Terminal Commissioning Case Study- Terminal A Logan International Airport

Similar documents
NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

TESTING, ADJUSTING AND BALANCING

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Subcontract Agreement No.

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Exhibit J. Subcontract Agreement No.

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

An HVAC Audit of the Canberra Institute of Technology

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Demonstration and Training of MEP Systems Page 1 of 15

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

CxA to Answer this Section

Automatic Fire Alarm Association Webinar On Inspection, Testing, And Maintenance Of Fire Alarm Systems

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

City of Duluth Festival Center 04/25

SECTION Fire Pumps

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

HVAC Controls Upgrades: Requirement Details ( )

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Fire Prevention Coffee Break Training. February 2017

FIRE & LIFE SAFTEY STANDARD

SECTION GAS-FIRED RADIANT HEATERS

Purpose : Project Manager. Professional. Contractor: devices/system. compatibility

Element Z General Design Requirements Existing Facilities Information

SECTION ELECTRICAL SYSTEMS COMMISSIONING

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation

ATSP3. Advanced Technology Support Program III. Comprehensive Solutions for Obsolescence and Performance Issues:

SECTION INTEGRATED AUTOMATION COMMISSIONING

Fire System Impairment Policy

THE DESIGN FIRM ADDENDUM #1 PINE GROVE BAPTIST FELLOWSHIP HALL RENOVATION 759 PINE GROVE RD. HARVEST, AL MAY 10, 2017

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES

HVAC Controls Upgrades: Requirement Details ( )

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Smoke Management in Operating Room Renovations

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Electronic Safety and Security

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

Communication and Coordination Failures in the Process Industries

MIDWEST HEALTH CONFERENCE

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

COMMERCIAL CONDENSING BOILER OPTIMIZATION

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Properties that are determined to be architecturally and/or historically significant may be designated as one of the following:

Auburn University Basketball Arena:

The Technical Committee on Commissioning and Integrated Testing

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

T-Series Climate Changer Air Handler. It s Hard To Stop A Trane.

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018

HVAC System Consideration$ 05/14/2012 SAVING MONEY IN HVAC SYSTEMS

ASHRAE Guideline 36P: High Performance Sequences of Operation for HVAC Systems

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Technical Paper. Functional Safety Update IEC Edition 2 Standards Update

The SKD direct steam injection system uses low pressure steam from an in-house boiler to humidify the air.

ASHRAE JOURNAL ON REHEAT

ISO/TR TECHNICAL REPORT. Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Virginia Tech Standards for Building Automation System

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

I. INTRODUCTION Codes, Rules, Laws, & Requirements

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

VDOT Tunnel Facilities Action Plan

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

IMC Significant Changes Summary Tier I

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

Welsh Commissioning Group, Inc.

Improving Control of Dual-Duct Single-Fan Variable Air Volume Systems

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Introduction PLAYING NICE: HVAC AND LIGHTING CONTROLS INTEGRATION. Why should I care? Background Integration VAV box Occ sensor

Florida Department of Transportation

Building Electrical System Overview

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Successful Applications Using ISA100 Wireless Technology

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

Narrative Reports As Regulated by 780 CMR, Section 903.0

PIP PCTPA001 Testing of Process Analyzer Systems

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

RESOLUTION NO. WHEREAS, the City of San José (City ) owns and operates the Norman Y. Mineta San José International Airport ( Airport ); and

Humidity Control Design Tips. R. Mark Nunnelly, PE, CxA, LEED AP President

Transcription:

Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Brad Jones, PE, AP Sebesta Blomberg Sam Sleiman, PE, CCM Massport

AGENDA Commissioning What is Commissioning? Who Performs Commissioning? How to Internalize Commissioning? What are the Costs of Commissioning? Keys to Success Case Study: Terminal A Logan International Airport

Commissioning On your projects, have you ever experienced: When the project is over, have you ever felt that you did not get the building you wanted and paid for? Incomplete training of your O&M staff? Lack of quality as-built drawings and/or systems manuals? Inheriting incomplete work from your contractor, that now has to be completed by your O&M staff?

Commissioning On your projects, would you prefer: the Terminal A project has been by far the best project that was turned over to Massport to have our personnel available to visit the site, comment and to be a part in the Commissioning process was invaluable. Manager, CHP/HVAC

Boston Logan Terminal A 500,000 sf 22 Gates $500M Three Contract Packages Terminal, Tunnel, Satellite First Certified Airport Terminal

Project Highlights Developed by Delta Air Lines, turned over to Massport for operations Multiple engineers mechanical & electrical by different firms Proprietary systems fire alarm and building controls established airport systems Delta utilized third party commissioning for and to demonstrate to Massport that systems were properly functioning (Note: Massport requires meeting requirements for any development on land it owns)

Definition of Commissioning Systematic process of assuring by verification and documentation, from the design phase to a minimum of one year after construction, that all project systems function and perform interactively in accordance with the design documentation and intent, and in accordance with the owner s operational needs, including training preparation of O&M personnel.

