CONCLUSION AND IMPLEMENTATION

Similar documents
ESTABLISH AN EFFICIENT TOWN CENTER

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Port Lavaca Future Land Use

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Arlington, Virginia is a worldclass

Municipal Comprehensive and Open Space Plans

OPEN SPACE CHAPTER 7: OVERVIEW. Preserve open space to protect natural resources, enhance character and provide passive recreation opportunities

City of Mahtomedi Park System Plan Public Hearing Draft: September 13, 2006

Town of Peru Comprehensive Plan Executive Summary

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

Asbury Chapel Subdivision Sketch Plan

Hibbing. Land Use. Hibbing Comprehensive Plan 8.1. Land Use

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Chapter 2: Vision, Goals and Strategies

8implementation. strategies

Executive Summary. The goals of the Plan are to:

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

Brian Madigan, RLA, CPESC Director Land Planning & Design

DRAFT DESIGN GUIDELINES

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission

Implementation Guide Comprehensive Plan City of Allen

City of Royalton Comprehensive Land Use Plan 2005 to Revision February 8, 2011

Town Center (part of the Comprehensive Plan)

Small Area Plan. South Gateway

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

GATEWAY AREA STRUCTURE PLAN

LAND USE ELEMENT. Purpose. General Goals & Policies

3 Vision and Goals. Vision and Goals. Blueprint for Bloomsburg. Vision. Town of Bloomsburg Comprehensive Plan,

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Planning Districts INTRODUCTION

Sorted citizen input comments in review of Blount County plans July, August, and September 2007

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

CHAPTER FIVE COMMUNITY DESIGN

Gloucester County s Comprehensive Plan. The Community Connection

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

SALISBURY TOMORROW Our Vision

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

Parks, Trails, and Open Space Element

Chapter 13: Implementation Plan

CROWN POINT SUBDIVISION

Whitemarsh Township Greenway Plan

2010 Plan of Conservation and Development

Master Plan for Preservation and Scenic Conservation (1995)

Executive Summary. Parks and Recreation Plan. Executive Summary

Community Open House March 26 th, 2018

CITY OF PUYALLUP. Background. Development Services

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

TOWN OF INNISFIL SPECIAL COUNCIL AGENDA OUR JOBS INNISFIL HEIGHTS WORKSHOP WEDNESDAY JANUARY 20, :30 P.M.

Town of Washington Master Plan & Regulatory Audit: Interim Results

Rolla Comprehensive Plan Update, 2005 COMMUNITY ISSUES MEMORANDUM 11/1/2004

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

implementation10 Village of Greendale Comprehensive Plan: Greendale, Wisconsin. Revisiting a Greenbelt Community

Hockessin Community Redevelopment Plan

Mendota Heights 2040 Comprehensive Plan Draft Vers

COLVER ROAD INDUSTRIAL CONCEPT PLAN

4- PA - LD - LIVELY DOWNTOWN. LD - Background

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

implementation r expression in landscape

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

City of Heath. Town Center Concept

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

Regional Context Statement

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

CHAPTER 7: Transportation, Mobility and Circulation

KEIZER STATION PLAN INTRODUCTION

Purpose of the Master Plan

It Takes A Village.. Preserving Rural Character In Standish

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Further input invited as Colchester Growth Strategy nears final phase

Purpose of the Master Plan

Implementation Vision

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Beautification Advisory Committee Mission Statement and Goals & Objectives

Official Plan Review

Downtown Whitby Action Plan

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

Olde Towne Vision Plan

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

The City shall enhance and improve the accessibility of parks and recreational facilities while protecting their quality. by:

REQUEST FOR QUALIFICATIONS

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

Route 1 Corridor Study

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

Municipal Development Plan. Summer Village of ROCHON SANDS. Bylaw #241-18

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

ARLINGTON COUNTY, VIRGINIA

Transcription:

