St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

Similar documents
Commissioners Road West Realignment Environmental Assessment

TRANSPORTATION COMMITTEE

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

St. Clair Avenue West Area Transportation Master Plan

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

Mavis Road Class Environmental Assessment

Alta Vista Transportation Corridor Environmental Study Report November 2005

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

Richmond Road Complete Street Meeting #1, April 25, 2016

City of Toronto. Emery Village Transportation Master Plan

WELCOME TO OPEN HOUSE # 3

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

WELCOME TO OPEN HOUSE TWO November 28, 2018

Highway 417 Expansion East

Portage Parkway Environmental Assessment Public Information Centre No. 1

Lambeth Main Street Streetscape Improvements

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Services Department F May 28, 2007

Wiles Road from University Drive to Riverside Drive

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

Victoria Bridge Municipal Class EA Civic Works Committee

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Middlebury RS 0174(8)

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting

SOUTH UNIVERSITY Street Design Alternatives in Progress

COLLIER BOULEVARD (CR 951) CORRIDOR

Cottage Grove Road Reconstruction. City of Madison Engineering

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

2040 Long Range Transportation Plan

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Commissioners Road West Realignment Environmental Assessment

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

Value Engineering Seminar & Design for the Woodroffe Avenue Pedestrian Bridge November 24, 2009

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Project Purpose. Project Need

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Public Information Centre #1

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH CENOTAPH COMMITTEE Monday, April 3, 2017, 4:00 PM Council Chambers AGENDA

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Fall 2017 Construction Update

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

Burloak Drive Grade Separation

TABLE OF CONTENTS Page

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

WESTERN ILLINOIS UNIVERSITY

Moving The Metro. A special construction update for the metro Omaha area.

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

3. Are there any projects exempt from the definition of Regulated Projects?

Maplewood Avenue Downtown Complete Street Project

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Southeast Extension to RidgeGate Parkway Scoping Booklet

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

ONLINE PUBLIC INFORMATION CENTRE

MONTGOMERY COUNTY PLANNING DEPARTMENT

D ESIGN REVIEW COMMITTEE

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

COMPLETE GREEN STREET CHECKLIST

Appendix B-13: Community Stakeholders Group Meeting Materials and Minutes

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works

This page left intentionally blank.

776 and 784 St. Laurent Boulevard City of Ottawa

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017

Design Services for Wiles Road Broward County Project #104026

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

TAC/CAC, TPO Project Update February 2016

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Transcription:

St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015

Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing New sidewalk construction (Tremblay to Belfast) Project Issues Identified to Date Environmental Impacts (Traffic / Construction) Next Steps

Introductions Ward Councillor (Alta Vista) Jean Cloutier Project Team Andy Smith, City of Ottawa Program Manager Michael Paul, City of Ottawa Project Manager Charmaine Sue, Assistant Project Manager Matthew Wolstenholme, OC Transpo Program Manager, Operational Planning Colin Leech, OC Transpo Senior Engineer, Transit Priority Patrick Hill, Consultant Project Manager, MMM Group Michel Bisson, Senior Project Engineer, MMM Group Emily Sangster, Planner, MMM Group

Project Scope Initiated due to congestion on St. Laurent Boulevard New transit-only lanes on St. Laurent from Innes/Industrial to Smyth Need to address congestion and safety concerns at the Innes / Industrial intersection Resurfacing of St. Laurent Boulevard from Innes / Industrial to south of Smyth New cycletracks, sidewalks, traffic signals, and street lighting within the project limits

NEW SIDEWALK CONSTRUCTION INTERSECTION MODIFICATIONS ROADWAY WIDENING ENTRANCE MODIFICATIONS

Project Background Project Need 2013 Transportation Master Plan identifies St. Laurent Boulevard as a Transit Priority Corridor Project initiated in Sept 2014 to review options Work Completed to date Collected base mapping, utility and traffic information Preliminary design Roadway geometry / lane arrangement Sidewalks, cycle tracks, and multi-use pathways

Project Background (con t) Work Completed to date (con t) Reviewed geotechnical / pavement information Initial cross-sections, intersection configuration Initiated traffic signal and street light design Meeting with Ward Councillor October 2015 Meetings with City Staff Confirmed functional design Roadway geometry / lane arrangement Sidewalks, cycle tracks, and multi-use pathways

Existing Cross-Section Looking North

Proposed Design Typical Section WEST EAST

Bourassa to Innes / Industrial

Innes / Industrial Intersection Modifications TRANSIT LANES THROUGH INTERSECTION SMART CHANNEL & PROTECTED BIKE BOX NEW ISLANDS (AODA-COMPLIANT) DOUBLE LEFT-TURN LANES NEW MULTI-USE PATHWAY & CROSSRIDE

Preliminary Design Roadway widening from existing pavement Maintains existing crossfall and drainage patterns New cycletracks and sidewalks relocated toward the property line Existing hydro poles to remain in place Some utility relocations required (e.g. Hydro Ottawa, Rogers, etc.) Minor grading required

Preliminary Design (con t) Roadway resurfacing St. Laurent Boulevard from Innes / Industrial to just south of Smyth / Lancaster New traffic signal plant Innes / Industrial Bourassa Smyth / Lancaster New street lighting

New Sidewalk Construction Tremblay to Belfast Existing condition is substandard and in poor condition Will be included as part of this project, but not part of the EA

Sidewalk Tremblay to Belfast New concrete sidewalk will be at least 1.8 m wide, meeting current City standards Sidewalk construction will not include rail overpass MATCHLINE BELFAST TREMBLAY MATCHLINE

Project Issues Identified To Date Utility Relocations Need to maintain existing hydro poles Three Hydro Ottawa vaults at Innes / Industrial require relocation Property Requirements Approximately 21 m 2 of property required at SW corner of Innes / Industrial to accommodate design Minor grading encroachments may be required

Environmental Impacts Project corridor in heavily disturbed area No species at risk (SAR) identified No requirement for archaeological assessment Approvals Required Municipal Class EA - Schedule C Noise By-law exemption for night work

Traffic Impacts During Construction Contractor will prepare traffic control and traffic management plans prior to start of construction Two full lanes on St. Laurent open throughout the day Limited daytime (off-peak) turn lane closures Nighttime lane reductions Access to commercial areas and key driveways maintained at all times Potential for temporary relocation of bus stops / shelters

Next Steps Review comments from this Public Open House Finalize preliminary design Present to Transportation Committee Prepare and file Environmental Study Report for public review Complete detail design

Questions/Comments Let us know please fill-out a comment sheet Thank you! For project updates visit: www.ottawa.ca/en/st-laurent-blvd-industrial-smyth