What Is Commissioning? Deliver a Building that Works Develop an Operations Team that can keep it working Documentation Testing Training

What Is Commissioning? How does Commissioning differ from Inspections? Building Inspections Required by law and are minimum standards Construction Inspections Review of static installation Building Commissioning Proactive process that builds from installation inspections through performance checks of dynamic operation of systems

Question: Aren t I already paying for this?

Answer: 1995 Study of New Buildings 50% suffered from controls problems 40% had HVAC equipment problems 25% had malfunctioning: Energy management systems Economizers Variable speed drives 15% had missing equipment

Cx Review Question: How will large equipment be moved into and out of the penthouse mechanical room in the future there doesn t appear to be any roof access? Answer: That s a Day 2 project. Architect

Design Review Comment: The sequence of operations is general and will not provide enough information to the controls contractor. Answer: That s how we always do it. Engineer

Scheduling Question: So now that the fire alarm vendor has finished his check out, are we ready to schedule the system tests? Answer: I can get a good look at a T-bone by sticking my head up a bull s ass, but I d rather take the butcher s word for it. Electrical Contractor

The presence of an independent third party commissioning agent helped to keep design and construction teams focused on developing resolutions to construction issues that would not impact long term building operations. The easy resolution was often not the best for the long term building operation.

Commissioning Process Pre-Design Phase Design Phase Construction Phase Acceptance Phase Warranty Phase

Commissioning Process FUND. FUND.

Design Phase Cx Activities FUND. FUND. Design Intent Document ENHANCED ENHANCED FUND. FUND.

Early Construction Phase Cx milestones into the master construction schedule Keeps Cx off Critical Path Activities Review Commissionability Accessibility & maintainability Design Intent Document ENHANCED ENHANCED ENHANCED ENHANCED ENHANCED ENHANCED

Testing and Training Phase ENHANCED ENHANCED FUND. FUND. All Cx Activities Blank Test Procedures FUND. FUND.

Warranty Phase ENHANCED ENHANCED FUND. FUND. O&M Staff meeting ENHANCED Areas of concern ENHANCED wish list for system optimization Update with warranty phase activities

Who Provides Commissioning? Designers Contractors Third Party Professional Owner Design/Construction Team Operators Someone leads effort as Cx Authority, but it s a TEAM EFFORT!

What Systems are Commissioned? Factors influencing decision: Past problems? Risks of malfunction? Political implications of poor system operation? How easily will issues be identified with out Cx? How many parties involved with design & construction of the system? resolution of issues Program requirements, utility

What Systems Are Commissioned? HVAC Building Controls System Electrical Life Safety Lighting Plumbing Building Envelope Specialty Systems Selected to meet project needs,

Systems Commissioning

Streamlining the Cx Process Integration w/ Authorities Having Jurisdiction Massport Fire & Rescue Simulated Power Outage Test Smoke Evacuation Tests Fire Alarm - Check of AHU s start/stop, but not damper operation

Importance of Systems Testing Example: Tunnel Fire Alarm Testing

Importance of Systems Testing Example: Tunnel Fire Alarm Testing

Importance of Systems Testing Architect Mechanical Engineer Electrical Engineer Code Consultant Delta Owner s Rep Massport Owner s Rep Massport Facilities Massport Fire & Rescue Massport Code Consultant Construction Manager Mechanical Contractors (3) Electrical Contractors (3) Sheet Metal Subs (3) Air Balancing (3) Controls Contractor Fire Alarm Contractor

Overview of Results Short Circuit & Coordination Study Caught Incorrect Breaker Settings Minimum speed settings on VFD s and damper operation in smoke evacuation mode safety issues Conflicts between designed and installed operating sequences identified and clarified (e.g. preheat coil valves) Impact of programmed sequences at central plant Control point alarm labels clarified at central facilities identified and resolved AHU piping and clearances for coil pulls Duct work access panels Timers for sump trap primers

Owner Commissioning? How to Internalize Commissioning Needs Support at All Levels Identify Champion Build Proper Procedures Know Resources/Limitations Funding Sources Capital Planning? Operations? Ask for Help

Cost of Commissioning 0.5-1% of Total Construction Cost 2-5% of the Construction Cost of the Systems Being Commissioned Recommended not Using $/S.F. Unit Costs (too many variables in scope)

Benefits of Commissioning for Terminal A Supports Effective QC Eases Building Turn-Over Reduces Warranty Callbacks Energy Savings Persistence of Savings Occupant Acceptance Certification/Accreditation

Keys to Success Develop effective relationships with all team members Mutual respect for each team member s contribution Involve Operations Staff wherever practical Early & Diligent Scheduling Manage Expectations Facilitate a Win-Win Conclusion for All

Summary What is Commissioning? Systems-based Documentation, Testing, Training; 0.5-1% of project cost Why Commission your building? Independent party keeps focus on owner s needs When does Commissioning start? Ideally early design phase; project dependent based on needs Who Commissions the building? Whole project team; Commissioning Agent leads & facilitates What to Commission? Project dependent based on needs

QUESTIONS? Brad Jones, PE, AP bjones@sebesta.com 781-721-8319 Sam Sleiman, PE, CCM hsleiman@massport.com 617-561-1873