Lisbon s Vision CONCLUSION AND IMPLEMENTATION 7 Lisbon residents clearly appreciate the character, amenities, and opportunities that define our community. This Plan of Conservation and Development identifies the critical issues that must be faced over the next ten years and beyond to address a vision for Lisbon: Lisbon will guide future growth and change to Protect its rural character, Provide a strong economic base, and Enhance the quality of life for its residents. Undertake not what you cannot Perform but be careful to keep your Promise. George Washington To achieve this vision, Lisbon will pursue four guiding objectives: Preserve community character, Establish an efficient Town Center and municipal campus, Guide residential growth, and Encourage economic development. For each objective, the Plan identifies a focused set of challenging, yet achievable, strategies and action steps. These are summarized in the implementation table provided in each Chapter and in the complete implementation table below. Plan Consistency State Plan This Plan was compared with the Locational Guide Map in the 1998-2003 State Plan of Conservation and Development and found to be generally consistent with that Plan. In addition, it was compared with the Draft Locational Guide Map being considered for the 2004-2009 State Plan of Conservation and Development and found to be generally consistent with that Plan. 7-1

Legend Future Land Use Plan Objective The guiding objectives of this Plan Strategy The implementation components of each theme Action A brief description of the task Primary The organization most responsible for implementation Others Other organizations that will assist with implementation Timeline 1: immediate 2: 1-5 years 3: 1-10 years Done A checkbox for designating a task that has been implemented Abbreviations BOS BOF BOE CC IWA/ CC Board of Selectmen Board of Finance Board of Education Conservation Commission (future) Inland Wetlands and Conservation Commission (current) IWWA Inland Wetlands and Watercourses Agency (future) OSC Open Space Committee (future) PZC Planning and Zoning Commission PR Parks and Recreation PW Public Works Department The Future Land Use Plan on the facing page provides a graphic representation of the zoning, structural, and other physical concepts discussed in this Plan. Implementation There is little doubt that the most important step of the planning process will be implementation of the recommended strategies. For this, the Plan calls on all Lisbon residents to ensure that the vision of the community s future is realized. The Plan proposes to establish an implementation subcommittee of the Planning and Zoning Commission, which will work with the Board of Selectmen, other town agencies and officials, and Lisbon residents and business people to develop a program and schedule for conducting the evaluations, studies, development of regulations, organizational tasks, and program development outlined in this Plan. This Chapter provides a complete set of the objectives and strategies developed to guide implementation of the Plan of Conservation and Development for Lisbon. Although all of the strategies are considered important, an appropriate timeframe is provided for each. The implementation tables are organized as follows. Column headings are described in the sidebar. Objective Strategy 1. PZC 2. PZC CC 3. CC IWWA PZC 4. BOS OSC It is important to recognize that the following objectives are the main policy statements and planning goals of the Town of Lisbon. The strategies associated with each objective identify specific initiatives intended to help implement the strategy. Issues will arise in the future that are not identified specifically in the Plan. In such situations, the overall strategies of the Plan will be the benchmarks used in evaluating whether a proposed activity or proposal is consistent with the Plan. It should also be recognized that objectives and strategies will evolve over time as implementation or new situations provide insight into desirable policy directions. In other words, the Plan is not a static document and will continue to be reviewed and refined over time. `These implementation guides are intended to be used and refined over time as strategies are implemented and as priorities may change. The priorities outlined on the following pages may be adjusted due to resource constraints (fiscal or staff) or changing policy issues. 7-2

7-3

Preserve Community Character A. Open Space 1. Adopt the Open Space Plan as part of this Plan of Conservation and Development. 2. Assign implementation of the Open Space Program to the Conservation Commission. 3. Establish open space land acquisition fund, consider bond issuance for open space, and consider annual appropriation based on Open Space Committee recommendations. 4. Prepare, implement, and regularly update open space action plan: Review and refine priorities Identify and evaluate resources Evaluate existing municipal properties Develop evaluation tools Recommend subdivision set-aside priorities Identify and seek funding, grants, donations, etc. Evaluate PA 490 program for open space land PZC IWW/C C BOS 1 BOS, BOF 1 CC OSIC 1,3 CC BOS BOF 2 B. Environmental Regulation 1. Create separate Inland Wetlands and Watercourses Agency and Conservation Commission BOS IWA/C C 2. Revise and update subdivision regulations PZC 1 3. Strengthen wetlands and water resource protections IWA CC 2 4. Evaluate and revise environmental and site development monitoring and inspection procedures, including fees PZC, IWWA C. Historic Resources and Welcoming Gateways 1. Continue support for Lisbon Historic Society All 3 2. Consider adoption of demolition delay ordinance PZC 3 3. Establish welcoming elements at entrances to Town, into Newent Center, and at Lisbon Landing 4. Identify potential partner organizations to contribute or cooperate with gateway elements, including restoration of railroad trestles BOS PW Private 2 BOS 2 1 2 7-4

