plinth and wall rebar in progress Turbine centreline HP and IP has been put in place CPP building top floor columns construction in progress Aux bay roof cladding progressing well Generator transformer ancillary installation is progressing well Course ash conveyor ready for concrete pour on 1 December

Units 2 & 1 Unit 2 the 1200ton crane moves onto unit 2 and prepared to lift an 80ton section of ducting. Unit 1 and 2 the Turbine Hall steel frame becomes on continues structure from North to South Unit 1 drainage works progress well following good access arrangements between MPS/JV and Alstom/Kentz Unit 1 Boiler the last Wolf crane is installed on the 105M grid.

Safety SAFETY ON MEDUPI IS CRITICAL MEDUPI DAYS SINCE LAST LTI PER CONTRACTOR Team Medupi now have two more major milestones to achieve before producing power to the grid: These are Steam to Set and then 1 st Synchronisation of Unit 6. Before steam to set we have to complete: Blow through to be completed, pipe work re-instatement, hot vacuum test, ACC steam cleaning, safety valve testing. Thereafter we have to complete: Generator clean air run, inspect H2 coolers, Generator CO2 purge, H2 filling, Turbine 1 st start, excitations - protection synchronisation (hot) and finally 1 st Synchronisation. Roman Crookes Project Director: Medupi Power Station Project