Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Similar documents
APPENDIX F: DETAIL DRAWINGS

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

STANDARD DETAILS QUICK REFERENCE

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

STORMWATER - GENERAL NOTES

Guidance on Preparation of Construction and Maintenance Costs

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

5.0 Storm Water Landscape Guidance Introduction

Appendix G. Detailed Design

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

EROSION & SEDIMENT CONTROL

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

APPLICATION FOR MINOR SITE PLAN REVIEW

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Inspection and Maintenance of Stormwater Best Management Practices

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Florence County Small Commercial Land Disturbance Permit Application

APPLICATION FOR MINOR SITE PLAN REVIEW

Subsurface Infiltration Bed

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Kittson Parkway / Watershed Park Parking Lot

Preventing Storm Water Pollution: What We Can Do

Development of LID Design Guide in Edmonton

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Stormwater Control Plan: Small (Tier 1) Land Development Project

Table 4.7.1: Swales Potential Application and Storm Water Regulation

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

VEHICULAR AND PEDESTRIAN CIRCULATION

Small Project Guidance Document

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Costs Design Construction Operation Maintenance

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

Ames City Hall Campus: Stormwater Improvements

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

City of Richmond. Engineering Design Specifications

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Appendix B DETAILED DESIGN

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

EROSION PREVENTION BMP SUGGESTED USES MATRIX

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

APPENDIX E: CITY OF HAMILTON* STANDARD REQUIREMENTS FOR PARK OR OPEN SPACE DEVELOPMENT

Table of Contents. Preface... xv

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Costs Design Construction Operation Maintenance

Worksheet #14 Water Runoff Management

Appendix D - Technical Design Criteria for BMPs

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

Erosion Control for Home Builders in the. City of Jacksonville

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

CRESCENT RESOURCES INC.

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Analyzing the Bioretention Construction Sequence

Small Town Sustainable Stormwater Solutions

Structural Storm Water Best Management Practices (BMPs)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

3. Are there any projects exempt from the definition of Regulated Projects?

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS

Federal Project No.: OC-095-1(365), OC-095-1(367)

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

Department of Planning & Development Planning Unit

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Homeowners Guide to Stormwater BMP Maintenance

Green Infrastructure and Low-Impact Development Technologies

Preparing a Stormwater Control Plan for a Small Land Development Project

3.13. Development Guidelines

Gas Stations ottawa.ca

SECTION A-1: DESCRIPTION

Department of Planning & Development Planning Unit

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

SOIL EROSION AND SEDIMENT CONTROL

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

ARLINGTON COUNTY, VIRGINIA

Definition of Terms. Bay Meadows Phase II Design Guidelines and Development Standards. Glossary. December 12, Glossary

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

Storm Water Managament at the University of Michigan

Maintaining Your Neighborhood Stormwater Facilities

Transcription:

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for review. Date: Site Plan Number: Project Name: Address: Owner: Prepared by (Consultant(s)): Prime Consultant 1 Subconsultant - Civil Subconsultant - Lighting Subconsultant - Landscape Subconsultant - CPTED Subconsultant - Note: All estimated costs below to include material and installation costs of on-site and off-site works. ITEM UNITS UNIT PRICE COST COMPLETE OUTSTANDING 1 GRADING a) Rough Grading Mobilization/demobilization Temporary site trailer Clearing and grubbing Topsoil stripping and stockpiling Pre-grading Import/export of soil Temporary site entrance Removals & disposals b) Erosion Control UNITS UNIT PRICE COST COMPLETE OUTSTANDING Silt fencing Temporary sedimentation ponds Catchbasin/manhole protection Tree protection fencing Temporary protective fencing Entrance protection (mud mat) Hickenbottom Temporary flow check dam Rip-rap Site maintenance 3 Page 1

2 STORMWATER MANAGEMENT a) SWM Quantity Control UNITS UNIT PRICE COST COMPLETE OUTSTANDING Orifice Weir Infiltration chamber Cistern Pond grading Inlet structure Outlet structure Roof top storage device Access road Fencing Monitoring and sampling Pond cleanout and maintenance Rip-rap LID's (green roofs,bio swales, etc) b) SWM Quality Control UNITS UNIT PRICE COST COMPLETE OUTSTANDING Infiltration ponds/swales Sedimentation chambers Stormwater cooling facility Oil grit separator 3 SERVICING 4 Storm Servicing UNITS UNIT PRICE COST COMPLETE OUTSTANDING Catchbasin Double catchbasin Catchbasin manhole Ditch inlet catchbasin Storm manhole Splitter manhole Subdrains 300 mm dia Storm sewer 525 mm dia Storm sewer Pipe insulation Cleanout Concrete Headwall C/W rodent grate Sanitary Servicing Sanitary Manhole Cleanout Sanitary Sewer Pipe Insulation Water Servicing Valves and Appurtneances Water Pipe Hydrant Metering Page 2

4 SURFACING UNITS UNIT PRICE COST COMPLETE OUTSTANDING Gravel areas (tonne) Granular bases for pavement Concrete pavement Concrete pavement coloured Asphalt pavement Asphalt walkway Asphalt coloured Concrete sidewalk Pavement markings 5 CURBING UNITS UNIT PRICE COST COMPLETE OUTSTANDING Porta curbs Barrier curb Barrier curb & gutter Mountable curb & gutter 6 VEGETATION a) Site Plantings (Botanical Name & Size) UNITS UNIT PRICE COST COMPLETE OUTSTANDING b) SWM Pond Plantings (Botanical Name & Size) UNITS UNIT PRICE COST COMPLETE OUTSTANDING Page 3

c) Ground Cover UNITS UNIT PRICE COST COMPLETE OUTSTANDING Topsoil & sod Topsoil & seed SWM Pond topsoil & seed Mulch Geotextile fabric Edging Planting bed preparation Growing Media (min 10m 3 /tree) 7 LANDSCAPE UNITS UNIT PRICE COST COMPLETE OUTSTANDING Fencing Decks & patios Retaining wall Recycling and garbage enclosure Planter Play area and equipment Bike rack Irrigation system Site furniture Multiple Unit identification signage Noise Barrier Brick pavers Patio stones 8 LIGHTING UNITS UNIT PRICE COST COMPLETE OUTSTANDING Wallpack Pole, base and luminaire Electrical, conduit and wire 9 CONSULTING FEES COST COMPLETE OUTSTANDING (To Include: Tendering, Project Management, Site Supervision, Inspection, Certification, ) Engineering $0.00 Landscape $0.00 Lighting $0.00 Acoustical CPTED Page 4

Stormceptor Cost (100% of Stormceptor Cost for MOE approval to Engineering Department) Total Estimated Cost $ Total Works Outstanding $ Site Plan Review Fee (5.0%) of Total Estimated Cost) $ Total Estimated Cost (excluding water and sanitary sewer) 5 Letter of Credit Required (50% of other Estimated Costs) $ $ 1 The Prime Consultant is the contact for the City and is responsible for arranging sub-consultants as needed. 2 Release of any securities cannot be applied for until over 50% of the site development works have been completed. Letter of Credit will not be reduced below 50% of original letter of credit amount or $250,000 whichever is the lesser until all works are complete and all conditions have been met. 3 Includes: dust control, street cleaning, erosion control maintenance and removal. 4 Servicing Items to include all servicing related costs except for the portion to be installed and restored by City forces between the main and the subject property line. 5 Letter of credit is based on total estimated cost excluding water and sanitary sewers, however, site plan review fee includes the water and sanitary sewers as these are items reviewed by City staff. Page 5