Establish an Efficient Town Center A. Pedestrian and Vehicle Access 1. Consider development of sidewalk system connecting municipal properties and private institutions in Newent area. 2. Evaluate future Connecticut Department of Transportation plans for Route 169/138 intersection and propose appropriate alternatives, such as roundabout design. 3. Seek funding for sidewalks and other Newent area improvements through Small Town Economic Assistance grants, Federal TEA grants, Quinebaug-Shetucket Rivers Valley Corridor programs, other sources. BOS PW, PR BOE 1 BOS 2 BOS PW, PR BOE 2 B. Municipal Facilities 1. Conduct municipal space needs and facility availability including offices, public works, public safety, schools, recreation, and community center. 2. Set goals for expanding town office capacity, relocating public works and public safety functions, establishing a community function center, and planning for future school facilities. 3. Initiate site assessment of municipal properties in Newent area for establishment of integrated municipal campus. 4. Monitor properties abutting existing municipal properties or located on State highways in Newent area for possible acquisition by the Town. BOS PW 1, 3 BOS PW 2 BOS 2 BOS PW 2 C. Special Design District 1. Consider establishment of special Newent Center Village Design District, subject to special permits for defined commercial uses consistent with overall goals for Newent. 2. Develop standards for defined commercial and mixed uses, based on current home occupation standards and definitions, to address specific village design standards. PZC 2 PZC 2 D. Newent Village Center Study 1. Establish an ad hoc study committee to conduct a comprehensive study of the Newent Center area including Municipal space needs assessment and design of municipal campus to integrate services, recreation, schools, and related facilities; Zoning and other approaches to enhancing and preserving the essence of Newent, including special design district concepts and standards and preservation of historic assets; and Designs and plans for accessible and safe pedestrian circulation inside and outside the area with sidewalks, pedestrian paths, and trails. BOS PZC BOE, PR, PW 1, 3 7-5

Guide Residential Growth A. Zoning Concepts 1. Revise zoning regulations to provide buildable area, density-based standards for parcel subdivision. PZC 1 B. Update and Refine Subdivision Regulations 1. Evaluate and develop standards to encourage conservation design subdivisions, within maximum density limits or as permitted under revised zoning density standards, to maximize preservation of open space and reduce environmental and aesthetic impacts of development, including Road design standards, Cul-de-sac specifications, Drainage design options. 2. Revise subdivision regulations to set minimum open space set-aside, define criteria for such open space, and permit a fee-in-lieu of open space where appropriate. PZC PW 2 PZC OSC 2 C. Housing Diversity 1. Evaluate regulatory standards to encourage affordable housing and promote housing diversity. PZC 3 2. Consider regulations permitting development of congregate housing and PZC 3 assisted living facilities. 3. Consider regulation revisions to encourage housing options, such as PZC 3 mixed residential uses in village areas. 4. Support public and private efforts to develop elderly housing. PZC 3 7-6

Encourage Economic Development A. Route 12 Commercial Corridor 1. Restructure the zoning districts to establish new Regional Commercial and Business Village Districts. 2. Develop regulatory standards for Business Village District, including parking, access, and other standards to encourage mixed-0use, pedestrian friendly development and discourage strip development. 3. Define permitted uses in the Regional Commercial district to exclude incompatible industrial or other uses. 4. Review standards (coverage setbacks, height, parking, access, etc.) applying to Regional Commercial uses as defined to ensure appropriateness. 5. Seek ways to protect additional flood plain and agricultural land along the Quinebaug River adjoining the Route 12 commercial districts. 6. Consider potential for through connector road from Route 12 to Route 169 in evaluation of any site development proposals for intervening parcels adjoining I-395. 7. Evaluate the need for improvements to public transportation to the Route 12 Commercial Corridor and work with the Transportation District and Regional Planning Agency to effect necessary improvements. PZC 1 CC PZC 2 PZC 1 PZC 1 PZC OSC BOS 2 PZC BOS 3 BOS 3 B. Other Commercial Areas 1. Retain Industrial Park districts on Lisbon s western border; monitor conditions and be prepared to address new development proposals. 2. Evaluate reverting Route 169 Business Village District to residential district. 3. If Route 169 Business Village District is retained, consider revisions to Business Village regulations to address parking, access, and other standards to encourage mixed-use, pedestrian friendly development and discourage strip developments. PZC BOS 3 PZC 2 PZC 3 7-7

This Page Intentionally Blank 7-8